CN109614665A - A kind of power circuit figure automatic drafting method - Google Patents
A kind of power circuit figure automatic drafting method Download PDFInfo
- Publication number
- CN109614665A CN109614665A CN201811397507.XA CN201811397507A CN109614665A CN 109614665 A CN109614665 A CN 109614665A CN 201811397507 A CN201811397507 A CN 201811397507A CN 109614665 A CN109614665 A CN 109614665A
- Authority
- CN
- China
- Prior art keywords
- equipment
- shaft tower
- auspicious
- corresponding shaft
- transformer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 13
- 238000012423 maintenance Methods 0.000 description 4
- 238000010276 construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 238000009877 rendering Methods 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Geometry (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The present invention relates to a kind of power circuit figure automatic drafting method, technical characterstic is: the following steps are included: step 1, being ranked up to each equipment on route according to the number of equipment;Step 2 names new shaft tower according to rule, binds the corresponding shaft tower data input management platform of each number and with number, and then complete the foundation of new equipment;Step 3, by online electronic map reconnaissance, the longitude and latitude of point bound to the number of each equipment, while the state of equipment is not move back fortune, and one tree-like table of generation in systems;Step 4 carries out automatic line map drafting to equipment;Step 5 increases breaker, and system finds corresponding shaft tower, connection is interrupted, and is associated with the increased breaker of institute;Step 6 increases transformer, and system finds corresponding shaft tower, transformer is associated.The accuracy for the electrical power wiring figure that the present invention is drawn out is higher and time saving and energy saving, effectively prevents power system security hidden danger.
Description
Technical field
The invention belongs to power circuit figure rendering technique field, especially a kind of power circuit figure automatic drafting method.
Background technique
Electrical power wiring figure is the indispensable a part of work about electric power, production run personnel need to rely on it carry out it is daily
A few thing, especially regulation personnel are even more so.Therefore, the accuracy of electrical power wiring figure is particularly important.Real work at present
In, electrical power wiring figure is all by picture typing is safeguarded in systems by hand, this frequently results in maintenance not in time or ties up
The generation for protecting mistake, very big security risk is carried out to power generation work belt.
Summary of the invention
It is an object of the invention to overcome the deficiencies in the prior art, propose a kind of to design reasonable, convenient and practical power line
Road figure automatic drafting method.
The present invention solves its realistic problem and adopts the following technical solutions to achieve:
A kind of power circuit figure automatic drafting method, comprising the following steps:
Step 1 is ranked up each equipment on route according to the number of equipment;
Step 2 names new shaft tower according to rule, by each number corresponding shaft tower data input management platform and with volume
It number is bound, and then completes the foundation of new equipment;
Step 3, by online electronic map reconnaissance, the longitude and latitude of point is bound to the number of each equipment, is set simultaneously
Standby state is not move back fortune, and generate a tree-like table in systems;
Step 4 carries out automatic line map drafting to equipment;
Step 5 increases breaker, and system finds corresponding shaft tower, connection is interrupted, and is associated with the increased breaker of institute;
Step 6 increases transformer, and system finds corresponding shaft tower, transformer is associated.
Moreover, the equipment should have the following characteristics that the different longitude and latitude of unique number, voltage class, same type equipment
Address, equipment running status, forward-backward correlation equipment.
The advantages of the present invention:
A kind of accuracy for the electrical power wiring figure that power circuit figure automatic drafting method is drawn out of the present invention is higher and time saving
It is laborsaving, effectively prevent power system security hidden danger.
Detailed description of the invention
Fig. 1 is that tree represenation of the invention is intended to.
Specific embodiment
The embodiment of the present invention is described in further detail below in conjunction with attached drawing:
A kind of power circuit figure automatic drafting method, comprising the following steps:
Step 1 is ranked up the equipment on route according to the number of equipment;
In the present embodiment, the number of equipment are as follows: auspicious 030152-4, auspicious 030152-3, auspicious 030152-2, auspicious 030152-
1, auspicious 03000152, auspicious 030152+1, auspicious 030152+2, auspicious 030152+3, auspicious 030152+4, auspicious 030153-4, auspicious 030153-
3, auspicious 030153-2, auspicious 030153-1. auspicious 030153.
