CN106451475A - Searching method for generator tripping value and generator tripping range - Google Patents

Searching method for generator tripping value and generator tripping range Download PDF

Info

Publication number
CN106451475A
CN106451475A CN201611092304.0A CN201611092304A CN106451475A CN 106451475 A CN106451475 A CN 106451475A CN 201611092304 A CN201611092304 A CN 201611092304A CN 106451475 A CN106451475 A CN 106451475A
Authority
CN
China
Prior art keywords
cut
machine
amount
power system
lower limit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611092304.0A
Other languages
Chinese (zh)
Other versions
CN106451475B (en
Inventor
司大军
钱迎春
李玲芳
陈义宣
游广增
陈姝敏
肖友强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Power Grid Co Ltd
Original Assignee
Yunnan Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Power Grid Co Ltd filed Critical Yunnan Power Grid Co Ltd
Priority to CN201611092304.0A priority Critical patent/CN106451475B/en
Publication of CN106451475A publication Critical patent/CN106451475A/en
Application granted granted Critical
Publication of CN106451475B publication Critical patent/CN106451475B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a searching method for generator tripping value and generator tripping range which determines a cut generator rejection, according to a preset value CO of the generator tripping. After the cut generator rejection is cut, whether an electrical power system is stable or not is estimated. If the electrical power system is in an instability, the preset value CO of the generator tripping is increased to a searching step Delta CO. Whether the preset value CO of the generator tripping is less than a maximum output and C max or not is estimated. If the preset value CO of the generator tripping is less than the maximum and C max, a cut generator rejection is redetermined and a stability of system is estimated according to the changed preset value CO of the generator tripping. Until the electrical power system is in a stability, the preset value CO of the generator tripping is a pending generator tripping value C. When the preset value CO of the generator tripping is assigned to the generator tripping value C, a search for the generator tripping value C is finished. Base on an obtainment of the generator tripping value C, a dichotomy is used to search a range of the generator tripping. The invention relates to the searching method for generator tripping value and generator tripping range which can search the generator tripping value and the generator tripping range quickly, therefore a safe and stable strategy can be made quickly and simply.

Description

One kind is cut machine amount and cuts machine range searching method
Technical field
The present invention relates to Power System Analysis technical field, more particularly to one kind are cut machine amount and cut machine range searching side Method.
Background technology
Power system is a complicated big system, and operation of power networks needs to keep the safety and stability of electrical network.According to《Power train System safety and stability directive/guide》, power system follows in N-1 principle, i.e. power system any element (as circuit, unit, transformator Deng) fault-free or for some reason barrier disconnect, power system should be able to keep stable operation and normal power supply.
Therefore, if a certain element that power system occurs in N-1 fault, i.e. power system disconnects, then power system need not Any measure is taken, system can keep stable.But, if there are two elements in N-2 fault, i.e. power system in power system Simultaneously switch off, then power system will occur unstability, to recover stablizing for power system, excision need to be taken to send out unit (letter below Claim to cut machine), cut off the load measure such as (hereinafter referred to as cutting load).
At present, power system is provided with safety stabilization control system, is provided with the peace for pre-establishing in safety stabilization control system Full stable strategy, there is N-2 event in safety and stability strategy in the case of no overhauling, overhaul for the different typical operation modes that manpower is calculated That need to taken during barrier cuts the measures such as machine, cutting load.When there is the N-2 fault of certain quasi-representative in power system, security and stability control System sends the instruction such as the machine of cutting, cutting load according to safety and stability strategy set in advance, completes to cut the operation such as machine, cutting load, from And maintain the stability of power system.
The calculating process for cutting the measures such as machine, cutting load includes cutting machine capacity (lower file claims to cut machine amount) and cutting load capacity The calculating of (hereinafter referred cutting load amount).Cutting load is primarily directed to circuit on power system, transformer overload, therefore, general root Just can better simply determination cutting load amount according to overload degree.But, angle stability of the machine mainly for power system is cut, therefore, Cannot be determined by simple method and machine amount is cut, in prior art, machine amount be cut by artificial calculating.Power system scale now Huge, element is numerous, and power system has multiple units, by sound out method find out its corresponding cut machine amount, therefore, cut machine The calculating process of amount is an extremely loaded down with trivial details, complicated process, needs to put into substantial amounts of manpower and time.
Content of the invention
Machine amount is cut there is provided one kind in the embodiment of the present invention and machine range searching method is cut, to solve people of the prior art Power is calculated cuts that machine amount is time-consuming, the problem of effort.
In order to solve above-mentioned technical problem, the embodiment of the invention discloses following technical scheme:
One kind cuts machine amount searching method, it is adaptable in the safety and stability strategy of power system, including,
S11, according to cutting machine preset value C0, determine and unit is cut, wherein, the unit of being cut includes several units, described Sum C of exerting oneself of several unitsaddWith cut machine predetermined amount C0Match;
S12, judges that excision is described and is cut after unit, whether power system reaches stable;
S121, if power system is not up to stable, cuts machine predetermined amount C by described0Increase a default unstability search Step delta C0, i.e. C0=C0+ΔC0, and judge to cut machine predetermined amount C0Whether less than EIAJ and Cmax, i.e. C0≤Cmax, wherein, The EIAJ and CmaxSum of exerting oneself for all units;If cutting machine predetermined amount C0Less than EIAJ and Cmax, then return Step S11;
S122, if power system reach stable, now cut machine predetermined amount C0Machine amount C is as cut, machine predetermined amount C will be cut0 Numerical value be assigned to cut machine amount C, complete to cut the search of machine amount C.
Preferably, also include before step S11, S10, set and cut machine predetermined amount C0Numerical value.
Preferably, the judgement excision is described is cut after unit, and it is stable whether power system reaches, and cuts off institute including obtaining The Temporal Data for being cut power system after unit is stated, the Temporal Data includes generator rotor angle, voltage, damping and overload numerical value;Successively Judge whether each Temporal Data reaches default stability criterion, if default stability criterion is all reached, judge power system Reach stable state;If there is any one Transient Stability Criterion default stability criterion is not up to, judge that power system is not up to Stable state.
One kind cuts machine range searching method, cuts machine amount C according to the method search in any one in claim 1-3, Acquisition cuts machine amount scope described in searching on the basis of cutting machine amount C, including S21, cuts machine upper limit C using dichotomizing searchupWith S22, Machine lower limit C is cut using dichotomizing searchdown.
Preferably, the S21, cuts machine upper limit C using dichotomizing searchupIncluding,
S211, the numerical value for cutting machine amount C is assigned to cut machine pre-determined lower limit C0, down, by the EIAJ and C0, max's Numerical value is assigned to cut machine preset upper limit C0, up
S212, according to cutting machine pre-determined lower limit C0, downWith cut machine preset upper limit C0, up, calculate machine amount C to be cutx, the machine to be cut Amount CxComputing formula be
S213, according to machine amount C to be cutx, determine and unit cut, and judge that excision is cut whether power system after unit is in Stable;
S2131, if power system is in stable, by machine amount C to be cutxNumerical value be assigned to cut machine pre-determined lower limit C0, down
S2132, if band is cut machine amount C in unstable by power systemxNumerical value is assigned to cut machine preset upper limit C0, up
S214, judges to cut machine pre-determined lower limit C0, downWith cut machine preset upper limit C0, upDifference whether more than default stable Judge step-length CSTEP
If so, then return to step S212;
If it is not, then now cut machine preset upper limit C0, upMachine upper limit C is as cutup, machine preset upper limit C will be cut0, upNumerical value It is assigned to cut machine upper limit Cup, complete to cut machine upper limit CupSearch.
Preferably, shown S22, cuts machine lower limit C using dichotomizing searchdownIncluding,
S221, will cut machine pre-determined lower limit C0, downGive 0 to be worth, the numerical value for cutting machine amount C is assigned to cut machine preset upper limit C0, up
S222, according to cutting machine pre-determined lower limit C0, downWith cut machine preset upper limit C0, up, calculate machine amount C to be cutx, the machine to be cut Amount CxComputing formula be
S223, according to machine amount C to be cutx, determining and cut unit, and judges to cut and whether power system is cut after unit in steady Fixed;
S2231, if power system is in stable, by machine amount C to be cutxNumerical value be assigned to cut machine pre-determined lower limit C0, down
S2232, if band is cut machine amount C in unstable by power systemxNumerical value is assigned to cut machine preset upper limit C0, up
S224, judges to cut machine pre-determined lower limit C0, downWith cut machine preset upper limit C0, upDifference whether more than default stable Judge step-length CSTEP
If so, then return to step S222;
If it is not, then now cut machine pre-determined lower limit C0, downMachine lower limit C is as cutdown, machine pre-determined lower limit C will be cut0, down's Numerical value is assigned to cut machine lower limit Cdown, complete to cut machine lower limit CdownSearch.
Beneficial effects of the present invention include:For carry out in safety and stability policy development cutting the search of machine amount need to put into a large amount of Manpower and time problem, the present invention proposes one kind and cuts machine amount and cut machine range searching method, cut for safety and stability strategy Formulation, improve cut machine amount search efficiency, reduce human input, save the time.
Description of the drawings
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing Accompanying drawing to be used needed for technology description is had to be briefly described, it should be apparent that, for those of ordinary skill in the art Speech, on the premise of not paying creative work, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is a kind of flow chart for cutting machine amount searching method provided in an embodiment of the present invention;
Fig. 2 is a kind of flow chart for judging stability of power system provided in an embodiment of the present invention;
Fig. 3 is the flow chart for cutting machine amount with machine range searching method is cut provided in an embodiment of the present invention;
Fig. 4 is a kind of flow chart for cutting machine upper limit searching method provided in an embodiment of the present invention;
Fig. 5 is a kind of flow chart for cutting machine lower limit searching method provided in an embodiment of the present invention.
Specific embodiment
In order that those skilled in the art more fully understand the technical scheme in the present invention, below in conjunction with reality of the present invention The accompanying drawing in example is applied, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described enforcement Example is only a part of embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, this area is common The every other embodiment obtained under the premise of creative work is not made by technical staff, should all belong to present invention protection Scope.
Fig. 1 is a kind of flow chart for cutting machine amount searching method provided in an embodiment of the present invention, as shown in figure 1, this example is carried For cut machine amount searching method be applied to power system safety and stability strategy formulation process, it is characterised in that including following Step:
S11, according to cutting machine preset value C0, determine and unit is cut, wherein, being cut unit includes several units, several units Sum C of exerting oneselfaddWith cut machine predetermined amount C0Match;
Herein, several units exert oneself be and cut the sum of exerting oneself of unit, should illustrate to be cut unit exerts oneself it And with cut machine predetermined amount C0Match and refer to, cut exerting oneself sum and cutting machine predetermined amount C for unit0Equal or close.If any quilt Cut unit exert oneself sum all not with cut machine predetermined amount C0Equal, then according to phase approximately principle of exerting oneself, then select to exert oneself sum and cut Machine predetermined amount C0Immediate Unit Combination is to be cut unit.
S12, judges to cut off and is cut after unit, and whether power system reaches stable;
Judge to cut off and cut after unit, it is stable whether power system reaches, and specifically includes, obtain to cut off and cut electricity after unit The Temporal Data of Force system, Temporal Data includes generator rotor angle, voltage, damping and overload numerical value;Judge that each Temporal Data is successively No reach default stability criterion, if all reaching default stability criterion, judge power system reach stable state;If existing any One Transient Stability Criterion is not up to default stability criterion, then judge that power system is not up to stable state.
In the present embodiment, the stability state for being cut power system after unit is cut off using Transient State Simulation Software simulation, is read The Temporal Data of power system, and according to the Temporal Data for reading, judge that power system is not up to stable state.Fig. 2 is reality of the present invention The flow chart for applying a kind of judgement stability of power system of example offer, as shown in Fig. 2 Temporal Data includes generator rotor angle, voltage, damping And overload numerical value;Judge whether each Temporal Data reaches default stability criterion successively, specifically, judging power system most Whether big generator rotor angle is if so, then not up to stable state, if it is not, then reach stable state more than 360 °;Judge the lower voltage node of power system The voltage low persistent period, whether more than 1 second, is if so, then not up to stable state, if it is not, then reaching stable state;Analytical calculation the system Transient state curve damping ratio, and judge dominant oscillating mode damping ratio whether less than Dset, if so, then stable state is not up to, if it is not, then Reach stable state;Judging in power system, whether have element to transship, if so, then stable state being not up to, if it is not, then reaching stable state.
S121, if power system is not up to stable, will cut machine predetermined amount C0Increase a default unstability step-size in search ΔC0, and judge to cut machine predetermined amount C0Whether less than EIAJ and Cmax, wherein, EIAJ and CmaxUnit is cut for all Sum of exerting oneself;If cutting machine predetermined amount C0Less than EIAJ and Cmax, then return to step S11;
S122, if power system reach stable, now cut machine predetermined amount C0Machine amount C is as cut, machine predetermined amount C will be cut0 Numerical value be assigned to cut machine amount C, i.e. C=C0, complete to cut the search of machine amount C.
In the present embodiment, also include before step S11, S10, set and cut machine predetermined amount C0Numerical value.Search in actual During machine amount cut by rope, certain unstability situation cutting machine amount that those skilled in the art can occur to power system carries out one Preliminary estimation, and estimated value is assigned to cut machine predetermined amount C0.If one can be provided suitably cut machine predetermined amount C0, will shorten Cut the search time of machine amount C.Certainly, if not cutting machine predetermined amount C0Preset or cut machine predetermined amount C0Situation about estimating is difficult, Then by automatic cutting machine predetermined amount C0Give 0 to be worth.
Search procedure below with reference to example cutting machine amount C is illustrated, and in power system, AH-JG circuit occurs N- 2 faults, cause electrical network unstability.
The power station unit cut on AH-JG circuit is defined, including AH power station unit and LY power station unit, wherein, AH power station unit includes 5 units, exerting oneself as 400MW per platform unit;LY power station unit includes 4 units, per platform unit Exert oneself as 600MW, then EIAJ and CmaxFor 4400MW;
Machine predetermined amount C is cut in setting0Numerical value be 2000MW, unstability step-size in search Δ C0Numerical value be 500MW;
According to cutting machine preset value C0=2000MW, determines 2 units (the referred to as AH 2 for being cut unit for AH power station unit Platform machine) with 2 units (referred to as 2 machines of LY) of LY power station unit, after actually cutting machine 2000MW unit, through judging, electrical network is still Unstability is not up to stable;
Machine predetermined amount C will be cut0Increase a unstability step-size in search Δ C0, i.e. C0=2000MW+500MW=2500MW, according to Determined again cuts machine preset value C0=2500MW, determines and is cut unit for 3 machines of 2 machines of AH and LY, actually cut machine After 2600MW (capacity phase approximately principle), through judging, electrical network still unstability is not up to stable;
Continue to cut machine predetermined amount C0Increase a unstability step-size in search Δ C0, i.e. C0=2500MW+500MW=3000MW, Machine preset value C is cut according to redefined0=3000MW, determines and is cut unit for 3 machines of 3 machines of AH and LY, actually cut machine After 3000MW, through judging, electrical network reaches stable;
Then now cut machine predetermined amount C0Machine amount C is as cut, machine predetermined amount C will be cut0Numerical value be assigned to cut machine amount C, i.e. C= 3000MW, completes to cut the search of machine amount C.
In actual applications, except needing search to cut machine amount, cutting machine scope is also often needed to scan for, i.e. machine is cut in search The upper limit with cut machine lower limit.Fig. 3 is the flow chart for cutting machine amount with machine range searching method is cut provided in an embodiment of the present invention, such as Fig. 3 Shown, machine amount C is cut by the machine amount searching method determination of cutting that the present embodiment is provided, if when machine amount is cut in search, being made Electrical network reach stable cut machine amount, then do not carry out cutting the search of machine amount scope, directly terminate search procedure.If obtaining to make electrical network Reach stable cut machine amount, then cutting machine amount scope is scanned for, and machine amount scope is cut in search includes S21, and machine upper limit C is cut in searchup With S22, search for and cut machine lower limit Cdown.Complete cutting machine amount and cut after the search procedure of machine scope, cut determined machine amount C, cut Machine upper limit CupAnd cut machine lower limit CdownExported
It should be noted that the machine amount of cutting is not limited only to obtain using the machine amount searching method of cutting in the present invention, which can also be adopted He obtains method, such as artificial calculating.
Fig. 4 is a kind of flow chart for cutting machine upper limit searching method provided in an embodiment of the present invention, as shown in figure 4, this enforcement In example, machine upper limit C is cut using dichotomizing searchup, specifically include,
S211, the numerical value for cutting machine amount C is assigned to cut machine pre-determined lower limit C0, down, i.e. C0, down=C, by EIAJ and Cmax Numerical value be assigned to cut machine preset upper limit C0, up, i.e. C0, up=Cmax
S212, according to cutting machine pre-determined lower limit C0, downWith cut machine preset upper limit C0, up, calculate machine amount C to be cutx, machine amount C to be cutx Computing formula be
S213, according to machine amount C to be cutx, determining and cut unit, and judges to cut and whether power system is cut after unit in steady Fixed;
S2131, if power system is in stable, by machine amount C to be cutxNumerical value be assigned to cut machine pre-determined lower limit C0, down, i.e., C0, down=Cx
S2132, if band is cut machine amount C in unstable by power systemxNumerical value is assigned to cut machine preset upper limit C0, up, i.e., C0, up=Cx
S214, judges to cut machine pre-determined lower limit C0, downWith cut machine preset upper limit C0, upDifference whether less than default stable Judge step-length CSTEP, i.e. C0, up-C0, down≤CSTEP
If it is not, then return to step S212;
If so, then now cut machine preset upper limit C0, upMachine upper limit C is as cutup, machine preset upper limit C will be cut0, upNumerical value It is assigned to cut machine upper limit Cup, i.e. Cup=C0, up, complete to cut machine upper limit CupSearch.
Process below with reference to the search of the examples detailed above cutting machine upper limit is illustrated, and in the above-described example, has been obtained Cut machine amount C=3000MW, EIAJ and Cmax=4400MW, meanwhile, set stably and judge step-length CSTEPFor 200MW, search is cut Machine upper limit detailed process is as follows:
The numerical value for cutting machine amount C is assigned to cut machine pre-determined lower limit C0, down, i.e. C0, down=3000MW;By EIAJ and Cmax Numerical value be assigned to cut machine preset upper limit C0, up, i.e. C0, up=4400MW;
Calculate machine amount C to be cutx, i.e.,
According to machine amount C to be cutx=3700MW, determines and is cut unit for 4 machines of 3 machines of AH and LY, cut going out for unit Power sum is 3600MW, and after unit is cut in excision, the stabilization of power grids, then by machine amount C to be cutxNumerical value be assigned to cut machine pre-determined lower limit C0, down, i.e. C0, down=3700MW;
Judge to cut machine pre-determined lower limit C0, downWith cut machine preset upper limit C0, upDifference whether stable judge step more than default Long CSTEP, i.e. C0, up-C0, down=4400-3700=700MW > 200MW;
Return and calculate amount C to be cutxStep, cuts machine pre-determined lower limit C according to new settings0, down, recalculate amount C to be cutx,
I.e.
According to machine amount C to be cutx=4050MW, determines and is cut unit for 4 machines of 4 machines of AH and LY, cut going out for unit Power sum is 4000MW, cuts off and is cut after unit, and the stabilization of power grids, then by machine amount C to be cutxNumerical value be assigned to cut machine pre-determined lower limit C0, down, i.e. C0, down=4050MW;
Judge to cut machine pre-determined lower limit C0, downWith cut machine preset upper limit C0, upDifference whether stable judge step more than default Long CSTEP, i.e. C0, up-C0, down=4400-4050=350MW > 200MW;
Return and calculate amount C to be cutxStep, cuts machine pre-determined lower limit C according to new settings0, down, recalculate amount C to be cutx,
I.e.
According to machine amount C to be cutx=4225MW, determines and is cut unit for 4 machines of 5 machines of AH and LY, cut going out for unit Power sum is 4400MW, cuts off and is cut after unit, and the stabilization of power grids, then by machine amount C to be cutxNumerical value be assigned to cut machine pre-determined lower limit C0, down, i.e. C0, down=4225MW;
Judge to cut machine pre-determined lower limit C0, downWith cut machine preset upper limit C0, upDifference whether stable judge step more than default Long CSTEP, i.e. C0, up-C0, down=4400-4225=175MW < 200MW;
Now cut machine preset upper limit C0, upMachine upper limit C is as cutup, machine preset upper limit C will be cut0, upNumerical value be assigned to cut machine Upper limit Cup, i.e. Cup=4400MW, completes to cut machine upper limit CupSearch.
Fig. 5 is a kind of flow chart for cutting machine lower limit searching method provided in an embodiment of the present invention, as shown in figure 5, this enforcement In example, machine lower limit C is cut using dichotomizing searchdown, specifically include,
S221, will cut machine pre-determined lower limit C0, downGive 0 to be worth, the numerical value for cutting machine amount C is assigned to cut machine preset upper limit C0, up
S222, according to cutting machine pre-determined lower limit C0, downWith cut machine preset upper limit C0, up, calculate machine amount C to be cutx, machine amount C to be cutx Computing formula be
S223, according to machine amount C to be cutx, determining and cut unit, and judges to cut and whether power system is cut after unit in steady Fixed;
S2231, if power system is in stable, by machine amount C to be cutxNumerical value be assigned to cut machine pre-determined lower limit C0, down
S2232, if band is cut machine amount C in unstable by power systemxNumerical value is assigned to cut machine preset upper limit C0, up
S224, judges to cut machine pre-determined lower limit C0, downWith cut machine preset upper limit C0, upDifference whether more than default stable Judge step-length CSTEP
If so, then return to step S222;
If it is not, then now cut machine pre-determined lower limit C0, downMachine lower limit C is as cutdown, machine pre-determined lower limit C will be cut0, down's Numerical value is assigned to cut machine lower limit Cdown, complete to cut machine lower limit CdownSearch.
Process below with reference to the search of examples detailed above cutting machine lower limit is illustrated, and in the above-described example, has been obtained Machine amount C=3000MW is cut, meanwhile, set stably and judge step-length CSTEPFor 200MW, it is as follows that machine lower limit detailed process is cut in search:
Machine pre-determined lower limit C will be cut0, downGive 0 to be worth, i.e. C0, down=0MW, by the numerical value for cutting machine amount C be assigned to cut machine default on Limit C0, up, i.e. C0, down=3000MW;
Calculate machine amount C to be cutx, i.e.,
According to machine amount C to be cutx=1500MW, determines and is cut unit for 2 machines of 1 machine of AH and LY, cut going out for unit Power sum is 1600MW, and after unit is cut in excision, electrical network unstability, then by machine amount C to be cutxNumerical value be assigned to cut machine pre-determined lower limit C0, down, i.e. C0, down=1500MW;
Judge to cut machine pre-determined lower limit C0, downWith cut machine preset upper limit C0, upDifference whether stable judge step more than default Long CSTEP, i.e. C0, up-C0, down=3000-1500=1500MW > 200MW;
Return and calculate amount C to be cutxStep, cuts machine pre-determined lower limit C according to new settings0, down, recalculate amount C to be cutx,
I.e.
According to machine amount C to be cutx=2250MW, determines and is cut unit for 2 machines of 3 machines of AH and LY, cut going out for unit Power sum is 2400MW, cuts off and is cut after unit, and electrical network unstability, then by machine amount C to be cutxNumerical value be assigned to cut machine pre-determined lower limit C0, down, i.e. C0, down=2250MW;
Judge to cut machine pre-determined lower limit C0, downWith cut machine preset upper limit C0, upDifference whether stable judge step more than default Long CSTEP, i.e. C0, up-C0, down=3000-2250=750MW > 200MW;
Return and calculate amount C to be cutxStep, cuts machine pre-determined lower limit C according to new settings0, down, recalculate amount C to be cutx,
I.e.
According to machine amount C to be cutx=2625MW, determines and is cut unit for 3 machines of 2 machines of AH and LY, cut going out for unit Power sum is 2600MW, cuts off and is cut after unit, and electrical network unstability, then by machine amount C to be cutxNumerical value be assigned to cut machine pre-determined lower limit C0, down, i.e. C0, down=2625MW;
Judge to cut machine pre-determined lower limit C0, downWith cut machine preset upper limit C0, upDifference whether stable judge step more than default Long CSTEP, i.e. C0, up-C0, down=3000-2625=375MW > 200MW;
Return and calculate amount C to be cutxStep, cuts machine pre-determined lower limit C according to new settings0, down, recalculate amount C to be cutx,
I.e.
According to machine amount C to be cutx=2812.5MW, determines and is cut unit for 2 machines of 4 machines of AH and LY, cut unit Sum of exerting oneself is 2800MW, cuts off and is cut after unit, and electrical network unstability, then by machine amount C to be cutxNumerical value be assigned to cut machine pre-determined lower limit C0, down, i.e. C0, down=2800MW;
Judge to cut machine pre-determined lower limit C0, downWith cut machine preset upper limit C0, upDifference whether stable judge step more than default Long CSTEP, i.e. C0, up-C0, down=3000-2812.5=187.5MW < 200MW;
Now cut machine pre-determined lower limit C0, downMachine lower limit C is as cutdown, machine pre-determined lower limit C will be cut0, downNumerical value be assigned to Cut machine lower limit Cdown, i.e. Cdown=2800MW, completes to cut machine lower limit CdownSearch.
The present invention can be described in the general context of computer executable instructions, such as program Module.Usually, program module includes execution particular task or realizes the routine of particular abstract data type, program, object, group Part, data structure etc..The present invention is put into practice in a distributed computing environment can also, in these distributed computing environment, by The remote processing devices connected by communication network are executing task.In a distributed computing environment, program module is permissible It is located at including in the local and remote computer-readable storage medium including storage device.
The above is only the specific embodiment of the present invention, makes skilled artisans appreciate that or realizing this Bright.Multiple modifications to these embodiments will be apparent to one skilled in the art, as defined herein General Principle can be realized without departing from the spirit or scope of the present invention in other embodiments.Therefore, the present invention The embodiments shown herein is not intended to be limited to, and is to fit to and principles disclosed herein and features of novelty phase one The most wide scope for causing.
The above is only the specific embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should It is considered as protection scope of the present invention.
