CN109546691A - A kind of electric system generator rotor angle Transient Instability cuts the searching method and device of machine automatically - Google Patents

A kind of electric system generator rotor angle Transient Instability cuts the searching method and device of machine automatically Download PDF

Info

Publication number
CN109546691A
CN109546691A CN201811436599.8A CN201811436599A CN109546691A CN 109546691 A CN109546691 A CN 109546691A CN 201811436599 A CN201811436599 A CN 201811436599A CN 109546691 A CN109546691 A CN 109546691A
Authority
CN
China
Prior art keywords
power generation
generation node
machine amount
electric system
cut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811436599.8A
Other languages
Chinese (zh)
Other versions
CN109546691B (en
Inventor
司大军
周俊东
朱欣春
李玲芳
游广增
肖友强
钱迎春
陈义宣
陈姝敏
何烨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Power Grid Co Ltd
Original Assignee
Yunnan Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Power Grid Co Ltd filed Critical Yunnan Power Grid Co Ltd
Priority to CN201811436599.8A priority Critical patent/CN109546691B/en
Publication of CN109546691A publication Critical patent/CN109546691A/en
Application granted granted Critical
Publication of CN109546691B publication Critical patent/CN109546691B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • H02J3/48Controlling the sharing of the in-phase component
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/04Circuit arrangements for ac mains or ac distribution networks for connecting networks of the same frequency but supplied from different sources
    • H02J3/06Controlling transfer of power between connected networks; Controlling sharing of load between connected networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/24Arrangements for preventing or reducing oscillations of power in networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Abstract

The application provides the searching method and device that a kind of electric system generator rotor angle Transient Instability cuts machine automatically, in described search method, after obtaining target's center's branch, end system and receiving-end system are sent into electric system, system stability is improved by accurately cutting off sending unit, " blindness " that unit is cut in artificial selection is avoided, is solved in the prior art by the subjective judgement for calculating analysis personnel, the lower problem of accuracy.In addition, searching method provided by the present application can use computer technology realization, calculating analysis efficiency is improved, solves the problems, such as to expend time and manpower in the prior art.Further, by specifying the preferential excision sequence of power generation node to power generation node generator terminal voltage phase angle sequence, the machine result of cutting is optimized the application.

Description

A kind of electric system generator rotor angle Transient Instability cuts the searching method and device of machine automatically
Technical field
This application involves power system security stability control techniques fields, and in particular to a kind of electric system generator rotor angle transient state mistake The searching method and device of machine are surely cut automatically.
Background technique
Electric power system dispatching or planning department are being scheduled, are planning or when other electric system researchs, it will usually use The power system analysis softwares such as PSD-BPA, PSS/E, PSASP to electric system carry out simulation analysis, simulation analysis include stable state, Dynamic and transient emulation analysis.In power system transient simulation analytic process, it is possible that since electric power system fault is led The case where generator rotor angle Transient Instability of cause, two kinds main for the solution of generator rotor angle Transient Instability of tradition, the first is that reduction is defeated Electric section tidal current, second is timely cut-out generating set, the method quilt of cut-out generating set after breaking down It referred to as " cuts machine ", makes electric system restore stable again by cutting machine, to guarantee the safe and stable operation of electric system.
When solving generator rotor angle Transient Instability using machine is cut, critical issue is the generator for how selecting to need to cut off Group.Due in electric system after breaking down, it will usually there is asynchronous oscillation, during an asynchronous oscillation, lose Walk the point of the voltage minimum occurred on the interconnection of oscillation, as asynchronous oscillation oscillation center.Existing selection cuts off generator Group method in, generator rotor angle Transient Instability generation after, calculate analysis personnel firstly the need of observation transient emulation analysis in include The generator rotor angle of each generating set is posed for photograph curve, is determined by generator rotor angle curve of posing for photograph and is caused the generating set area of generator rotor angle Transient Instability Domain, rule of thumb excision cuts off one or more groups of generating sets in the generating set region.
However, inventor has found in the research process of the application, the method for the generating set that existing selection needs to cut off The subjective judgement for calculating analysis personnel is relied primarily on, accuracy is lower;In addition, during the generating set of selection excision, Continuous " trial and error " is needed, i.e., one by one increases or decreases the generating set quantity of excision, to seek to solve generator rotor angle Transient Instability Critical state, in the process, it usually needs it is a large amount of to calculate, expend time and manpower.
Summary of the invention
The application provides the searching method and device that a kind of electric system generator rotor angle Transient Instability cuts machine automatically, existing to solve In the method for selection excision generating set, accuracy is low, expends the problem of time and manpower.
The application's in a first aspect, provide the searching method that a kind of electric system generator rotor angle Transient Instability cuts machine automatically, comprising:
In the case where occurring generator rotor angle Transient Instability in transient emulation analytic process, electric system asynchronous oscillation center is obtained Place branch, using branch where electric system asynchronous oscillation center as target's center's branch;
Calculation of tidal current of the target's center's branch before breaking down is obtained, and according to the Load flow calculation knot Electric system is divided into sending and receiving-end system by the effective power flow direction in fruit, and the sending is to the receiving end system System transmission power;
The power generation node for including in the sending is obtained, and obtains each power generation node in the Load flow calculation As a result set end voltage phase angle and active power output in;
It sorts according to the size order of the set end voltage phase angle, establishes power generation node sequencing table, the power generation node row Include power generation node, set end voltage phase angle and active power output in sequence table, wherein each power generation node and the set end voltage Phase angle or active power output are corresponding;
Determination cut machine amount, according to it is described power generation node sequencing table in sequencing choose K power generation node, and according to Lower formula determines the value of K:
Wherein, PtTo cut machine amount, PiFor active power output, i=1,2,3 ... N, N are the number of power generation node;
Before input excision after the instruction of K power generation node, transient emulation analysis is re-started;
It is analyzed by the transient emulation recalculated as a result, judging that electric system whether there is the feelings of generator rotor angle Transient Instability Condition;
If it exists the case where generator rotor angle Transient Instability, machine amount is cut in increase, obtain it is new cut machine amount, and return to execution and choose power generation The operation of node, until the case where generator rotor angle Transient Instability is not present in electric system;
There will be no when generator rotor angle Transient Instability situation to cut machine amount, power generation number of nodes and specific power generation node defeated Out.
Optionally, machine amount is cut in the determination, comprising:
Fixed step size P is set according to the following formulastep:
Pstep=min (Pi);
Machine amount P is cut in determination according to the following formulat:
Pt=Pstep
Optionally, machine amount is cut in the increase, is obtained and new is cut machine amount, comprising:
Enable Pt=Pt+Pstep, by PtCalculated value cut machine amount as new.
Optionally, according to the effective power flow direction in the calculation of tidal current, by electric system be divided into sending and Receiving-end system, comprising:
According to the effective power flow in the calculation of tidal current, the effective power flow direction of target's center's branch is determined;
In the case where target's center's branch disconnects, according to the effective power flow direction, electric system is divided into and is sent End system and receiving-end system, wherein the sending is the input terminal in the effective power flow direction, and the receiving-end system is institute State the output end in effective power flow direction.
The second aspect of the application provides the searcher that a kind of electric system generator rotor angle Transient Instability cuts machine automatically, comprising:
First obtains module, in the case where for occurring generator rotor angle Transient Instability in transient emulation analytic process, obtains electricity Branch where Force system asynchronous oscillation center, using branch where electric system asynchronous oscillation center as target's center's branch Road;
Division module, for obtaining calculation of tidal current of the target's center's branch before breaking down, and according to Electric system is divided into sending and receiving-end system, the sending end system by the effective power flow direction in the calculation of tidal current It unites to the receiving-end system transmission power;
Second obtains module, for obtaining the power generation node for including in the sending, and obtains each power generation Set end voltage phase angle and active power output of the node in the calculation of tidal current;
Power generation node sequencing table establishes module, for the size order sequence according to the set end voltage phase angle, establishes hair Electrical nodes sequencing table includes power generation node, set end voltage phase angle and active power output in the power generation node sequencing table, wherein each A power generation node is corresponding with the set end voltage phase angle or active power output;
Generate electricity node determining module, cuts machine amount for determination, selects according to the sequencing in the power generation node sequencing table K power generation node is taken, and determines the value of K according to following formula:
Wherein, PtTo cut machine amount, PiFor active power output, i=1,2,3 ... N, N are the number of power generation node;
It is imitative to re-start transient state after the instruction of K power generation node before input excision for transient emulation analysis module True analysis;
Judgment module, for the transient emulation analysis by recalculating as a result, judging electric system with the presence or absence of generator rotor angle The case where Transient Instability;
Loop module, for determining that electric system there are in the case where generator rotor angle Transient Instability, increases in the judgment module Cut machine amount, obtain it is new cut machine amount, and the operation for executing and choosing power generation node is returned to, until generator rotor angle transient state is not present in electric system The case where unstability;
Output module cuts machine amount, power generation number of nodes and specific when for will be not present generator rotor angle Transient Instability situation Power generation node output.
Optionally, the power generation node determining module includes cutting machine amount determination unit, and the machine amount determination unit of cutting is used for Machine amount is cut in determination, and the machine amount determination unit of cutting includes:
Fixed step size determines subelement, for setting fixed step size P according to the following formulastep:
Pstep=min (Pi);
The machine amount of cutting determines subelement, cuts machine amount P for determination according to the following formulat:
Pt=Pstep
Optionally, the loop module include it is new cut machine amount determination unit, the new machine amount determination unit of cutting is used for Determine electric system there are in the case where generator rotor angle Transient Instability in the judgment module, machine amount is cut in increase, obtain it is new cut machine amount, The new machine amount determination unit of cutting includes:
New machine amount of cutting determines subelement, for enabling Pt=Pt+Pstep, by PtCalculated value cut machine amount as new.
Optionally, the division module includes division unit, and the division unit is used for according to the calculation of tidal current In effective power flow direction, electric system is divided into sending and receiving-end system, the division unit includes:
Direction of tide determines subelement, for determining the target according to the effective power flow in the calculation of tidal current The effective power flow direction of central branches;
Subelement is divided, is used in the case where target's center's branch disconnects, it, will according to the effective power flow direction Electric system is divided into sending and receiving-end system, wherein the sending is the input terminal in the effective power flow direction, institute State the output end that receiving-end system is the effective power flow direction.
It from the above technical scheme,, will be electric after obtaining target's center's branch in searching method provided by the present application Force system sends end system and receiving-end system, improves system stability by accurately cutting off sending unit, avoids artificial " blindness " of unit is cut in selection, is solved in the prior art by the subjective judgement for calculating analysis personnel, accuracy is lower The problem of.In addition, searching method provided by the present application can use computer technology realization, calculating analysis efficiency is improved, is solved It has determined and has expended the time in the prior art and the problem of manpower.Further, the application passes through power generation node generator terminal voltage phase angle row Sequence, specifies the preferential excision sequence of power generation node, and the machine result of cutting is optimized.
Detailed description of the invention
In order to illustrate more clearly of the technical solution of the application, letter will be made to attached drawing needed in the embodiment below Singly introduce, it should be apparent that, for those of ordinary skills, without creative efforts, also Other drawings may be obtained according to these drawings without any creative labor.
Fig. 1 is the work for the searching method that a kind of electric system generator rotor angle Transient Instability provided by the embodiments of the present application cuts machine automatically Make flow chart;
Fig. 2 is sending end provided by the embodiments of the present application and receiving end schematic diagram;
Fig. 3 is electric system line chart provided by the embodiments of the present application;
Fig. 4 is the knot for the searcher that a kind of electric system generator rotor angle Transient Instability provided by the embodiments of the present application cuts machine automatically Structure schematic diagram.
Specific embodiment
Accuracy is low in method to solve the problem of selection excision generating set, expend the time and manpower, the application mention Cut the searching method and device of machine automatically for a kind of electric system generator rotor angle Transient Instability.
Work flow diagram shown in referring to Fig.1, it is automatic that the embodiment of the present application provides a kind of electric system generator rotor angle Transient Instability Cut the searching method of machine, comprising the following steps:
Step 101, in the case where occurring generator rotor angle Transient Instability in transient emulation analytic process, electric system step-out is obtained Branch where oscillation center, using branch where electric system asynchronous oscillation center as target's center's branch.
In the step, in the case of generator rotor angle Transient Instability, it will usually electric system asynchronous oscillation occur, from analysis software In branch where available asynchronous oscillation center.
Step 102, calculation of tidal current of the target's center's branch before breaking down is obtained, and according to the tide Electric system is divided into sending and receiving-end system by the effective power flow direction in stream calculation result, and the sending is to institute State receiving-end system transmission power.
In the step, transient emulation analysis, which refers to, to be carried out under the premise of a certain fixed trend, that is to say, that in transient state Before simulation analysis, Load flow calculation is had been carried out in analysis software, and calculation of tidal current is stored in analysis software, passes through click Operation or input instruction, can obtain calculation of tidal current.
It will according to the effective power flow direction in the calculation of tidal current referring to sending end shown in Fig. 2 and receiving end schematic diagram Electric system is divided into sending and receiving-end system, comprising the following steps:
Step 1021, according to the effective power flow in the calculation of tidal current, the active of target's center's branch is determined Direction of tide.
In the step, if the numerical value of effective power flow is positive value, determine the effective power flow direction of target's center's branch with Sense of current is consistent;If the numerical value of effective power flow is negative value, the effective power flow direction of target's center's branch and electric current It is contrary.
Step 1022, in the case where target's center's branch disconnects, according to the effective power flow direction, by power train System is divided into sending and receiving-end system, wherein the sending is the input terminal in the effective power flow direction, the receiving end System is the output end in the effective power flow direction.
Step 103, the power generation node for including in the sending is obtained, and obtains each power generation node described Set end voltage phase angle and active power output in calculation of tidal current.
In the step, sending includes one or more generating sets, the corresponding one or more hairs of each generating set Electrical nodes.Virtual voltage when set end voltage refers to generator operation on generator outlet terminal.Set end voltage phase angle and have Function power output can obtain in analysis software.
Step 104, it sorts according to the size order of the set end voltage phase angle, establishes power generation node sequencing table, the hair Include power generation node, set end voltage phase angle and active power output in electrical nodes sequencing table, wherein each power generation node with it is described Set end voltage phase angle or active power output are corresponding.
In the step, according to the remoter rule of the power generation bigger electrical distance of node phase angle, the preferential electrical distance that cuts off is remote Unit is conducive to keep the stability of electric system, therefore, sorts, sorts forward according to the size order of set end voltage phase angle The corresponding generating set of power generation node is preferentially removed.
Step 105, machine amount is cut in determination, chooses K power generation node according to the sequencing in the power generation node sequencing table, And the value of K is determined according to following formula:
Wherein, PtTo cut machine amount, PiFor active power output, i=1,2,3 ... N, N are the number of power generation node.
In the step, in a kind of achievable mode, machine amount is cut in the determination, comprising the following steps:
Step 1051, fixed step size P is set according to the following formulastep:
Pstep=min (Pi);
Step 1052, machine amount P is cut in determination according to the following formulat:
Pt=Pstep
Step 106, before input excision after the instruction of K power generation node, transient emulation analysis is re-started.
Step 107, it is analyzed by the transient emulation recalculated as a result, judging that electric system is lost with the presence or absence of generator rotor angle transient state Steady situation.
In the step, if the case where electric system still has generator rotor angle Transient Instability, illustrate it is aforementioned cut machine operation be not enough to Reach generator rotor angle transient stability, executes the operation of step 108 at this time;If the case where generator rotor angle Transient Instability is not present in electric system, say It is bright to cut machine operation just at the critical state for reaching generator rotor angle transient stability, the operation of step 109 can be performed at this time.
Step 108, if it exists generator rotor angle Transient Instability the case where, machine amount is cut in increase, obtain it is new cut machine amount, and return to execution The operation of power generation node is chosen, until the case where generator rotor angle Transient Instability is not present in electric system.
In a kind of achievable mode, P is enabledt=Pt+Pstep, by PtCalculated value cut machine amount as new.
Wherein, PstepFor fixed step size, if new machine amount of cutting after returning and executing the operation for choosing power generation node, still It is unable to reach generator rotor angle transient stability, then is needed in Pt' on the basis of continue to sum it up with fixed step size, obtain it is new cut machine amount, such as This circulate operation stops circulation when electric system reaches generator rotor angle transient stability, and last time is calculated generator rotor angle transient stability When cut machine amount, power generation number of nodes and specific power generation node output.
Step 109, there will be no cut machine amount, power generation number of nodes and specific power generation when generator rotor angle Transient Instability situation Node output.
In the step, the specific node that generates electricity is corresponding with generating set, after finding specific power generation node, can obtain Know generating set to be cut off.
It from the above technical scheme,, will be electric after obtaining target's center's branch in searching method provided by the present application Force system sends end system and receiving-end system, improves system stability by accurately cutting off sending unit, avoids artificial " blindness " of unit is cut in selection, is solved in the prior art by the subjective judgement for calculating analysis personnel, accuracy is lower The problem of.In addition, searching method provided by the present application can use computer technology realization, calculating analysis efficiency is improved, is solved It has determined and has expended the time in the prior art and the problem of manpower.Further, the application passes through power generation node generator terminal voltage phase angle row Sequence, specifies the preferential excision sequence of power generation node, and the machine result of cutting is optimized.
The application is further illustrated below by way of specific embodiment.
Referring to certain simple power system schematic diagram shown in Fig. 3, simulation analysis is carried out using PDS-BPA simulation software.It will It is analyzed using electric system shown in Fig. 3 as embodiment, the feasibility of the above method is verified by simulation analysis.In Fig. 3, " collecting E " is transmitted electric power by two loop line road directions " load A " as 2 × 210MW.When collecting the two loop line road E~load A (I, II time) In I time line fault after, system will lose stabilization, show as sending end power generation one, power generation two, power generation three power station units to infinite The asynchronous oscillation (transient state generator rotor angle unstability) of big G unit.The following are the power generations that excision is found using searching method provided by the present application Unit, to keep the process of power system stability.
Step 1 reads central branches where asynchronous oscillation.According to electromechanical transient calculated result, collects E~load A two and return Route N-1 (occur a failure) generator rotor angle unstability afterwards, asynchronous oscillation center, which is located at, collects E~II loop line of load A road.
Step 2, the effective power flow of branch (collecting E~load A II to return) where reading asynchronous oscillation center are 210MW.It will Collect E~load A II and return disconnection (collect E~load A I and return failed disconnection), system is divided into two systems at this time.Collect the side E System transmission power from system to the side load A, therefore collect the side E system be sending, and the system of the side load A be by End system.
Step 3 obtains all power generation nodes of sending.From figure 3, it can be seen that the power generation node in sending Have: the 1G that generates electricity, one 2G of power generation, two 1G of power generation, two 2G of power generation, three 1G of power generation, generate electricity three 2G totally 6 units.
Step 4, from the set end voltage phase angle for reading the node that generates electricity in sending in calculation of tidal current, and pressing will be each Power generation node is sorted from large to small by phase angle, and the active power output and set end voltage phase angle for the node that generates electricity are as shown in Table 1.
The power generation node sequencing table of one sending of table
Generating set (power generation node) title Active power output (MW) Set end voltage mutually spends (degree)
Generate electricity a 1G 85.00 33.37
Generate electricity a 2G 75.00 33.09
Generate electricity two 1G 75.00 32.54
Generate electricity two 2G 65.00 32.27
Generate electricity three 1G 65.00 31.72
Generate electricity three 2G 55.00 31.44
Step 5 sums 6 unit outputs of sending for 420MW, and minimum unit output is 55MW, and P is arrangedstep= min(Pi)=55MW, enables Pt=Pstep=55MW chooses K power generation node from front to back from table one, meetsK=1 is calculated, i.e. one 1G of excision power generation.
The instruction of one 1G of excision power generation is added in the transient emulation analysis for carrying out failure, carries out transient state again for step 6 Simulation analysis.
Step 7, it is generator rotor angle Transient Instability that transient emulation, which analyzes result,.Enable Pt=Pt+Pstep=110MW, from table one from K power generation node is chosen front to back, is metK=2 is calculated, i.e. one 1G of excision power generation, hair One 2G of electricity.
The instruction of excision power generation one 1G, the 2G that generates electricity is added, again in step 8 in the transient emulation analysis for carrying out failure Carry out transient emulation analysis.
Step 9, it is generator rotor angle transient stability that transient emulation, which analyzes result, then power system stability can be restored by having found Cut machine combination: one 1G of excision power generation, one 2G of power generation.
Step 10 terminates simultaneously outputting cutting machine amount 110MW, cuts machine quantity K=2, the generating set specifically cut off: power generation one 1G, one 2G of power generation.
Referring to structural schematic diagram shown in Fig. 4, originally who asks embodiment to provide a kind of electric system generator rotor angle Transient Instability automatic Cut the searcher of machine, comprising:
First obtains module 100, in the case where for occurring generator rotor angle Transient Instability in transient emulation analytic process, obtains Branch where electric system asynchronous oscillation center, using branch where electric system asynchronous oscillation center as target's center's branch Road;
Division module 200, for obtaining calculation of tidal current of the target's center's branch before breaking down, and root According to the effective power flow direction in the calculation of tidal current, electric system is divided into sending and receiving-end system, the sending end System is to the receiving-end system transmission power;
Second obtains module 300, for obtaining the power generation node for including in the sending, and obtains each hair Set end voltage phase angle and active power output of the electrical nodes in the calculation of tidal current;
Power generation node sequencing table establishes module 400, for the size order sequence according to the set end voltage phase angle, establishes Generate electricity node sequencing table, and power generation node, set end voltage phase angle and active power output are included in the power generation node sequencing table, wherein Each power generation node is corresponding with the set end voltage phase angle or active power output;
Generate electricity node determining module 500, for determining machine amount of cutting, chooses K power generation node, and determine according to following formula The value of K:
Wherein, PtTo cut machine amount, PiFor active power output, i=1,2,3 ... N, N are the number of power generation node;
Transient emulation analysis module 600, for according to the sequence in the power generation node sequence table, K to generate electricity before choosing Node, and before input excision after the instruction of K power generation node, re-start transient emulation analysis;
Judgment module 700, for the transient emulation analysis by recalculating as a result, judging electric system with the presence or absence of function The case where angle Transient Instability;
Loop module 800, for determining that electric system there are in the case where generator rotor angle Transient Instability, increases in the judgment module Add and cut machine amount, obtain it is new cut machine amount, and the operation for executing and choosing power generation node is returned to, until there is no generator rotor angle is temporary for electric system The case where state unstability;
Output module 900 cuts machine amount, power generation number of nodes and tool when for will be not present generator rotor angle Transient Instability situation The power generation node of body exports.
Optionally, the power generation node determining module includes cutting machine amount determination unit, and the machine amount determination unit of cutting is used for Machine amount is cut in determination, and the machine amount determination unit of cutting includes:
Fixed step size determines subelement, for setting fixed step size P according to the following formulastep:
Pstep=min (Pi);
The machine amount of cutting determines subelement, cuts machine amount P for determination according to the following formulat:
Pt=Pstep
Optionally, the loop module include it is new cut machine amount determination unit, the new machine amount determination unit of cutting is used for Determine electric system there are in the case where generator rotor angle Transient Instability in the judgment module, machine amount is cut in increase, obtain it is new cut machine amount, The new machine amount determination unit of cutting includes:
New machine amount of cutting determines subelement, for enabling Pt=Pt+Pstep, by PtCalculated value cut machine amount as new.
Optionally, the division module includes division unit, and the division unit is used for according to the calculation of tidal current In effective power flow direction, electric system is divided into sending and receiving-end system, the division unit includes:
Direction of tide determines subelement, for determining the target according to the effective power flow in the calculation of tidal current The effective power flow direction of central branches;
Subelement is divided, is used in the case where target's center's branch disconnects, it, will according to the effective power flow direction Electric system is divided into sending and receiving-end system, wherein the sending is the input terminal in the effective power flow direction, institute State the output end that receiving-end system is the effective power flow direction.
It is required that those skilled in the art can be understood that the technology in the embodiment of the present invention can add by software The mode of general hardware platform realize.Based on this understanding, the technical solution in the embodiment of the present invention substantially or Say that the part that contributes to existing technology can be embodied in the form of software products, which can deposit Storage is in storage medium, such as ROM/RAM, magnetic disk, CD, including some instructions are used so that computer equipment (can be with It is personal computer, server or the network equipment etc.) execute certain part institutes of each embodiment of the present invention or embodiment The method stated.
Same and similar part may refer to each other between each embodiment in this specification.Implement especially for device For example, since it is substantially similar to the method embodiment, so being described relatively simple, related place is referring in embodiment of the method Explanation.
Combine detailed description and exemplary example that the application is described in detail above, but these explanations are simultaneously It should not be understood as the limitation to the application.It will be appreciated by those skilled in the art that without departing from the application spirit and scope, A variety of equivalent substitution, modification or improvements can be carried out to technical scheme and embodiments thereof, these each fall within the application In the range of.The protection scope of the application is determined by the appended claims.

Claims (8)

1. the searching method that a kind of electric system generator rotor angle Transient Instability cuts machine automatically characterized by comprising
In the case where occurring generator rotor angle Transient Instability in transient emulation analytic process, electric system asynchronous oscillation center place is obtained Branch, using branch where electric system asynchronous oscillation center as target's center's branch;
Calculation of tidal current of the target's center's branch before breaking down is obtained, and according in the calculation of tidal current Effective power flow direction, electric system is divided into sending and receiving-end system, the sending is defeated to the receiving-end system Send power;
The power generation node for including in the sending is obtained, and obtains each power generation node in the calculation of tidal current In set end voltage phase angle and active power output;
It sorts according to the size order of the set end voltage phase angle, establishes power generation node sequencing table, the power generation node sequencing table In include power generation node, set end voltage phase angle and active power output, wherein each power generation node and the set end voltage phase angle Or active power output is corresponding;
Machine amount is cut in determination, chooses K power generation node according to the sequencing in the power generation node sequencing table, and according to following public affairs Formula determines the value of K:
Wherein, PtTo cut machine amount, PiFor active power output, i=1,2,3 ... N, N are the number of power generation node;
Before input excision after the instruction of K power generation node, transient emulation analysis is re-started;
It is analyzed by the transient emulation recalculated as a result, judging the case where electric system is with the presence or absence of generator rotor angle Transient Instability;
If it exists the case where generator rotor angle Transient Instability, machine amount is cut in increase, obtain it is new cut machine amount, and return to execution and choose power generation node Operation, until electric system be not present generator rotor angle Transient Instability the case where;
There will be no cut machine amount, power generation number of nodes and specific power generation node output when generator rotor angle Transient Instability situation.
2. searching method according to claim 1, which is characterized in that machine amount is cut in the determination, comprising:
Fixed step size P is set according to the following formulastep:
Pstep=min (Pi);
Machine amount P is cut in determination according to the following formulat:
Pt=Pstep
3. searching method according to claim 2, which is characterized in that machine amount is cut in the increase, is obtained and new is cut machine amount, packet It includes:
Enable Pt=Pt+Pstep, by PtCalculated value cut machine amount as new.
4. searching method according to claim 1, which is characterized in that according to the effective power flow in the calculation of tidal current Electric system is divided into sending and receiving-end system by direction, comprising:
According to the effective power flow in the calculation of tidal current, the effective power flow direction of target's center's branch is determined;
In the case where target's center's branch disconnects, according to the effective power flow direction, electric system is divided into sending end system System and receiving-end system, wherein the sending is the input terminal in the effective power flow direction, and the receiving-end system has to be described The output end of function direction of tide.
5. the searcher that a kind of electric system generator rotor angle Transient Instability cuts machine automatically characterized by comprising
First obtains module, in the case where for occurring generator rotor angle Transient Instability in transient emulation analytic process, obtains power train Branch where system asynchronous oscillation center, using branch where electric system asynchronous oscillation center as target's center's branch;
Division module, for obtaining calculation of tidal current of the target's center's branch before breaking down, and according to described Electric system is divided into sending and receiving-end system by the effective power flow direction in calculation of tidal current, the sending to The receiving-end system transmission power;
Second obtains module, for obtaining the power generation node for including in the sending, and obtains each power generation node Set end voltage phase angle and active power output in the calculation of tidal current;
Power generation node sequencing table establishes module, for the size order sequence according to the set end voltage phase angle, establishes power generation section Sequencing table is put, includes power generation node, set end voltage phase angle and active power output in the power generation node sequencing table, wherein Ge Gesuo It is corresponding with the set end voltage phase angle or active power output to state power generation node;
Generate electricity node determining module, cuts machine amount for determination, chooses K according to the sequencing in the power generation node sequencing table Generate electricity node, and the value of K is determined according to following formula:
Wherein, PtTo cut machine amount, PiFor active power output, i=1,2,3 ... N, N are the number of power generation node;
Transient emulation analysis module re-starts transient emulation point after the instruction of K power generation node before input excision Analysis;
Judgment module, for the transient emulation analysis by recalculating as a result, judging electric system with the presence or absence of generator rotor angle transient state The case where unstability;
Loop module, for determining electric system there are in the case where generator rotor angle Transient Instability in the judgment module, machine is cut in increase Amount, obtain it is new cut machine amount, and the operation for executing and choosing power generation node is returned to, until generator rotor angle Transient Instability is not present in electric system The case where;
Output module cuts machine amount, power generation number of nodes and specific hair when for will be not present generator rotor angle Transient Instability situation Electrical nodes output.
6. searcher according to claim 5, which is characterized in that the power generation node determining module is true including cutting machine amount Order member, it is described cut machine amount determination unit for determination cut machine amount, the machine amount determination unit of cutting includes:
Fixed step size determines subelement, for setting fixed step size P according to the following formulastep:
Pstep=min (Pi);
The machine amount of cutting determines subelement, cuts machine amount P for determination according to the following formulat:
Pt=Pstep
7. searcher according to claim 6, which is characterized in that the loop module includes that new machine amount of cutting determines list Member, the new machine amount determination unit of cutting is for the case where the judgment module determines electric system there are generator rotor angle Transient Instabilities Under, machine amount is cut in increase, obtain it is new cut machine amount, the new machine amount determination unit of cutting includes:
New machine amount of cutting determines subelement, for enabling Pt=Pt+Pstep, by PtCalculated value cut machine amount as new.
8. searcher according to claim 5, which is characterized in that the division module includes division unit, and described stroke Sub-unit is used to that electric system to be divided into sending and receiving end system according to the effective power flow direction in the calculation of tidal current System, the division unit include:
Direction of tide determines subelement, for determining the target's center according to the effective power flow in the calculation of tidal current The effective power flow direction of branch;
Subelement is divided, is used in the case where target's center's branch disconnects, according to the effective power flow direction, by electric power System is divided into sending and receiving-end system, wherein the sending be the effective power flow direction input terminal, it is described by End system is the output end in the effective power flow direction.
CN201811436599.8A 2018-11-28 2018-11-28 A kind of electric system generator rotor angle Transient Instability cuts the searching method and device of machine automatically Active CN109546691B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811436599.8A CN109546691B (en) 2018-11-28 2018-11-28 A kind of electric system generator rotor angle Transient Instability cuts the searching method and device of machine automatically

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811436599.8A CN109546691B (en) 2018-11-28 2018-11-28 A kind of electric system generator rotor angle Transient Instability cuts the searching method and device of machine automatically

Publications (2)

Publication Number Publication Date
CN109546691A true CN109546691A (en) 2019-03-29
CN109546691B CN109546691B (en) 2019-10-25

Family

ID=65852237

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811436599.8A Active CN109546691B (en) 2018-11-28 2018-11-28 A kind of electric system generator rotor angle Transient Instability cuts the searching method and device of machine automatically

Country Status (1)

Country Link
CN (1) CN109546691B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112332408A (en) * 2020-10-22 2021-02-05 云南电网有限责任公司 Power transmission section tide adjusting method and device for power system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102510071A (en) * 2011-11-15 2012-06-20 河海大学 Power grid system emergency control method and device
CN104331837A (en) * 2014-08-13 2015-02-04 国网电力科学研究院 Simplification method for optimal cutting machine control strategy search of electric system transient stability
CN106451475A (en) * 2016-11-30 2017-02-22 云南电网有限责任公司 Searching method for generator tripping value and generator tripping range
CN106786727A (en) * 2017-02-17 2017-05-31 合肥工业大学 Control method after the wind fire bundling system useable direct current locking that wind thermoelectricity and capacitor are coordinated
CN107546749A (en) * 2017-09-04 2018-01-05 中国电力科学研究院 A kind of peace control after direct current locking failure cuts machine measure amount and calculates method and system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102510071A (en) * 2011-11-15 2012-06-20 河海大学 Power grid system emergency control method and device
CN104331837A (en) * 2014-08-13 2015-02-04 国网电力科学研究院 Simplification method for optimal cutting machine control strategy search of electric system transient stability
CN106451475A (en) * 2016-11-30 2017-02-22 云南电网有限责任公司 Searching method for generator tripping value and generator tripping range
CN106786727A (en) * 2017-02-17 2017-05-31 合肥工业大学 Control method after the wind fire bundling system useable direct current locking that wind thermoelectricity and capacitor are coordinated
CN107546749A (en) * 2017-09-04 2018-01-05 中国电力科学研究院 A kind of peace control after direct current locking failure cuts machine measure amount and calculates method and system

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
DAJUN SI: "《Critical line identification applicable to power system cascading failures》", 《2017 18TH INTERNATIONAL SCIENTIFIC CONFERENCE ON ELECTRIC POWER ENGINEERING》 *
任伟: "《基于暂态能量的电力系统暂态稳定切机》", 《中国博士学位论文全文数据库 工程科技Ⅱ辑》 *
董哲: "《针对风电外送基地的暂态切机决策模型》", 《电网技术》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112332408A (en) * 2020-10-22 2021-02-05 云南电网有限责任公司 Power transmission section tide adjusting method and device for power system
CN112332408B (en) * 2020-10-22 2023-05-26 云南电网有限责任公司 Power transmission section tide adjusting method and device for power system

Also Published As

Publication number Publication date
CN109546691B (en) 2019-10-25

Similar Documents

Publication Publication Date Title
CN107658840B (en) Distribution network failure restoration methods based on A* algorithm Yu fireworks algorithm
CN105958486B (en) Consider the multi-period dynamic fault-recovery method of power distribution network of distributed generation resource power curve
CN103778230A (en) Online automatic generation method for black-start scheme
CN110492526A (en) A kind of isolated island division methods based on deferrable load
CN109193706A (en) A kind of electric system generator rotor angle Transient Instability cuts the searching method and device of machine automatically
CN106921177B (en) Low voltage ride through control method and device of wind generating set and simulation system
CN105262131A (en) Black-start system and black-start method applicable to light storage micro grid
CN109546691B (en) A kind of electric system generator rotor angle Transient Instability cuts the searching method and device of machine automatically
Jin et al. A new system splitting scheme based on the unified stability control framework
Liu et al. Modeling and simulation of hybrid AC-DC system on a cloud computing based simulation platform-CloudPSS
CN108199381A (en) A kind of cutting load place selection method for wind power integration system voltage stability
CN109301880A (en) Method, apparatus and system are determined based on the direct current near region minimum booting of unit static state and dynamic electric voltage support effect
CN104113086B (en) A kind of wind-powered electricity generation thermoelectricity cuts machine policy co-ordination optimization method
CN109378835A (en) Based on the large-scale electrical power system Transient Stability Evaluation system that mutual information redundancy is optimal
Zamani et al. Active and reactive power scheduling optimization using firefly algorithm to improve voltage stability under load demand variation
CN109149618A (en) A kind of alternating current-direct current mixed connection electric system parallel recovery Study on Decision-making Method for Optimization
Moirangthem et al. Zero-one integer programming approach to determine the minimum break point set in multi-loop and parallel networks
CN115115133B (en) Parallel operation control method and device of generator and computer program product
CN110401208A (en) A kind of intelligent setting method of ac and dc systems high-frequency cutting machine
CN113204854B (en) Power grid partitioning method based on generator node and network weighted topology
CN110350596A (en) It is a kind of for improving the unit output optimization method of receiving end Power Network Transient Stability nargin
Birchfield Graph decomposition for constructing blackstart restoration strategies in benchmark cases
CN110165712B (en) Backbone net rack planning modeling method based on network flow constraint derivation
Koyama et al. Voltage collapse scenario search
CN109873454B (en) Method and device for evaluating group voltage supporting capability in receiving end power grid

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant