CN109557482A - The monitoring of railway signal input power and breaker remote start system and control method - Google Patents

The monitoring of railway signal input power and breaker remote start system and control method Download PDF

Info

Publication number
CN109557482A
CN109557482A CN201910068339.8A CN201910068339A CN109557482A CN 109557482 A CN109557482 A CN 109557482A CN 201910068339 A CN201910068339 A CN 201910068339A CN 109557482 A CN109557482 A CN 109557482A
Authority
CN
China
Prior art keywords
road
module
electricity
circuit breaker
breaker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910068339.8A
Other languages
Chinese (zh)
Other versions
CN109557482B (en
Inventor
蔡红标
唐浩林
周佳睿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Fenyi Technology Co Ltd
Original Assignee
Wuhan Fenyi Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Fenyi Technology Co Ltd filed Critical Wuhan Fenyi Technology Co Ltd
Priority to CN201910068339.8A priority Critical patent/CN109557482B/en
Publication of CN109557482A publication Critical patent/CN109557482A/en
Application granted granted Critical
Publication of CN109557482B publication Critical patent/CN109557482B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/40Testing power supplies
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/327Testing of circuit interrupters, switches or circuit-breakers
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/05Programmable logic controllers, e.g. simulating logic interconnections of signals according to ladder diagrams or function charts
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/02Protocols based on web technology, e.g. hypertext transfer protocol [HTTP]
    • H04L67/025Protocols based on web technology, e.g. hypertext transfer protocol [HTTP] for remote control or remote monitoring of applications

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Automation & Control Theory (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a kind of monitoring of railway signal input power and breaker remote start systems, it is described by remote control computer, Ethernet, interchanger, PLC programming in logic circuit, I circuit breaker, II circuit breaker, the road I electricity grasps module, the road II electricity grasps module, the road I communication module, the road II communication module, RJ45 mould and button control cabinet composition, the remote control computer is connect by Ethernet and interchanger with the RJ45 module of PLC programming in logic circuit, the present invention also protects a kind of railway signal input power to monitor and breaker long-range control method, utilize remote control technology means, real-time monitoring and early warning are carried out to signal input power power grid, the work quality of power supply is grasped in time, when breaker is because of over-voltage, overcurrent, after the reasons such as ground connection disconnect automatically, combined floodgate can remotely be started, significantly Failure delay is compressed, conevying efficiency is improved.

Description

The monitoring of railway signal input power and breaker remote start system and control method
Technical field
The present invention relates to railway signal control technical field more particularly to a kind of monitorings of railway signal input power and open circuit Device remote start system and control method.
Background technique
Railway is one of the important infrastructure of country, the main artery of country, popular mode of transportation, it has transport energy Power is big, at low cost, less energy consumption, speed are high, many merits such as adaptable.Backbone status, iron are in integrated transportation system The modernization of road technique equipment and information technology is to realize one of the key task of railway modernization, and rolling stock project is railway The material base of transport, power-supply device operate normally for the safety of railway advanced technology resource and provide technical guarantee.
Signal power source is the power supply of railways train operation signal designation, belongs to first order load, generally by the electric power that automatically closes up Route (abbreviation stick wire) and perforation power circuit (abbreviation through track) two-way power supply power supply.There was only the case where power supply all the way Under, then electric power generating composition double-power supply loop all the way is drawn by local electricity system again.Two-way power supply is mutually redundant, and when failure mutually cuts It changes, to improve power supply reliability.
Since by external influence to will appear power quality bad for signal-powered power supply, cause in signal power source lightning protection box Hydraulic circuit breaker is fallen, and so as to cause whole station signalling arrangement power-off fault, can seriously affect conevying efficiency and traffic safety, for Outlying unattended station and relay station but will cause the failure of overlength to be delayed.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of remote controlled and stable to power supply panel input power The performance good monitoring of railway signal input power and breaker remote start system and control method, solve that peopleware is not high to ask Topic reduces cost of labor, improves working efficiency, safe and reliable orderly management.
To achieve the above object, the present invention provides technical solution below: the monitoring of railway signal input power and breaker Remote start system is by remote control computer, Ethernet, interchanger, PLC programming in logic circuit, I circuit breaker, the open circuit of the road II Device, the road I electricity grasp module, and the road II electricity grasps module, the road I communication module, the road II communication module, RJ45 mould and button control cabinet composition, The remote control computer is connect by Ethernet and interchanger with the RJ45 module of PLC programming in logic circuit, described PLC programming in logic circuit grasps module to the road I electricity by data line and the road II electricity grasps module and assigns control instruction, the road I electricity behaviour and II Electricity behaviour in road drives I circuit breaker and II circuit breaker to act respectively after being instructed, the I circuit breaker and II circuit breaker 7 pass through I0 and I1 by data line by the respective contact OF, by the make and break state of I circuit breaker and II circuit breaker respectively PLC programming in logic circuit is passed in port;Meanwhile I circuit breaker and II circuit breaker pass through cable and the road I communication module and the road II Communication module connection, and it is connected to the port SL1 of PLC programming in logic circuit, the external power grid that included monitoring modular 15 is acquired The parameters such as voltage, electric current, frequency, the harmonic wave of input power utilize 485 communication moulds by the road I communication module and the road II communication module Formula is transmitted to PLC programming in logic circuit, and PLC programming in logic circuit uploads to remote control computer 1 by Ethernet and interchanger, The PLC programming in logic circuit is TM200CE24R using chip.
Further, the PLC programming in logic circuit is connect with outside UPS mobile power source, and UPS mobile power source directly by Outer net 220V power voltage supply.
Further, the road I electricity behaviour module is connect with the port Q1 and Q2 of PLC programming in logic circuit respectively, the II Electricity behaviour's module in road is connect with the port Q4 and Q5 of PLC programming in logic circuit respectively.
Further, the road I electricity behaviour's module and the road II electricity grasp module, I circuit breaker and II circuit breaker, the communication of the road I Module and the road II communication module are all respectively three groups of identity units, while being all mounted on button control with PLC programming in logic circuit Inside cabinet, meanwhile, it is respectively set on the panel of button control cabinet 19 and is opened there are two 18, three rotations of "on" position indicator light Close 17 and four disconnected lock buttons 16, at the same four disconnected lock buttons 16 be followed successively by the road I close a floodgate, the road I break lock, the road II close a floodgate, the road II it is disconnected Lock button.
A kind of monitoring of railway signal input power and breaker remotely start control method, include the following steps:
Step 1: when button control cabinet panel on three rotary switches at telemechanical position, by PLC programming in logic circuit into After row logical process, combined floodgate, disconnected lock instruction are issued to electricity behaviour's module by the port Q1, Q2;
Step 2: grasping module to the road II electricity by the port Q4, Q5 again issues combined floodgate, disconnected lock instruction, meanwhile, the road I electricity grasps module, II After electricity behaviour's module 6 in road is ordered, I circuit breaker and II circuit breaker is driven to execute corresponding combined floodgate, disconnected lock operation;
Step 3: I circuit breaker and II circuit breaker 7 are passed through the make and break state of respective breaker by the respective contact OF Data line passes to the port I0 and I1 of PLC programming in logic circuit respectively, then uploads to long-range control by Ethernet and interchanger Computer;Pass through the respective contact OF 13 simultaneously, the "on" position indicator light 18 on 19 panel of push button control cabinet is shown respectively Show I circuit breaker 4 and the disconnected lock of II circuit breaker 7, "on" position;Step 4: when remote control computer receives PLC logic volume The I circuit breaker that journey circuit transmits, II circuit breaker are logical by the road I communication module or the road II when wherein some is disconnected Believe that the module control road I electricity grasps module, the road II electricity grasps module action, so that I circuit breaker or II circuit breaker are automatically performed closure Operation.
Further, when button being controlled three rotary switches on cabinet panel in manual position, by PLC programming in logic After circuit carries out logical process, remote control command is prohibited, and the road I on pressing control cabinet panel is closed a floodgate, break lock button, the road II It closes a floodgate, disconnected lock button, meanwhile, can be closed a floodgate by the port Q1, Q2 of PLC programming in logic circuit to the behaviour's sending of module 5 of the road I electricity, Disconnected lock instruction grasps module to the road II electricity by the port Q4, Q5 and issues combined floodgate, disconnected lock instruction, finally, the road I electricity grasps module, the road II electricity After grasping module order, I circuit breaker is driven, II circuit breaker executes corresponding combined floodgate, disconnected lock operation.
Further, when button being controlled three rotary switches on cabinet panel in maintenance position, by PLC programming in logic After circuit carries out logical process, remote control order and manual control commands will all be prohibited, and can at this time carry out to button Equipment in cabinet carries out repair and maintenance.
Further, when the I circuit breaker and II circuit breaker are automatically performed closed procedure, if three times can not continuously It is automatically performed closure, at this point, PLC programming in logic circuit stops working, alarm condition refers on 1 display interface of remote control computer Show that lamp flashes, prompt need to be accomplished manually maintenance.
The beneficial effects of the present invention are: the present invention utilizes remote control technology means, signal input power power grid is carried out Real-time monitoring and early warning grasp the work quality of power supply, when breaker because the reasons such as over-voltage, overcurrent, ground connection disconnect automatically in time Afterwards, it can remotely start combined floodgate, greatly reduce failure delay, improve conevying efficiency.
Detailed description of the invention
Fig. 1 is frame connection schematic diagram of the invention;
Fig. 2 is remote control equipment connection schematic diagram;
Fig. 3 is control cabinet panel schematic diagram
1- remote control computer, 2- Ethernet, 3- interchanger, 4-I circuit breaker, the road 5-I electricity grasp module, the road 6-II electricity behaviour Module, 7-II circuit breaker, 8-I communication module, 9-II communication module, 10-PLC programming in logic circuit, 11-RJ45 module, 12- UPS mobile power source, the contact 13-OF, 14- cable, 15- monitoring modular, bis- nonstick buttons of 16-, tri- rotary switches of 17-, 18- "on" position indicator light 19- button control cabinet.
Specific embodiment
The monitoring of the invention will now be described in detail with reference to the accompanying drawings railway signal input power and breaker remote start system and The preferred embodiment of control method.
Railway signal input power of the present invention monitors and breaker remote start system and control method as shown in Figs. 1-3 Specific embodiment: the monitoring of railway signal input power and breaker remote start system, by remote control computer 1, ether Net 2, interchanger 3, PLC programming in logic circuit 10, I circuit breaker 4, II circuit breaker 7, the road I electricity grasp module 5, and the road II electricity grasps mould Block 6, the road I communication module 8, the road II communication module 9, RJ45 mould 11 and button control cabinet 19 form, and remote control computer 1 passes through 11 pieces of RJ45 mould of Ethernet 2 and interchanger 3 and PLC programming in logic circuit 10 are connect, meanwhile, PLC programming in logic circuit 10 is logical It crosses data line and assigns control instruction to the road I electricity behaviour's module 5 and the road II electricity behaviour's module 6, after electricity Cao He II road electricity behaviour in the road I is instructed Drive I circuit breaker 4 and II circuit breaker 7 to act respectively, the road I electricity grasp module 5 respectively with the Q1 of PLC programming in logic circuit 10 and The connection of the port Q2, the road II electricity behaviour's module 6 are connect with the port Q4 and Q5 of PLC programming in logic circuit 10 respectively.And PLC programming in logic Circuit 10 is connect with outside UPS mobile power source 12, and UPS mobile power source 12, directly by outer net 220V power voltage supply, PLC logic is compiled Journey circuit is TM200CE24R using chip.I circuit breaker 4 and II circuit breaker 7 are broken the road I by the respective contact OF 13 The make and break state of road device 4 and II circuit breaker 7 passes through the port I0 and I1 by data line respectively and passes to PLC programming in logic circuit 10;Meanwhile I circuit breaker 4 and II circuit breaker 7 are connect by cable 14 with the road I communication module 8 and the road II communication module 9, and It is connected to the port SL1 of PLC programming in logic circuit 10, the electricity for the external power grid input power that included monitoring modular 15 is acquired The parameters such as pressure, electric current, frequency, harmonic wave are transmitted to PLC using 485 communication patterns by the road I communication module 8 and the road II communication module 9 Programming in logic circuit 10, PLC programming in logic circuit 10 upload to remote control computer 1 by Ethernet 2 and interchanger 3.Together When, the road I electricity behaviour's module 5 and the road II electricity grasp module 6, I circuit breaker 4 and II circuit breaker 7, the road I communication module 8 and II Road communication module 9 is all respectively three groups of identity units, while being all mounted in button control cabinet 19 with PLC programming in logic circuit 10 Face, meanwhile, it is respectively set on the panel of button control cabinet 19 there are two 18, three rotary switches 17 of "on" position indicator light And four two nonstick buttons 16, while four disconnected lock buttons 16 are followed successively by the road I combined floodgate, the disconnected lock in the road I, the road II combined floodgate, the road II Disconnected lock button.
A kind of monitoring of railway signal input power and breaker remotely start control method, include the following steps:
Step 1: when three rotary switches 17 on 19 panel of button control cabinet are at telemechanical position, by PLC programming in logic electricity After road 10 carries out logical process, combined floodgate, disconnected lock instruction are issued to electricity behaviour's module 5 by the port Q1, Q2;
Step 2: grasping module 6 to the road II electricity by the port Q4, Q5 again issues combined floodgate, disconnected lock instruction, meanwhile, the road I electricity grasps module 5, After electricity behaviour's module 6 in the road II is ordered, I circuit breaker 4 and II circuit breaker 7 is driven to execute corresponding combined floodgate, disconnected lock operation;
Step 3: I circuit breaker 4 and II circuit breaker 7 pass through the respective contact OF 13, by the make and break state of respective breaker It passes to the port I0 and I1 of PLC programming in logic circuit 10 respectively by data line, then is uploaded to by Ethernet 2 and interchanger 3 Remote control computer 1;Pass through the respective contact OF 13 simultaneously, the "on" position instruction on 19 panel of push button control cabinet Lamp 18 shows I circuit breaker 4 and the disconnected lock of II circuit breaker 7, "on" position respectively.
Step 4: when remote control computer 1 receives the I circuit breaker 4 that PLC programming in logic circuit 10 transmits, the road II is disconnected Road device 7 passes through the road I communication module 8 or the road II communication module 9 controls the road I electricity and grasps module 5, II when wherein some is disconnected Road electricity is grasped module 6 and is acted, so that I circuit breaker 4 or II circuit breaker 7 are automatically performed closed procedure;
Meanwhile when three rotary switches 17 on 19 panel of button control cabinet in manual position, by PLC programming in logic electricity After road 10 carries out logical process, remote control command is prohibited, two nonstick buttons 16 on pressing control cabinet panel, together When, module 5 can be grasped to the road I electricity by the port Q1, Q2 of PLC programming in logic circuit 10 and issue combined floodgate, disconnected lock instruction, passed through The port Q4, Q5 issues combined floodgate, disconnected lock instruction to the road II electricity behaviour's module 6, finally, the road I electricity grasps module 5, the road II electricity grasps the acquisition of module 6 After order, I circuit breaker 4 is driven, II circuit breaker 7 executes corresponding combined floodgate, disconnected lock operation.
When three rotary switches 17 on 19 panel of button control cabinet in maintenance position, by PLC programming in logic electricity After road 10 carries out logical process, remote control order and manual control commands will all be prohibited, and can at this time carry out to button Equipment in cabinet carries out repair and maintenance.
When the I circuit breaker 4 and II circuit breaker 7 are automatically performed closed procedure, if continuous three times can not be automatic complete At closure, at this point, PLC programming in logic circuit 10 stops working, status indicator lamp of alarming on 1 display interface of remote control computer 18 flashings, prompt need to be accomplished manually maintenance.
The above are merely the preferred embodiment of the present invention, it is noted that for those of ordinary skill in the art, Without departing from the concept of the premise of the invention, various modifications and improvements can be made, these belong to guarantor of the invention Protect range.

Claims (8)

1. the monitoring of railway signal input power and breaker remote start system, it is characterised in that: described by remotely controlling calculating Machine 1, Ethernet 2, interchanger 3, PLC programming in logic circuit 10, I circuit breaker 4, II circuit breaker 7, the road I electricity grasp module 5, II Road electricity is grasped module 6, the road I communication module 8, the road II communication module 9, RJ45 mould 11 and button control cabinet 19 and is formed, the long-range control Computer 1 processed is connect by 11 pieces of RJ45 mould of Ethernet 2 and interchanger 3 and PLC programming in logic circuit 10, the PLC logic Programmed circuit 10 grasps module 5 to the road I electricity by data line and the road II electricity grasps module 6 and assigns control instruction, the road the I road electricity Cao He II electricity Behaviour drives I circuit breaker 4 and II circuit breaker 7 to act respectively after being instructed, the I circuit breaker 4 and II circuit breaker 7 are logical The respective contact OF 13 is crossed, the make and break state of I circuit breaker 4 and II circuit breaker 7 is passed through into I0 and I1 by data line respectively PLC programming in logic circuit 10 is passed in port;Meanwhile I circuit breaker 4 and II circuit breaker 7 pass through cable 14 and the road I communication module The road 8 and II communication module 9 connects, and is connected to the port SL1 of PLC programming in logic circuit 10, and included monitoring modular 15 is adopted The parameters such as voltage, electric current, frequency, the harmonic wave of external power grid input power of collection pass through the road I communication module 8 and the road II communication module 9 It is transmitted to PLC programming in logic circuit 10 using 485 communication patterns, PLC programming in logic circuit 10 passes through on Ethernet 2 and interchanger 3 Pass to remote control computer 1.
2. railway signal input power monitoring according to claim 1 and breaker remote start system, it is characterised in that: The PLC programming in logic circuit 10 is connect with outside UPS mobile power source 12, and UPS mobile power source 12 is directly by outer net 220V electricity Pressure power supply.
3. railway signal input power monitoring according to claim 1 and breaker remote start system, it is characterised in that: Electricity behaviour's module 5 in the road I is connect with the port Q1 and Q2 of PLC programming in logic circuit 10 respectively, and the road II electricity is grasped module 6 and distinguished It is connect with the port Q4 and Q5 of PLC programming in logic circuit 10.
4. railway signal input power monitoring according to claim 1 and breaker remote start system, it is characterised in that: The road I electricity grasps module 5 and the road II electricity grasps module 6, I circuit breaker 4 and II circuit breaker 7, and the road I communication module 8 and the road II are logical Believing module 9 all is respectively three groups of identity units, while being all mounted on 19 faces in button control cabinet with PLC programming in logic circuit 10.
5. railway signal input power monitoring according to claim 1 and breaker remotely start control method, feature It is: includes the following steps:
Step 1: when three rotary switches 17 on 19 panel of button control cabinet are at telemechanical position, by PLC programming in logic electricity After road 10 carries out logical process, combined floodgate, disconnected lock instruction are issued to electricity behaviour's module 5 by the port Q1, Q2;
Step 2: grasping module 6 to the road II electricity by the port Q4, Q5 again issues combined floodgate, disconnected lock instruction, meanwhile, the road I electricity grasps module 5, After electricity behaviour's module 6 in the road II is ordered, I circuit breaker 4 and II circuit breaker 7 is driven to execute corresponding combined floodgate, disconnected lock operation;
Step 3: I circuit breaker 4 and II circuit breaker 7 pass through the respective contact OF 13, by the make and break state of respective breaker It passes to the port I0 and I1 of PLC programming in logic circuit 10 respectively by data line, then is uploaded to by Ethernet 2 and interchanger 3 Remote control computer 1;Pass through the respective contact OF 13, the "on" position indicator light on 19 panel of push button control cabinet simultaneously 18, I circuit breaker 4 and the disconnected lock of II circuit breaker 7, "on" position are shown respectively;Step 4: when remote control computer 1 is received The I circuit breaker 4 transmitted to PLC programming in logic circuit 10, II circuit breaker 7 are logical by the road I when wherein some is disconnected Believe that module 8 or the road II communication module 9 control the road I electricity and grasp module 5, the road II electricity is grasped module 6 and acted, so that I circuit breaker 4 or the road II Breaker 7 is automatically performed closed procedure.
6. railway signal input power monitoring according to claim 5 and breaker remotely start control method, feature Be: when three rotary switches 17 on 19 panel of button control cabinet in manual position, by PLC programming in logic circuit 10 After carrying out logical process, remote control command is prohibited, and presses two nonstick buttons 16 on 19 panel of control cabinet, meanwhile, Module 5 can be grasped to the road I electricity by the port Q1, Q2 of PLC programming in logic circuit 10 and issue combined floodgate, disconnected lock instruction, pass through Q4, Q5 Port issues combined floodgate, disconnected lock instruction to the road II electricity behaviour's module 6, finally, the road I electricity grasps module 5, electricity behaviour's module 6 in the road II is ordered Afterwards, I circuit breaker 4 is driven, II circuit breaker 7 executes corresponding combined floodgate, disconnected lock operation.
7. railway signal input power monitoring according to claim 5 and breaker remotely start control method, feature Be: when three rotary switches 17 on 19 panel of button control cabinet in maintenance position, by PLC programming in logic circuit 10 After carrying out logical process, remote control order and manual control commands will all be prohibited, and can at this time carry out in button cabinet Equipment carry out repair and maintenance.
8. railway signal input power monitoring according to claim 5 and breaker remotely start control method, feature It is: when the I circuit breaker 4 and II circuit breaker 7 are automatically performed closed procedure, is closed if can not continuously be automatically performed three times It closes, at this point, PLC programming in logic circuit 10 stops working, instruction state lamp 18 of alarming on 1 display interface of remote control computer dodges Bright, prompt need to be accomplished manually maintenance.
CN201910068339.8A 2019-01-24 2019-01-24 Railway signal input power supply monitoring and circuit breaker remote starting system and control method Active CN109557482B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910068339.8A CN109557482B (en) 2019-01-24 2019-01-24 Railway signal input power supply monitoring and circuit breaker remote starting system and control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910068339.8A CN109557482B (en) 2019-01-24 2019-01-24 Railway signal input power supply monitoring and circuit breaker remote starting system and control method

Publications (2)

Publication Number Publication Date
CN109557482A true CN109557482A (en) 2019-04-02
CN109557482B CN109557482B (en) 2024-05-28

Family

ID=65873529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910068339.8A Active CN109557482B (en) 2019-01-24 2019-01-24 Railway signal input power supply monitoring and circuit breaker remote starting system and control method

Country Status (1)

Country Link
CN (1) CN109557482B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201694209U (en) * 2010-06-25 2011-01-05 上海铁大电信设备有限公司 Remote monitoring apparatus of railway signal equipment
CN203365657U (en) * 2013-08-09 2013-12-25 刘伟 Remotely controlled simulation load device
US20170072881A1 (en) * 2014-03-05 2017-03-16 Brose Fahrzeugteile Gmbh & Co. Kommanditgesellschaft, Bamberg Controller for a multi-voltage on-board power supply system in a vehicle
US20170110875A1 (en) * 2015-10-14 2017-04-20 Schweitzer Engineering Laboratories, Inc. High-Frequency Electric Power System Signal Processing System
CN206389181U (en) * 2016-08-31 2017-08-08 曲阜师范大学 A kind of remote power supply intelligent monitor system
CN107884724A (en) * 2017-12-18 2018-04-06 东莞铭普光磁股份有限公司 A kind of dc source supervising device
CN109149780A (en) * 2018-10-26 2019-01-04 武汉奋翼科技有限公司 A kind of long-range switching system of railway signal power supply screen input power
CN209606592U (en) * 2019-01-24 2019-11-08 武汉奋翼科技有限公司 The monitoring of railway signal input power and breaker remote start system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201694209U (en) * 2010-06-25 2011-01-05 上海铁大电信设备有限公司 Remote monitoring apparatus of railway signal equipment
CN203365657U (en) * 2013-08-09 2013-12-25 刘伟 Remotely controlled simulation load device
US20170072881A1 (en) * 2014-03-05 2017-03-16 Brose Fahrzeugteile Gmbh & Co. Kommanditgesellschaft, Bamberg Controller for a multi-voltage on-board power supply system in a vehicle
US20170110875A1 (en) * 2015-10-14 2017-04-20 Schweitzer Engineering Laboratories, Inc. High-Frequency Electric Power System Signal Processing System
CN206389181U (en) * 2016-08-31 2017-08-08 曲阜师范大学 A kind of remote power supply intelligent monitor system
CN107884724A (en) * 2017-12-18 2018-04-06 东莞铭普光磁股份有限公司 A kind of dc source supervising device
CN109149780A (en) * 2018-10-26 2019-01-04 武汉奋翼科技有限公司 A kind of long-range switching system of railway signal power supply screen input power
CN209606592U (en) * 2019-01-24 2019-11-08 武汉奋翼科技有限公司 The monitoring of railway signal input power and breaker remote start system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
郑达 等: "铁路车站信号电源液压断路器远程投入系统", 《铁道通信信号》, vol. 47, no. 11, pages 23 - 25 *

Also Published As

Publication number Publication date
CN109557482B (en) 2024-05-28

Similar Documents

Publication Publication Date Title
CN101439725B (en) Control and monitoring system for railway switch location
CN101428635B (en) Electronic apparatus and method for controlling three phase current point switch
CN102518352A (en) Platform door control system and platform door control method
CN201329879Y (en) Device for controlling and monitoring positions of railroad turnouts
WO2020199658A1 (en) Intelligent controller for permanent magnet maglev turnout
CN102157212A (en) Indicating method and system for nuclear power plant back-up control panel
CN103631193A (en) System and method for realizing equipment control mode centralized undisturbed transfer
CN202197145U (en) Intelligent dual-power automatic transfer switch
CN202475014U (en) Regional electrical network integrated five-preventing system
CN201354082Y (en) Device for controlling three-phase alternating current switching machine
CN209241088U (en) Switch status monitoring system
CN209606592U (en) The monitoring of railway signal input power and breaker remote start system
CN104882795B (en) Power distribution network ring main unit control circuit having broken line monitoring function
CN111697705B (en) Power distribution integrated device based on multi-source information control
CN211826929U (en) Remote and local control system of vibration ore drawing motor
CN109557482A (en) The monitoring of railway signal input power and breaker remote start system and control method
CN2109466U (en) Automatic working device for spare pump
CN208689413U (en) A kind of load ratio bridging switch control system
CN109159799A (en) A kind of general track switch driving interface module and its application method
CN103373361B (en) The platform level electric-control system of rail traffic platform safety rail system
CN203430555U (en) Down-hole draw shaft automatic dust clearing system
CN207304150U (en) Secondary equipment in power system dual power supply comprehensive management apparatus
CN109541933A (en) Diesel locomotive status monitoring and emergency flight control system and method
CN106246039B (en) A kind of electronic conversion equipment control system of urban track traffic
CN203051186U (en) Local fan dual-power source remote automatic control device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant