CN109558659A - 一种基于变形控制的悬臂式支护结构设计方法 - Google Patents
一种基于变形控制的悬臂式支护结构设计方法 Download PDFInfo
- Publication number
- CN109558659A CN109558659A CN201811385427.2A CN201811385427A CN109558659A CN 109558659 A CN109558659 A CN 109558659A CN 201811385427 A CN201811385427 A CN 201811385427A CN 109558659 A CN109558659 A CN 109558659A
- Authority
- CN
- China
- Prior art keywords
- supporting construction
- displacement
- foundation pit
- earth pressure
- supporting structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2119/00—Details relating to the type or aim of the analysis or the optimisation
- G06F2119/06—Power analysis or power optimisation
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Geometry (AREA)
- General Physics & Mathematics (AREA)
- Computer Hardware Design (AREA)
- General Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Evolutionary Computation (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Pure & Applied Mathematics (AREA)
- Computational Mathematics (AREA)
- Mathematical Optimization (AREA)
- Mathematical Analysis (AREA)
- Architecture (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
本发明提供了一种基于变形控制的悬臂式支护结构设计方法,包括:S1、确定基坑的剖面参数以及土体的物理力学参数;S2、确定支护结构的位移模式,确立模型简图;S3、分别对基坑支护结构的主动土压力和被动土压力进行计算,并根据力矩平衡原理确定支护结构的抗倾覆临界嵌固深度;S4、分别计算支护结构的最大弯矩及最大剪力,并根据最大弯矩和最大剪力分别确定支护结构的材料及配筋;S5、进行整体稳定性验算、抗隆起稳定性验算。本发明克服了常规基坑设计方法中无法考虑支护结构变形的情况,通过悬臂式支护结构的变形大小来控制其设计计算,计算方法简单可行,可以在确保安全的前提下有效节约工程造价,减小施工量,具有很好的推广应用价值。
Description
技术领域
本发明涉及土木工程施工技术领域,特别是涉及一种基于变形控制的悬臂式支护结构设计方法。
背景技术
随着我国基本建设工程的进一步推进,基坑工程设计理论水平也得到了很大的发展,传统的按承载力设计的方法正逐渐过渡为按变形控制设计。
但现有支护结构设计方法多基于极限平衡法,该方法在假定桩前后的土体均达到极限土压力状态的情况下,对支护结构的内力进行计算,无法考虑支护结构的变形对其内力的影响,但在实际基坑工程中,支护结构变形限制通常较为严格,桩前后的土体往往无法全部达到极限土压力状态。
发明内容
本发明针对以上不足之处,提供一种基于变形控制的悬臂式支护结构设计方法,该方法可以通过悬臂式支护结构的变形大小来控制其设计计算。
一种基于变形控制的悬臂式支护结构设计方法,包括以下步骤:
S1:确定基坑的剖面参数以及土体的物理力学参数;
所述基坑的剖面参数包括基坑表面与坑底的标高;所述土体物理力学参数包括三倍开挖深度范围内土层的内摩擦角及重度γ;
S2:确定支护结构的位移模式,确立模型简图;
S3:分别对基坑支护结构的主动土压力和被动土压力进行计算,并根据力矩平衡原理确定支护结构的抗倾覆临界嵌固深度;
S4:分别计算支护结构的最大弯矩及最大剪力,并根据最大弯矩和最大剪力分别确定支护结构的材料及配筋;
S5:进行整体稳定性验算、抗隆起稳定性验算。
上述基于变形控制的悬臂式支护结构设计方法,其中,所述步骤S3具体包括步骤S31~S34:
S31:基于位移修正,计算支护结构上作用的主动土压力:
式中:
L为待求的悬臂式支护结构桩长;
是土层的等效重度,对多层土层通过分层总和法求得;
sa为土体的主动极限位移,取0.001L~0.005L;
smax为支护结构的容许位移值;
z为以支护结构顶端处为零点时,土压力计算处的深度;
K0为静止土压力系数;
Ka为库伦主动土压力系数:
式中:是土层的等效内摩擦角,对多层土层通过分层总和法求得;
δ支护结构与土体间的外摩擦角;
S32:基于位移修正,计算支护结构内侧作用的被动土压力:
式中:h为基坑的开挖深度;
sp为土体的被动极限位移,取0.01(L-h)~0.05(L-h);
Kp为库伦主动土压力系数:
S33:根据对转动点通过力矩平衡原理确定悬臂式支护结构抗倾覆临界桩长Lcr:
得到Lcr之后,计算桩顶位移smax是否超过土体的主动极限位移sa,若超过,则通过下式对Lcr进行重新计算,获得最终的支护结构抗倾覆临界桩长:
S34:计算支护结构抗倾覆临界嵌固深度Dcr:
Dcr=Lcr-h。
上述基于变形控制的悬臂式支护结构设计方法,其中,所述支护结构的位移模式,为绕坑底下一点向坑内转动,支护结构的位移最大值位于支护桩桩顶,该位移最大值由基坑支护结构的容许位移值确定。
本发明的有益效果为,根据本发明提供的基于变形控制的悬臂式支护结构设计方法,基于支护结构的变形大小对支护结构上作用的土压力模式进行修正,通过受力分析确定支护结构的嵌固深度,克服了常规基坑设计方法中无法考虑支护结构变形的情况,通过悬臂式支护结构的变形大小来控制其设计计算,计算方法简单可行,可以在确保安全的前提下有效节约工程造价,减小施工量,具有很好的推广应用价值。
附图说明
图1本发明一实施例提供的基于变形控制的悬臂式支护结构设计方法的流程示意图;
图2是简化基坑剖面模型图(含支护结构位移模式);
图3是基坑支护结构受力分析示意图;
图中:1为支护结构,2为支护结构位移模式,3为开挖区坑底,4为转动点。
具体实施方式
为了便于理解本发明,下面将参照相关附图对本发明进行更全面的描述。附图中给出了本发明的若干实施例。但是,本发明可以以许多不同的形式来实现,并不限于本文所描述的实施例。相反地,提供这些实施例的目的是使对本发明的公开内容更加透彻全面。
除非另有定义,本文所使用的所有的技术和科学术语与属于本发明的技术领域的技术人员通常理解的含义相同。本文中在本发明的说明书中所使用的术语只是为了描述具体的实施例的目的,不是旨在于限制本发明。本文所使用的术语“及/或”包括一个或多个相关的所列项目的任意的和所有的组合。
请参阅图1,本发明的实施例提供了一种基于变形控制的悬臂式支护结构设计方法,包括以下步骤:
S1:确定基坑的剖面参数以及土体的物理力学参数;
所述基坑的剖面参数包括基坑表面与坑底的标高;所述土体物理力学参数包括三倍开挖深度范围内土层的内摩擦角及重度γ;
参见图2,某基坑的剖面参数如下:
基坑地面标高为0,开挖区坑底3标高为-4.0m,即开挖深度h=4.0m。
三倍开挖深度范围内的土体物理力学参数如表1所示:
表1土层参数
对多层土体进行分层总和法处理,得到地层土体的等效内摩擦角等效有效重度
S2:确定支护结构的位移模式,确立模型简图;
支护结构的容许位移值smax=3cm,位移最大值位于支护桩桩顶,支护结构的位移模式,为绕坑底下一转动点向坑内转动,含位移模式的模型简图如图2所示。
S3:分别对基坑支护结构的主动土压力和被动土压力进行计算,并根据力矩平衡原理确定支护结构的抗倾覆临界嵌固深度;
请参阅图3,分别对基坑的主动土压力和被动土压力进行计算,具体的,该步骤包括步骤S31~S34:
S31:基于位移修正,计算基坑支护结构上的主动土压力:
S32:基于位移修正,计算基坑支护结构上的被动土压力:
S33:根据对转动点取矩,可获得支护结构抗倾覆临界桩长Lcr:
将S31、S32得到的主动土压力、被动土压力计算式代入S33的力矩平衡方程,求解可以得到支护结构的抗倾覆临界桩长Lcr为6.65m。
S34:计算支护结构抗倾覆临界嵌固深度Dcr:
Dcr=Lcr-h=2.25m。
S4:分别计算支护结构的最大弯矩及最大剪力,并根据最大弯矩和最大剪力分别确定支护结构的材料及配筋;
S5:进行整体稳定性验算、抗隆起稳定性验算。
与常规设计方法相比,本实施例提供的方法能够基于支护结构的变形大小(如本例中控制支护结构容许变形值为3cm),求得支护结构抗倾覆临界嵌固深度,采用变形控制设计,大大改进了现有的通过承载力控制设计的计算方法,更为精准可靠。
以上所述实施例仅表达了本发明的一种实施方式,其描述较为具体和详细,但并不能因此而理解为对本发明专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干变形和改进,这些都属于本发明的保护范围。因此,本发明专利的保护范围应以所附权利要求为准。
Claims (3)
1.一种基于变形控制的悬臂式支护结构设计方法,其特征在于,包括以下步骤:
S1:确定基坑的剖面参数以及土体的物理力学参数;
所述基坑的剖面参数包括基坑表面与坑底的标高;所述土体物理力学参数包括三倍开挖深度范围内土层的内摩擦角及重度γ;
S2:确定支护结构的位移模式,确立模型简图;
S3:分别对基坑支护结构的主动土压力和被动土压力进行计算,并根据力矩平衡原理确定支护结构的抗倾覆临界嵌固深度;
S4:分别计算支护结构的最大弯矩及最大剪力,并根据最大弯矩和最大剪力分别确定支护结构的材料及配筋;
S5:进行整体稳定性验算、抗隆起稳定性验算。
2.根据权利要求1所述的基于变形控制的悬臂式支护结构设计方法,其特征在于,所述步骤S3具体包括步骤S31~S34:
S31:基于位移修正,计算支护结构上作用的主动土压力:
式中:
L为待求的悬臂式支护结构桩长;
是土层的等效重度,对多层土层通过分层总和法求得;
sa为土体的主动极限位移,取0.001L~0.005L;
smax为支护结构的容许位移值;
z为以支护结构顶端处为零点时,土压力计算处的深度;
K0为静止土压力系数;
Ka为库伦主动土压力系数:
式中:是土层的等效内摩擦角,对多层土层通过分层总和法求得;
δ支护结构与土体间的外摩擦角;
S32:基于位移修正,计算支护结构内侧作用的被动土压力:
式中:h为基坑的开挖深度;
sp为土体的被动极限位移,取0.01(L-h)~0.05(L-h);
Kp为库伦主动土压力系数:
S33:根据对转动点通过力矩平衡原理确定悬臂式支护结构抗倾覆临界桩长Lcr:
得到Lcr之后,计算桩顶位移smax是否超过土体的主动极限位移sa,若超过,则通过下式对Lcr进行重新计算,获得最终的支护结构抗倾覆临界桩长:
S34:计算支护结构抗倾覆临界嵌固深度Dcr:
Dcr=Lcr-h。
3.根据权利要求1或2所述的基于变形控制的悬臂式支护结构设计方法,其特征在于,所述支护结构的位移模式,为绕坑底下一点向坑内转动,支护结构的位移最大值位于支护桩桩顶,该位移最大值由基坑支护结构的容许位移值确定。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811385427.2A CN109558659B (zh) | 2018-11-20 | 2018-11-20 | 一种基于变形控制的悬臂式支护结构设计方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811385427.2A CN109558659B (zh) | 2018-11-20 | 2018-11-20 | 一种基于变形控制的悬臂式支护结构设计方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109558659A true CN109558659A (zh) | 2019-04-02 |
CN109558659B CN109558659B (zh) | 2022-04-19 |
Family
ID=65866740
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811385427.2A Active CN109558659B (zh) | 2018-11-20 | 2018-11-20 | 一种基于变形控制的悬臂式支护结构设计方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109558659B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112647515A (zh) * | 2020-11-27 | 2021-04-13 | 中铁西安勘察设计研究院有限责任公司 | 人工挖孔井微型灌注桩支护后开挖进尺的预测方法 |
CN113591184A (zh) * | 2021-07-19 | 2021-11-02 | 浙江大学 | 一种邻近地下室外墙基坑悬臂式刚性围护结构设计计算方法 |
CN114970016A (zh) * | 2022-05-13 | 2022-08-30 | 安徽省城建设计研究总院股份有限公司 | Π型支座斜撑位移计算方法、π型支座设计方法和支护方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060252623A1 (en) * | 2005-05-03 | 2006-11-09 | Bobst S.A. | Method of converting web or sheet material and press for applying said method |
CN104652448A (zh) * | 2015-01-10 | 2015-05-27 | 华东交通大学 | 一种不平衡基坑支护设计方法 |
CN105569050A (zh) * | 2015-12-29 | 2016-05-11 | 华东交通大学 | 一种相邻边界侧压力不均衡基坑角撑支护结构设计方法 |
US20160130022A1 (en) * | 2012-05-03 | 2016-05-12 | Schott Ag | Process and apparatus for treating containers for storing substances for medical, pharmaceutical or cosmetic applications |
CN108385693A (zh) * | 2018-02-27 | 2018-08-10 | 中科院广州化灌工程有限公司 | 一种用于分期地下室支护的等代锚杆支护方法和支护体系 |
CN108487258A (zh) * | 2018-03-28 | 2018-09-04 | 华东交通大学 | 一种粉砂土地层刚性围护结构非平衡设计方法 |
-
2018
- 2018-11-20 CN CN201811385427.2A patent/CN109558659B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060252623A1 (en) * | 2005-05-03 | 2006-11-09 | Bobst S.A. | Method of converting web or sheet material and press for applying said method |
US20160130022A1 (en) * | 2012-05-03 | 2016-05-12 | Schott Ag | Process and apparatus for treating containers for storing substances for medical, pharmaceutical or cosmetic applications |
CN104652448A (zh) * | 2015-01-10 | 2015-05-27 | 华东交通大学 | 一种不平衡基坑支护设计方法 |
CN105569050A (zh) * | 2015-12-29 | 2016-05-11 | 华东交通大学 | 一种相邻边界侧压力不均衡基坑角撑支护结构设计方法 |
CN108385693A (zh) * | 2018-02-27 | 2018-08-10 | 中科院广州化灌工程有限公司 | 一种用于分期地下室支护的等代锚杆支护方法和支护体系 |
CN108487258A (zh) * | 2018-03-28 | 2018-09-04 | 华东交通大学 | 一种粉砂土地层刚性围护结构非平衡设计方法 |
Non-Patent Citations (4)
Title |
---|
JINTAO WAN 等: "A comparative study of epoxy resin cured with a linear diamine and a branched polyamine", 《CHEMICAL ENGINEERING JOURNAL》 * |
TIBERIU GYONGYOSI 等: "Aspects regarding the steam generator tube plugging at the support plate entrance using a high speed mechanical deformation procedure", 《2017 INTERNATIONAL CONFERENCE ON ENERGY AND ENVIRONMENT (CIEM)》 * |
伍露露: "挡土结构附加土压力与位移关系的试验研究与数值分析", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 * |
徐长节 等: "非对称开挖基坑支撑式围护结构解析解", 《岩土力学》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112647515A (zh) * | 2020-11-27 | 2021-04-13 | 中铁西安勘察设计研究院有限责任公司 | 人工挖孔井微型灌注桩支护后开挖进尺的预测方法 |
CN113591184A (zh) * | 2021-07-19 | 2021-11-02 | 浙江大学 | 一种邻近地下室外墙基坑悬臂式刚性围护结构设计计算方法 |
CN113591184B (zh) * | 2021-07-19 | 2023-10-20 | 浙江大学 | 一种邻近地下室外墙基坑悬臂式刚性围护结构设计计算方法 |
CN114970016A (zh) * | 2022-05-13 | 2022-08-30 | 安徽省城建设计研究总院股份有限公司 | Π型支座斜撑位移计算方法、π型支座设计方法和支护方法 |
CN114970016B (zh) * | 2022-05-13 | 2022-11-25 | 安徽省城建设计研究总院股份有限公司 | Π型支座斜撑位移计算方法、π型支座设计方法和支护方法 |
Also Published As
Publication number | Publication date |
---|---|
CN109558659B (zh) | 2022-04-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109558659A (zh) | 一种基于变形控制的悬臂式支护结构设计方法 | |
CN108509376B (zh) | 一种基于位移模式修正的土压力计算方法 | |
CN100591868C (zh) | 桩基建筑物发生倾斜后的纠偏方法 | |
CN108487258B (zh) | 一种粉砂土地层刚性围护结构非平衡设计方法 | |
CN104200100B (zh) | 一种基于滑动位移分析的三维边坡稳定性预测方法 | |
JP7262874B1 (ja) | 非極限土圧分布モードを考慮した偏圧ピット囲い保護構造の設計方法 | |
CN104484503A (zh) | 考虑作用点位置的基坑柔性支护主动土压力计算方法 | |
Jin et al. | The use of improved radial movement optimization to calculate the ultimate bearing capacity of a nonhomogeneous clay foundation adjacent to slopes | |
Zhang et al. | Force transfer characteristics of composite bucket foundation for offshore wind turbines | |
Karaulov et al. | A static solution for the problem of the stability of a smooth freestanding sheet pile wall. | |
Fu et al. | Vertical load transfer behavior of composite foundation and its responses to adjacent excavation: centrifuge model test | |
Rojas | A mathematical model for the dimensioning of circular footings | |
CN111859660B (zh) | 大直径筒型基础抗倾覆稳定性验算方法 | |
CN113935098A (zh) | 基于滑裂面形状修正的基坑支护主动土压力计算方法 | |
AU2011255650B2 (en) | Method and apparatus for internally determining a load applied by a jack | |
CN104652462B (zh) | 建筑复合地基桩顶预刺入式褥垫层 | |
CN116484471A (zh) | 一种圆形地连墙墙体等效模型的等效参数确定方法 | |
CN116070325A (zh) | 一种附加多层有限刚度梁的刚性桩水平承载力计算方法 | |
CN109918841A (zh) | 基于有限单元与极限平衡的土体稳定性评价方法 | |
Fay et al. | Dynamics of the Salton block: Absolute fault strength and crust-mantle coupling in Southern California | |
Ter-Martirosyan et al. | Settlement and Bearing Capacity of the Pile in A Three-Layer Base Taking into Account the Elastic-Visco-Plastic Properties of Soils | |
CN110321577A (zh) | 承压水地层基坑内不完整井降水使坑外地表沉降计算方法 | |
CN109001021B (zh) | 采用离心模型试验评价岩土边坡安全储备的方法 | |
CN113591183A (zh) | 一种黏性土地层多支点式围护结构非平衡计算方法 | |
CN209555997U (zh) | 一种灌注桩桩顶标高的测量装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |