CN109610502A - A kind of construction method of dark formula Modified soil long and short anchor arm - Google Patents

A kind of construction method of dark formula Modified soil long and short anchor arm Download PDF

Info

Publication number
CN109610502A
CN109610502A CN201811514723.8A CN201811514723A CN109610502A CN 109610502 A CN109610502 A CN 109610502A CN 201811514723 A CN201811514723 A CN 201811514723A CN 109610502 A CN109610502 A CN 109610502A
Authority
CN
China
Prior art keywords
auxiliary
construction
top regions
excavation
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811514723.8A
Other languages
Chinese (zh)
Other versions
CN109610502B (en
Inventor
刘龙武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha University of Science and Technology
Original Assignee
Changsha University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha University of Science and Technology filed Critical Changsha University of Science and Technology
Priority to CN201811514723.8A priority Critical patent/CN109610502B/en
Publication of CN109610502A publication Critical patent/CN109610502A/en
Application granted granted Critical
Publication of CN109610502B publication Critical patent/CN109610502B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0275Retaining or protecting walls characterised by constructional features cast in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

A kind of construction method of dark formula Modified soil long and short anchor arm is using excavation section by section mode (L1) and Sub-region and hierarchical (h1, h2) digging mode combines, main digging mode (7) and auxiliary are excavated (6) mode and are combined, Site compacting rapid construction is constructed with the construction method that in due course gib combines, with congenic method ratio, it is fast with speed of application, slurry trench stability, construction quality is easily controllable, the advantages such as project cost is low, particularly suitable for argillaceous sandstone, high liquid limit residual soil mid-deep strata the landslide control more than interface culm residual soil cut slope Tu Yan.

