CN109577657A - One kind is built a wall with brick carriage - Google Patents
One kind is built a wall with brick carriage Download PDFInfo
- Publication number
- CN109577657A CN109577657A CN201811389991.1A CN201811389991A CN109577657A CN 109577657 A CN109577657 A CN 109577657A CN 201811389991 A CN201811389991 A CN 201811389991A CN 109577657 A CN109577657 A CN 109577657A
- Authority
- CN
- China
- Prior art keywords
- brick
- transverse slat
- plate
- spring
- right sides
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000011449 brick Substances 0.000 title claims abstract description 75
- 230000002146 bilateral effect Effects 0.000 claims description 10
- 230000000694 effects Effects 0.000 claims description 7
- 208000027418 Wounds and injury Diseases 0.000 description 7
- 230000006378 damage Effects 0.000 description 3
- 208000014674 injury Diseases 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000003780 insertion Methods 0.000 description 2
- 230000037431 insertion Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 235000008331 Pinus X rigitaeda Nutrition 0.000 description 1
- 235000011613 Pinus brutia Nutrition 0.000 description 1
- 241000018646 Pinus brutia Species 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/162—Handles to carry construction blocks
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Machines For Laying And Maintaining Railways (AREA)
Abstract
The present invention relates to a kind of carriages more particularly to one kind to build a wall with brick carriage.Technical problem are as follows: a kind of conveying that can be more convenient to brick is provided, the efficiency built a wall is improved, and can also prevent staff from throwing injured build a wall with brick carriage.Technical solution is: one kind is built a wall with brick carriage, includes transverse slat, supporting leg, universal wheel, connecting rod, riser, upright slide block, u-shaped frame etc.;Transverse slat bottom left and right sides symmetrical expression is equipped with supporting leg, and universal wheel is two, is respectively arranged in left and right sides supporting leg bottom end, connecting rod is connected between the supporting leg medial surface lower part of the left and right sides, is provided with opening on the left of transverse slat, open back side is connected with riser.The present invention is by the way that brick to be placed on the movable plate in u-shaped frame, starting hoist engine can be such that brick is moved on transverse slat, it exchanges the movable plate for not putting brick with the movable plate for being placed with brick, can make staff is continual brick is used to build a wall, work efficiency is high.
Description
Technical field
The present invention relates to a kind of carriages more particularly to one kind to build a wall with brick carriage.
Background technique
In construction, building a wall is essential something, but needs of building a wall use a large amount of brick, brick one
As be all located on shelf for staff use, usual brick is all that staff goes down oneself to remove brick after use
On upper shelf, since brick quantity is more, requires a great deal of time and remove the efficiency that brick influence is built a wall, and staff builds
It needs to walk about when wall and is easy to throw injury from shelf, so another staff help is needed to remove brick on the top of the shelf,
And cautious to build a wall, such high labor cost.
Summary of the invention
It removes brick in order to overcome to require a great deal of time since brick quantity is more and influences the efficiency built a wall, and work
It needs to walk about when building a wall as personnel and is easy to throw injured disadvantage, technical problem are as follows: providing one kind can be more convenient from shelf
Conveying to brick improves the efficiency built a wall, and can also prevent staff from throwing injured build a wall with brick carriage.
Technical solution is: one kind is built a wall with brick carriage, includes transverse slat, supporting leg, universal wheel, connecting rod, riser, vertical
Sliding block, u-shaped frame, fixed plate, hoist engine, wirerope and mobile device, transverse slat bottom left and right sides symmetrical expression are equipped with supporting leg,
Universal wheel is two, is respectively arranged in left and right sides supporting leg bottom end, and the left and right sides is connected with connecting rod between supporting leg medial surface lower part,
Opening is provided on the left of transverse slat, open back side is connected with riser, and what lower part was symmetrical at left and right sides of riser leading flank is provided with vertical cunning
Slot, vertical chute inner sliding type are equipped with upright slide block, are slidably matched in upright slide block and vertical chute, u-shaped frame is installed on a left side
Between right two sides upright slide block leading flank, bottom and transverse slat top left side are designed with the mobile dress that brick can be made to place in u-shaped frame
It sets, fixed plate is installed at the top of riser, and fixed plate bottom middle pin is connected to hoist engine, it is wound with two wirerope on hoist engine, two
Root wirerope is fixedly connected with the left and right sides at the top of u-shaped outer frame respectively.
Further, mobile device includes movable plate, wheel and holding rod, in u-shaped frame at left and right sides of bottom and at the top of transverse slat
Left side is all provided with arc groove, can make movable plate two that brick is placed, symmetrical expression is equipped at left and right sides of movable plate bottom
Wheel, wheel are located in arc groove, and card slot is provided among transverse slat bottom, and holding rod is installed on movable plate top right side.
It further, further include having fixed device, fixed device includes kelly, L-type pedal, the first spring, supporting plate, leads
Bar, pulling plate, movable block and second spring, transverse slat left side are provided with guide hole, and the kelly that movable plate can be made fixed is located in guide hole, kelly
Top is located in card slot, and L-type pedal is installed on kelly bottom end, the first spring pocket on kelly, wherein one end of the first spring with
Transverse slat bottom is fixedly connected, and is fixedly connected at the top of the other end and L-type pedal of the first spring, is connected with branch on the right side of transverse slat leading flank
Plate, the upper and lower bilateral type of supporting plate are provided with pilot hole, and guide rod is located in pilot hole, and upper and lower two sides guide rod is equipped between left end
Movable block, the upper and lower bilateral type in movable block left side are provided with groove, and L-type pedal right end is located in groove and cooperates with it, the
On guide rod, wherein one end of second spring is fixedly connected two spring pockets with movable block right side, the other end of second spring with
Supporting plate left side is fixedly connected, and pulling plate is installed between two sides guide rod right end up and down.
It further, further include having N-shaped bar, sliding sleeve, fastening bolt and u-shaped plate, the N-shaped bar playing the guiding role is two, point
It is not installed on before and after transverse slat top right side, N-shaped bar is equipped with sliding sleeve, and the u-shaped plate that can prevent staff from throwing is installed on front and back
Between at the top of the sliding sleeve of two sides, middle part is equipped with fastening bolt on front side of the sliding sleeve of front side, and fastening bolt is contacted with N-shaped bar.
Further, further include having inserted link, handle and third spring, front-side n-type bar top right side is evenly spaced be provided with it is slotting
Slot, u-shaped plate right part front side are provided with the through-hole playing the guiding role, and inserted link is located in through-hole, and inserted link top is connected with handle, third bullet
Spring covers on inserted link, and wherein one end of third spring is fixedly connected with handle outer bottom, the other end of third spring and u-shaped plate top
Portion is fixedly connected, and inserted link bottom end is located in slot.
The invention has the benefit that the present invention, by the way that brick to be placed on the movable plate in u-shaped frame, starting hoist engine is
Brick can be made to be moved on transverse slat, then exchange the movable plate for not putting brick with the movable plate for being placed with brick, work people can be made
Member is continual to use brick to build a wall, and work efficiency is high, and by fixed device, can prevent movable plate from driving brick
Moving influence staff's builds a wall, and by the effect of u-shaped plate, can prevent staff from throwing injury, highly-safe.
Detailed description of the invention
Fig. 1 is schematic view of the front view of the invention.
Fig. 2 is the enlarged diagram of part A of the present invention.
Fig. 3 is the enlarged diagram of part B of the present invention.
Parts title and serial number in figure: 1: transverse slat, 2: supporting leg, 3: universal wheel, 4: connecting rod, 5: opening, 6: riser, 7: perpendicular
Straight runner, 8: upright slide block, 9:u type frame, 10: fixed plate, 11: hoist engine, 12: wirerope, 13: mobile device, 131: arc
Slot, 132: movable plate, 133: wheel, 134: holding rod, 135: card slot, 14: fixed device, 141: guide hole, 142: kelly, 143:L
Type pedal, 144: the first springs, 145: supporting plate, 146: pilot hole, 147: guide rod, 148: pulling plate, 149: movable block, 1410: recessed
Slot, 1411: second spring, 15:n type bar, 16: sliding sleeve, 17: fastening bolt, 18:u template, 19: through-hole, 20: inserted link, 21:
Hand, 22: third spring, 23: slot.
Specific embodiment
It is described more fully hereinafter with the present invention now with reference to attached drawing, the invention is shown in the accompanying drawings presently preferably
Embodiment.However, the present invention can be embodied in many different forms, and should not be construed as limited to described herein
Embodiment;But these embodiments are provided for penetrability and integrality, and these embodiments will be of the invention
Range be fully conveyed to technical staff.
Embodiment 1
One kind is built a wall to be included transverse slat 1, supporting leg 2, universal wheel 3, connecting rod 4, riser 6, erected as shown in Figs. 1-2 with brick carriage
Straight sliding block 8, u-shaped frame 9, fixed plate 10, hoist engine 11, wirerope 12 and mobile device 13,1 bottom of the transverse slat left and right sides are symmetrical
Supporting leg 2 is installed, transverse slat 1 is connect with supporting leg 2 by bolted connection, universal wheel 3 be two, be respectively arranged in left and right
Two side legs, 2 bottom end, left and right sides supporting leg are connected with connecting rod 4 between 2 medial surface lower part, and supporting leg 2 is by bolted connection
It is connect with connecting rod 4, opening 5 is provided on the left of transverse slat 1,5 rear side of opening is connected with riser 6, lower part pair at left and right sides of 6 leading flank of riser
Title formula is provided with vertical chute 7, and 7 inner sliding type of vertical chute is equipped with upright slide block 8, slides in upright slide block 8 and vertical chute 7
Dynamic cooperation, u-shaped frame 9 are installed between 8 leading flank of upright slide block of the left and right sides, and bottom and 1 top left side of transverse slat be all in u-shaped frame 9
Equipped with the mobile device 13 that brick can be made to place, fixed plate 10 is installed on 6 top of riser, the side that fixed plate 10 is bolted
Formula is connect with riser 6, and 10 bottom middle pin of fixed plate is connected to hoist engine 11, is wound with two wirerope 12 on hoist engine 11, and two
Wirerope 12 is fixedly connected with the outer top left and right sides of u-shaped frame 9 respectively.
Embodiment 2
One kind is built a wall to be included transverse slat 1, supporting leg 2, universal wheel 3, connecting rod 4, riser 6, erected as shown in Figs. 1-2 with brick carriage
Straight sliding block 8, u-shaped frame 9, fixed plate 10, hoist engine 11, wirerope 12 and mobile device 13,1 bottom of the transverse slat left and right sides are symmetrical
Supporting leg 2 is installed, universal wheel 3 is two, the left and right sides 2 bottom end of supporting leg is respectively arranged in, under 2 medial surface of left and right sides supporting leg
It is connected with connecting rod 4 between portion, opening 5 is provided on the left of transverse slat 1,5 rear side of opening is connected with riser 6,6 leading flank of the riser left and right sides
Lower part symmetrical expression is provided with vertical chute 7, and 7 inner sliding type of vertical chute is equipped with upright slide block 8, and upright slide block 8 is slided with vertical
It is slidably matched in slot 7, u-shaped frame 9 is installed between 8 leading flank of upright slide block of the left and right sides, 1 top of bottom and transverse slat in u-shaped frame 9
Left side is designed with the mobile device 13 that brick can be made to place, and fixed plate 10 is installed on 6 top of riser, 10 bottom middle pin of fixed plate
It is connected to hoist engine 11, two wirerope 12 are wound on hoist engine 11, top controls two to two wirerope 12 outside with u-shaped frame 9 respectively
Side is fixedly connected.
Mobile device 13 includes movable plate 132, wheel 133 and holding rod 134, the bottom left and right sides and transverse slat in u-shaped frame 9
1 top left side is all provided with arc groove 131, can make movable plate 132 two that brick is placed, 132 bottom of the movable plate left and right sides
Symmetrical is equipped with wheel 133, and movable plate 132 is connect with wheel 133 by bolted connection, and wheel 133 is located at arc
In shape slot 131, card slot 135 is provided among 1 bottom of transverse slat, holding rod 134 is installed on 132 top right side of movable plate, and holding rod 134 passes through
Bolted mode is connect with movable plate 132.
Embodiment 3
One kind is built a wall to be included transverse slat 1, supporting leg 2, universal wheel 3, connecting rod 4, riser 6, erected as shown in Figs. 1-2 with brick carriage
Straight sliding block 8, u-shaped frame 9, fixed plate 10, hoist engine 11, wirerope 12 and mobile device 13,1 bottom of the transverse slat left and right sides are symmetrical
Supporting leg 2 is installed, universal wheel 3 is two, the left and right sides 2 bottom end of supporting leg is respectively arranged in, under 2 medial surface of left and right sides supporting leg
It is connected with connecting rod 4 between portion, opening 5 is provided on the left of transverse slat 1,5 rear side of opening is connected with riser 6,6 leading flank of the riser left and right sides
Lower part symmetrical expression is provided with vertical chute 7, and 7 inner sliding type of vertical chute is equipped with upright slide block 8, and upright slide block 8 is slided with vertical
It is slidably matched in slot 7, u-shaped frame 9 is installed between 8 leading flank of upright slide block of the left and right sides, 1 top of bottom and transverse slat in u-shaped frame 9
Left side is designed with the mobile device 13 that brick can be made to place, and fixed plate 10 is installed on 6 top of riser, 10 bottom middle pin of fixed plate
It is connected to hoist engine 11, two wirerope 12 are wound on hoist engine 11, top controls two to two wirerope 12 outside with u-shaped frame 9 respectively
Side is fixedly connected.
Mobile device 13 includes movable plate 132, wheel 133 and holding rod 134, the bottom left and right sides and transverse slat in u-shaped frame 9
1 top left side is all provided with arc groove 131, can make movable plate 132 two that brick is placed, 132 bottom of the movable plate left and right sides
Symmetrical is equipped with wheel 133, and wheel 133 is located in arc groove 131, and card slot 135, holding rod 134 are provided among 1 bottom of transverse slat
It is installed on 132 top right side of movable plate.
It further include having fixed device 14, fixed device 14 includes kelly 142, L-type pedal 143, the first spring 144, branch
Plate 145, guide rod 147, pulling plate 148, movable block 149 and second spring 1411 are provided with guide hole 141 on the left of transverse slat 1, can make movable plate
132 fixed kellies 142 are located in guide hole 141, and 142 top of kelly is located in card slot 135, and L-type pedal 143 is installed on kelly
142 bottom ends, L-type pedal 143 are connect with kelly 142 by bolted connection, and the first 144 sets of spring is on kelly 142, and
Wherein one end of one spring 144 is fixedly connected with 1 bottom of transverse slat, solid at the top of the other end and L-type pedal 143 of the first spring 144
Fixed connection, 1 leading flank of transverse slat right side are connected with supporting plate 145, and transverse slat 1 is connect with supporting plate 145 by bolted connection, supporting plate
About 145 bilateral types are provided with pilot hole 146, and guide rod 147 is located in pilot hole 146, upper and lower 147 left end of two sides guide rod it
Between movable block 149 is installed, guide rod 147 is connect by way of welded connecting with movable block 149, on 149 left side of movable block
Lower bilateral type is provided with groove 1410, and 143 right end of L-type pedal is located in groove 1410 and cooperates with it, second spring 1411
It covers on guide rod 147, wherein one end of second spring 1411 is fixedly connected with 149 right side of movable block, second spring 1411
The other end is fixedly connected with 145 left side of supporting plate, and pulling plate 148 is installed between 147 right end of two sides guide rod up and down.
Embodiment 4
One kind is built a wall with brick carriage, as shown in Figure 1-3, include transverse slat 1, supporting leg 2, universal wheel 3, connecting rod 4, riser 6, perpendicular
Straight sliding block 8, u-shaped frame 9, fixed plate 10, hoist engine 11, wirerope 12 and mobile device 13,1 bottom of the transverse slat left and right sides are symmetrical
Supporting leg 2 is installed, universal wheel 3 is two, the left and right sides 2 bottom end of supporting leg is respectively arranged in, under 2 medial surface of left and right sides supporting leg
It is connected with connecting rod 4 between portion, opening 5 is provided on the left of transverse slat 1,5 rear side of opening is connected with riser 6,6 leading flank of the riser left and right sides
Lower part symmetrical expression is provided with vertical chute 7, and 7 inner sliding type of vertical chute is equipped with upright slide block 8, and upright slide block 8 is slided with vertical
It is slidably matched in slot 7, u-shaped frame 9 is installed between 8 leading flank of upright slide block of the left and right sides, 1 top of bottom and transverse slat in u-shaped frame 9
Left side is designed with the mobile device 13 that brick can be made to place, and fixed plate 10 is installed on 6 top of riser, 10 bottom middle pin of fixed plate
It is connected to hoist engine 11, two wirerope 12 are wound on hoist engine 11, top controls two to two wirerope 12 outside with u-shaped frame 9 respectively
Side is fixedly connected.
Mobile device 13 includes movable plate 132, wheel 133 and holding rod 134, the bottom left and right sides and transverse slat in u-shaped frame 9
1 top left side is all provided with arc groove 131, can make movable plate 132 two that brick is placed, 132 bottom of the movable plate left and right sides
Symmetrical is equipped with wheel 133, and wheel 133 is located in arc groove 131, and card slot 135, holding rod 134 are provided among 1 bottom of transverse slat
It is installed on 132 top right side of movable plate.
It further include having fixed device 14, fixed device 14 includes kelly 142, L-type pedal 143, the first spring 144, branch
Plate 145, guide rod 147, pulling plate 148, movable block 149 and second spring 1411 are provided with guide hole 141 on the left of transverse slat 1, can make movable plate
132 fixed kellies 142 are located in guide hole 141, and 142 top of kelly is located in card slot 135, and L-type pedal 143 is installed on kelly
142 bottom ends, on kelly 142, wherein one end of the first spring 144 is fixedly connected the first 144 sets of spring with 1 bottom of transverse slat, the
It is fixedly connected at the top of the other end of one spring 144 and L-type pedal 143, is connected with supporting plate 145, supporting plate on the right side of 1 leading flank of transverse slat
About 145 bilateral types are provided with pilot hole 146, and guide rod 147 is located in pilot hole 146, upper and lower 147 left end of two sides guide rod it
Between movable block 149 is installed, bilateral type is provided with groove 1410,143 right end of L-type pedal to 149 left side of movable block up and down
Cooperate in groove 1410 with it, 1411 sets of second spring on guide rod 147, wherein one end of second spring 1411 and activity
149 right side of block is fixedly connected, and the other end of second spring 1411 is fixedly connected with 145 left side of supporting plate, and pulling plate 148 is installed on
Between 147 right end of upper and lower two sides guide rod.
It further include having N-shaped bar 15, sliding sleeve 16, fastening bolt 17 and u-shaped plate 18, the N-shaped bar 15 playing the guiding role is two,
It is respectively arranged in front of and after 1 top right side of transverse slat, N-shaped bar 15 is connect with transverse slat 1 by way of welded connecting, set on N-shaped bar 15
There is sliding sleeve 16, the u-shaped plate 18 that can prevent staff from throwing is installed between 16 top of front and rear sides sliding sleeve, and u-shaped plate 18 passes through
The mode of welded connecting is connect with sliding sleeve 16, and sliding sleeve 16 front side middle part in front side is equipped with fastening bolt 17, fastening bolt 17 and N-shaped bar
15 contacts.
Embodiment 5
One kind is built a wall with brick carriage, as shown in Figure 1-3, include transverse slat 1, supporting leg 2, universal wheel 3, connecting rod 4, riser 6, perpendicular
Straight sliding block 8, u-shaped frame 9, fixed plate 10, hoist engine 11, wirerope 12 and mobile device 13,1 bottom of the transverse slat left and right sides are symmetrical
Supporting leg 2 is installed, universal wheel 3 is two, the left and right sides 2 bottom end of supporting leg is respectively arranged in, under 2 medial surface of left and right sides supporting leg
It is connected with connecting rod 4 between portion, opening 5 is provided on the left of transverse slat 1,5 rear side of opening is connected with riser 6,6 leading flank of the riser left and right sides
Lower part symmetrical expression is provided with vertical chute 7, and 7 inner sliding type of vertical chute is equipped with upright slide block 8, and upright slide block 8 is slided with vertical
It is slidably matched in slot 7, u-shaped frame 9 is installed between 8 leading flank of upright slide block of the left and right sides, 1 top of bottom and transverse slat in u-shaped frame 9
Left side is designed with the mobile device 13 that brick can be made to place, and fixed plate 10 is installed on 6 top of riser, 10 bottom middle pin of fixed plate
It is connected to hoist engine 11, two wirerope 12 are wound on hoist engine 11, top controls two to two wirerope 12 outside with u-shaped frame 9 respectively
Side is fixedly connected.
Mobile device 13 includes movable plate 132, wheel 133 and holding rod 134, the bottom left and right sides and transverse slat in u-shaped frame 9
1 top left side is all provided with arc groove 131, can make movable plate 132 two that brick is placed, 132 bottom of the movable plate left and right sides
Symmetrical is equipped with wheel 133, and wheel 133 is located in arc groove 131, and card slot 135, holding rod 134 are provided among 1 bottom of transverse slat
It is installed on 132 top right side of movable plate.
It further include having fixed device 14, fixed device 14 includes kelly 142, L-type pedal 143, the first spring 144, branch
Plate 145, guide rod 147, pulling plate 148, movable block 149 and second spring 1411 are provided with guide hole 141 on the left of transverse slat 1, can make movable plate
132 fixed kellies 142 are located in guide hole 141, and 142 top of kelly is located in card slot 135, and L-type pedal 143 is installed on kelly
142 bottom ends, on kelly 142, wherein one end of the first spring 144 is fixedly connected the first 144 sets of spring with 1 bottom of transverse slat, the
It is fixedly connected at the top of the other end of one spring 144 and L-type pedal 143, is connected with supporting plate 145, supporting plate on the right side of 1 leading flank of transverse slat
About 145 bilateral types are provided with pilot hole 146, and guide rod 147 is located in pilot hole 146, upper and lower 147 left end of two sides guide rod it
Between movable block 149 is installed, bilateral type is provided with groove 1410,143 right end of L-type pedal to 149 left side of movable block up and down
Cooperate in groove 1410 with it, 1411 sets of second spring on guide rod 147, wherein one end of second spring 1411 and activity
149 right side of block is fixedly connected, and the other end of second spring 1411 is fixedly connected with 145 left side of supporting plate, and pulling plate 148 is installed on
Between 147 right end of upper and lower two sides guide rod.
It further include having N-shaped bar 15, sliding sleeve 16, fastening bolt 17 and u-shaped plate 18, the N-shaped bar 15 playing the guiding role is two,
It is respectively arranged in front of and after 1 top right side of transverse slat, N-shaped bar 15 is equipped with sliding sleeve 16, and the u-shaped plate 18 that can prevent staff from throwing is pacified
Loaded between 16 top of front and rear sides sliding sleeve, sliding sleeve 16 front side middle part in front side is equipped with fastening bolt 17, fastening bolt 17 and N-shaped bar
15 contacts.
Further include having inserted link 20, handle 21 and third spring 22,15 top right side of front-side n-type bar is evenly spaced be provided with it is slotting
Slot 23,18 right part of u-shaped plate front side are provided with the through-hole 19 playing the guiding role, and inserted link 20 is located in through-hole 19, and 20 top of inserted link is affixed
Have handle 21, inserted link 20 is connect by way of welded connecting with handle 21,22 sets of third spring on inserted link 20, third spring
22 wherein one end is fixedly connected with 21 outer bottom of handle, is fixedly connected at the top of the other end and u-shaped plate 18 of third spring 22, the
Three springs 22 are connect by way of welded connecting with u-shaped plate 18, and 20 bottom end of inserted link is located in slot 23.
It is operated first personnel and pushes the present apparatus to be moved to the position built a wall by universal wheel 3, operator station is in transverse slat 1
On, the brick on ground is placed in the mobile device 13 in u-shaped frame 9 by operator, there is suitable brick in mobile device 13
When block, starting hoist engine 11 is inverted, and wirerope 12 is rolled in the reversion of hoist engine 11, and wirerope 12, which is rolled, drives u-shaped frame 9 to moving up
Dynamic, u-shaped frame 9 moves upwardly through mobile device 13 and brick is driven to move up, and when brick is moved upward to 1 top of transverse slat, closes
Hoist engine 11 is closed, staff can pull the mobile device for being placed with brick 13 to move right to transverse slat 1, then will not put brick
Mobile device 13 be placed in u-shaped frame 9, brick can be picked up and be built a wall by staff, meanwhile, operator start elevator
Machine 11 rotates forward, and wirerope 12 is loosened in the rotating forward of hoist engine 11, and because of the influence of gravity, u-shaped frame 9, which moves down, drives mobile device 13
It moves down, when u-shaped frame 9 is moved downward in situ, closes hoist engine 11, the mobile device 13 brick being placed in u-shaped frame 9
On, so staff by the brick in the mobile device 13 on transverse slat 1 after use, by aforesaid operations, can will be placed with brick
The mobile device 13 of block is moved on transverse slat 1, repeatedly, can make staff is continual brick is used to build a wall.
After the completion of building a wall, staff can get off from transverse slat 1, and operator can push the present apparatus under by universal wheel 3
One position of building a wall.
When the present apparatus, which is moved to, builds a wall position, suitable brick can be placed on the movable plate in u-shaped frame 9 by operator
On 132, restart the reversion of hoist engine 11, and then u-shaped frame 9 moves up and movable plate 132 is driven to move up, when movable plate 132
When being moved to 1 top of transverse slat, hoist engine 11 is closed, staff holds holding rod 134 and picks up the movable plate 132 on transverse slat 1, work
Making the holding rod 134 that personnel are held again in u-shaped frame 9 drives movable plate 132 to move right, and movable plate 132, which moves right, drives brick
It moves right, meanwhile, wheel 133 and the disengaging of arc groove 131 are moved on transverse slat 1, when brick moves right to suitable position
When, holding rod 134 is stopped drag, brick can be picked up from movable plate 132 and be built a wall by staff, and will not be placed with brick
Movable plate 132 is put into u-shaped frame 9, operator can start hoist engine 11 rotate forward make not to be placed with brick to movable plate
132 are moved downward to suitable position, repeatedly, can make staff is continual brick is used to build a wall.
When staff picks up the movable plate 132 for being not charged with brick, card slot 135 and kelly 142 are detached from, and can be pulled
Pulling plate 148 moves right, and pulling plate 148, which moves right, drives guide rod 147 to move right, and guide rod 147, which moves right, drives movable block
149 move right, second spring 1411 compress, movable block 149, which moves right, drives groove 1410 to move right, groove 1410 to
It moves right and is detached from 143 right end of L-type pedal, staff can step on L-type pedal 143 and move down, and L-type pedal 143 is downward
Mobile that kelly 142 is driven to move down, the first spring 144 stretches, when L-type pedal 143 is moved downward to suitable position, pine
Pulling plate 148 is opened, because of the effect of second spring 1411, guide rod 147, which is moved to the left, drives movable block 149 to be moved to the left recovery to original
Position, and then movable block 149 makes to be fixed in the groove 1410 below the insertion of L-type pedal 143, pulls the movable plate for being placed with brick
132 move right, and then when wheel 133 moves right to the arc groove 131 on transverse slat 1, stop drag movable plate 132,
Pulling plate 148 is pulled to move right again, and then movable block 149 moves right that drive groove 1410 to move right de- with L-type pedal 143
From because of the effect of the first spring 144, L-type pedal 143, which moves up, drives kelly 142 to move up, and kelly 142 moves up
It is caught in card slot 135, kelly 142 and the cooperation of card slot 135 are fixed by movable plate 132, and unclamping pulling plate 148 is caught in L-type pedal 143
In upper grooves 1410, brick can be removed from movable plate 132 and be built a wall by staff.In this way, movable plate can be prevented
132 drive brick moving influence staff's builds a wall.
When operator station is on transverse slat 1, fastening bolt 17 can be twisted and be displaced outwardly, fastening bolt 17 is displaced outwardly
It is not contacted with N-shaped bar 15, u-shaped plate 18 is pulled to move left and right, when u-shaped plate 18 is moved left and right to suitable position, stop drag u-shaped
Plate 18, twisting fastening bolt 17, which is moved inward, contacts sliding sleeve 16 is fixed and then u-shaped plate 18 is fixed, work people with N-shaped bar 15
Member can stand to build a wall in u-shaped plate 18.In this way, can prevent staff from dropping to ground injury.
Twisting fastening bolt 17, which is displaced outwardly, first does not contact with N-shaped bar 15, when operator station is on transverse slat 1, i.e.,
Can pull handle 21 move up, third spring 22 stretch, handle 21 move up drive inserted link 20 move up, inserted link 20 to
Upper movement and slot 23 are detached from, and are pulled u-shaped plate 18 to move left and right to suitable position, handle 21 are unclamped again, because of third spring 22
Effect, handle 21 drive inserted link 20 move down insertion slot 23 in.In this way, more convenient shifting of the staff to u-shaped plate 18
It is dynamic.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered
It is considered as protection scope of the present invention.
Claims (5)
- It include transverse slat (1), supporting leg (2), universal wheel (3), connecting rod (4) and riser (6) 1. one kind is built a wall with brick carriage, Symmetrical at left and right sides of transverse slat (1) bottom to be equipped with supporting leg (2), universal wheel (3) is two, is respectively arranged in left and right sides branch Leg (2) bottom end is connected with connecting rod (4) between left and right sides supporting leg (2) medial surface lower part, is provided with opening (5) on the left of transverse slat (1), Opening (5) on rear side of be connected with riser (6), which is characterized in that further include have upright slide block (8), u-shaped frame (9), fixed plate (10), Hoist engine (11), wirerope (12) and mobile device (13), riser (6) leading flank left and right sides lower part is symmetrical to be provided with vertically Sliding slot (7), vertical chute (7) inner sliding type are equipped with upright slide block (8), and upright slide block (8) is matched with sliding in vertical chute (7) It closes, u-shaped frame (9) is installed between upright slide block (8) leading flank of the left and right sides, u-shaped frame (9) interior bottom and transverse slat (1) top left Side is designed with the mobile device (13) that brick can be made to place, and fixed plate (10) is installed at the top of riser (6), fixed plate (10) bottom Middle pin is connected to hoist engine (11), is wound with two wirerope (12) on hoist engine (11), two wirerope (12) respectively with u-shaped frame (9) the top left and right sides is fixedly connected outside.
- 2. one kind according to claim 1 is built a wall with brick carriage, which is characterized in that mobile device (13) includes work Movable plate (132), wheel (133) and holding rod (134), u-shaped frame (9) are all provided at left and right sides of interior bottom with transverse slat (1) top left side Arc groove (131), the movable plate (132) that brick can be made to place are two, symmetrical peace at left and right sides of movable plate (132) bottom Equipped with wheel (133), wheel (133) is located in arc groove (131), is provided with card slot (135), holding rod among transverse slat (1) bottom (134) it is installed on movable plate (132) top right side.
- 3. one kind according to claim 2 is built a wall with brick carriage, which is characterized in that further include having fixed device (14), fixed device (14) include kelly (142), L-type pedal (143), the first spring (144), supporting plate (145), guide rod (147), pulling plate (148), movable block (149) and second spring (1411), transverse slat (1) left side are provided with guide hole (141), can make activity The fixed kelly (142) of plate (132) is located in guide hole (141), and kelly (142) top is located in card slot (135), L-type pedal (143) it is installed on kelly (142) bottom end, the first spring (144) covers on kelly (142), wherein one end of the first spring (144) It is fixedly connected, is fixedly connected at the top of the other end and L-type pedal (143) of the first spring (144), transverse slat (1) with transverse slat (1) bottom It is connected with supporting plate (145) on the right side of leading flank, bilateral type is provided with pilot hole (146) supporting plate (145) up and down, guide rod (147) It in pilot hole (146), is equipped with movable block (149) between upper and lower two sides guide rod (147) left end, on the left of movable block (149) The upper and lower bilateral type in face is provided with groove (1410), and L-type pedal (143) right end is located in groove (1410) and cooperates with it, the Two springs (1411) cover on guide rod (147), and wherein one end and movable block (149) right side of second spring (1411) are fixed to be connected It connects, the other end of second spring (1411) is fixedly connected with supporting plate (145) left side, and pulling plate (148) is installed on two sides up and down and leads Between bar (147) right end.
- 4. one kind according to claim 3 is built a wall with brick carriage, which is characterized in that further include having N-shaped bar (15), sliding (16), fastening bolt (17) and u-shaped plate (18) are covered, the N-shaped bar (15) playing the guiding role is two, is respectively arranged in transverse slat (1) Before and after top right side, N-shaped bar (15) is equipped with sliding sleeve (16), and the u-shaped plate (18) that can prevent staff from throwing is installed on front and back Between at the top of two sides sliding sleeve (16), middle part is equipped with fastening bolt (17) on front side of front side sliding sleeve (16), fastening bolt (17) and N-shaped bar (15) it contacts.
- 5. one kind according to claim 4 is built a wall with brick carriage, which is characterized in that further include have inserted link (20), Hand (21) and third spring (22), front-side n-type bar (15) top right side is evenly spaced to be provided with slot (23), and u-shaped plate (18) is right The through-hole (19) playing the guiding role is provided on front side of portion, inserted link (20) is located in through-hole (19), and inserted link (20) top is connected with handle (21), third spring (22) covers on inserted link (20), wherein one end of third spring (22) and the fixed company of handle (21) outer bottom It connects, is fixedly connected at the top of the other end and u-shaped plate (18) of third spring (22), inserted link (20) bottom end is located in slot (23).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811389991.1A CN109577657B (en) | 2018-11-21 | 2018-11-21 | Brick conveying frame for wall building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811389991.1A CN109577657B (en) | 2018-11-21 | 2018-11-21 | Brick conveying frame for wall building |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109577657A true CN109577657A (en) | 2019-04-05 |
CN109577657B CN109577657B (en) | 2020-10-27 |
Family
ID=65923599
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811389991.1A Active CN109577657B (en) | 2018-11-21 | 2018-11-21 | Brick conveying frame for wall building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109577657B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111648608A (en) * | 2020-06-16 | 2020-09-11 | 潘晓丹 | Building site builds a wall with electronic brick device of passing of portable |
CN111962911A (en) * | 2020-08-28 | 2020-11-20 | 唐晓艳 | Building safety displacement device |
CN111962888A (en) * | 2020-07-10 | 2020-11-20 | 陈来 | Lime device is criticized with criticizing to black brick wall |
CN112065067A (en) * | 2020-09-10 | 2020-12-11 | 温州泰乐维工程设计有限公司 | Construction pedal frame for building construction |
CN112900896A (en) * | 2021-01-18 | 2021-06-04 | 张新辉 | Intelligent building wall building device and wall building method thereof |
CN113309367A (en) * | 2020-07-16 | 2021-08-27 | 湖南翰坤实业有限公司 | Building material supply equipment for construction hanging basket |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04176962A (en) * | 1990-11-09 | 1992-06-24 | Fujita Corp | Unloading and conveying system for construction site |
EP0714848A2 (en) * | 1994-11-30 | 1996-06-05 | Firma Käthe Schulten | Lift for hoisting loads in or on a building |
KR100583785B1 (en) * | 2004-04-23 | 2006-06-01 | 금강공업 주식회사 | Construction-material lift being installed at the outside of the construction-structure |
CN104878916A (en) * | 2015-06-25 | 2015-09-02 | 湖南省第六工程有限公司 | Detachable simple four-wheel moving operating platform with building material lifting function |
CN206581620U (en) * | 2017-03-13 | 2017-10-24 | 王志华 | A kind of high building structure construction electric lifts outfeed platforms |
-
2018
- 2018-11-21 CN CN201811389991.1A patent/CN109577657B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04176962A (en) * | 1990-11-09 | 1992-06-24 | Fujita Corp | Unloading and conveying system for construction site |
EP0714848A2 (en) * | 1994-11-30 | 1996-06-05 | Firma Käthe Schulten | Lift for hoisting loads in or on a building |
KR100583785B1 (en) * | 2004-04-23 | 2006-06-01 | 금강공업 주식회사 | Construction-material lift being installed at the outside of the construction-structure |
CN104878916A (en) * | 2015-06-25 | 2015-09-02 | 湖南省第六工程有限公司 | Detachable simple four-wheel moving operating platform with building material lifting function |
CN206581620U (en) * | 2017-03-13 | 2017-10-24 | 王志华 | A kind of high building structure construction electric lifts outfeed platforms |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111648608A (en) * | 2020-06-16 | 2020-09-11 | 潘晓丹 | Building site builds a wall with electronic brick device of passing of portable |
CN111648608B (en) * | 2020-06-16 | 2021-06-15 | 潘晓丹 | Building site builds a wall with electronic brick device of passing of portable |
CN111962888A (en) * | 2020-07-10 | 2020-11-20 | 陈来 | Lime device is criticized with criticizing to black brick wall |
CN111962888B (en) * | 2020-07-10 | 2022-01-25 | 安徽携昇建设工程有限公司 | Lime device is criticized with criticizing to black brick wall |
CN113309367A (en) * | 2020-07-16 | 2021-08-27 | 湖南翰坤实业有限公司 | Building material supply equipment for construction hanging basket |
CN111962911A (en) * | 2020-08-28 | 2020-11-20 | 唐晓艳 | Building safety displacement device |
CN112065067A (en) * | 2020-09-10 | 2020-12-11 | 温州泰乐维工程设计有限公司 | Construction pedal frame for building construction |
CN112065067B (en) * | 2020-09-10 | 2021-09-14 | 温州泰乐维工程设计有限公司 | Construction pedal frame for building construction |
CN112900896A (en) * | 2021-01-18 | 2021-06-04 | 张新辉 | Intelligent building wall building device and wall building method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN109577657B (en) | 2020-10-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109577657A (en) | One kind is built a wall with brick carriage | |
CN205404306U (en) | Falling ball impact test device for glass | |
CN111392114B (en) | Deformed steel bar quantitative bundling is with batch equipment | |
CN105819209B (en) | A kind of annular element feed mechanism | |
CN109909391A (en) | Feeding device for angle steel shearing | |
CN106115251A (en) | A kind of automatic charging transloading equipment | |
CN108975153A (en) | A kind of building waste conveyer | |
CN105966901A (en) | Power assisting device for desk-top water dispenser | |
CN108481403A (en) | A kind of Material moving device of wire box automatic punch machine | |
CN107128839B (en) | A kind of truck-loading facilities wholesale for cultural medium books | |
CN205512756U (en) | Pull head location conveyor | |
CN207228994U (en) | A kind of hydroenergy storage station overhaul of the equipments cat ladder | |
CN109793479A (en) | A kind of sole impurity removing machine | |
CN111115132A (en) | A suspension type conveying equipment for pyrotechnic composition | |
CN107098148A (en) | A kind of arranging apparatus of heat exchanger U-tube | |
US1703773A (en) | Delivery apparatus | |
CN108482982B (en) | Automatic material receiving roller conveyor | |
CN212287934U (en) | A perforating device for rock wool processing | |
CN205708741U (en) | A kind of annular element feed mechanism | |
CN203871729U (en) | Valve mechanism of switch cabinet | |
CN202063284U (en) | Cup placing device for egg tart production line | |
CN110043052A (en) | A kind of building template handling device | |
CN107140257B (en) | Logistics delivery transition system | |
CN210392626U (en) | Clothes conveying device of clothes folding machine | |
CN107670295B (en) | A kind of toy production plug cotton equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200930 Address after: Room 203, unit 2, building 10, longhui District, Congjiang street, Yiwu City, Jinhua City, Zhejiang Province Applicant after: Yiwu yanchuang Industrial Design Co., Ltd Address before: 210019 Room 1105, Block A, Phoenix Cultural Plaza, 211 Jiangdong Middle Road, Jianye District, Nanjing City, Jiangsu Province Applicant before: Zou Donghua |
|
TA01 | Transfer of patent application right |