System can first traverse auspicious 030152 this bar, then search whether that there are auspicious 030152-10, auspicious 030152-
9 ... auspicious 030152-1, auspicious 030152+1, auspicious 030152+2, auspicious 030152+3, the auspicious auspicious 030152+10 of 30152+4 ... is in this way
Sequence is just carried out, then in systems there are certain distance and is shown the corresponding device model of these bars, then by auspicious 03
The model of the equipment such as disconnecting link, the transformer of this branch road shows and safeguards into line map corresponding position, thus reaches
Purpose.
Devices in system should at least have the following characteristics that the different longitude and latitude of unique number, voltage class, same type equipment
Address, equipment running status, forward-backward correlation equipment.
Step 2 names new shaft tower according to rule, by each number corresponding shaft tower data input management platform and with volume
It number is bound, and then completes the foundation of new equipment;
In this example, it is assumed that our new routes, route is related to 15 shaft towers, a breaker, a transformer,
Shaft tower number is respectively auspicious 030151, auspicious 030151+1, auspicious 030151+2, auspicious 030151+3, auspicious 030152-3, auspicious 030152-
2, auspicious 030152-1, auspicious 030152, auspicious 030152+1, auspicious 030152+2, auspicious 030152+3, auspicious 030153-3, auspicious 030153-
2, it is on auspicious 030152 shaft tower that auspicious auspicious 030153. breaker of 030153-1., which is placed on number, we are auspicious by breaker number-
030152 breaker.Transformer is placed under auspicious 030153, and breaker number is-auspicious 030153 transformer by we.
Step 3, by online electronic map reconnaissance, the longitude and latitude of point is bound to the number of each equipment, is set simultaneously
Standby state is not move back fortune, and generate a tree-like table in systems;
In the present embodiment, corresponding specific address is numbered at this time not identify also, we can by it is online electronically
The longitude and latitude of point is bound the number of each equipment by figure reconnaissance, while the state of equipment is not move back fortune.Equipment a series of in this way
It is completed with regard to establishing.At this point, a tree-like table can be generated in system.
Step 4 carries out automatic line map drafting to equipment;
In the present embodiment, operation maintenance personnel selects auspicious 03 not associated equipment, obtains the newly-increased equipment of previous step.System
It can be ranked up according to number order, obtain auspicious 030151, auspicious 030151+1, auspicious 030151+2, auspicious 030151+3, it is auspicious
030152-3, auspicious 030152-2, auspicious 030152-1, auspicious 030152, auspicious 030152+1, auspicious 030152+2, auspicious 030152+3 are auspicious
030153-3, auspicious 030153-2, auspicious this shaft tower sequence of 030153-1. auspicious 030153, and be associated.Simultaneously for it
Longitude and latitude is positioned, and is matched to satellite map present in system.
Step 5 increases breaker, and system finds corresponding shaft tower, connection is interrupted, and is associated with the increased breaker of institute;
In the present embodiment, increase the breaker that number is auspicious 030152 breaker, system finds auspicious 030152 shaft tower, will
Connection interrupts, and is associated with this upper breaker.
Step 6 increases transformer, and system finds corresponding shaft tower, transformer is associated.
In the present embodiment, increase the transformer that number is auspicious 030153 transformer, system finds auspicious 030153 shaft tower, will
Auspicious 030153 transformer is associated.
In the present embodiment, system can print equipment two dimensional code at any time, and two dimensional code is specific to construction site with equipment
Position.Operation maintenance personnel carries out verification maintenance, and real-time update database with information of the handheld terminal to equipment to scene again.
It is emphasized that embodiment of the present invention be it is illustrative, without being restrictive, therefore the present invention includes
It is not limited to embodiment described in specific embodiment, it is all to be obtained according to the technique and scheme of the present invention by those skilled in the art
Other embodiments, also belong to the scope of protection of the invention.
Claims (2)
1. a kind of power circuit figure automatic drafting method, it is characterised in that: the following steps are included:
Step 1 is ranked up each equipment on route according to the number of equipment;
Step 2 names new shaft tower according to rule, by each number corresponding shaft tower data input management platform and with number into
Row binding, and then complete the foundation of new equipment;
Step 3, by online electronic map reconnaissance, the longitude and latitude of point bound to the number of each equipment, while equipment
State is not move back fortune, and generate a tree-like table in systems;
Step 4 carries out automatic line map drafting to equipment;
Step 5 increases breaker, and system finds corresponding shaft tower, connection is interrupted, and is associated with the increased breaker of institute;
Step 6 increases transformer, and system finds corresponding shaft tower, transformer is associated.
2. a kind of power circuit figure automatic drafting method according to claim 1, it is characterised in that: the equipment Ying Youru
Lower feature: unique number, voltage class, same type equipment different longitude and latitude address, equipment running status, forward-backward correlation
Equipment.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811397507.XA CN109614665A (en) | 2018-11-22 | 2018-11-22 | A kind of power circuit figure automatic drafting method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811397507.XA CN109614665A (en) | 2018-11-22 | 2018-11-22 | A kind of power circuit figure automatic drafting method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109614665A true CN109614665A (en) | 2019-04-12 |
Family
ID=66003690
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811397507.XA Pending CN109614665A (en) | 2018-11-22 | 2018-11-22 | A kind of power circuit figure automatic drafting method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109614665A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104166943A (en) * | 2014-07-04 | 2014-11-26 | 国家电网公司 | Method and device for drawing cable line graph |
CN105204458A (en) * | 2015-08-11 | 2015-12-30 | 许继集团有限公司 | Intelligent configuration method |
CN106651144A (en) * | 2016-11-25 | 2017-05-10 | 南京南瑞继保电气有限公司 | Tower and line relationship modeling method with common-tower parallel line information |
CN107247837A (en) * | 2017-06-06 | 2017-10-13 | 云南电网有限责任公司 | A kind of shaft tower information modelling approach of transmission line of electricity |
-
2018
- 2018-11-22 CN CN201811397507.XA patent/CN109614665A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104166943A (en) * | 2014-07-04 | 2014-11-26 | 国家电网公司 | Method and device for drawing cable line graph |
CN105204458A (en) * | 2015-08-11 | 2015-12-30 | 许继集团有限公司 | Intelligent configuration method |
CN106651144A (en) * | 2016-11-25 | 2017-05-10 | 南京南瑞继保电气有限公司 | Tower and line relationship modeling method with common-tower parallel line information |
CN107247837A (en) * | 2017-06-06 | 2017-10-13 | 云南电网有限责任公司 | A kind of shaft tower information modelling approach of transmission line of electricity |
Non-Patent Citations (1)
Title |
---|
陈世君等: "基于自动成图算法的城市配电网走径图设计", 《广东科技》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104951620B (en) | Intelligent substation configuration file SCD file checking method based on business rule | |
CN107527395A (en) | A kind of unmanned plane method for inspecting, device and unmanned plane | |
CN107024638A (en) | A kind of electrical power distribution network fault location method and device based on modified evolutionary programming | |
CN106600457B (en) | Microcomputer five-prevention main wiring diagram analysis system of transformer substation | |
CN103632229A (en) | Transmission line fault handling method and device | |
CN110532343A (en) | Comprehensive analysis of fault and information presentation system are pressed in a kind of power distribution network | |
CN104463702A (en) | Implementation method and system of business expansion scheme based on power grid GIS framework | |
CN104036374A (en) | Method for assisting in disposing operating accidents of power grid | |
CN109934360A (en) | Substation fault repairs system and method | |
CN103810350A (en) | Automatic pel creating method and creating device thereof | |
CN110034567A (en) | Power distribution network short circuit type voltage dip characteristic quantity calculating method based on propagation characteristic | |
CN107665467A (en) | A kind of method based on GIS supply paths analysis Net Frame of Electric Network | |
CN103761682A (en) | Configuration method of electric system phasor measuring units | |
CN105045991B (en) | The checking method of intelligent substation intelligent apparatus allocation plan and empty terminal | |
CN104537498A (en) | Electric power information device management system based on two-dimensional codes | |
CN105184660A (en) | Virtual secondary circuit examination method between intelligent station intelligent device configuration scheme and device | |
CN107944659A (en) | A kind of substation supervisory control system auto report completing method and apparatus | |
CN105321331B (en) | The processing method of ammeter information, apparatus and system | |
CN102299558A (en) | Method and device for providing electric power system information | |
CN109614665A (en) | A kind of power circuit figure automatic drafting method | |
CN105117836A (en) | Power grid management system of power grid geographical wiring diagram | |
CN105095571B (en) | Intelligent substation intelligent apparatus allocation plan checking method based on business rule | |
CN104537143B (en) | A kind of primary equipment maintaining method for Power SCADA system | |
CN104218668B (en) | The tracking defining method of the prepared auto restart of action is caused during device fails | |
CN105590268A (en) | Power grid maintenance plan simulation system based on geographical information |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |