CN109575956A - A kind of construction method of down-regulation type tamping coke furnace regenerator lattice brick - Google Patents

A kind of construction method of down-regulation type tamping coke furnace regenerator lattice brick Download PDF

Info

Publication number
CN109575956A
CN109575956A CN201811298385.9A CN201811298385A CN109575956A CN 109575956 A CN109575956 A CN 109575956A CN 201811298385 A CN201811298385 A CN 201811298385A CN 109575956 A CN109575956 A CN 109575956A
Authority
CN
China
Prior art keywords
brick
checker brick
completion
construction method
cleaning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811298385.9A
Other languages
Chinese (zh)
Other versions
CN109575956B (en
Inventor
隋新
吴晓峰
牛国宾
韩晓强
王明明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201811298385.9A priority Critical patent/CN109575956B/en
Publication of CN109575956A publication Critical patent/CN109575956A/en
Application granted granted Critical
Publication of CN109575956B publication Critical patent/CN109575956B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B29/00Other details of coke ovens
    • C10B29/02Brickwork, e.g. casings, linings, walls

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Organic Chemistry (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

A kind of construction method of down-regulation type tamping coke furnace regenerator lattice brick; regenerator lattice brick is filled to half height and protective mulch in advance; the cleaning work at regenerative chamber position is cleared up with industrial dust collector from the bottom to top; and the cleaning work of chute, combustion chamber and furnace roof is from top to bottom cleared up with air compressor machine; finally it is pooled to the position of checker brick half; after the completion of complete liquidation, then carries out putting for remaining half checker brick and build work with protection wall.The construction method can saving working hour, save process, save turnover material tool, province's expense and can guarantee quality, conducive to operator masonry operate, can after the completion of masonry be conducive to checker brick inspection.

Description

A kind of construction method of down-regulation type tamping coke furnace regenerator lattice brick
Technical field
The invention belongs to coke furnace masonry construction technical fields, are related to a kind of applying for down-regulation type tamping coke furnace regenerator lattice brick Work method.
Background technique
The method that tamping coke furnace regenerator lattice brick construction method mainly uses at this stage is after having built regenerative chamber furnace wall, It constructs again checker brick and protection wall, checker brick of constructing while still an alternative is that building regenerative chamber.In both construction methods The first method cleaned after using, second using the synchronous method cleaned.Checker brick construction is filled after the first construction method In, it is necessary to coke oven is all built to build after completing and being blowed cleaning and lowers hole adjusting brick, checker brick, regenerative chamber partition wall And protection wall, it needs to set up a large amount of masonry scaffolds when building regenerative chamber, removes and remove after the completion of building, then set up dress checker brick The scaffold of protection wall, this method occupies a large amount of circulation material, consumes that a large amount of manpowers, working efficiency be low, worker's operating environment Difference, poor quality guarantee, are not easy to quality examination and be easy to cause dust pollution to environment.And second of construction method is constructed into This height, construction cleaning works are cumbersome.
Summary of the invention
The object of the present invention is to provide a kind of construction method of down-regulation type tamping coke furnace regenerator lattice brick, the construction methods Can saving working hour, save process, save turnover material tool, province's expense and can guarantee quality, conducive to operator masonry operate, can build It is conducive to the inspection of checker brick after the completion.
As above design, the technical scheme adopted by the invention is that: a kind of down-regulation type tamping coke furnace regenerator lattice brick is applied Work method, it is characterised in that: regenerator lattice brick is filled to half height and protective mulch, the cleaning at regenerative chamber position in advance Work cleared up from the bottom to top with industrial dust collector, and the cleaning work of chute, combustion chamber and furnace roof with air compressor machine from top to bottom into Row cleaning, is finally pooled to the position of checker brick half, after the completion of complete liquidation, then carries out putting for remaining half checker brick Work is built with protection wall.
The construction method of above-mentioned down-regulation type tamping coke furnace regenerator lattice brick, comprises the following specific steps that:
1. after the completion of bottom flue is built with lower portion according to drawing, after the completion of lining brick, double-edged fine-toothed comb brick all correct masonry, After regenerative chamber wall builds 6 layers, start half dress grid brick masonry;
2. covering multi-protective layer on it after the completion of first segment checker brick are put with regenerative chamber main wall;
3. after regenerative chamber main wall builds 6 layers again, carrying out the pendulum of second segment checker brick after the completion of the construction of first segment checker brick Put, lift just can be carried out putting for next section of checker brick after first layer protective layer first, checker brick put after again with step 2. Method is laid with multi-protective layer and carries out finished product protection;
4. there are also at 13 layers, while when checker brick are emitted into the 10th layer, being stored when regenerative chamber is built to apart from regenerator top Wall continuation in hot cell is up built, and checker brick stopping is put, and remaining 14 layers of indwelling to coke oven main body, which are all built, completes blowing cleaning It is being put afterwards;
5. carrying out lower blowing-out reason:
A. cleaning is carried out to chute mouth after the completion of building slope air course of coke, chute position first must after building daily The chute mouth that the same day is built must be cleared up, then after the completion of coke furnace building, in the long shovel opposition fire of furnace roof peephole Secondary cleaning is carried out to chute mouth after having cleared up in road;
B. after combustion chamber is built to lower circulation port, spread separation layer in flue bottom, be then arranged one layer of chute mouth and The protective layer of gas pipe brick places vertical flame path protection-plate in building process and by the mortar fallen on protection board cleaning when building Flue out is cleared up flue brick wall after building daily, by chute after final combustion chamber spanning hole masonry Mouth protective layer takes out, then carries out the masonry of upper section;
C. to the cleaning of combustion chamber reheating air channel;
D. after the completion of furnace roof is built, cleaning from top to bottom is carried out with air compressor machine to entire coke oven;
6. remaining half checker brick are put: after the clean passed examination of complete liquidation in entire coke oven vertical flame path, successively Protective layer is taken out, then remaining checker brick is carried out by the way of moving back platform and puts, finally carry out top half protection wall masonry again.
The protective layer of above-mentioned first segment checker brick include along the elongated laying of checker brick one layer of rubber slab and be laid on the rubber Glued board on offset plate.
Above-mentioned rubber slab with a thickness of 10mm, width and regenerative chamber it is of same size be 515mm.
Above-mentioned glued board with a thickness of 20mm, width and regenerative chamber it is of same size be 515mm.
Regenerator lattice brick is filled to half height and protective mulch, the cleaning work at regenerative chamber position by the present invention in advance It is cleared up from the bottom to top with industrial dust collector, the cleaning work of chute, combustion chamber, furnace roof is from top to bottom cleared up with air compressor machine, It is finally pooled to the position of checker brick half, after the completion of complete liquidation, then putting for remaining half checker brick is carried out and is built with protection wall Build work.The construction method can saving working hour, save process, save turnover material tool, province's expense and can guarantee quality, conducive to operator's Operation is built, the inspection of checker brick can be conducive to after the completion of masonry.
Detailed description of the invention
Fig. 1 is that regenerative chamber builds precedence diagram;
Fig. 2 is coke oven regenerator longitudinal direction section view node diagram;
Fig. 3 is that longitudinally construction cleans detail drawing to coke oven regenerator;
Fig. 4 is coke oven regenerator transverse direction detail of construction.
In figure: 1.-main wall, 2.-mono- wall, 3.-lining brick, 4.-double-edged fine-toothed comb brick, 5.-checker brick, 6.-partition wall, 7.-protection wall, 8.- 10mm thickness wear-resistant rubber sheet, 9. -20mm thickness glued board.
Specific embodiment
A kind of construction method of down-regulation type tamping coke furnace regenerator lattice brick, is filled to half the height for regenerator lattice brick in advance Simultaneously protective mulch is spent, the cleaning work at regenerative chamber position is cleared up with industrial dust collector from the bottom to top, and chute, combustion chamber and furnace The cleaning work on top is from top to bottom cleared up with air compressor machine, is finally pooled to the position of checker brick half, complete to complete liquidation Cheng Hou, then carry out putting for remaining half checker brick and build work with protection wall.
As shown in Figs 1-4: the construction method of above-mentioned down-regulation type tamping coke furnace regenerator lattice brick comprises the following specific steps that:
One, regenerative chamber masonry sequence:
After the completion of bottom flue is built with lower portion according to drawing, after the completion of lining brick, double-edged fine-toothed comb brick all correct masonry, store After hot cell wall builds 6 layers, start half dress grid brick masonry and the cleaning with industrial dust collector to regenerative chamber from the bottom to top.(such as Fig. 1 It is shown)
Waste, the chamotte on the metope built, double-edged fine-toothed comb brick must be cleared up with industrial dust collector before putting checker brick Completely, it just can be carried out first segment checker brick to put.
After the completion of first segment checker brick are put with regenerative chamber main wall, it is necessary to while the protective mulch of checker brick is carried out, with Mud is fallen into checker brick when exempting to build the preceding paragraph main wall again.Checker brick protective layer way is first along elongated one layer of the laying of checker brick Thick 10mm rubber slab, width 515mm as regenerative chamber width, blend compounds band is by rubber slab interface and rubber slab and silica brick wall Gap sealing between face.Again along the elongated laying 20mm thickness glued board of checker brick, width and regenerative chamber width one on rubber slab Sample 515mm is as protective layer.(as shown in Figure 2)
After the completion of the construction of first segment checker brick, after regenerative chamber main wall builds 6 layers again, the pendulum of second segment checker brick is carried out It puts.Waste, the chamotte on the metope built and checker brick protective layer must be cleaned out before putting checker brick every time, First lift first layer rubber slab protective layer, then waste, the chamotte particle on rubber slab is cleaned out with industrial dust collector, ability Next section of checker brick are carried out to put.Checker brick are laid with two layers of protective layer in aforementioned manners again and carry out finished product protection after having put.
When regenerative chamber is built to apart from regenerator top, there are also when 13 layers (1625mm), while checker brick are emitted into the 10th layer When (1280mm), the continuation of regenerative chamber wall is up built, and checker brick stopping is put.Remaining 14 layers of indwelling are all built to coke oven main body It is being put after completing blowing cleaning.(as shown in Figure 3)
By cokery side regenerator sealing wall, synchronous masonry is same to checker brick by drawing while each checker brick are put Sample height.
Two, lower blowing-out reason:
1, cleaning is carried out to chute mouth after the completion of building slope air course of coke, the cleaning of chute mouth divides two steps, and the first step is clear Reason: chute position must clear up the chute mouth that the same day is built after building daily, first use scuppit spade by chute mouth The mortar of interior extrusion is rooted out, and is disclosed in regenerative chamber, is then swept dust completely with besom;Second step cleaning: work as coke oven After the completion of masonry, secondary cleaning carried out to chute mouth to after having cleared up in flue with long shovel in furnace roof peephole, elder generation when cleaning With rake by chute mouth ash and sundries all rake off, then blower is put in and is put in chute mouth by flue, then is beaten Valve opening door is blowed, until cleaning out.
2, after combustion chamber is built to lower circulation port, sprinkle dry wood shavings in flue bottom prevents as separation layer It builds the mud that upper section combustion chamber is fallen and is sticked to flue bottom.With preprepared protective bag, one layer of chute mouth and coal are set The protective layer of tracheae brick.Vertical flame path protection-plate is placed when building in building process and cleans out the mortar fallen on protection board Flue carefully clears up flue brick wall using small flat chisel and besom after building daily.It is built across hole combustion chamber Chute mouth protective bag is taken out after building, then carries out the masonry of upper section.
The cleaning of reheating air channel, every layer of combustion chamber partition wall will keep off grey rubber swab before building and be put into reheating sky In air flue, finished to road wall masonry, then skin is extracted.After combustion chamber reheating air channel is built, stop building Reheating air channel is cleaned with compressed air, until cleaning out.
3, after the completion of furnace roof is built, primary top-down cleaning is carried out to entire coke oven.First by peephole brick wall On grey scar shovel fall, then fallen with the grey scar shovel of the small shovel flue wall of special lengthening and bottom, finally opposed with compressed air Cleaning is blowed in quirk, and waste and grey scar are cleared up by chute mouth to the pre-set checker brick protective layer of regenerative chamber.
Three, remaining half checker brick are put:
After the clean passed examination of complete liquidation in entire coke oven vertical flame path, pre-set checker brick protective layer will be fallen in On waste pack remove.Take out first layer bakelite plate protective layer, then by the waste on rubber layer, the industrial dust suction of chamotte particle Device is cleaned out, then rubber layer is taken out, and remaining checker brick are carried out by the way of moving back platform and are put.(as shown in Figure 4) is most laggard Row top half protection wall is built.

Claims (5)

1. a kind of construction method of down-regulation type tamping coke furnace regenerator lattice brick, it is characterised in that: regenerator lattice brick is preparatory It is filled to half height and protective mulch, the cleaning work at regenerative chamber position is cleared up with industrial dust collector from the bottom to top, and chute, The cleaning work of combustion chamber and furnace roof is from top to bottom cleared up with air compressor machine, is finally pooled to the position of checker brick half, to After the completion of complete liquidation, then carries out putting for remaining half checker brick and build work with protection wall.
2. a kind of construction method of down-regulation type tamping coke furnace regenerator lattice brick according to claim 1, it is characterised in that: The construction method of above-mentioned down-regulation type tamping coke furnace regenerator lattice brick, the specific steps are as follows:
1. after the completion of bottom flue is built with lower portion according to drawing, after the completion of lining brick, double-edged fine-toothed comb brick all correct masonry, accumulation of heat After room wall builds 6 floor, start half dress grid brick masonry;
2. covering multi-protective layer on it after the completion of first segment checker brick are put with regenerative chamber main wall;
3. after regenerative chamber main wall builds 6 layers again, putting for second segment checker brick is carried out after the completion of the construction of first segment checker brick, Lift first and just can be carried out putting for next section of checker brick after first layer protective layer, checker brick put after again with step 2. method It is laid with multi-protective layer and carries out finished product protection;
4. when regenerative chamber build to apart from regenerator top there are also at 13 layers, while when checker brick are emitted into the 10th layer, regenerative chamber Wall continuation is up built, and checker brick stopping is put, remaining 14 layers of indwelling to coke oven main body are all built complete blowing cleaning after It is put;
5. carrying out lower blowing-out reason:
A. cleaning is carried out to chute mouth after the completion of building slope air course of coke, chute position first must be right after building daily The chute mouth that the same day is built is cleared up, then after the completion of coke furnace building, in furnace roof peephole with long shovel in flue Secondary cleaning is carried out to chute mouth after having cleared up;
B. after combustion chamber is built to lower circulation port, separation layer is spread in flue bottom, then one layer of chute mouth and coal gas are set The protective layer of pipe brick is placed vertical flame path protection-plate when building in building process and is cleaned out the mortar fallen on protection board vertical Quirk clears up flue brick wall after building daily, protects chute mouth after final combustion chamber spanning hole masonry Sheath takes out, then carries out the masonry of upper section;
C. to the cleaning of combustion chamber reheating air channel;
D. after the completion of furnace roof is built, cleaning from top to bottom is carried out with air compressor machine to entire coke oven;
6. remaining half checker brick are put: after the clean passed examination of complete liquidation in entire coke oven vertical flame path, successively taking out Then protective layer carries out remaining checker brick by the way of moving back platform and puts, finally carry out top half protection wall masonry again.
3. a kind of construction method of down-regulation type tamping coke furnace regenerator lattice brick according to claim 1, it is characterised in that: The protective layer of above-mentioned first segment checker brick include along the elongated laying of checker brick one layer of rubber slab and be laid on the rubber slab Glued board.
4. a kind of construction method of down-regulation type tamping coke furnace regenerator lattice brick according to claim 1, it is characterised in that: Above-mentioned rubber slab with a thickness of 10mm, width and regenerative chamber it is of same size be 515mm.
5. a kind of construction method of down-regulation type tamping coke furnace regenerator lattice brick according to claim 1, it is characterised in that: Above-mentioned glued board with a thickness of 20mm, width and regenerative chamber it is of same size be 515mm.
CN201811298385.9A 2018-11-02 2018-11-02 Construction method of downward-adjusting stamping coke oven regenerator checker bricks Active CN109575956B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811298385.9A CN109575956B (en) 2018-11-02 2018-11-02 Construction method of downward-adjusting stamping coke oven regenerator checker bricks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811298385.9A CN109575956B (en) 2018-11-02 2018-11-02 Construction method of downward-adjusting stamping coke oven regenerator checker bricks

Publications (2)

Publication Number Publication Date
CN109575956A true CN109575956A (en) 2019-04-05
CN109575956B CN109575956B (en) 2024-09-06

Family

ID=65921157

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811298385.9A Active CN109575956B (en) 2018-11-02 2018-11-02 Construction method of downward-adjusting stamping coke oven regenerator checker bricks

Country Status (1)

Country Link
CN (1) CN109575956B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111440620A (en) * 2020-03-25 2020-07-24 五冶集团上海有限公司 Method for repairing carbonization chamber of coke oven after overall shutdown
CN111718732A (en) * 2020-06-30 2020-09-29 中冶天工集团有限公司 Masonry structure of coke oven assisted by polyethylene film and construction method thereof
CN112457869A (en) * 2019-09-06 2021-03-09 中国五冶集团有限公司 Method for repairing regenerative chamber after coke oven integral shutdown
CN113403089A (en) * 2021-05-25 2021-09-17 中国一冶集团有限公司 Ash isolating device for construction of checker bricks of heat storage chamber of coke oven
CN114806611A (en) * 2022-04-19 2022-07-29 中国一冶集团有限公司 Dust cleaning device for checker bricks of coke oven regenerator

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103509565A (en) * 2012-06-20 2014-01-15 五冶集团上海有限公司 Cleaning and protection method of chute above parts of large-scale coke oven in construction process
CN104927882A (en) * 2015-05-21 2015-09-23 中冶天工集团有限公司 Down-regulated 7m coke oven regenerator masonry method
JP2016222758A (en) * 2015-05-27 2016-12-28 黒崎播磨株式会社 Method for constructing coke oven
CN206359465U (en) * 2016-11-11 2017-07-28 中冶焦耐(大连)工程技术有限公司 A kind of coke oven regenerator tolerance distributes adjustment structure
CN107418600A (en) * 2016-05-24 2017-12-01 五冶集团上海有限公司 A kind of capacity coke oven combustion chamber flue bottom purge method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103509565A (en) * 2012-06-20 2014-01-15 五冶集团上海有限公司 Cleaning and protection method of chute above parts of large-scale coke oven in construction process
CN104927882A (en) * 2015-05-21 2015-09-23 中冶天工集团有限公司 Down-regulated 7m coke oven regenerator masonry method
JP2016222758A (en) * 2015-05-27 2016-12-28 黒崎播磨株式会社 Method for constructing coke oven
CN107418600A (en) * 2016-05-24 2017-12-01 五冶集团上海有限公司 A kind of capacity coke oven combustion chamber flue bottom purge method
CN206359465U (en) * 2016-11-11 2017-07-28 中冶焦耐(大连)工程技术有限公司 A kind of coke oven regenerator tolerance distributes adjustment structure

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112457869A (en) * 2019-09-06 2021-03-09 中国五冶集团有限公司 Method for repairing regenerative chamber after coke oven integral shutdown
CN111440620A (en) * 2020-03-25 2020-07-24 五冶集团上海有限公司 Method for repairing carbonization chamber of coke oven after overall shutdown
CN111718732A (en) * 2020-06-30 2020-09-29 中冶天工集团有限公司 Masonry structure of coke oven assisted by polyethylene film and construction method thereof
CN113403089A (en) * 2021-05-25 2021-09-17 中国一冶集团有限公司 Ash isolating device for construction of checker bricks of heat storage chamber of coke oven
CN114806611A (en) * 2022-04-19 2022-07-29 中国一冶集团有限公司 Dust cleaning device for checker bricks of coke oven regenerator
CN114806611B (en) * 2022-04-19 2023-08-29 中国一冶集团有限公司 Dust cleaning device for checker bricks of coke oven regenerator

Also Published As

Publication number Publication date
CN109575956B (en) 2024-09-06

Similar Documents

Publication Publication Date Title
CN109575956A (en) A kind of construction method of down-regulation type tamping coke furnace regenerator lattice brick
CN100529016C (en) Method for retaining cleaning of 7.63m coke oven in building process
CN106753449B (en) A method of cleaning coke oven chute
CN109666487A (en) A kind of closing of coke oven and ventilating dust-arrester and method
CN103374357B (en) Method for building cellular regenerative chamber of coke oven
WO2023115722A1 (en) Intelligent movable dust removal device for mining and control method
CN104927882A (en) Down-regulated 7m coke oven regenerator masonry method
CN110117494A (en) A kind of method for cleaning of 5.5 meters of tamping coke furnaces chute mouth tamper
CN101104809B (en) Coal feeding and coke extracting two-in-one earth station dust removing system for coke oven
CN109021988A (en) The totally-enclosed coke oven smoke collection system of the collateral support of one kind and loss flue dust collecting method
CN101509051A (en) Building and supporting method for semiring brick on hoogoven's warm-air duct inside lining
CN106032469A (en) Coke oven regenerative chamber checker brick on-line replacing method
CN204461115U (en) A kind of environmental protection flue structure with automatic cleaning function
CN103509565B (en) Cleaning and protection method of chute above parts of large-scale coke oven in construction process
CN107987853A (en) Smoke-guiding car and tamping coke furnace lead dust collection system
CN208104288U (en) The furnace wall that coke furnace carbonization chamber carries out in production repairs Special combined tools
WO2011111518A1 (en) Method for repairing coke oven
CN108277025A (en) The furnace wall method for repairing and mending and Special combined tools that coke furnace carbonization chamber carries out in production
CN203177188U (en) Movable and adjustable deashing device of silicon iron heat furnace waste heat boiler
CN201074220Y (en) Supporting device for vertical flue shielding plate
CN205340381U (en) Preheating -type sack cleaner
CN211771071U (en) Coke oven seals high-efficient gas collection structure
CN203878096U (en) Built-in smoke guide channel for coke oven and coke oven using same
CN104673335B (en) Stepped heat storage co-firing chamber smoke suppressing energy saving vehicle
CN209509588U (en) A kind of coke oven integrally closed greenhouse

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant