CN109560545A - A kind of energy storage battery system applied to the standby electricity service of communications equipment room and standby method for electrically - Google Patents

A kind of energy storage battery system applied to the standby electricity service of communications equipment room and standby method for electrically Download PDF

Info

Publication number
CN109560545A
CN109560545A CN201811499917.5A CN201811499917A CN109560545A CN 109560545 A CN109560545 A CN 109560545A CN 201811499917 A CN201811499917 A CN 201811499917A CN 109560545 A CN109560545 A CN 109560545A
Authority
CN
China
Prior art keywords
energy
storage battery
battery group
load
daily
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811499917.5A
Other languages
Chinese (zh)
Inventor
王昭林
黎康
彭建辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hu'nan Fengri Power And Electric Co Ltd
Original Assignee
Hu'nan Fengri Power And Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hu'nan Fengri Power And Electric Co Ltd filed Critical Hu'nan Fengri Power And Electric Co Ltd
Priority to CN201811499917.5A priority Critical patent/CN109560545A/en
Publication of CN109560545A publication Critical patent/CN109560545A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/008Circuit arrangements for ac mains or ac distribution networks involving trading of energy or energy transmission rights
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/44Methods for charging or discharging
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/02Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries for charging batteries from ac mains by converters
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/50The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2310/56The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
    • H02J2310/62The condition being non-electrical, e.g. temperature
    • H02J2310/64The condition being economic, e.g. tariff based load management
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Abstract

The present invention relates to a kind of energy storage battery systems applied to the standby electricity service of communications equipment room, including energy-storage battery group, battery management system, energy storage monitor system.The invention further relates to a kind of standby method for electrically based on above-mentioned energy storage battery system, the energy-storage battery group completes 1 charge and discharge cycles daily, complete the process that battery charges during battery discharge, the low electricity price of low-valley interval during peak period high electricity price, the daily actual discharge depth of energy-storage battery group is about 50%, other 50% electricity ensures that load standby in 15 minutes ensures the time in mains failure.The method of the present invention carries out echelon charge and discharge according to the peak of electricity consumption and low ebb rule, using the energy-storage battery group of large capacity, to realize that it is best with economic benefit that battery makes full use of.

Description

A kind of energy storage battery system applied to the standby electricity service of communications equipment room and standby method for electrically
Technical field
The invention belongs to battery energy storage technical fields, and in particular to a kind of energy storage storage applied to the standby electricity service of communications equipment room Battery system and standby method for electrically.
Background technique
Commercial power peak period and night low ebb electricity price gap are huge, and general electricity price gap is about 0.8~1.0 yuan/degree, This enters market for energy storage and lays a good foundation.By serving as uninterruptible power supply in peak period and being powered with energy-storage battery, It is charged the battery in the ebb period, peak load cutting is realized with this, reduce power grid peak load, realize data center The effect of machine room energy-saving emission reduction.The construction cost of energy-storage battery is disposable big cost input, uses depreciation year by year and uses year Limit should have grid electricity fee cost to compare, and remain to generate huge economic benefit, therefore energy-storage battery project construction is allowed to be possibly realized, and And the using effect and service life of battery are put forward higher requirements, to ensure the minimum of use cost.
Number of patent application is 201710448726.5, patent name is " the standby electricity of energy storage for data center machine room construction The application for a patent for invention of service system " discloses a kind of standby electric service system of the energy storage for data center machine room construction, including Cell array, Modular UPS unit and Capacity Management unit;Cell array stores by Modular UPS unit and discharges number According to energy needed for central machine room operating;Energy management unit monitors the working condition of cell array, obtains and according to cell array The residual electric quantity of column sends park instruction, electric discharge instruction or charging instruction to Modular UPS unit;Modular UPS unit root According to the flat period setting cell array of the peak valley of user locality charging and discharging state in different time periods and charging time, in alternating current In the case where power failure, cell array powering mode is automatically switched to, meanwhile, it is instructed and is controlled according to energy management unit Cell array is in discharge condition, stops electric discharge or charged state.When present invention aims at reducing data center machine room peak electricity Between section the electricity charge, reduce data center machine room operation cost, realize the energy-saving and emission-reduction of data center machine room.
Summary of the invention
The purpose of the invention is to overcome the deficiencies of the prior art and provide a kind of to be served by for electricity in communications equipment room New energy storage battery system and standby method for electrically.
The present invention is achieved by the following technical programs:
A kind of energy storage battery system applied to the standby electricity service of communications equipment room, including energy-storage battery group, battery management system, storage It can monitoring system.
Energy-storage battery group: for storing electric energy, load supplying into communications equipment room, the energy-storage battery group is by 2V great Rong Measure battery composition.
Battery management system: for acquiring battery operation parameter, including monomer voltage, temperature, battery voltage, electric current letter Breath realizes that balanced management and battery remaining power calculate.
Energy storage monitor system: all kinds of operating parameters for collecting data center computer room energy storage and backup power supply system, including battery work Make the fault warning information of parameter, Alternating Current Power Supply parameter, network load parameter, building environment parameter and power-supply device, and leads to Data analysis is crossed, adjusts the charge-discharge parameter of energy-storage battery in real time.
A kind of standby method for electrically based on above-mentioned energy storage battery system, it is characterised in that: the energy-storage battery group is complete daily At 1 charge and discharge cycles, that is, complete the battery charging during battery discharge, the low electricity price of low-valley interval during peak period high electricity price Process, the daily actual discharge depth (DOD) of energy-storage battery group is about 50%, and in addition 50% electricity is in mains failure situation Under, ensure that load standby in 15 minutes ensures the time.
Further, daily 00:00~08:00 powers to the load, while charging to energy-storage battery group;Daily 08:00~ 12:00, fractional load are powered by mains-supplied, another part load by energy-storage battery group, and energy-storage battery group discharge time is 4h; Daily 12:00~17:00, all load is stood 5h, is not charged, do not discharged by mains-supplied, energy-storage battery group;Daily 17:00 ~21:00, by mains-supplied, another part load is powered by energy-storage battery group for fractional load, and energy-storage battery group discharge time is 4h;Daily 21:00~00:00, all load is stood 3h, is not charged, do not discharged by mains-supplied, energy-storage battery group;If met It to mains failure, is then discharged by energy-storage battery group, ensures load uninterrupted power supply.
Further, daily 08:00~12:00, by mains-supplied, 50% load is supplied by energy-storage battery group for 50% load Electricity, energy-storage battery group discharge time are 4h.
Further, daily 17:00~21:00, by mains-supplied, 50% load is supplied by energy-storage battery group for 50% load Electricity, energy-storage battery group discharge time are 4h.
Beneficial effects of the present invention are as follows:
A kind of energy storage battery system applied to the standby electricity service of communications equipment room of the present invention, including energy-storage battery group, battery management System, energy storage monitor system, battery group is more reliable using operational process, and energy storage battery group carries out standby electricity to communications equipment room When service, implement new technical method.In order to reach better business efficiency, the energy-storage battery group completes 1 charge and discharge daily Electricity circulation, that is, complete the process that battery charges during battery discharge, the low electricity price of low-valley interval during peak period high electricity price, institute Stating the daily actual discharge depth (DOD) of energy-storage battery group is about 50%, and in addition 50% electricity ensures load in mains failure Standby in 15 minutes ensures the time.The method of the present invention is according to the peak of electricity consumption and low ebb rule, using the energy-storage battery group of large capacity Echelon charge and discharge are carried out, to realize that it is best with economic benefit that battery makes full use of.
Specific embodiment
The invention will be further described combined with specific embodiments below, it is clear that described embodiment is only this The section Example of invention, rather than whole embodiments.
Battery energy storage system (power station) mainly has energy-storage battery group (Battery pack), battery management system (BMS), storage The components such as energy monitoring system (EMS) composition.
Energy-storage battery group: the load supplying for storing electric energy, into communications equipment room.The energy-storage battery group need to have peace The features such as Quan Xing, efficiency height, performance stable and consistent, long-life generally use 2V large capacity series energy-storage battery, such as 2V800Ah ~2V 2000Ah.
Battery management system (BMS): acquisition battery operation parameter, including monomer voltage, temperature, battery voltage, electric current Etc. information, realize that balanced management and battery remaining power calculate (SOC) and Gernral Check-up (SOH).
Energy storage monitor system (EMS): all kinds of operating parameters of data center computer room energy storage and backup power supply system, including battery work are collected Make the information such as the fault warning of parameter, Alternating Current Power Supply parameter, network load parameter, building environment parameter and power-supply device, and By big data analysis, the charge-discharge parameter of energy-storage battery is adjusted in real time.
By taking certain city mobile data center as an example, for battery arrangement two blocks, battery pack quantity is respectively 28 groups and 42 Group, amounting to number of batteries is 9120,2V800Ah battery, 7680,2V1000Ah battery (nearly 30,000 KVAh altogether), UPS quantity 70 Set, 70 sets of BMS management system, 2 sets of EMS monitoring system.
A kind of standby method for electrically based on above-mentioned energy storage battery system, the energy-storage battery group complete 1 charge and discharge daily Circulation completes the process that battery charges during battery discharge, the low electricity price of low-valley interval during peak period high electricity price, described The daily actual discharge depth (DOD) of energy-storage battery group is about 50%, and in addition 50% electricity ensures load 15 in mains failure Minute standby ensures the time.
The charge and discharge according to the form below of the energy-storage battery group carries out:
The present invention provides a kind of energy storage battery system applied to the standby electricity service of communications equipment room and standby method for electrically, specific implementations There are many technical solution of the invention, and embodiment described above is only the preferred embodiment of the present invention.It should be pointed out that for this skill For the those of ordinary skill in art field, under the premise of not departing from technical solution of the present invention, can also make it is several improvement and Modification, these improvement and modification also should be regarded as protection scope of the present invention, each component part being not known in the present embodiment It is realized with the prior art.

Claims (5)

1. a kind of energy storage battery system applied to the standby electricity service of communications equipment room, which is characterized in that including energy-storage battery group, electricity Pond management system, energy storage monitor system;
Energy-storage battery group: for storing electric energy, load supplying into communications equipment room, the energy-storage battery group is by 2V large capacity electricity Pond composition;
Battery management system: for acquiring battery operation parameter, including monomer voltage, temperature, battery voltage, current information, Realize that balanced management and battery remaining power calculate;
Energy storage monitor system: all kinds of operating parameters for collecting data center computer room energy storage and backup power supply system, including battery work ginseng The fault warning information of number, Alternating Current Power Supply parameter, network load parameter, building environment parameter and power-supply device, and pass through number According to analysis, the charge-discharge parameter of energy-storage battery is adjusted in real time.
2. a kind of standby method for electrically based on above-mentioned energy storage battery system, it is characterised in that: the energy-storage battery group completes 1 daily A charge and discharge cycles complete the battery charging during battery discharge, the low electricity price of low-valley interval during peak period high electricity price Process, the daily actual discharge depth (DOD) of energy-storage battery group is about 50%, in addition 50% electricity in mains failure, Ensure that load standby in 15 minutes ensures the time.
3. the standby method for electrically according to claim 2 based on above-mentioned energy storage battery system, it is characterised in that: daily 00: 00~08:00 powers to the load, while charging to energy-storage battery group;Daily 08:00~12:00, fractional load by mains-supplied, Another part load is powered by energy-storage battery group, and energy-storage battery group discharge time is 4h;Daily 12:00~17:00, all loads By mains-supplied, energy-storage battery group stands 5h, does not charge, do not discharge;Daily 17:00~21:00, fractional load are supplied by alternating current Electricity, another part load are powered by energy-storage battery group, and energy-storage battery group discharge time is 4h;Daily 21:00~00:00, all Load is stood 3h, is not charged, do not discharged by mains-supplied, energy-storage battery group;If encountering mains failure, by energy-storage battery group Electric discharge ensures load uninterrupted power supply.
4. the standby method for electrically according to claim 3 based on above-mentioned energy storage battery system, it is characterised in that: daily 08: 00~12:00, by mains-supplied, 50% load is powered by energy-storage battery group for 50% load, and energy-storage battery group discharge time is 4h。
5. the standby method for electrically according to claim 3 based on above-mentioned energy storage battery system, it is characterised in that: daily 17: 00~21:00, by mains-supplied, 50% load is powered by energy-storage battery group for 50% load, and energy-storage battery group discharge time is 4h。
CN201811499917.5A 2018-12-10 2018-12-10 A kind of energy storage battery system applied to the standby electricity service of communications equipment room and standby method for electrically Pending CN109560545A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811499917.5A CN109560545A (en) 2018-12-10 2018-12-10 A kind of energy storage battery system applied to the standby electricity service of communications equipment room and standby method for electrically

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811499917.5A CN109560545A (en) 2018-12-10 2018-12-10 A kind of energy storage battery system applied to the standby electricity service of communications equipment room and standby method for electrically

Publications (1)

Publication Number Publication Date
CN109560545A true CN109560545A (en) 2019-04-02

Family

ID=65869498

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811499917.5A Pending CN109560545A (en) 2018-12-10 2018-12-10 A kind of energy storage battery system applied to the standby electricity service of communications equipment room and standby method for electrically

Country Status (1)

Country Link
CN (1) CN109560545A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110797598A (en) * 2019-09-26 2020-02-14 双登集团股份有限公司 Charge and discharge control strategy and method for lead-carbon energy storage battery for power frequency modulation
CN113078668A (en) * 2021-06-04 2021-07-06 深圳市普禄科智能检测设备有限公司 Method, system, equipment and storage medium for realizing demand side response virtual power station
CN113839423A (en) * 2020-06-24 2021-12-24 中兴通讯股份有限公司 Control management method, device, equipment and storage medium
CN113922458A (en) * 2021-10-20 2022-01-11 深圳市灵适智慧能源有限公司 Flexibly-configurable storage integrated battery control method and system
CN114865752A (en) * 2022-07-05 2022-08-05 广东采日能源科技有限公司 Charging and discharging control method and control device for energy storage equipment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103337869A (en) * 2013-07-17 2013-10-02 国家电网公司 Novel battery energy-storage system and function integration designing method thereof
CN107332266A (en) * 2017-08-25 2017-11-07 浙江南都电源动力股份有限公司 User side energy-accumulating power station and its application model
CN107437847A (en) * 2017-06-14 2017-12-05 浙江南都电源动力股份有限公司 Energy storage for data center machine room construction is for electric service system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103337869A (en) * 2013-07-17 2013-10-02 国家电网公司 Novel battery energy-storage system and function integration designing method thereof
CN107437847A (en) * 2017-06-14 2017-12-05 浙江南都电源动力股份有限公司 Energy storage for data center machine room construction is for electric service system
CN107332266A (en) * 2017-08-25 2017-11-07 浙江南都电源动力股份有限公司 User side energy-accumulating power station and its application model

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110797598A (en) * 2019-09-26 2020-02-14 双登集团股份有限公司 Charge and discharge control strategy and method for lead-carbon energy storage battery for power frequency modulation
CN110797598B (en) * 2019-09-26 2022-07-26 双登集团股份有限公司 Charge-discharge control method for lead-carbon energy storage battery for power frequency modulation
CN113839423A (en) * 2020-06-24 2021-12-24 中兴通讯股份有限公司 Control management method, device, equipment and storage medium
CN113839423B (en) * 2020-06-24 2024-01-02 中兴通讯股份有限公司 Control management method, device, equipment and storage medium
CN113078668A (en) * 2021-06-04 2021-07-06 深圳市普禄科智能检测设备有限公司 Method, system, equipment and storage medium for realizing demand side response virtual power station
CN113078668B (en) * 2021-06-04 2021-09-03 深圳市普禄科智能检测设备有限公司 Method, system, equipment and storage medium for realizing demand side response virtual power station
CN113922458A (en) * 2021-10-20 2022-01-11 深圳市灵适智慧能源有限公司 Flexibly-configurable storage integrated battery control method and system
CN113922458B (en) * 2021-10-20 2024-03-12 深圳市福光动力通信设备有限公司 Flexible-configuration storage integrated battery control method and system
CN114865752A (en) * 2022-07-05 2022-08-05 广东采日能源科技有限公司 Charging and discharging control method and control device for energy storage equipment

Similar Documents

Publication Publication Date Title
CN109560545A (en) A kind of energy storage battery system applied to the standby electricity service of communications equipment room and standby method for electrically
CN107144796B (en) Feedback type storage battery pack nuclear capacity discharging device and application method
CN103199564A (en) Intelligent power grid distributed self-supporting photovoltaic power supply system
CN207184068U (en) A kind of grid-connected integrated optical photovoltaic generating system of residents off-network
CN110098630A (en) Energy storage for power supply system and energy storage for power supply case
CN103580052B (en) A kind of composite energy storage power station for active distribution network and distribution method thereof
CN202076821U (en) Lithium iron phosphate battery emergency power supply system and battery charge-discharge management system
CN110570047A (en) user side energy storage capacity configuration system and method
CN202888862U (en) Energy storage inverter suitable for distributed new energy power
CN104950262A (en) Charge-discharge test system
CN110380506A (en) A kind of distributed multiple-connected battery system for prefabricated cabin formula unit equipment
CN207884316U (en) A kind of equipment extending base station storage batteries discharge time
CN202206168U (en) Lithium ion battery energy storage system
CN210297268U (en) Hybrid energy storage system for thermal power combined AGC frequency modulation
CN206272263U (en) New and old intelligent accummulator uses device with
CN104617652A (en) Battery supply device of portable terminal
CN209329762U (en) A kind of and energy storage and uninterruptible power supply system
CN107171433A (en) A kind of power supply device, method of supplying power to and a kind of server
CN204271668U (en) A kind of solar cell charge-discharge controller
CN214590627U (en) Uninterrupted power supply with peak clipping, valley filling and quick charging functions
CN102856977A (en) Solar uninterrupted power system based on serial peripheral interface (SPI)
CN214626379U (en) High efficiency charge-discharge energy storage control system
CN214756142U (en) Household solar power generation storage management system
CN209709738U (en) A kind of power supply system based on more solar panels and more rechargeable batteries
CN211655753U (en) Direct-current energy storage backup power supply applied to base station

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190402

WD01 Invention patent application deemed withdrawn after publication