Description

A kind of construction method of dark formula Modified soil long and short anchor arm
Technical field
The present invention relates to a kind of dark formula Modified soil long and short anchor arms, especially relate to a kind of dark formula Modified soil antiskid gear The construction method of cob wall.
Background technique
In recent years, highway and hydraulic engineering scientific worker are beginning one's study soil improvement technology applied to expansion The punishment of native side slope of embankment achieves original project benefit and technological achievement.But due to lacking suitable construction technical method, Soil improvement technology can not be also directly used for the improvement on mid-deep strata swelled ground soil-slope landslide at present, both at home and abroad to such cunning The improvement on slope, still mainly using less economical anchor cable and friction pile composite construction scheme, therefore, engineering practice urgent need is found A kind of technically reliable and the better administering method of economy.
Expansive soil slope comes down based on shallow failure, but the thick-layer on argillaceous sandstone, culm cut slope top Residual soil landslide then Chang Weizhong, deep-level landslide.Argillaceous sandstone, culmiferous residual soil are often with weak expansile high liquid limit Soil, therefore, such landslide belongs in swelled ground, deep-level landslide.The main inducing that such landslide is destroyed is made due to excavating off-load The desiccation crack that the contraction of the high liquid limit soil soil body is formed under the conditions of the relief joint that slope surface excavation face is formed and dry dehydration Convenience is opened for rain infiltration, and rain infiltration enters the interface Tu Yan, so that the high liquid limit soil soil above the interface Tu Yan Body water content increases, and soil body humidifying is caused to expand, and shearing strength sharply declines, until close to the intensity of weak soil, finally, low-intensity It induces high liquid limit residual soil and the destruction of mid-deep strata landslide occurs along the interface Tu Yan.Often length is larger on this kind of landslide, such as uses earth-retaining Wall is administered, and Retaining Walls are generally required, this must just build dark formula retaining wall in the middle part of slip mass.
Currently, modified cement soil is usually used in the chemical modifying to high liquid limit soil filler, the cement after chemistry of cement is improved Modified soil not only eliminates the undesirable deformation characteristic of high liquid limit soil drying shrinkage bulking, and the modified cement soil of higher cement mixing content also has There is quick-hardening, forms the superperformance for being much higher than humidifying original state high liquid limit soil body shearing strength.Cement is changed if can find Property the suitable construction method built to dark formula retaining wall of soil technical application, can have by big width modified cement soil retaining wall Larger self weight, form multigrade cement Modified soil gravity retaining wall, realize the improvement come down to such high liquid limit soil mid-deep strata Background technique describes paragraph.
Summary of the invention
It is the mud on the landslide destroyed that Modified soil, which is difficult to use in and administers the main problem of mid-deep strata land slide of swelled ground, When carrying out dark formula Modified soil long and short anchor arm excavation construction on matter sandstone, culm residual soil cut slope, it is difficult to guarantee side Secondary sliding does not occur and is difficult to keep the stabilization for excavating cell wall for slope.
In argillaceous sandstone, culm residual soil cut slope, deep-level landslide often led along what the interface Tu Yan occurred Draw formula, gradual landslide, slip mass is often made of large-scale whole sliding block and fissure zone, and sliding surface is more gentle, and mostly compacted Dynamic landslide, thus, when large-scale whole slide body progress segment face is excavated, still there is slip mass short-term interim soil arching effect to mention Supply the stabilization of crater wall in short-term.Technical thought of the invention is the interim soil arch effect that medium-and-large-sized slide body has that come down based on such It answers, using reasonable excavation method, using exploratory trench formula light section Rapid Excavation and the modified earth process of quickly stuffing, and cooperates and changing Property soil in add early strength agent so that backfill Modified soil physical efficiency provides branch before the interim soil arching effect failure of exploratory trench formula light section in time Shield effect, to realize the stabilization excavation construction of dark formula retaining wall.Specifically, the present invention is mainly achieved by the following measures The stabilization of dark formula long and short anchor arm, low cost construction:
(1), the present invention using solid weight mixed ratio be respectively 10% cement, 3% waterglass and 87% excavation landslide it is high Liquid limit soil earth material is modified mixing for soil and matches, then will mix the modification earth material prepared plus suitable quantity of water, is mixed and stirred simultaneously with excavator scene It is backfilling and compacted in box cut, to form the modified cement cob wall body with quick-hardening feature.It is main due to the wall Material is the high liquid limit soil residual soil landslide earth material excavated, and earth material cost is very low, in addition, is mixed and stirred with excavator scene and backfills pressure Real, the construction cost for mixing and stirring and being backfilling and compacted also is greatly lowered, this has construction method provided by the invention than congenic method There is quick and economic advantage;
(2), the present invention is encircleed using segmentation, subregion and stage excavation mode so as to excavate the interim soil provided by light section Effect realizes that cell wall keeps of short duration stable purpose when excavating.On the one hand, the present invention in the plane (1-a) by Modified soil antiskid The design length (L) of retaining wall is divided into several construction sections with 5m width (L1), single construction section include main excavation area (7) and The part of excavation area (6) two is assisted, and keeps the design width (b) of main excavation area (7) length and Modified soil long and short anchor arm Unanimously, and guarantee after completing a construction section construction, should at least separate a construction section and carry out applying for next construction section again Work, thus the stabilization for the slopes that come down during ensure that integral construction;On the other hand, the present invention on section (1-b) by Modified soil The half depth of long and short anchor arm projected depth (h) presses upper layer (h1) and lower layer (h2) as single layer cutting depth, by construction section It is divided into top regions and area, lower layer, in order to which excavator excavates operation.The present invention is just opened by excavation section by section and subregion, layering in this way The combination of digging realizes the control of single excavated section in the light section range of 5m × 5m, and can provide interim soil by light section Arching is come the of short duration stabilization of cell wall during guaranteeing excavation;
(3), the present invention is combined using main digging mode and auxiliary digging mode, and Lai Shixian quick supporting and deep layer are quickly opened The stable purpose of crater wall during digging, guaranteeing entire excavate.The present invention is using dark formula Modified soil long and short anchor arm scope of design as master Excavation area (7), main excavation area (7) include two layers of main excavation top regions (1) and area, main excavation lower layer (5), and in the main excavation Upward slope orientation and descending orientation the setting auxiliary excavation area (6) of top regions (1), auxiliary excavation area (6) includes the auxiliary of upward slope orientation It helps and excavates top regions (2), the auxiliary that the auxiliary of descending orientation side-lower is excavated immediately below top regions (3) and descending orientation is excavated Floor area (4) totally three parts.When excavation, auxiliary is excavated first and excavates top regions (2), and by shifting to an earlier date spice, fast compacting time The measures such as modified cement soil are filled out, using the characteristic of modified cement soil quick-hardening, reaches and gets the jump on the landslide interim soil arching effect of the soil body It is formed to the main temporary support structures for excavating top regions (1) in auxiliary excavation top regions (2) range before failure and ensures main excavation The purpose of top regions (1) excavation slurry trench stability;Auxiliary by excavating descending orientation excavates top regions (3) to carry out to excavator Area, main excavation lower layer (5), which is excavated, provides operation path up and down, and excavates top regions (4) by excavating descending orientation auxiliary come to digging Pick machine carries out the main excavation for excavating area, lower layer (5) and provides operation seat in the plane.
In short, a kind of construction method of dark formula Modified soil long and short anchor arm provided by the invention makes Modified soil antiskid earth-retaining The improvement that wall can be used for argillaceous sandstone, culm residual soil cut slope comes down along the mid-deep strata at the interface Tu Yan, is applied with similar Work method ratio has the advantages such as speed of application is fast, crater wall supporting is stable, construction quality is easily controllable, project cost is low.
Detailed description of the invention
Fig. 1 is a kind of dark formula Modified soil long and short anchor arm construction method schematic diagram, and (1-a) is wall construction in Fig. 1 Section divides plan view, (1-b) is single construction section plan view, (1-c) is the A-A ' cross-section diagram of single construction section, (1-d) is single B-B ' the cross-section diagram of a construction section.
Fig. 2 is that one kind provided by the invention is used on the expansive soil slope slip mass of Baise of Guangxi road event portion guard station The construction method of dark formula Modified soil long and short anchor arm carries out the engineering after dark formula Modified soil long and short anchor arm construction is completed 1 year and answers Use instance graph.
Specific embodiment
A kind of wall of dark formula Modified soil long and short anchor arm proposed by the present invention is made of Modified soil;The Modified soil is consolidated Body weight mixed ratio be respectively 10% cement, 3% waterglass and 87% excavation landslide high liquid limit soil earth material;The present invention is by opening A kind of dark formula Modified soil long and short anchor arm is divided into several construction section 1-a by excavation construction process;Single construction section 1-b includes that master opens Dig area 7 and the auxiliary part of excavation area 6 two;Main excavation area 7 includes positioned at the main excavation top regions 1 of upper layer h1 and positioned at lower layer h2 Area, main excavation lower layer 5, be distributed in Modified soil long and short anchor arm scope of design 1-c;Auxiliary excavation area 6 includes being located at upper layer h1 The auxiliary in upward slope orientation excavates top regions 2, the auxiliary of descending orientation side-lower excavate it is auxiliary immediately below top regions 3 and descending orientation It helps and excavates top regions 4, be increased boundary of works area 1-b, 1-c, 1-d for auxiliary construction.With reference to the accompanying drawing 1 and in Guangxi hundred Specific construction example figure 2 in color excavated expansive soil slope landslide reinforcement, the invention will be further described.
A kind of wall of dark formula Modified soil long and short anchor arm proposed by the present invention is made of Modified soil;The Modified soil is consolidated Body weight mixed ratio be respectively 10% cement, 3% waterglass and 87% excavation landslide high liquid limit soil earth material;The dark formula The construction method of Modified soil long and short anchor arm, steps characteristic are:
(1), a construction section is chosen, with length L1 is 5m and width b1 is the planar dimension 1-a of 3m, and is the depth of 5m with depth Degree size excavates the main auxiliary for excavating 1 upward slope orientation of top regions and excavates top regions 2, while the high liquid limit soil earth material dug out being sprinkled water To soft plastic state, by the solid weight mixed ratio of cement 10%, waterglass 3% and high liquid limit soil 87%, scene is mixed and stirred with excavator Uniformly, the modified cement soil earth material mixed of being subject to is in hard plastic state 1-a;
(2), top regions 2 being excavated to earth's surface with the Modified soil earth material back-filling in layers auxiliary mixed and stirred, single layer virtual resurfacing thickness is 70cm, Width b1 is 3m, is compacted using excavator machine bucket, compacting counting is no less than 6 times, and thickness should ensure that no more than 50cm.Layering After being backfilling and compacted completion 1 day, the modified soil body can be hardened, thus formed to the main temporary support structures 1-a for excavating top regions 1, 1-d;
(3), main excavation top regions 1 are excavated with the excavation size of length b width L1 and depth h2;
(4), with length L1 be 5m and width b1 is the planar dimension 1-a of 3m, and is that 0m and right end terminate to play left end beginning depth The size that depth is 5m excavates auxiliary and excavates top regions 3, and with length L1 be 5m and width b1 for 3m planar dimension 1-a, with The size that depth is 5m excavates auxiliary and excavates top regions 41-d;
(5), excavator is excavated into top regions 3 from the auxiliary dug and reaches the bottom that auxiliary excavates top regions 4;
(6), main excavation area, lower layer 5 is excavated with length b width L1 and depth h1 and is layered with the Modified soil earth material mixed and stirred Backfill, single layer void paving and compacting requirement are identical as step (2);
(7), main excavation top regions 1 are backfilled referring to step (5);
(8), top regions 3 excavated referring to step (5) backfill auxiliary, assist excavating top regions 4, the whole for completing first construction section is applied Work;
(9), next construction section is chosen by the principle for being separated by a construction section width L1, and referring to step (2) to step (7), Carry out the construction of next construction section;
(10), referring to step (8), the construction of all construction sections is completed.
Baise of Guangxi road event portion guard station is being administered using the application of construction technology for originally declaring patent in July, 2017 The construction drawing 2 for the Modified soil long and short anchor arm that Weathered Mudstone comes down with side slope mid-deep strata, the more torrential rains of Jing Yinian are examined It tests and shows originally to declare that patented technology is fast with speed of application, crater wall supporting is stable, construction quality is easily controllable, project cost is low Etc. advantages.

Claims (2)

1. a kind of wall of dark formula Modified soil long and short anchor arm proposed by the present invention is made of Modified soil;The solid of the Modified soil Weight mixed ratio be respectively 10% cement, 3% waterglass and 87% excavation landslide high liquid limit soil earth material;The present invention is by opening A kind of dark formula Modified soil long and short anchor arm is divided into several construction sections (1-a) by excavation construction process;Individually construction section (1-b) includes Main excavation area (7) and auxiliary two parts excavation area (6) (1-a);Main excavation area (7) includes on the main excavation of upper layer (h1) Floor area (1) and the area, main excavation lower layer (5) for being located at lower layer (h2), are distributed in Modified soil long and short anchor arm scope of design (1-c);It is auxiliary Helping excavation area (6) includes the auxiliary that top regions (2), descending orientation side-lower are excavated positioned at the auxiliary in the upward slope orientation of upper layer (h1) It excavates the auxiliary immediately below top regions (3) and descending orientation and excavates top regions (4), be increased boundary of works area for auxiliary construction (1-b)、(1-c)、(1-d)。
2. a kind of construction method of dark formula Modified soil long and short anchor arm as described in claim 1, steps characteristic is:
1) one construction section of selection, the planar dimension (1-a) that with length (L1) be 5m and width (b1) is 3m, and with 5m depth Size excavates the main auxiliary for excavating top regions (1) upward slope orientation and excavates top regions (2), while the high liquid limit soil earth material dug out being spilt Water is live to excavate by the solid weight mixed ratio of cement 10%, waterglass 3% and high liquid limit soil 87% to soft plastic state Machine uniform mixing, the modified cement soil earth material mixed of being subject to are in hard plastic state (1-a);
2) top regions (2) being excavated to earth's surface with the Modified soil earth material back-filling in layers auxiliary mixed and stirred, single layer virtual resurfacing thickness is 70cm, Width (b1) is 3m, is compacted using excavator machine bucket, compacting counting is no less than 6 times, and thickness should ensure that no more than 50cm.Point After layer is backfilling and compacted completion 1 day, the modified soil body can be hardened, to be formed to the main temporary support structures for excavating top regions (1) (1-a,1-d);
3) main excavation top regions (1) are excavated with the excavation size of length (b), width (L1) and depth (h2);
It 4) is 5m with length (L1) and planar dimension (1-a) that width (b1) is 3m, and with left end initial depth for 0m and right end Terminate the size that depth is 5m and excavate auxiliary to excavate top regions (3), and is 5m with length (L1) and plane that width (b1) is 3m Size (1-a) excavates auxiliary excavation top regions (4) (1-d) with the size of 5m depth;
5) excavator is excavated into top regions (3) from the auxiliary dug and reaches the bottom that auxiliary excavates top regions (4);
6) with length (b), width (L1) and depth (h1) excavate main excavation area, lower layer (5) and with the Modified soil earth material mixed and stirred into Row back-filling in layers, single layer void paving and compacting requirement are identical as step 2);
7) main excavation top regions (1) are backfilled referring to step 5);
8) top regions (3) excavated referring to step 5) backfill auxiliary, assist excavating top regions (4), complete the whole of first construction section Construction;
9) next construction section is chosen by the principle for being separated by a construction section width (L1), and referring to step 2) to step 7), into The construction of the next construction section of row;
10) referring to step 8), the construction of all construction sections is completed.
CN201811514723.8A 2018-12-11 2018-12-11 Construction method of concealed modified soil anti-slip retaining wall Active CN109610502B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811514723.8A CN109610502B (en) 2018-12-11 2018-12-11 Construction method of concealed modified soil anti-slip retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811514723.8A CN109610502B (en) 2018-12-11 2018-12-11 Construction method of concealed modified soil anti-slip retaining wall

Publications (2)

Publication Number Publication Date
CN109610502A true CN109610502A (en) 2019-04-12
CN109610502B CN109610502B (en) 2020-12-01

Family

ID=66008348

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811514723.8A Active CN109610502B (en) 2018-12-11 2018-12-11 Construction method of concealed modified soil anti-slip retaining wall

Country Status (1)

Country Link
CN (1) CN109610502B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08209679A (en) * 1995-02-03 1996-08-13 Seibu Kensetsu Kk Inside slope structure of waste disposal place
CN103088834A (en) * 2013-02-01 2013-05-08 河海大学 Method for improving slope stability of expansive soil and controlling structural damage of expansive soil
CN103572765A (en) * 2013-11-19 2014-02-12 成军 Treatment and construction method of bridge site river bank expansive soil landslide positions
CN104674842A (en) * 2015-02-13 2015-06-03 福建省建专岩土工程有限公司 Solidified soil retaining wall and construction method thereof
CN106351239A (en) * 2016-10-28 2017-01-25 长沙理工大学 Cement modified soil strengthened geogrid reinforced soil structure and construction method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08209679A (en) * 1995-02-03 1996-08-13 Seibu Kensetsu Kk Inside slope structure of waste disposal place
CN103088834A (en) * 2013-02-01 2013-05-08 河海大学 Method for improving slope stability of expansive soil and controlling structural damage of expansive soil
CN103572765A (en) * 2013-11-19 2014-02-12 成军 Treatment and construction method of bridge site river bank expansive soil landslide positions
CN104674842A (en) * 2015-02-13 2015-06-03 福建省建专岩土工程有限公司 Solidified soil retaining wall and construction method thereof
CN106351239A (en) * 2016-10-28 2017-01-25 长沙理工大学 Cement modified soil strengthened geogrid reinforced soil structure and construction method thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
孟国忠: "《山区油气管道地质灾害防治研究》", 30 April 2008, 中国大地出版社 *
陈维: "南水北调中线工程水泥改性土换填施工工艺浅析", 《四川水力发电》 *

Also Published As

Publication number Publication date
CN109610502B (en) 2020-12-01

Similar Documents

Publication Publication Date Title
CN104153380B (en) A kind of antiseepage cofferdam structure and construction technology
CN106759473B (en) The constructing structure and its construction method of underground pipe gallery and road
CN208605184U (en) The ruggedized construction of loose highfill embankment is worn under a kind of large cross-section tunnel
CN104847362B (en) Ground consisting of hard rock construction method across underground digging in subway station greatly
CN104863113A (en) Method for curing in-situ soil in situ and stirring device
CN111851505A (en) Construction method and structure of pouring type impervious core earth-rock dam
CN108368685A (en) Stability fundamental ground moulding method
CN106522966B (en) Antifriction construction method is dug on sand-pebble layer earth pressure balance rectangular shield top
CN101008178B (en) Soft base processing construction process using excavating and stirring method
US2757514A (en) Method of forming an impermeable wall in the terrain
CN109763513A (en) A kind of anchor cable lattice and the compound retaining structure of Modified soil retaining wall and its construction method
KR101278127B1 (en) Surface solidification deep cement mixing method for recycling floating soil
CN109610502A (en) A kind of construction method of dark formula Modified soil long and short anchor arm
US2809118A (en) Process for compacting and the plastic stiffening of natural and artificial soils
CN110043271A (en) A kind of hole Shallow-buried section spaces union supporting construction and its construction method
CN213143069U (en) Pouring type impervious core earth-rock dam structure
CN108842813A (en) Open trench tunnel differential settlement control structure and construction technology
EP0433558A1 (en) Method and apparatus for increasing bearing capacity of soft soil and constructing cutoff wall
JP3760343B2 (en) Drilling bottom stabilization method and construction method of underground building
CN106285696A (en) Sand-pebble layer rectangular shield top digging pressure balanced sets up construction method
CN106703043A (en) Soft soil foundation pit construction method by using dynamic compaction block stone displacement instead of supporting
CN111333374A (en) Carrier pile machine rammed karst cave filler and karst cave filling method
CN206438522U (en) Open trench tunnel crosses section building enclosure
CN110374609A (en) A kind of ultra-shallow earth-covered shield lakebed builds island driving method
CN109629583A (en) GCL bentonite waterproof pad combines TGXG grouting water-tight and reinforces powdery soil slope and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant