CN109578343A - A kind of lifting fan para-seismic support - Google Patents

A kind of lifting fan para-seismic support Download PDF

Info

Publication number
CN109578343A
CN109578343A CN201811504590.6A CN201811504590A CN109578343A CN 109578343 A CN109578343 A CN 109578343A CN 201811504590 A CN201811504590 A CN 201811504590A CN 109578343 A CN109578343 A CN 109578343A
Authority
CN
China
Prior art keywords
base plate
lifted
fan
seismic support
para
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811504590.6A
Other languages
Chinese (zh)
Inventor
张鹏
王德顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201811504590.6A priority Critical patent/CN109578343A/en
Publication of CN109578343A publication Critical patent/CN109578343A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D29/00Details, component parts, or accessories
    • F04D29/60Mounting; Assembling; Disassembling
    • F04D29/64Mounting; Assembling; Disassembling of axial pumps
    • F04D29/644Mounting; Assembling; Disassembling of axial pumps especially adapted for elastic fluid pumps
    • F04D29/646Mounting or removal of fans
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D25/00Pumping installations or systems
    • F04D25/02Units comprising pumps and their driving means
    • F04D25/08Units comprising pumps and their driving means the working fluid being air, e.g. for ventilation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D29/00Details, component parts, or accessories
    • F04D29/002Details, component parts, or accessories especially adapted for elastic fluid pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D29/00Details, component parts, or accessories
    • F04D29/66Combating cavitation, whirls, noise, vibration or the like; Balancing
    • F04D29/661Combating cavitation, whirls, noise, vibration or the like; Balancing especially adapted for elastic fluid pumps
    • F04D29/668Combating cavitation, whirls, noise, vibration or the like; Balancing especially adapted for elastic fluid pumps damping or preventing mechanical vibrations

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The present invention provides a kind of lifting fan para-seismic support, including base plate, is lifted on the more braces and more vertical pull rods of the base plate, and be lifted on the fan shock-absorbing device of the base plate bottom surface, blower is lifted on the fan shock-absorbing device.During installation, the fan shock-absorbing device for being placed in base plate in the prior art is lifted on to the bottom surface of base plate, and by assembling on fan shock-absorbing device, so, blower and air hose are integrally placed at the lower section of base plate, due to stopping without air hose, the problem of brace wears air hose and brace setting angle irregularity is avoided.

