CN110098630A - Energy storage for power supply system and energy storage for power supply case - Google Patents

Energy storage for power supply system and energy storage for power supply case Download PDF

Info

Publication number
CN110098630A
CN110098630A CN201910498705.3A CN201910498705A CN110098630A CN 110098630 A CN110098630 A CN 110098630A CN 201910498705 A CN201910498705 A CN 201910498705A CN 110098630 A CN110098630 A CN 110098630A
Authority
CN
China
Prior art keywords
energy storage
power supply
grid
supply system
terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910498705.3A
Other languages
Chinese (zh)
Inventor
申望屏
张华农
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Center Power Tech Co Ltd
Original Assignee
Shenzhen Center Power Tech Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Center Power Tech Co Ltd filed Critical Shenzhen Center Power Tech Co Ltd
Priority to CN201910498705.3A priority Critical patent/CN110098630A/en
Publication of CN110098630A publication Critical patent/CN110098630A/en
Priority to PCT/CN2019/105718 priority patent/WO2020248415A1/en
Pending legal-status Critical Current

Links

Classifications

    • H—ELECTRICITY
    • H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00—Circuit arrangements for AC mains or AC distribution networks
    • H02J3/28—Arrangements for balancing of the load in networks by storage of energy
    • H02J3/32—Arrangements for balancing of the load in networks by storage of energy using batteries or super capacitors with converting means
    • H—ELECTRICITY
    • H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00—Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network
    • H02J13/10—Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network characterised by displaying of information or by user interaction, e.g. supervisory control and data acquisition [SCADA] systems
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00—Systems supporting electrical power generation, transmission or distribution
    • Y04S10/14—Energy storage units
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00—Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/126—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wireless data transmission

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本申请涉及一种储能供电系统,包括:储能装置、储能管理装置、双向换流装置、储能监控终端以及设置在电网控制中心的储能监控后台设备。储能装置和双向换流装置的直流端电连接,双向换流装置的交流端用于接入电网,储能装置和储能管理装置电连接,储能监控终端分别与储能管理装置、双向换流装置以及储能监控后台设备通信连接。通过储能管理装置和双向换流装置上报储能状态信息和换流状态信息,并由储能监控终端和储能监控后台设备实时判断充放电需求,控制储能装置充放电。当电网负荷高时,可稳定为电网提供额外电能,保障电力供应和电网安全运行;在电网负荷低时,自动进行充电,完成电能储备,充分利用电网剩余电力,节能环保,稳定可靠。

The present application relates to an energy storage power supply system, including: an energy storage device, an energy storage management device, a bidirectional converter, an energy storage monitoring terminal, and an energy storage monitoring background device installed in a grid control center. The DC terminal of the energy storage device is electrically connected to the bidirectional converter device, the AC terminal of the bidirectional converter device is used to connect to the power grid, the energy storage device is electrically connected to the energy storage management device, and the energy storage monitoring terminal is connected to the energy storage management device and the bidirectional converter respectively. The converter device and the energy storage monitoring background equipment are connected by communication. The energy storage status information and commutation status information are reported through the energy storage management device and the bidirectional converter device, and the energy storage monitoring terminal and the energy storage monitoring background equipment judge the charging and discharging requirements in real time, and control the charging and discharging of the energy storage device. When the load of the grid is high, it can stably provide extra power for the grid to ensure power supply and safe operation of the grid; when the load of the grid is low, it will automatically charge, complete the power reserve, and make full use of the remaining power of the grid, which is energy-saving, environmentally friendly, stable and reliable.

Description

储能供电系统和储能供电箱Energy storage power supply system and energy storage power supply box

技术领域technical field

本申请涉及电力技术领域,特别是涉及一种储能供电系统和储能供电箱。The present application relates to the field of electric power technology, in particular to an energy storage power supply system and an energy storage power supply box.

背景技术Background technique

随着经济的发展,人民物质生活水平的提高,电网用电负荷也在逐步增长。在冬夏两季,因为居民的取暖和降温需求时间段集中,日用电负荷的波动非常大。为在用电负荷的峰值期尽量保证居民用电供给,传统技术中增加风力、太阳能等可再生能源辅助供电分担配电站的供电负荷。With the development of the economy and the improvement of people's material living standards, the electricity load of the power grid is also gradually increasing. In winter and summer, because the heating and cooling needs of residents are concentrated in time periods, the daily electricity load fluctuates greatly. In order to ensure the power supply of residents as much as possible during the peak period of electricity load, traditional technology adds wind power, solar energy and other renewable energy auxiliary power supply to share the power supply load of distribution stations.

然而,在实现过程中,发明人发现传统技术中至少存在如下问题:风电、太阳能等可再生能源具有随机性和间歇性,很难在用电负荷的高峰期为电网提供稳定匹配的辅助电能,当可再生能源供给过少,则导致居民用电供给不足;当可再生能源供给过多,电网系统安全可能会受到影响,而且也会造成能源浪费。However, during the implementation process, the inventors found that there are at least the following problems in the traditional technology: wind power, solar energy and other renewable energy sources are random and intermittent, and it is difficult to provide stable matching auxiliary power for the grid during the peak period of power load. When the supply of renewable energy is too small, it will lead to insufficient supply of electricity for residents; when the supply of renewable energy is too large, the security of the power grid system may be affected, and it will also cause energy waste.

发明内容Contents of the invention

基于此,有必要针对上述技术问题,提供一种储能供电系统和储能供电箱。Based on this, it is necessary to provide an energy storage power supply system and an energy storage power supply box for the above technical problems.

一方面,本发明实施例提供一种储能供电系统,包括:储能装置、储能管理装置、双向换流装置、储能监控终端以及设置在电网控制中心的储能监控后台设备;On the one hand, an embodiment of the present invention provides an energy storage power supply system, including: an energy storage device, an energy storage management device, a bidirectional converter device, an energy storage monitoring terminal, and an energy storage monitoring background device installed in a power grid control center;

储能装置和双向换流装置的直流端电连接,双向换流装置的交流端用于接入电网,储能装置和储能管理装置电连接,储能监控终端分别与储能管理装置、双向换流装置以及储能监控后台设备通信连接;The DC terminal of the energy storage device is electrically connected to the bidirectional converter device, the AC terminal of the bidirectional converter device is used to connect to the power grid, the energy storage device is electrically connected to the energy storage management device, and the energy storage monitoring terminal is connected to the energy storage management device and the bidirectional converter respectively. Communication connection between converter device and energy storage monitoring background equipment;

储能管理装置,用于监测储能装置的运行状态,将储能状态信息发送至储能监控终端,并从储能监控终端接收充放电指令,控制储能装置充放电;储能状态信息标示储能装置的运行状态;The energy storage management device is used to monitor the operating status of the energy storage device, send the energy storage status information to the energy storage monitoring terminal, and receive charging and discharging instructions from the energy storage monitoring terminal, and control the charging and discharging of the energy storage device; the energy storage status information is marked The operating status of the energy storage device;

储能监控终端,用于将接收的换流状态信息和储能状态信息转发至储能监控后台设备,并从储能监控后台设备接收充放电信息,根据充放电信息,发送充放电指令至储能监控终端;换流状态信息表示双向换流装置的运行状态。The energy storage monitoring terminal is used to forward the received commutation status information and energy storage status information to the energy storage monitoring background equipment, receive charging and discharging information from the energy storage monitoring background equipment, and send charging and discharging instructions to the storage equipment according to the charging and discharging information. The terminal can be monitored; the commutation status information indicates the running status of the bidirectional converter device.

在其中一个实施例中,还包括温控装置,温控装置用于检测储能装置的温度,并控制储能装置的温度在一定范围内。In one of the embodiments, a temperature control device is also included, and the temperature control device is used to detect the temperature of the energy storage device and control the temperature of the energy storage device within a certain range.

在其中一个实施例中,温控装置包括温度检测模块和灭火装置,温控检测模块连接灭火装置,用于当储能装置的温度高于阈值时启动灭火装置。In one embodiment, the temperature control device includes a temperature detection module and a fire extinguishing device, and the temperature control detection module is connected to the fire extinguishing device for activating the fire extinguishing device when the temperature of the energy storage device is higher than a threshold.

在其中一个实施例中,储能装置包括多个并联的电池组,电池组并联后与双向换流装置的直流端电连接。In one embodiment, the energy storage device includes a plurality of battery packs connected in parallel, and the battery packs are electrically connected to the DC terminal of the bidirectional converter device after being connected in parallel.

在其中一个实施例中,还包括直流汇流装置,直流汇流装置一端与各电池组电连接,另一端与双向换流装置的直流端电连接。In one of the embodiments, it further includes a DC converging device, one end of the DC converging device is electrically connected to each battery pack, and the other end is electrically connected to the DC terminal of the bidirectional converter device.

在其中一个实施例中,电池组包括多个串联的磷酸铁电池。In one embodiment, the battery pack includes a plurality of iron phosphate cells connected in series.

在其中一个实施例中,还包括绝缘检测装置,绝缘检测装置分别电连接储能装置和储能管理装置电连接。In one of the embodiments, an insulation detection device is further included, and the insulation detection device is electrically connected to the energy storage device and the energy storage management device respectively.

在其中一个实施例中,储能监控终端和储能后台设备通过无线公网通信连接;储能监控终端分别通过以太网或LAN总线连接储能管理装置和双向换流装置。In one of the embodiments, the energy storage monitoring terminal and the energy storage background equipment are connected through wireless public network communication; the energy storage monitoring terminal is respectively connected to the energy storage management device and the bidirectional converter device through Ethernet or LAN bus.

在其中一个实施例中,储能状态信息包括剩余电量、第一状态信息;第一状态信息指示储能装置处于正常或异常状态;In one of the embodiments, the energy storage state information includes remaining power and first state information; the first state information indicates that the energy storage device is in a normal or abnormal state;

储能监控后台设备用于,获取当前电网负荷,根据当前电网负荷、剩余电量、第一状态信息和换流状态信息,确定充放电信息,并发送至储能监控终端。The energy storage monitoring background equipment is used to obtain the current grid load, determine the charging and discharging information according to the current grid load, remaining power, first state information and commutation state information, and send it to the energy storage monitoring terminal.

另一方面,本发明实施例还提供一种储能供电箱,包括箱体和上述的储能供电系统,储能供电系统设置于箱体内。On the other hand, an embodiment of the present invention also provides an energy storage power supply box, including a box body and the above-mentioned energy storage power supply system, and the energy storage power supply system is arranged in the box body.

上述储能供电系统和储能供电箱,通过储能管理装置和双向换流装置上报储能状态信息和换流状态信息,并由储能监控终端和储能监控后台设备实时判断充放电需求,控制储能装置充放电。当电网负荷高时,可稳定为电网提供额外电能,保障电力供应和电网安全运行;在电网负荷低时,自动进行充电,完成电能储备,充分利用电网剩余电力,节能环保,稳定可靠。The energy storage power supply system and the energy storage power supply box above report energy storage status information and commutation status information through the energy storage management device and the bidirectional converter device, and the energy storage monitoring terminal and the energy storage monitoring background equipment judge the charging and discharging requirements in real time, Control the charge and discharge of the energy storage device. When the load of the grid is high, it can stably provide extra power for the grid to ensure power supply and safe operation of the grid; when the load of the grid is low, it will automatically charge, complete the power reserve, and make full use of the remaining power of the grid, which is energy-saving, environmentally friendly, stable and reliable.

附图说明Description of drawings

通过附图中所示的本发明的优选实施例的更具体说明,本发明的上述及其它目的、特征和优势将变得更加清晰。在全部附图中相同的附图标记指示相同的部分,且并未刻意按实际尺寸等比例缩放绘制附图,重点在于示出本发明的主旨。The above and other objects, features and advantages of the present invention will become more apparent by a more particular description of preferred embodiments of the present invention shown in the accompanying drawings. The same reference numerals designate the same parts throughout the drawings, and the drawings are not intentionally scaled to actual size and the emphasis is on illustrating the gist of the present invention.

图1为一个实施例中储能供电系统的结构示意图;Fig. 1 is a schematic structural diagram of an energy storage power supply system in an embodiment;

图2为另一个实施例中储能供电系统的结构示意图;Fig. 2 is a schematic structural diagram of an energy storage power supply system in another embodiment;

图3为又一个实施例中储能供电系统的结构示意图;Fig. 3 is a schematic structural diagram of an energy storage power supply system in yet another embodiment;

图4为一个实施例中储能供电系统的电路示意图;Fig. 4 is a schematic circuit diagram of an energy storage power supply system in an embodiment;

图5为图4所示实施例接入电网的电路示意图。Fig. 5 is a schematic circuit diagram of the embodiment shown in Fig. 4 connected to the power grid.

具体实施方式Detailed ways

为了便于理解本发明,下面将参照相关附图对本发明进行更全面的描述。附图中给出了本发明的首选实施例。但是,本发明可以以许多不同的形式来实现,并不限于本文所描述的实施例。相反地,提供这些实施例的目的是使对本发明的公开内容更加透彻全面。In order to facilitate the understanding of the present invention, the present invention will be described more fully below with reference to the associated drawings. A preferred embodiment of the invention is shown in the drawings. However, the present invention can be embodied in many different forms and is not limited to the embodiments described herein. Rather, these embodiments are provided so that the disclosure of the present invention will be thorough and complete.

需要说明的是,当一个元件被认为是“连接”另一个元件,它可以是直接连接到另一个元件并与之结合为一体,或者可能同时存在居中元件。本文所使用的术语“安装”、“一端”、“另一端”以及类似的表述只是为了说明的目的。It should be noted that when an element is considered to be "connected" to another element, it may be directly connected to and integrally integrated with the other element, or there may be an intervening element at the same time. The terms "mounted", "one end", "the other end" and similar expressions are used herein for the purpose of description only.

除非另有定义,本文所使用的所有的技术和科学术语与属于本发明的技术领域的技术人员通常理解的含义相同。本文中在本发明的说明书中所使用的术语只是为了描述具体的实施例的目的,不是旨在于限制本发明。本文所使用的术语“及/或”包括一个或多个相关的所列项目的任意的和所有的组合。Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the technical field of the invention. The terms used herein in the description of the present invention are for the purpose of describing specific embodiments only, and are not intended to limit the present invention. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.

在一个实施例中,如图1所示,提供了一种储能供电系统,包括:储能装置10、储能管理装置20、双向换流装置30、储能监控终端40以及设置在电网控制中心的储能监控后台设备50。In one embodiment, as shown in Figure 1, an energy storage power supply system is provided, including: an energy storage device 10, an energy storage management device 20, a bidirectional converter device 30, an energy storage monitoring terminal 40, and The central energy storage monitors the background equipment 50 .

储能装置10和双向换流装置30的直流端电连接,双向换流装置30的交流端用于接入电网,储能装置10和储能管理装置20电连接,储能监控终端40分别与储能管理装置20、双向换流装置30以及储能监控后台设备50通信连接。The DC terminal of the energy storage device 10 is electrically connected to the bidirectional converter device 30, the AC terminal of the bidirectional converter device 30 is used to connect to the power grid, the energy storage device 10 is electrically connected to the energy storage management device 20, and the energy storage monitoring terminal 40 is connected to the power grid respectively. The energy storage management device 20 , the bidirectional converter device 30 and the energy storage monitoring background device 50 are connected in communication.

储能管理装置20,用于监测储能装置10的运行状态,将储能状态信息发送至储能监控终端40,并从储能监控终端40接收充放电指令,控制储能装置10充放电;储能状态信息标示储能装置10的运行状态。The energy storage management device 20 is used to monitor the operating status of the energy storage device 10, send the energy storage status information to the energy storage monitoring terminal 40, and receive charging and discharging instructions from the energy storage monitoring terminal 40, so as to control the charging and discharging of the energy storage device 10; The energy storage status information indicates the running status of the energy storage device 10 .

储能监控终端40,用于将接收的换流状态信息和储能状态信息转发至储能监控后台设备50,并从储能监控后台设备50接收充放电信息,根据充放电信息,发送充放电指令至储能监控终端40;换流状态信息表示双向换流装置30的运行状态。The energy storage monitoring terminal 40 is used to forward the received commutation status information and energy storage status information to the energy storage monitoring background device 50, receive charging and discharging information from the energy storage monitoring background device 50, and send charging and discharging information according to the charging and discharging information. The command is sent to the energy storage monitoring terminal 40; the commutation status information indicates the running status of the bidirectional converter device 30.

具体而言,储能管理装置20监测储能装置10的运行状态(例如充放电状态、剩余电量、是否故障等)上报储能状态信息至储能监控终端40。双向换流装置30可双向进行换流,将直流电转换为交流电或将交流电转换为直流电。双向换流装置30的监测端连接储能监控终端40,上报双向换流装置30的换流状态信息,例如正常、异常。Specifically, the energy storage management device 20 monitors the operating status of the energy storage device 10 (such as charging and discharging status, remaining power, whether it is faulty, etc.) and reports the energy storage status information to the energy storage monitoring terminal 40 . The bidirectional commutation device 30 can commutate bidirectionally, converting direct current into alternating current or converting alternating current into direct current. The monitoring terminal of the bidirectional converter device 30 is connected to the energy storage monitoring terminal 40 to report commutation status information of the bidirectional converter device 30 , such as normal and abnormal.

当电网处于负荷高峰时,储能监控后台设备50根据储能状态信息和换流状态信息,发送放电信息,通过储能监控终端40接收识别放电信息,下发放电指令至储能管理装置20,储能管理装置20控制储能装置10放电,双向换流装置30将储能装置10输出的直流电转换为交流电输出值电网中,为负载供电。When the power grid is at a peak load, the energy storage monitoring background device 50 sends discharge information according to the energy storage status information and the commutation status information, receives and identifies the discharge information through the energy storage monitoring terminal 40, and issues a discharge command to the energy storage management device 20, The energy storage management device 20 controls the discharge of the energy storage device 10, and the bidirectional converter device 30 converts the direct current output by the energy storage device 10 into an alternating current output value in the power grid to supply power to the load.

当电网不在负荷高峰时,储能监控后台设备50根据储能状态信息和换流状态信息,发送充电信息,通过储能监控终端40接收识别充电信息,下发充电指令至储能管理装置20,储能管理装置20控制储能装置10充电,双向换流装置30将电网的交流电转换为直流电输入储能装置10,为储能装置10充电。When the power grid is not in peak load, the energy storage monitoring background device 50 sends charging information according to the energy storage status information and the commutation status information, receives and identifies the charging information through the energy storage monitoring terminal 40, and sends a charging command to the energy storage management device 20, The energy storage management device 20 controls the charging of the energy storage device 10 , and the bidirectional converter device 30 converts the AC power of the grid into a DC power input to the energy storage device 10 to charge the energy storage device 10 .

其中,双向换流装置30可以是双向换流器PCS。Wherein, the bidirectional converter device 30 may be a bidirectional converter PCS.

上述储能供电系统,当电网负荷高时,可稳定为电网提供额外电能,保障电力供应和电网安全运行;在电网负荷低时,自动进行充电,完成电能储备,充分利用电网剩余电力,节能环保,稳定可靠。The above-mentioned energy storage and power supply system can stably provide additional power to the grid when the load on the grid is high, ensuring power supply and safe operation of the grid; when the load on the grid is low, it will automatically charge to complete the power reserve and make full use of the remaining power of the grid, saving energy and protecting the environment ,Stable and reliable.

在一个实施例中,储能状态信息包括剩余电量、第一状态信息;第一状态信息指示储能装置10处于正常或异常状态。In one embodiment, the energy storage state information includes remaining power and first state information; the first state information indicates that the energy storage device 10 is in a normal or abnormal state.

储能监控后台设备50用于,获取当前电网负荷,根据当前电网负荷、剩余电量、第一状态信息和换流状态信息,确定充放电信息,并发送至储能监控终端40。The energy storage monitoring background device 50 is used to acquire the current grid load, determine the charging and discharging information according to the current grid load, remaining power, first state information and commutation state information, and send it to the energy storage monitoring terminal 40 .

具体而言,储能监控后台设备50可以是电网总控服务器,储能监控后台设备50中会进行储能装置10充放电的判定流程,包括:获取当前电网负荷、储能状态信息和换流状态信息,根据当前电网负荷、剩余电量、第一状态信息和换流状态信息判定充电信息或放电信息,并发送至储能监控终端40。储能监控终端40接收充电信息或放电信息,识别转换为充电指令或放电指令发送至储能管理装置20。储能管理装置20接收充电指令或放电指令,控制储能装置10充电或放电。其中,换流状态信息表示双向换流器是否正常运行。Specifically, the energy storage monitoring background device 50 may be a grid master control server, and the energy storage monitoring background device 50 will carry out the determination process of charging and discharging the energy storage device 10, including: obtaining the current grid load, energy storage status information and commutation The state information determines charging information or discharging information according to the current grid load, remaining power, first state information and commutation state information, and sends it to the energy storage monitoring terminal 40 . The energy storage monitoring terminal 40 receives charging information or discharging information, identifies and converts it into a charging command or a discharging command and sends it to the energy storage management device 20 . The energy storage management device 20 receives the charging command or the discharging command, and controls the charging or discharging of the energy storage device 10 . Wherein, the commutation status information indicates whether the bidirectional converter is running normally.

进一步的,当储能监控后台设备50进行以下判断:Further, when the energy storage monitoring background device 50 makes the following judgments:

在当前电网负荷大于高峰负荷阈值、第一状态信息为正常运行、剩余电量大于放电阈值、且换流状态信息为正常运行时,发送放电信息至储能监控终端40。When the current grid load is greater than the peak load threshold, the first state information is normal operation, the remaining power is greater than the discharge threshold, and the commutation state information is normal operation, the discharge information is sent to the energy storage monitoring terminal 40 .

在当前电网负荷小于平均负荷阈值、第一状态信息为正常运行、剩余电量小于满电阈值、且换流状态信息为正常运行时,发送充电信息至储能监控终端40。When the current grid load is less than the average load threshold, the first state information is normal operation, the remaining power is less than the full power threshold, and the commutation state information is normal operation, the charging information is sent to the energy storage monitoring terminal 40 .

其中,高峰负荷阈值、平均负荷阈值为预设值,由电力工程师根据供电负荷统计数据预设。高峰负荷阈值大于平均负荷阈值。满电阈值为储能装置10充满电时的电量值。Wherein, the peak load threshold and the average load threshold are preset values, which are preset by the electric power engineer according to the statistical data of the power supply load. The peak load threshold is greater than the average load threshold. The full charge threshold is the power value when the energy storage device 10 is fully charged.

在一个实施例中,储能监控后台设备50中的判定流程包括:In one embodiment, the determination process in the energy storage monitoring background device 50 includes:

在夜间预设时段,若剩余电量小于满电阈值,则发送充电信息至储能监控终端40。使储能装置10在夜间用电负荷谷值期自动充电。夜间预设时段可以根据经验设定,例如22:00-4:00。During the preset time period at night, if the remaining power is less than the full charge threshold, the charging information is sent to the energy storage monitoring terminal 40 . The energy storage device 10 is automatically charged during the valley period of the electricity load at night. The preset time period at night can be set according to experience, such as 22:00-4:00.

在一个实施例中,还包括温控装置60,温控装置60用于检测储能装置10的温度,并控制储能装置10的温度在一定范围内。温控装置60保障储能装置10在安全温度下工作,减少储能装置10因高温造成损耗或安全隐患。In one embodiment, a temperature control device 60 is also included, and the temperature control device 60 is used to detect the temperature of the energy storage device 10 and control the temperature of the energy storage device 10 within a certain range. The temperature control device 60 ensures that the energy storage device 10 works at a safe temperature, reducing loss or potential safety hazards of the energy storage device 10 due to high temperature.

进一步的,在一个实施例中,如图2所示,温控装置60包括温度检测模块61和灭火装置62,温控检测模块61连接灭火装置62,用于当储能装置10的温度高于阈值时启动灭火装置62。Further, in one embodiment, as shown in FIG. 2 , the temperature control device 60 includes a temperature detection module 61 and a fire extinguishing device 62, and the temperature control detection module 61 is connected to the fire extinguishing device 62 for use when the temperature of the energy storage device 10 is higher than The fire extinguishing device 62 is activated at the threshold.

在一个实施例中,温度检测模块由储能装置10供电,储能装置10通过DC/AC转换器连接温度检测模块,为温度检测模块提供交流供电。In one embodiment, the temperature detection module is powered by the energy storage device 10, and the energy storage device 10 is connected to the temperature detection module through a DC/AC converter to provide AC power for the temperature detection module.

在一个实施例中,储能装置10包括多个串联的电池组。在另一个实施例中,储能装置10包括多个并联的电池组,电池组并联后与双向换流装置30的直流端电连接。相比串联的电池组,电池组并联可减少因个别电池故障导致储能装置10异常,当其中一组电池出现故障也不会影响其他电池组工作。优选的,一个电池组包括多个串联的磷酸铁电池。In one embodiment, the energy storage device 10 includes a plurality of battery packs connected in series. In another embodiment, the energy storage device 10 includes a plurality of battery packs connected in parallel, and the battery packs are electrically connected to the DC terminal of the bidirectional converter device 30 after being connected in parallel. Compared with battery packs connected in series, the parallel connection of battery packs can reduce the abnormality of the energy storage device 10 caused by the failure of individual batteries, and the failure of one of the batteries will not affect the operation of other battery packs. Preferably, a battery pack includes a plurality of iron phosphate batteries connected in series.

其中,储能管理装置20可以是电池管理系统BMS,它由多个检测模块和主控模块CCU组成。各检测模块电连接主控模块CCU。各检测模块设置在各电池组上,用于检测电池的状态,主控模块CCU接收各检测模块的检测结果,处理后得到储能状态信息。储能模块通过DC/DC转换器为主控模块CCU提供12V或24V的直流供电。Wherein, the energy storage management device 20 may be a battery management system BMS, which is composed of a plurality of detection modules and a main control module CCU. Each detection module is electrically connected to the main control module CCU. Each detection module is arranged on each battery pack to detect the state of the battery, and the main control module CCU receives the detection results of each detection module, and obtains energy storage state information after processing. The energy storage module provides 12V or 24V DC power supply to the main control module CCU through the DC/DC converter.

在一个实施例中,如图3所示,还包括直流汇流装置70,直流汇流装置70一端与各电池组电连接,另一端与双向换流装置30的直流端电连接。In one embodiment, as shown in FIG. 3 , a DC bus device 70 is further included. One end of the DC bus device 70 is electrically connected to each battery pack, and the other end is electrically connected to the DC terminal of the bidirectional converter device 30 .

在一个实施例中,还包括绝缘检测装置,绝缘检测装置分别电连接储能装置10和储能管理装置20电连接,用于检测储能装置10和储能管理装置20的绝缘保护是否正常。具体的,绝缘检测装置可由储能模块通过DCDC转换器提供直流供电。In one embodiment, an insulation detection device is also included. The insulation detection device is electrically connected to the energy storage device 10 and the energy storage management device 20 respectively, and is used to detect whether the insulation protection of the energy storage device 10 and the energy storage management device 20 is normal. Specifically, the insulation detection device may be powered by a DC power supply provided by the energy storage module through a DCDC converter.

在一个实施例中,储能监控终端40和储能后台设备通过无线公网通信连接;储能监控终端40分别通过以太网或LAN总线连接储能管理装置20和双向换流装置30。具体的,无线公网通信包括但不限于2G、3G、4G、5G制式的无线通信。In one embodiment, the energy storage monitoring terminal 40 and the energy storage background equipment are connected through wireless public network communication; the energy storage monitoring terminal 40 is connected to the energy storage management device 20 and the bidirectional converter device 30 through Ethernet or LAN bus respectively. Specifically, wireless public network communication includes but is not limited to wireless communication of 2G, 3G, 4G, and 5G standards.

另一方面,本发明实施例还提供一种储能供电箱,包括箱体和上述的储能供电系统,储能供电系统设置于所述箱体内。其中,箱体可以是集装箱。储能供电箱可搭载在运输工具上,移动的为电网提供额外电源供电,更加灵活便捷,易于部署调度。On the other hand, an embodiment of the present invention also provides an energy storage power supply box, including a box body and the above-mentioned energy storage power supply system, and the energy storage power supply system is arranged in the box body. Wherein, the box body may be a container. The energy storage and power supply box can be mounted on the means of transportation, and the mobile one can provide additional power supply for the grid, which is more flexible and convenient, and easy to deploy and dispatch.

在一个具体实施例中,提供一种1MWh储能供电箱,如图4、5所示,储能装置10包括14个并联的电池组,每个电池组由4箱134.4V/160Ah的磷酸铁锂电池串联而成,由电池管理系统BMS负责电池组的管理。14个电池组安装在两排电池架上,设置于集装箱两侧。14个电池组的正极并联接入250W双向换流器的直流正极端,14个电池组的负极并联接入250W双向换流器的直流负极端。250W双向换流器的交流端分为三个分别接入入网配电柜的三项电接口,通过入网配电柜接入电网中。In a specific embodiment, a 1MWh energy storage and power supply box is provided. As shown in FIGS. Lithium batteries are connected in series, and the battery management system BMS is responsible for the management of the battery pack. 14 battery packs are installed on two rows of battery racks, which are arranged on both sides of the container. The positive poles of the 14 battery packs are connected in parallel to the DC positive terminal of the 250W bidirectional converter, and the negative poles of the 14 battery packs are connected in parallel to the DC negative terminal of the 250W bidirectional converter. The AC end of the 250W bidirectional converter is divided into three electrical interfaces connected to the grid-connected power distribution cabinet, which are connected to the grid through the grid-connected power distribution cabinet.

以上所述实施例的各技术特征可以进行任意的组合,为使描述简洁,未对上述实施例中的各个技术特征所有可能的组合都进行描述,然而,只要这些技术特征的组合不存在矛盾,都应当认为是本说明书记载的范围。The technical features of the above-mentioned embodiments can be combined arbitrarily. To make the description concise, all possible combinations of the technical features in the above-mentioned embodiments are not described. However, as long as there is no contradiction in the combination of these technical features, should be considered as within the scope of this specification.

以上所述实施例仅表达了本发明的几种实施方式,其描述较为具体和详细,但并不能因此而理解为对发明专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干变形和改进,这些都属于本发明的保护范围。因此,本发明专利的保护范围应以所附权利要求为准。The above-mentioned embodiments only express several implementation modes of the present invention, and the descriptions thereof are relatively specific and detailed, but should not be construed as limiting the patent scope of the invention. It should be pointed out that those skilled in the art can make several modifications and improvements without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the patent for the present invention should be based on the appended claims.

Claims (10)

1. a kind of energy storage for power supply system characterized by comprising energy storage device, energy storage managing device, two-way current converter, storage Energy monitor terminal and the energy storage monitoring background devices that grid control centre is set;
The electrical connection of the DC terminal of the energy storage device and the two-way current converter, the exchange end of the two-way current converter is used for Access power grid, the energy storage device and the energy storage managing device electrical connection, the energy storage monitor terminal respectively with the energy storage Managing device, the two-way current converter and energy storage monitoring background devices communication connection;
Energy storage state information is sent to described by the energy storage managing device for monitoring the operating status of the energy storage device Energy storage monitor terminal, and charge and discharge instruction is received from the energy storage monitor terminal, control the energy storage device charge and discharge;The storage Energy status information indicates the operating status of the energy storage device;
The energy storage monitor terminal, for received commutation states information and the energy storage state information to be forwarded to the energy storage Background devices are monitored, and receive charge and discharge power information from energy storage monitoring background devices, according to the charge and discharge power information, send institute Charge and discharge are stated to instruct to the energy storage monitor terminal;The commutation states information indicates the operation shape of the two-way current converter State.
2. energy storage for power supply system according to claim 1, which is characterized in that it further include temperature control device, the temperature control device For detecting the temperature of the energy storage device, and control the temperature of the energy storage device in a certain range.
3. energy storage for power supply system according to claim 2, which is characterized in that the temperature control device includes temperature detecting module And extinguishing device, the temperature control detection module connect the extinguishing device, are higher than threshold value for the temperature when the energy storage device Shi Qidong extinguishing device.
4. energy storage for power supply system according to claim 3, which is characterized in that the energy storage device includes the electricity of multiple parallel connections Pond group is electrically connected after the battery pack is in parallel with the DC terminal of the two-way current converter.
5. energy storage for power supply system according to claim 4, which is characterized in that further include direct current collector-shoe gear, the direct current Collector-shoe gear one end is electrically connected with each battery pack, and the other end is electrically connected with the DC terminal of the two-way current converter.
6. energy storage for power supply system according to claim 5, which is characterized in that the battery pack includes multiple concatenated phosphoric acid Iron cell.
7. energy storage for power supply system according to claim 6, which is characterized in that it further include insulation detection device, the insulation Detection device is electrically connected the energy storage device and energy storage managing device electrical connection.
8. energy storage for power supply system according to claim 7, which is characterized in that after the energy storage monitor terminal and the energy storage Platform equipment is communicated to connect by wireless public network;The energy storage monitor terminal passes through Ethernet respectively or LAN bus connects the storage It can managing device and the two-way current converter.
9. energy storage for power supply system according to claim 1, which is characterized in that the energy storage state information includes remaining electricity Amount, first state information;The first state information indicates that the energy storage device is in normal or abnormal state;
The energy storage monitoring background devices are used for, and obtain current electric grid load, according to the current electric grid load, the remaining electricity Amount, first state information and commutation states information, determine the charge and discharge power information, and be sent to the energy storage monitor terminal.
10. a kind of energy storage for power supply case, which is characterized in that supplied including cabinet and energy storage as claimed in any one of claims 1 to 9 Electric system, the energy storage for power supply system are set in the cabinet.
CN201910498705.3A 2019-06-10 2019-06-10 Energy storage for power supply system and energy storage for power supply case Pending CN110098630A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201910498705.3A CN110098630A (en) 2019-06-10 2019-06-10 Energy storage for power supply system and energy storage for power supply case
PCT/CN2019/105718 WO2020248415A1 (en) 2019-06-10 2019-09-12 Energy storage power supply system and energy storage power supply box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910498705.3A CN110098630A (en) 2019-06-10 2019-06-10 Energy storage for power supply system and energy storage for power supply case

Publications (1)

Publication Number Publication Date
CN110098630A true CN110098630A (en) 2019-08-06

Family

ID=67450567

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910498705.3A Pending CN110098630A (en) 2019-06-10 2019-06-10 Energy storage for power supply system and energy storage for power supply case

Country Status (2)

Country Link
CN (1) CN110098630A (en)
WO (1) WO2020248415A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020248415A1 (en) * 2019-06-10 2020-12-17 深圳市雄韬电源科技股份有限公司 Energy storage power supply system and energy storage power supply box
CN114115006A (en) * 2021-11-17 2022-03-01 南方电网科学研究院有限责任公司 Energy storage control system
CN115864565A (en) * 2022-11-16 2023-03-28 惠州恒立能源科技有限公司 Lithium ion battery energy storage system and method based on energy storage converter

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113131504B (en) * 2021-05-24 2025-03-14 上海采日能源科技有限公司 Cluster energy storage system
CN114598008B (en) * 2022-03-25 2025-01-24 清华大学 Energy storage power supply device, energy storage power supply control method, device and single chip microcomputer
CN115001135B (en) * 2022-05-16 2024-08-27 国网智慧能源交通技术创新中心(苏州)有限公司 Charging and changing electric field station based on active fire control treatment
CN115189384B (en) * 2022-06-23 2024-04-30 深圳市鸿嘉利新能源有限公司 A V2G-based microgrid energy storage charging and discharging management method
WO2024067790A1 (en) * 2022-09-30 2024-04-04 格力博(江苏)股份有限公司 Energy station system, energy station control method, and energy station
CN223124602U (en) * 2024-04-22 2025-07-18 宁德时代新能源科技股份有限公司 Power control device and power distribution system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104319797A (en) * 2014-10-21 2015-01-28 国网上海市电力公司 Mobile type energy storage system of lithium iron phosphate battery and control method thereof
CN107332266A (en) * 2017-08-25 2017-11-07 浙江南都电源动力股份有限公司 User side energy-accumulating power station and its application model
JP6240445B2 (en) * 2013-09-13 2017-11-29 株式会社ピューズ Electric power peak cut device
CN108011386A (en) * 2017-11-24 2018-05-08 国网北京市电力公司 Battery energy storage system
CN108832647A (en) * 2018-06-21 2018-11-16 江苏英耐杰新能源有限公司 A kind of battery energy storage system for power distribution network peak load shifting
CN109245140A (en) * 2018-11-02 2019-01-18 谷明月 A kind of tou power price industrial energy-storage system and its charge and discharge strategy

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110098630A (en) * 2019-06-10 2019-08-06 深圳市雄韬电源科技股份有限公司 Energy storage for power supply system and energy storage for power supply case

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6240445B2 (en) * 2013-09-13 2017-11-29 株式会社ピューズ Electric power peak cut device
CN104319797A (en) * 2014-10-21 2015-01-28 国网上海市电力公司 Mobile type energy storage system of lithium iron phosphate battery and control method thereof
CN107332266A (en) * 2017-08-25 2017-11-07 浙江南都电源动力股份有限公司 User side energy-accumulating power station and its application model
CN108011386A (en) * 2017-11-24 2018-05-08 国网北京市电力公司 Battery energy storage system
CN108832647A (en) * 2018-06-21 2018-11-16 江苏英耐杰新能源有限公司 A kind of battery energy storage system for power distribution network peak load shifting
CN109245140A (en) * 2018-11-02 2019-01-18 谷明月 A kind of tou power price industrial energy-storage system and its charge and discharge strategy

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020248415A1 (en) * 2019-06-10 2020-12-17 深圳市雄韬电源科技股份有限公司 Energy storage power supply system and energy storage power supply box
CN114115006A (en) * 2021-11-17 2022-03-01 南方电网科学研究院有限责任公司 Energy storage control system
CN115864565A (en) * 2022-11-16 2023-03-28 惠州恒立能源科技有限公司 Lithium ion battery energy storage system and method based on energy storage converter
CN115864565B (en) * 2022-11-16 2023-09-26 惠州因博利电子科技有限公司 Lithium ion battery energy storage system and method based on energy storage converter

Also Published As

Publication number Publication date
WO2020248415A1 (en) 2020-12-17

Similar Documents

Publication Publication Date Title
WO2020248415A1 (en) Energy storage power supply system and energy storage power supply box
CN103606943B (en) A kind of microgrid Ni-MH battery energy storage system
WO2023029335A1 (en) Parameter configuration method and terminal for photovoltaic storage and charging system
CN107370201B (en) DC power system based on battery series-parallel combination
CN106253314A (en) Communication base station ferric phosphate lithium cell echelon utilizes charge-discharge system and control method
CN106300325A (en) A DC power supply system for data centers
CN103904735A (en) Energy storage subsystem used for batch-type renewable energy source power generation system and control method of energy storage subsystem
CN207234421U (en) distributed photovoltaic off-grid power supply system
CN203491707U (en) Energy storage system based on cascade utilization of power battery
CN209709744U (en) A communication base station power supply system for cascade utilization of decommissioned power batteries
CN202363924U (en) Multifunctional power supply management system
WO2024041383A1 (en) Energy storage system and power supply control method for battery management system
CN110011408A (en) A kind of moving emergency power-supply system and its working method
CN203368043U (en) Microgrid energy storage system based on battery echelon use
CN202888862U (en) Energy storage inverter suitable for distributed new energy power
CN217984657U (en) Data center power supply system
CN121777736A (en) An architecture and energy management method for an electric vehicle energy storage, charging, and discharging system
CN110126673B (en) A battery echelon utilization management system, electric vehicle and communication base station
CN104882936B (en) Communication energy storage power supply system
CN214626379U (en) High efficiency charge-discharge energy storage control system
CN205960753U (en) Battery charge and discharge is utilized to communication base station lithium iron phosphate battery echelon
CN222107592U (en) A high-voltage intelligent lithium battery module suitable for home energy storage systems
CN205355198U (en) Unmanned aerial vehicle electricity energy management system
CN104242362A (en) Power generation system and energy storage control device thereof
CN206211649U (en) A kind of looped network case distributed energy storage system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190806

RJ01 Rejection of invention patent application after publication