CN109610493A - Correct the construction method of open caisson center deviation - Google Patents

Correct the construction method of open caisson center deviation Download PDF

Info

Publication number
CN109610493A
CN109610493A CN201811635357.1A CN201811635357A CN109610493A CN 109610493 A CN109610493 A CN 109610493A CN 201811635357 A CN201811635357 A CN 201811635357A CN 109610493 A CN109610493 A CN 109610493A
Authority
CN
China
Prior art keywords
open caisson
construction
deviation
deflection
sinking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811635357.1A
Other languages
Chinese (zh)
Inventor
田继开
于宏伟
庞佑涛
毛家序
洪海涛
郭尚谦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FORTH ENGINEERING OF ZHONGTIE BRIDGE BUREAU CO LTD
4th Engineering Co Ltd of MBEC
Original Assignee
FORTH ENGINEERING OF ZHONGTIE BRIDGE BUREAU CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FORTH ENGINEERING OF ZHONGTIE BRIDGE BUREAU CO LTD filed Critical FORTH ENGINEERING OF ZHONGTIE BRIDGE BUREAU CO LTD
Priority to CN201811635357.1A priority Critical patent/CN109610493A/en
Publication of CN109610493A publication Critical patent/CN109610493A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • E02D23/08Lowering or sinking caissons
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D35/00Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Radar Systems Or Details Thereof (AREA)

Abstract

The invention discloses a kind of construction methods for correcting open caisson center deviation, it is related to Open caisson construction technology field, comprise steps of determining that the times N of correction sinking construction calculates the deflection of each sinking construction with the times N of construction, open caisson planar central line deviation D and open caisson peripheral wall length L;According to the deflection of each sinking construction, successively sinks to the open caisson side far from and close to open caisson target's center line, complete a sinking construction;N times sinking construction is executed, is overlapped open caisson plane centreline with open caisson target's center line.The present invention makes open caisson accurately correct open caisson center deviation during sinking construction, and rectifying effect is good, and the construction time is short.

Description

Correct the construction method of open caisson center deviation
Technical field
The present invention relates to Open caisson construction technology fields, and in particular to a kind of construction method for correcting open caisson center deviation.
Background technique
Well foundation is since rigidity is big, easy construction, is widely used in science of bridge building field.According to open caisson pier position from Right condition can be divided into land sunk well and two kinds of waters open caisson.Land sunk well construction, is first to make caisson structure on the ground, reaches Soil is taken after design strength in wellhole, open caisson overcomes end resistance and side frictional resistance by self gravity, constantly sinks in place Construction technology.Waters open caisson construction manufactures machine-shaping in factory first, is then lauched at transportation by driving to pier position, then positions Bed, open caisson overcome buoyancy, end resistance and side frictional resistance by being self-possessed and borehole wall concrete being perfused, construction in place of constantly sinking Technique.
Since various factors inevitably generates center deviation when open caisson construction, if reasonable correction is not taken to arrange It applies, deviation may exceed feasible value;If control is improper, correction is also easy to exceed the proper limits in righting a wrong, and extends the construction period.
Summary of the invention
In view of the deficiencies in the prior art, applying for open caisson center deviation is corrected the purpose of the present invention is to provide a kind of Work method corrects open caisson center deviation during caisson sinking construction, and rectifying effect is good, and the construction time is short.
To achieve the above objectives, the technical solution adopted by the present invention is that: it is a kind of correct open caisson center deviation construction method, The following steps are included:
The times N of correction sinking construction is determined, with the times N of construction, open caisson planar central line deviation D and open caisson outer wall Length L calculates the deflection of each sinking construction;
According to the deflection of each sinking construction, successively sink to the open caisson side far from and close to open caisson target's center line, Complete a sinking construction;
N times sinking construction is executed, is overlapped open caisson plane centreline with open caisson target's center line.
Based on the above technical solution, described with the times N of construction, open caisson planar central line deviation D and open caisson Peripheral wall length L calculates the deflection of each sinking construction, and calculation formula is as follows:
Wherein, DiIndicate the deflection of each sinking construction, unit mm;L indicates open caisson peripheral wall length, unit mm;D is indicated Total deviation amount of open caisson planar central deviation, unit mm;N indicates the number of correction sinking construction.
Based on the above technical solution, the deflection of each sinking construction of the basis, first to far from open caisson target The open caisson side of center line carries out a sinking construction, comprising the following steps:
Using the lower end close to the open caisson side of open caisson center line as fulcrum, it is rotated down open caisson, is made far from open caisson target's center The open caisson side of line moves down the deflection of calculating.
Based on the above technical solution, the deflection of each sinking construction of the basis, after to close to open caisson target The open caisson side of center line carries out a sinking construction, comprising the following steps:
Using the lower end of the open caisson side far from open caisson center line as fulcrum, it is rotated down open caisson, is made close to open caisson target's center The open caisson side of line moves down the deflection of calculating.
Based on the above technical solution, open caisson is made to sink to side using the measure of ballast or suction mud.
Based on the above technical solution, rectify a deviation sinking construction times N be 6.
Compared with the prior art, the advantages of the present invention are as follows: the construction method of correction open caisson center deviation of the invention, in advance It first determines construction times, the deflection constructed every time is calculated according to construction times, entangles open caisson accurately during sinking construction Positive open caisson center deviation, rectifying effect is good, and the construction time is short.
Detailed description of the invention
Fig. 1 is the schematic diagram that the construction method of open caisson center deviation is corrected in the embodiment of the present invention;
Fig. 2 is the signal for carrying out a sinking construction in the embodiment of the present invention to the open caisson side far from open caisson target's center line Figure;
Fig. 3 is the signal in the embodiment of the present invention to a sinking construction is carried out close to the open caisson side of open caisson target's center line Figure;
In figure: 1- open caisson, 2- open caisson plane centreline, 3- open caisson target's center line, 4- bedding.
Specific embodiment
Invention is further described in detail with reference to the accompanying drawings and embodiments.
Embodiment one
Shown in Figure 1, the embodiment of the present invention provides a kind of construction method for correcting open caisson center deviation, including following step It is rapid:
Step S1, determine correction sinking construction times N, with the times N of construction, open caisson planar central line deviation D and Open caisson peripheral wall length L, calculates the deflection of each sinking construction.Wherein, when open caisson is circular open caisson, length L indicates open caisson The diameter of outer wall, when open caisson is rectangular open caisson, length L indicates the side length of open caisson outer wall.
Specifically, the deflection of each sinking construction can be calculated as follows:
Wherein, DiIndicate the deflection of each sinking construction, unit mm;L indicates open caisson peripheral wall length, unit mm;D is indicated Total deviation amount of open caisson planar central deviation, unit mm;N indicates the number of correction sinking construction.Open caisson planar central deviation Total deviation amount D and open caisson peripheral wall length can be obtained by measuring tool.It is counted according to the performance requirement of construction equipment and duration It draws, determines correction cycle-index N.
Step S2 first sinks to the open caisson side far from open caisson target's center line according to the deflection of each sinking construction, after Sink to close to the open caisson side of open caisson target's center line, completes a sinking construction.
Specifically, shown in Figure 2, using the lower end close to the open caisson side of open caisson center line as fulcrum, it is rotated down open caisson, The open caisson side far from open caisson target's center line is set to move down the deflection of calculating.It is shown in Figure 3, far from open caisson center line The lower end of open caisson side be fulcrum, be rotated down open caisson, the open caisson side close to open caisson target's center line made to move down calculating Deflection.
Step S3 executes n times sinking construction, is overlapped open caisson plane centreline with open caisson target's center line.
Compared with prior art, the construction method of the correction open caisson center deviation in the embodiment of the present invention, predefines and applies Work number calculates the deflection constructed every time according to construction times, so that open caisson accurately corrects open caisson during sinking construction Center deviation, rectifying effect is good, and the construction time is short.
Embodiment two
Step S1 determines the times N of correction sinking construction, and the times N of optional correction sinking construction is 6, with time of construction Number N, open caisson planar central line deviation D and open caisson peripheral wall length L, calculate the deflection of each sinking construction.
Specifically, the deflection of each sinking construction can be calculated as follows:
Wherein, DiIndicate the deflection of each sinking construction, unit mm;L indicates open caisson peripheral wall length, unit mm;D is indicated Total deviation amount of open caisson planar central deviation, unit mm.The total deviation amount D and open caisson peripheral wall length of open caisson planar central deviation It can be obtained by measuring tool.
Step S2 first sinks to the open caisson side far from open caisson target's center line according to the deflection of each sinking construction, after Sink to close to the open caisson side of open caisson target's center line, completes a sinking construction.
Specifically, shown in Figure 2, using the lower end close to the open caisson side of open caisson center line as fulcrum, it is rotated down open caisson, The open caisson side far from open caisson target's center line is set to move down the deflection of calculating.It is shown in Figure 3, far from open caisson center line The lower end of open caisson side be fulcrum, be rotated down open caisson, the open caisson side close to open caisson target's center line made to move down calculating Deflection.
Step S3 executes 6 sinking constructions, is overlapped open caisson plane centreline with open caisson target's center line.
The present invention is not limited to the above-described embodiments, for those skilled in the art, is not departing from Under the premise of the principle of the invention, several improvements and modifications can also be made, these improvements and modifications are also considered as protection of the invention Within the scope of.The content being not described in detail in this specification belongs to the prior art well known to professional and technical personnel in the field.

Claims (6)

1. a kind of construction method for correcting open caisson center deviation, which comprises the following steps:
The times N of correction sinking construction is determined, with the times N of construction, open caisson planar central line deviation D and open caisson peripheral wall length L calculates the deflection of each sinking construction;
According to the deflection of each sinking construction, successively sinks to the open caisson side far from and close to open caisson target's center line, complete Sinking construction;
N times sinking construction is executed, is overlapped open caisson plane centreline with open caisson target's center line.
2. correct the construction method of open caisson planar central deviation as described in claim 1, which is characterized in that described with construction Times N, open caisson planar central line deviation D and open caisson peripheral wall length L, calculate the deflection of each sinking construction, calculation formula It is as follows:
Wherein, DiIndicate the deflection of each sinking construction, unit mm;L indicates open caisson peripheral wall length, unit mm;D indicates open caisson Total deviation amount of planar central deviation, unit mm;N indicates the number of correction sinking construction.
3. correcting the construction method of open caisson center deviation as described in claim 1, which is characterized in that the basis is sunk every time The deflection of construction first carries out a sinking construction to the open caisson side far from open caisson target's center line, comprising the following steps:
Using the lower end close to the open caisson side of open caisson center line as fulcrum, it is rotated down open caisson, is made far from open caisson target's center line Open caisson side moves down the deflection of calculating.
4. correcting the construction method of open caisson center deviation as described in claim 1, which is characterized in that the basis is sunk every time The deflection of construction, after to close to open caisson target's center line open caisson side carry out a sinking construction, comprising the following steps:
Using the lower end of the open caisson side far from open caisson center line as fulcrum, it is rotated down open caisson, is made close to open caisson target's center line Open caisson side moves down the deflection of calculating.
5. correcting the construction method of open caisson center deviation as described in claim 1, it is characterised in that: using ballast or inhale mud Measure make open caisson to side sink.
6. correcting the construction method of open caisson center deviation as described in claim 1, it is characterised in that: time for sinking construction of rectifying a deviation Number N is 6.
CN201811635357.1A 2018-12-29 2018-12-29 Correct the construction method of open caisson center deviation Pending CN109610493A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811635357.1A CN109610493A (en) 2018-12-29 2018-12-29 Correct the construction method of open caisson center deviation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811635357.1A CN109610493A (en) 2018-12-29 2018-12-29 Correct the construction method of open caisson center deviation

Publications (1)

Publication Number Publication Date
CN109610493A true CN109610493A (en) 2019-04-12

Family

ID=66015418

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811635357.1A Pending CN109610493A (en) 2018-12-29 2018-12-29 Correct the construction method of open caisson center deviation

Country Status (1)

Country Link
CN (1) CN109610493A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114319408A (en) * 2022-01-13 2022-04-12 中铁大桥局集团有限公司 Construction method for correcting open caisson

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201065505Y (en) * 2007-07-10 2008-05-28 宏润建设集团股份有限公司 Box culvert error-correcting device
JP2014077282A (en) * 2012-10-10 2014-05-01 Toshikazu Kodera Caisson method
CN105173015A (en) * 2015-09-21 2015-12-23 中铁大桥局集团第四工程有限公司 Positioning ship and method for assisting in sinking and positioning of steel open caisson thereof
CN106245653A (en) * 2016-08-09 2016-12-21 岩土科技股份有限公司 A kind of vertical mud and water balance construction method
CN108005134A (en) * 2017-12-15 2018-05-08 晋城市建筑工程总公司长治加固分公司 A kind of construction method for saw cuts formula rectification building of restricting

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201065505Y (en) * 2007-07-10 2008-05-28 宏润建设集团股份有限公司 Box culvert error-correcting device
JP2014077282A (en) * 2012-10-10 2014-05-01 Toshikazu Kodera Caisson method
CN105173015A (en) * 2015-09-21 2015-12-23 中铁大桥局集团第四工程有限公司 Positioning ship and method for assisting in sinking and positioning of steel open caisson thereof
CN106245653A (en) * 2016-08-09 2016-12-21 岩土科技股份有限公司 A kind of vertical mud and water balance construction method
CN108005134A (en) * 2017-12-15 2018-05-08 晋城市建筑工程总公司长治加固分公司 A kind of construction method for saw cuts formula rectification building of restricting

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
焦月芹等: "沉井基础下沉施工问题的成因与处理", 《中国高新技术企业》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114319408A (en) * 2022-01-13 2022-04-12 中铁大桥局集团有限公司 Construction method for correcting open caisson

Similar Documents

Publication Publication Date Title
CN104537162B (en) Determine shield tunnel liner interannular seam resistance faulting of slab ends and open deformability method
CN103243745B (en) A kind of method of pile tube deviation rectification
CN104294835A (en) Steel sheet pile cofferdam constructing method
CN108411920A (en) A kind of the multiple spot bellows grouting device and its method of control soil deformation
CN109610493A (en) Correct the construction method of open caisson center deviation
CN109281328A (en) The accurate construction method of steel cofferdam guide pile
CN106871882B (en) Hole digging pile verticality and flatness laser guiding device and construction method thereof
CN104631819A (en) Template system of arc-shaped facade arch-shaped concrete door beam and erection method of template system
CN207685996U (en) A kind of steel core concrete column and beam main tendon connecting node
CN107905108A (en) Tubular arch bolted web member hole group's accuracy control method
CN205530394U (en) Testing arrangement of stake side burden frictional resistance
CN103031863B (en) Multisequencing horizontal stress release aperture combines correcting method with heap lotus supercharging and consolidation slip casting
CN105544982B (en) A kind of hyperboloid reverses steel column construction method
CN204676540U (en) Anchor jacked pile anchor rod locating device
CN205000333U (en) Marine wind turbine foundation
CN106403996A (en) Production method of forced centering observation mark stake for precision engineering measurement
CN210221060U (en) Buckle formula sedimentation pipe
CN205804365U (en) A kind of cap excavation method top board node structure
CN209066929U (en) A kind of adjustable telescopic multifunctional stair of pedal angle
CN210459252U (en) Cofferdam sheet pile capable of monitoring deep horizontal displacement
CN205530263U (en) A locator for construction of steel pipe retaining pile
CN106869193A (en) Stake heart centering method and grout pile heart centralising device during filling pile construction
CN204492177U (en) A kind of template system of arc facade arch concrete door beam
CN206772309U (en) Measure sign protection sleeve
CN208235524U (en) A kind of multiple spot bellows grouting device controlling soil deformation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190412