Description

A kind of lifting fan para-seismic support
Technical field
The present invention relates to heating and ventilation project equipment technical fields, more specifically to a kind of lifting fan para-seismic support.
Background technique
In recent years, country is higher and higher for the shockproof requirements of installation electromechanical in construction and installation, and hanging device is proposed Special requirement, for example, reach the hanging device of 1.8KN or more for weight, when lifting, must add para-seismic support.However, Actual assembling space is typically more narrow, when installing blower hoisting bracket, brace and wind inevitably occurs Pipe mutually conflicts, so that brace is nowhere taken root on top plate, installs brace by force and is then unable to ensure oblique pull angle in specification It is required that 30 °~45 ° of angular range in.
Therefore, how in a limited space interior satisfaction installs standard to the oblique pull of blower para-seismic support, is art technology The technical issues of personnel's urgent need to resolve.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this The embodiment of invention for those of ordinary skill in the art without creative efforts, can also basis The attached drawing of offer obtains other attached drawings.
Fig. 1 is the structural schematic diagram of lifting fan para-seismic support provided by the present invention;
Fig. 2 is the top view of Fig. 1;
Wherein, 1- base plate, 2- brace, the vertical pull rod of 3-, 4- fan shock-absorbing device, 5- blower, 6- reinforced pull rod, 7- Top plate.
Summary of the invention
The object of the present invention is to provide a kind of lifting fan para-seismic support, solves in narrow installation space oblique pull nowhere Oblique pull angle cannot reach the problem of code requirement after taking root and taking root.
The present invention provides a kind of lifting fan para-seismic support, including base plate and is lifted on more of the base plate Brace and more vertical pull rods, further include the fan shock-absorbing device for being lifted on the bottom surface of the base plate, and blower is lifted on The fan shock-absorbing device.
Preferably, the base plate is specially rectangular base plate, and the brace is four, is lifted on respectively described The midpoint of the four edges of base plate, the vertical pull rod are four, are lifted on the four corners of the pedestal respectively.
Preferably, all the brace is equal with the angle of vertical direction, and is set between 30 °~45 °.
Preferably, the base plate is connected by channel steel welding.
Preferably, the fan shock-absorbing device is lifted on the bottom surface central location of the base plate.
Preferably, the distance between laterally adjacent two described vertical pull rods are greater than the length of the fan shock-absorbing device.
Preferably, reinforced pull rod is also lifted at the upper surface center of the base plate.
Compared with above-mentioned background technique, the present invention provides a kind of lifting fan para-seismic support, will in the prior art when installation The fan shock-absorbing device for being placed in base plate is lifted on the bottom surface of base plate, and by assembling on fan shock-absorbing device, So, blower and air hose are integrally placed at the lower section of base plate, when installing brace, due to stopping without air hose, Thus avoid the problem of brace wears air hose and brace setting angle irregularity.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
In order to make those skilled in the art more fully understand the present invention program, with reference to the accompanying drawing and it is embodied The present invention is described in further detail for mode.
Fig. 1 and Fig. 2 are please referred to, Fig. 1 is the structural schematic diagram of lifting fan para-seismic support provided by the present invention;Fig. 2 is The top view of Fig. 1.
The present invention provides a kind of lifting fan para-seismic support, including base plate 1, and base plate 1 is lifted with more oblique pulls Bar 2 and more vertical pull rods 3, brace 2 and vertical equal one end of pull rod 3 are lifted on base plate 1, and the other end is lifted on top plate 7;Base plate 1 is lifted with fan shock-absorbing device 4, that is, fan shock-absorbing device 4 is lifted on the bottom surface of base plate 1, and blower 5 are lifted on fan shock-absorbing device 4, and so, the air hose on blower 5 and blower 5 is set to the lower section of base plate 1, so The problem of being arranged, the installation of brace 2 and oblique pull being hindered to wear air hose in the process to avoid air hose, can because not having air hose blocking To ensure to meet standard installation requirement with the angle of vertical direction after brace 2 is installed.
That is, by the way that fan shock-absorbing device 4 to be lifted on base plate 1, and blower 5 is installed on fan shock-absorbing device On 4, while meeting shockproof requirements, it is ensured that brace 2 meets installation standard, realizes the firm installation of blower 5, thus It solves para-seismic support longitudinal direction oblique pull when conventional blower 5 lifts and air hose conflict can not install and blower is big away from floor spacing The problem of caused lateral oblique pull is unable to satisfy angle code requirement.
Above-mentioned base plate 1 is specially rectangular base plate, it is preferred that the quantity of brace 2 is specially four, is hung respectively The midpoint of four edges loaded on base plate 1, that is, the correspondence position of the midpoint of 1 four edges of base plate and top plate 7 It sets and is installed with hanging ring respectively, the upper and lower ends of brace 2 are separately mounted on two hanging rings, so, just form symmetrical Pull-up structure, to ensure that the installation of base plate 1 is stablized.
In addition, the four corners of base plate 1 are lifted with vertical pull rod 3 respectively, after installation, vertical pull rod 3 is in vertical lifting State mainly plays load-bearing effect, matches with four braces 2, while bearing 5 load of blower, it can be ensured that base plate 1 It is parallel to ground setting, and realizes the firm installation of blower 5.
To meet antidetonation force request, when installing each brace 2, it should be ensured that the angle of each brace 2 and vertical direction It is set between 30 °~45 °, and needs to guarantee, each brace 2 is equal with the angle of vertical direction, to avoid blower The installation inclination of pedestal 1.
Above-mentioned base plate 1 selects channel steel welding connection according to atlas by scene, when processing base plate 1, it should be ensured that weldering Point meets code requirement, and the four corners firm welding of base plate 1.
In order to avoid fan shock-absorbing device 4 lifts unstability, it should be ensured that fan shock-absorbing device 4 is lifted in the bottom surface of base plate 1 Position is entreated, that is, so, gravity can be applied evenly to by fan shock-absorbing device 4 at the center of 1 bottom surface of base plate At the center of base plate 1, to avoid 1 discontinuity of base plate and unstability and shaking.
In order to further enhance the stability that fan shock-absorbing device 4 lifts, when installing four vertical pull rods 3, it should be ensured that horizontal It is greater than the entire length of fan shock-absorbing device 4 to the distance between adjacent two vertical pull rods 3, is arranged such, it can be ensured that wind The stability that machine damper 4 and blower 5 lift.
In order to further promote the stability of lifting, reinforcement can be lifted at the upper surface center of base plate 1 Pull rod 6, so, reinforced pull rod 6 share the weight of fan shock-absorbing device 4 and blower 5 with vertical pull rod 3 jointly, play balance 5 weight of fan shock-absorbing device 4 and blower, the effect for promoting installation fastness.
Lifting fan para-seismic support provided by the present invention is described in detail above.It is used herein specifically a Principle and implementation of the present invention are described for example, and it is of the invention that the above embodiments are only used to help understand Method and its core concept.It should be pointed out that for those skilled in the art, not departing from the principle of the invention Under the premise of, it can be with several improvements and modifications are made to the present invention, these improvement and modification also fall into the claims in the present invention Protection scope in.

Claims (7)

1. a kind of lifting fan para-seismic support, including base plate (1) and it is lifted on more braces of the base plate (1) (2) and more vertical pull rods (3), which is characterized in that further include the fan shock-absorbing for being lifted on the bottom surface of the base plate (1) Device (4), blower (5) are lifted on the fan shock-absorbing device (4).
2. lifting fan para-seismic support according to claim 1, which is characterized in that the base plate (1) is specially side Shape base plate, the brace (2) are four, are lifted on the midpoint of the four edges of the base plate (1), institute respectively Stating vertical pull rod (3) is four, is lifted on the four corners of the base plate (1) respectively.
3. lifting fan para-seismic support according to claim 2, which is characterized in that all braces (2) and vertical The angle in direction is equal, and is set between 30 °~45 °.
4. lifting fan para-seismic support according to claim 3, which is characterized in that the base plate (1) is spelled by channel steel Weldering connection.
5. lifting fan para-seismic support according to any one of claims 1 to 4, which is characterized in that the fan shock-absorbing device (4) it is lifted on the bottom surface central location of the base plate (1).
6. lifting fan para-seismic support according to claim 5, which is characterized in that the vertical drawing of laterally adjacent two The distance between bar (3) is greater than the length of the fan shock-absorbing device (4).
7. lifting fan para-seismic support according to claim 6, which is characterized in that the upper surface of the base plate (1) Reinforced pull rod (6) are also lifted at center.
CN201811504590.6A 2018-12-10 2018-12-10 A kind of lifting fan para-seismic support Pending CN109578343A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811504590.6A CN109578343A (en) 2018-12-10 2018-12-10 A kind of lifting fan para-seismic support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811504590.6A CN109578343A (en) 2018-12-10 2018-12-10 A kind of lifting fan para-seismic support

Publications (1)

Publication Number Publication Date
CN109578343A true CN109578343A (en) 2019-04-05

Family

ID=65928747

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811504590.6A Pending CN109578343A (en) 2018-12-10 2018-12-10 A kind of lifting fan para-seismic support

Country Status (1)

Country Link
CN (1) CN109578343A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102009041610A1 (en) * 2009-09-17 2011-04-21 Helios Ventilatoren Gmbh & Co. Kg Air duct system for ventilation of rooms of a building
EP2397784A1 (en) * 2010-06-21 2011-12-21 Cmp Impianti S.R.L. Device for Ventilating a Room
CN207406698U (en) * 2017-09-29 2018-05-25 南京市第八建筑安装工程有限公司 A kind of combined earthquake-resistant stent
CN207728800U (en) * 2017-12-12 2018-08-14 四川意维高科技股份有限公司 Equipment antidetonation suspension and support

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102009041610A1 (en) * 2009-09-17 2011-04-21 Helios Ventilatoren Gmbh & Co. Kg Air duct system for ventilation of rooms of a building
EP2397784A1 (en) * 2010-06-21 2011-12-21 Cmp Impianti S.R.L. Device for Ventilating a Room
CN207406698U (en) * 2017-09-29 2018-05-25 南京市第八建筑安装工程有限公司 A kind of combined earthquake-resistant stent
CN207728800U (en) * 2017-12-12 2018-08-14 四川意维高科技股份有限公司 Equipment antidetonation suspension and support

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
卢斌: "《隧道通风与运营设施》", 31 January 2015, 四川大学出版社 *

Similar Documents

Publication Publication Date Title
CN109399432B (en) A kind of hoistway job platform that climbs certainly
CN208202138U (en) A kind of truss arch door system
CN109081247A (en) A kind of hanging method of vestibule large-span steel girder
CN104929353A (en) Detachable stepwise automatic climbing operating platform for elevator shafts
CN109578343A (en) A kind of lifting fan para-seismic support
CN107816209B (en) The large-scale Roof Truss construction technology of installation is lifted across outer two sides
CN101660660B (en) Novel installing method of gas cabinet
CN109057309B (en) Suspension type operating platform and assembling and disassembling method thereof
CN204675726U (en) Purlin lifting auxiliary device
CN105152052A (en) Glass curtain wall component lifting device and glass curtain wall component installing method
CN205502561U (en) Scaffold pedestal
CN209618648U (en) A kind of lifting lift hanger
CN209686833U (en) Operating platform support frame and operating platform
CN210530363U (en) Gradual change formula triangle-shaped curtain skeleton construction operation platform
CN209339514U (en) Adjustable flat lower margin
CN207890861U (en) A kind of height-adjustable elevator main machine base
CN209817389U (en) Hanging basket system for construction of outward-inclined wall
CN206244220U (en) A kind of frame support for elevator
CN214935476U (en) Gantry crane with automatically-adjusted height of supporting legs
CN205421883U (en) Suspension type operation platform
CN214575447U (en) A quick installation mechanism for assembly type structure curtain
CN211499707U (en) Construction platform with adjustable elevartor shaft
CN206917235U (en) A kind of simple landing stage of scaffold
CN208039531U (en) A kind of upright bed-jig of steel plate shear force wall
JPS5812990Y2 (en) Building loading platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication