CN108320180A - Construction project cost auditing system - Google Patents

Construction project cost auditing system Download PDF

Info

Publication number
CN108320180A
CN108320180A CN201810046209.XA CN201810046209A CN108320180A CN 108320180 A CN108320180 A CN 108320180A CN 201810046209 A CN201810046209 A CN 201810046209A CN 108320180 A CN108320180 A CN 108320180A
Authority
CN
China
Prior art keywords
cost
categories
audit
construction
reason
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810046209.XA
Other languages
Chinese (zh)
Inventor
丁诗文
曾云华
谢瑞伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan And Xingda Construction Consulting Co Ltd
Original Assignee
Sichuan And Xingda Construction Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan And Xingda Construction Consulting Co Ltd filed Critical Sichuan And Xingda Construction Consulting Co Ltd
Priority to CN201810046209.XA priority Critical patent/CN108320180A/en
Publication of CN108320180A publication Critical patent/CN108320180A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0201Market modelling; Market analysis; Collecting market data
    • G06Q30/0206Price or cost determination based on market factors
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Abstract

The invention discloses a kind of construction project cost auditing system, solve the problems, such as but be detrimental to user's searching wherein the cost categories of deviation occur between audit and budget, its key points of the technical solution are that:Construction project cost auditing system further includes the Construction Audit cost categories database for being stored with different cost categories and being stored with the constuction budget cost category database of cost categories and corresponding estimated cost in construction budget, being stored with cost categories and corresponding audit cost in Construction Audit, a kind of construction project cost auditing system of the present invention, the reason of facilitating user to understand in time and occur the cost categories of deviation between audit and budget, and understanding error produced by wherein Audit data and initial budget.

Description

Construction project cost auditing system
Technical field
The present invention relates to a kind of construction project cost auditing systems.
Background technology
Project cost refers to the construction price of engineering, embodies the full payment for carrying out being spent needed for an engineering construction, work Journey can be specially house, road, bridge etc..Technical staff carries out the audit of project cost according to audit project file, with right The total cost of truth, engineering of engineering construction is understood and is supervised.
The prior art includes a plurality of contract in this document generally according to inventory file in engineering signing contract acquisition contract Interior inventory, every inventory include at least one inventory feature.Inventory is subdivision to entire engineering, such as by building construction Engineering Division is the inventory of multiple metope construction, and inventory is characterized as the attribute of inventory, for example, metope inventory feature include size, Color, position etc..Each inventory, each inventory feature are corresponding with specific price metering method, when inventory file in contract When determining, project cost also determines.
But in the work progress of engineering, often occur construction error and need to construct again loss, should be in practical need Ask the loss for increasing sub- engineering and building materials market price there is a situation where fluctuating, so that project cost cost is changed, And with the change of cost, it will cause the change of cost, although final Audit data can be timely updated at present, But it is detrimental to user's searching and wherein the cost categories of deviation occurs between audit and budget, there is room for improvement.
Invention content
The object of the present invention is to provide a kind of construction project cost auditing systems, and user is facilitated to understand in time between audit and budget The reason of there are the cost categories of deviation, and understanding error produced by wherein Audit data and initial budget.
The present invention above-mentioned technical purpose technical scheme is that:
A kind of construction project cost auditing system, including central processing unit, construction project cost auditing system further include being stored with construction budget Middle cost categories and the constuction budget cost category database of corresponding estimated cost, be stored in Construction Audit cost categories with The Construction Audit cost categories database of corresponding audit cost;
If the absolute value of difference is more than the preset error range of central processing unit between construction budget result and Construction Audit result, Central processing unit is query object one by one in constuction budget cost class using the cost categories common to construction budget and Construction Audit Transferred in other database, Construction Audit cost categories database matching cost categories estimated cost and it is matching at The audit cost of the estimated cost of cost categories and matching cost categories is simultaneously compared by this classification audit cost, if The two is inconsistent, and central processing unit is then marked to inform in user corresponding cost categories.
Using the above scheme, central processing unit transfers constuction budget cost categorical data by query object of cost categories Library, estimated cost and audit cost in Construction Audit cost database, and the difference of the two is calculated, to judge indirectly Go out budget and the incongruent cost categories of result, and is informed in the form of a flag in staff.
Preferably, construction project cost auditing system include be stored with estimated cost and audit cost corresponding to cost categories it Between the absolute value data library of difference, the first sorting module;
Central processing unit inquired in absolute value data library using cost categories as query object cost categories estimated cost and The absolute value of difference between audit cost, and by estimated cost of first sorting module based on cost categories and audit cost it Between the absolute value of difference cost categories are ranked up from large to small.
Using the above scheme, answering in advance corresponding to each cost categories in absolute value data library is transferred by central processing unit The absolute value being counted as between this and audit cost, and specific absolute value can be ranked by the first sorting module, It is informed in user to which larger cost categories will be fluctuated in cost categories.
Preferably, the central processing unit between the estimated cost and audit cost of all cost categories difference it is exhausted Dividend is used as to value, one by one using the absolute value of difference between the estimated cost of cost categories and audit cost as divisor, from And the ratio between the estimated cost of cost categories and audit cost shared by the absolute value of difference is calculated, construction project cost auditing system System further includes for generating for counting between the estimated cost of cost categories and audit cost shared by the absolute value of difference The cake chart generation module of the cake chart of ratio.
Using the above scheme, the estimated cost of each cost categories is calculated between audit cost by central processing unit Ratio shared by the absolute value of difference, and reflected eventually by the form of cake chart, pass through the exhibition method of cake chart Be conducive to user substantially know each cost categories to eventually cause budget result and auditing result generate difference it is key because Element.
Preferably, construction project cost auditing system further includes fingerprint identification device, is stored with fingerprint and corresponding with fingerprint There are the cost categories exhibition method database of error cost categories exhibition method, the exhibition method of cost categories includes pie Figure displaying pattern and pattern is shown by the sequence of the first sorting module;
The fingerprint that central processing unit is identified with fingerprint identification device is in cost categories exhibition method data base querying to corresponding Exhibition method, and switch to corresponding exhibition method.
Using the above scheme, the fingerprint that is identified by fingerprint identification device, cost categories exhibition method database are set The matching exhibition method of different people hobby situation Auto-matching can be matched by setting, and information is obtained to improve user indirectly Efficiency.
Preferably, further including the Zoom module for scaling cost categories exhibition method;
If user with amplify gesture amplification cost classification exhibition method when, cost categories exhibition method will amplify;If When user reduces cost categories exhibition method with the gesture reduced, cost categories exhibition method will reduce.
Using the above scheme, it can facilitate user that can be carried out when needing to check certainly by the setting of Zoom module By amplification and diminution, to meet the needs of users.
Preferably, construction project cost auditing system further include be stored with cost categories estimated cost and audit cost differ The reason of causing existing reason database;
If the estimated cost of cost categories and the audit cost of cost categories are inconsistent, central processing unit is with corresponding cost Classification transfers matching all reasons in reason data library and is shown in user.
Using the above scheme, by the setting in reason data library can the corresponding estimated cost of corresponding cost classification and at When the audit cost of this classification is inconsistent, it would be possible to which the reason of occurring is informed in user.
Preferably, further including probability database and second row the reason of being stored with each reason practical probability occurred Sequence module;
If the estimated cost of cost categories and the audit cost of cost categories are inconsistent, central processing unit is with corresponding cost Classification transfers matching reason in reason data library, and is transferred in probability of cause database using reason as query object Matching reason probability, and reason is ranked up from large to small based on probability of cause by the second sorting module, to accuse Know in user.
It using the above scheme, can be to causing cost class by the setting of probability of cause database and central processing unit The inconsistent reason of the audit cost of not corresponding estimated cost and cost categories is ranked up, to facilitate user to understand in time Most probably cause the corresponding estimated cost of the cost categories reason different with auditing result.
Preferably, construction project cost auditing system further include be stored with cost categories estimated cost and audit cost differ Cause the proposed database of the suggestion corresponding to existing reason;
If the estimated cost of cost categories and the audit cost of cost categories are inconsistent, central processing unit is with reason data library tune The reason of taking out transfers out matched suggestion in proposed database and is shown in user.
It using the above scheme, can be while showing reason by the setting of proposed database and central processing unit Matching suggestion is shown, to facilitate how user's understanding reduces the countermeasure of difference between auditing result and budget result.
In conclusion the invention has the advantages that:Central processing unit transfers work by query object of cost categories Both journey estimated cost category database, estimated cost and audit cost in Construction Audit cost database, and calculate Difference, to judging budget and the incongruent cost categories of result indirectly, and informed in the form of a flag in staff.
Description of the drawings
Fig. 1 is the system block diagram of construction project cost auditing system.
Specific implementation mode
Below in conjunction with attached drawing 1, invention is further described in detail.
A kind of construction project cost auditing system disclosed in the present embodiment, including central processing unit, construction project cost auditing system is also Including being stored with cost categories and the constuction budget cost category database of corresponding estimated cost in construction budget, being stored with work The Construction Audit cost categories database of cost categories and corresponding audit cost in journey audit.
The absolute value of difference is more than the preset error of central processing unit between construction budget result and Construction Audit result Range, central processing unit using the cost categories common to construction budget and Construction Audit as query object one by one in construction budget at Matching cost categories estimated cost and matching is transferred in this category database, Construction Audit cost categories database Cost categories audit cost and the audit cost of the estimated cost of cost categories and matching cost categories is compared Compared with if the two is inconsistent, central processing unit is marked corresponding cost categories to inform in user, and to cause User's note that mark mode herein is realized by marking red mode.
Construction project cost auditing system includes the difference being stored between estimated cost and audit cost corresponding to cost categories Absolute value data library, the first sorting module;Central processing unit is looked into using cost categories as query object in absolute value data library The absolute value of difference between the estimated cost of cost categories and audit cost is ask out, and cost class is based on by the first sorting module The absolute value of difference is from large to small ranked up cost categories between other estimated cost and audit cost, to extract indirectly Gone out estimated cost and the larger cost categories of practical audit cost deviation, and by way of sequence, be conducive to user and When understand the wherein more serious situation of costvariation.
Central processing unit using the absolute value of difference between the estimated cost and audit cost of all cost categories as by except Number, one by one using the absolute value of difference between the estimated cost of cost categories and audit cost as divisor, to calculate cost Ratio between the estimated cost and audit cost of classification shared by the absolute value of difference, construction project cost auditing system further include being used for Generate the cake chart for counting the ratio between the estimated cost of cost categories and audit cost shared by the absolute value of difference Cake chart generation module, cake chart generation module be provided with conducive to user displaying when directly accounting therein is closed System is informed in staff.
And since the exhibition method that staff is inclined to is different, to further increase the efficiency of user, project cost is examined Meter systems further include fingerprint identification device, be stored with fingerprint and corresponding with fingerprint there are error cost categories exhibition methods The exhibition method of cost categories exhibition method database, cost categories includes that cake chart shows pattern and by the first sequence mould The sequence of block shows pattern, and wherein fingerprint identification device is Fingerprint Identification Unit.
When the fingerprint that central processing unit is identified with fingerprint identification device is arrived in cost categories exhibition method data base querying Corresponding exhibition method, and switch to corresponding exhibition method.
Further, it may be made because of the difference of personal observing effect, engineering when actual observation due to user Valence auditing system further includes the Zoom module for scaling cost categories exhibition method;If gesture amplification cost of the user to amplify When classification exhibition method, cost categories exhibition method will amplify;If user reduces cost categories exhibition with the gesture reduced When showing mode, cost categories exhibition method will reduce.
For above-mentioned setting construction project cost auditing system further include be stored with cost categories estimated cost and audit at The reason of this inconsistent existing reason database;If the estimated cost of cost categories and the audit cost of cost categories differ It causes, then central processing unit is transferred matching all reasons in reason data library with corresponding cost categories and is shown in User.
And in a practical situation, the probability occurred due to different is different, further includes being stored with each reason reality The reason of probability that border occurs probability database and the second sorting module;If the estimated costs of cost categories and cost categories Audit cost is inconsistent, then central processing unit transfers matching original with corresponding cost categories in reason data library Cause, and matching reason probability is transferred as query object in probability of cause database using reason, and pass through the second sequence Module is from large to small ranked up reason based on probability of cause, to inform in user.
And in real process, to be also required to provide matching suggestion for reason, construction project cost auditing system is also The suggestion number of suggestion corresponding to the inconsistent existing reason of estimated cost and audit cost including being stored with cost categories According to library;If the estimated cost of cost categories and the audit cost of cost categories are inconsistent, central processing unit is with reason data library The reason of taking out transfers out matched suggestion in proposed database and is shown in user.
The whole course of work is as follows:
In actual use, central processing unit can be identified the fingerprint of user based on fingerprint identification device first, and And the fingerprint identified based on fingerprint identification device transfers matching displaying side in cost categories exhibition method database Formula.
When showing sequence displaying pattern, it can be accompanied with therewith beside each cost categories accordingly at this time The reason of matching and suggestion, and due to each cost categories the case where is inconsistent, so reason caused by causing is inconsistent, this Place also sorts to reason probability of happening by the second sorting module.
When displaying is cake chart, cake chart can generate that each there are have between estimated cost and audit cost The corresponding difference accounting situation of cost categories of gap, and it is corresponding there are the cost categories of difference can be accompanied with it is matching Reason and suggestion, and due to each cost categories the case where is inconsistent, so reason caused by causing is inconsistent, here by Second sorting module also sorts to reason probability of happening.
User is not only contributed to through the above way and perceives cost categories there are deviation in time, and can will wherein The reason of and suggestion later inform in user.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, people in the art Member can as needed make the present embodiment the modification of not creative contribution after reading this specification, but as long as at this It is all protected by Patent Law in the right of invention.

Claims (8)

1. a kind of construction project cost auditing system, including central processing unit, it is characterized in that:Construction project cost auditing system further includes storage There are cost categories and the constuction budget cost category database of corresponding estimated cost in construction budget, be stored in Construction Audit The Construction Audit cost categories database of cost categories and corresponding audit cost;
If the absolute value of difference is more than the preset error range of central processing unit between construction budget result and Construction Audit result, Central processing unit is query object one by one in constuction budget cost class using the cost categories common to construction budget and Construction Audit Transferred in other database, Construction Audit cost categories database matching cost categories estimated cost and it is matching at The audit cost of the estimated cost of cost categories and matching cost categories is simultaneously compared by this classification audit cost, if The two is inconsistent, and central processing unit is then marked to inform in user corresponding cost categories.
2. construction project cost auditing system according to claim 1, it is characterized in that:Construction project cost auditing system includes being stored with The absolute value data library of difference between estimated cost and audit cost corresponding to cost categories, the first sorting module;
Central processing unit inquired in absolute value data library using cost categories as query object cost categories estimated cost and The absolute value of difference between audit cost, and by estimated cost of first sorting module based on cost categories and audit cost it Between the absolute value of difference cost categories are ranked up from large to small.
3. construction project cost auditing system according to claim 2, it is characterized in that:The central processing unit is with all cost classes The absolute value of difference is as dividend between other estimated cost and audit cost, with the estimated cost of cost categories and examines one by one The absolute value of difference is as divisor between meter cost, to calculate difference between the estimated cost of cost categories and audit cost Absolute value shared by ratio, construction project cost auditing system further includes for generating the estimated cost for counting cost categories The cake chart generation module of the cake chart of ratio between audit cost shared by the absolute value of difference.
4. construction project cost auditing system according to claim 3, it is characterized in that:Construction project cost auditing system further includes fingerprint Identification device is stored with fingerprint and corresponding with fingerprint there are the cost categories exhibition methods of error cost categories exhibition method The exhibition method of database, cake chart generation module, cost categories includes that cake chart shows pattern and by the first sequence mould The sequence of block shows pattern;
The fingerprint that central processing unit is identified with fingerprint identification device is in cost categories exhibition method data base querying to corresponding Exhibition method, and switch to corresponding exhibition method.
5. construction project cost auditing system according to claim 4, it is characterized in that:Further include for scaling cost categories displaying The Zoom module of mode;
If user with amplify gesture amplification cost classification exhibition method when, cost categories exhibition method will amplify;If When user reduces cost categories exhibition method with the gesture reduced, cost categories exhibition method will reduce.
6. construction project cost auditing system according to claim 1, it is characterized in that:Construction project cost auditing system further includes storage There is the reason of estimated cost and audit cost inconsistent existing reason of cost categories database;
If the estimated cost of cost categories and the audit cost of cost categories are inconsistent, central processing unit is with corresponding cost Classification transfers matching all reasons in reason data library and is shown in user.
7. construction project cost auditing system according to claim 6, it is characterized in that:Further include be stored with each reason it is practical go out The reason of existing probability probability database and the second sorting module;
If the estimated cost of cost categories and the audit cost of cost categories are inconsistent, central processing unit is with corresponding cost Classification transfers matching reason in reason data library, and is transferred in probability of cause database using reason as query object Matching reason probability, and reason is ranked up from large to small based on probability of cause by the second sorting module, to accuse Know in user.
8. construction project cost auditing system according to claim 7, it is characterized in that:Construction project cost auditing system further includes storage There is the proposed database of the estimated cost and the suggestion corresponding to the inconsistent existing reason of audit cost of cost categories;
If the estimated cost of cost categories and the audit cost of cost categories are inconsistent, central processing unit is with reason data library tune The reason of taking out transfers out matched suggestion in proposed database and is shown in user.
CN201810046209.XA 2018-01-17 2018-01-17 Construction project cost auditing system Withdrawn CN108320180A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810046209.XA CN108320180A (en) 2018-01-17 2018-01-17 Construction project cost auditing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810046209.XA CN108320180A (en) 2018-01-17 2018-01-17 Construction project cost auditing system

Publications (1)

Publication Number Publication Date
CN108320180A true CN108320180A (en) 2018-07-24

Family

ID=62894665

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810046209.XA Withdrawn CN108320180A (en) 2018-01-17 2018-01-17 Construction project cost auditing system

Country Status (1)

Country Link
CN (1) CN108320180A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111008816A (en) * 2019-11-23 2020-04-14 湖南新泉工程造价咨询有限公司 Dynamic management method for construction cost in whole process of engineering settlement
CN113673828A (en) * 2021-07-23 2021-11-19 北京信息科技大学 Audit data processing method, system, medium and device based on knowledge graph and big data

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111008816A (en) * 2019-11-23 2020-04-14 湖南新泉工程造价咨询有限公司 Dynamic management method for construction cost in whole process of engineering settlement
CN113673828A (en) * 2021-07-23 2021-11-19 北京信息科技大学 Audit data processing method, system, medium and device based on knowledge graph and big data

Similar Documents

Publication Publication Date Title
EP3985578A1 (en) Method and system for automatically training machine learning model
CN109064318A (en) A kind of internet financial risks monitoring system of knowledge based map
CN110781246A (en) Enterprise association relationship construction method and system
CN104598647B (en) A kind of tree graph search and the method for matching article
CN103605651A (en) Data processing showing method based on on-line analytical processing (OLAP) multi-dimensional analysis
CN103093154B (en) One is determined confidential information management system and determines confidential information management method
CN113032403B (en) Data insight method, device, electronic equipment and storage medium
CN106528828A (en) Multi-dimensional checking rule-based data quality detection method
Shanks et al. Understanding Data Quality and Data Warehousing: A Semiotic Approach.
CN115423289A (en) Intelligent plate processing workshop data processing method and terminal
CN110083632A (en) A kind of project cost listing service system
CN108320180A (en) Construction project cost auditing system
CN110825817B (en) Enterprise suspected association judgment method and system
Kashima et al. K-means clustering of proportional data using L1 distance
CN112330227A (en) Urban management capability evaluation method and system based on digital urban management service construction
CN115545103A (en) Abnormal data identification method, label identification method and abnormal data identification device
CN104268153A (en) Duplicate checking method and device of population data
CN112925899B (en) Ordering model establishment method, case clue recommendation method, device and medium
CN114092024A (en) Investment project full-process management method and system
CN113344673A (en) Product pushing method and device, electronic equipment and storage medium
CN114708073B (en) Intelligent detection method and device for surrounding mark and serial mark, electronic equipment and storage medium
CN116304251A (en) Label processing method, device, computer equipment and storage medium
CN112561500B (en) Salary data generation method, device, equipment and medium based on user data
CN110569435B (en) Intelligent dual-ended recommendation engine system and method
CN110909129B (en) Abnormal complaint event identification method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180724

WW01 Invention patent application withdrawn after publication