In prior art, safety and stability strategy is formulated for artificial, proposes some power system typical case operation sides according to actual Formula, that need to taken during all kinds of N-2 faults of calculating cuts machine, cutting load measure.
When the security performance of safety and stability strategy is assessed, also need the scope for cutting machine amount is calculated, that is, cut the machine amount upper limit and cut Machine amount lower limit, has surveyed the wellness of security performance by the ranging assessments safety and stability for cutting machine amount, for example, if cut the machine amount upper limit with When the difference of lower limit is close with maximum unit capacity, show that the safety of safety and stability strategy is poor.

Claims (6)

1. one kind cuts machine amount searching method, it is adaptable in the safety and stability strategy of power system, it is characterised in that include,
S11, according to cutting machine preset value C0, determine and unit is cut, wherein, the unit of being cut includes several units, the several machines Sum C of exerting oneself of groupaddWith cut machine predetermined amount C0Match;
S12, judges that excision is described and is cut after unit, whether power system reaches stable;
S1211, if power system is not up to stable, cuts machine predetermined amount C by described0Increase a default unstability step-size in search ΔC0
S1212, judges to cut machine predetermined amount C0Whether less than EIAJ and Cmax, wherein, the EIAJ and CmaxFor organic The sum of exerting oneself of group;If cutting machine predetermined amount C0Less than EIAJ and Cmax, then return to step S11;
S122, if power system reach stable, now cut machine predetermined amount C0Machine amount C is as cut, machine predetermined amount C will be cut0Number Value is assigned to cut machine amount C, completes to cut the search of machine amount C.
2. according to claim 1 cut machine amount searching method, it is characterised in that also include before step S11, S10, set Cut machine predetermined amount C0Numerical value.
3. according to claim 1 machine amount searching method is cut, it is characterised in that the judgement cuts off described is cut unit Afterwards, whether power system reaches and stablizes, and cuts off the Temporal Data for being cut power system after unit, the transient state including obtaining Data include generator rotor angle, voltage, damping and overload numerical value;Judge whether each Temporal Data reaches default stability criterion successively, If default stability criterion is all reached, judge that power system reaches stable state;If there is any one Transient Stability Criterion not reaching To default stability criterion, then judge that power system is not up to stable state.
4. one kind cuts machine range searching method, it is characterised in that cut according to the method search in any one in claim 1-3 Machine amount C, cuts machine amount scope described in search on the basis of machine amount C is cut in acquisition, including S21, cuts the machine upper limit using dichotomizing search CupWith S22, machine lower limit C is cut using dichotomizing searchdown.
5. according to claim 4 cut machine range searching method, it is characterised in that the S21, cut using dichotomizing search Machine upper limit CupIncluding,
S211, the numerical value for cutting machine amount C is assigned to cut machine pre-determined lower limit C0, down, by the EIAJ and C0, maxNumerical value It is assigned to cut machine preset upper limit C0, up
S212, according to cutting machine pre-determined lower limit C0, downWith cut machine preset upper limit C0, up, calculate machine amount C to be cutx, machine amount C to be cutx Computing formula be
S213, according to machine amount C to be cutx, determine and unit cut, and judge that excision is cut power system after unit and whether is in and stablize;
S2131, if power system is in stable, by machine amount C to be cutxNumerical value be assigned to cut machine pre-determined lower limit C0, down
S2132, if band is cut machine amount C in unstable by power systemxNumerical value is assigned to cut machine preset upper limit C0, up
S214, judges to cut machine pre-determined lower limit C0, downWith cut machine preset upper limit C0, upDifference whether stable judge step more than default Long CSTEP
If so, then return to step S212;
If it is not, then now cut machine preset upper limit C0, upMachine upper limit C is as cutup, machine preset upper limit C will be cut0, upNumerical value be assigned to cut Machine upper limit Cup, complete to cut machine upper limit CupSearch.
6. according to claim 4 cut machine range searching method, it is characterised in that the S22, cut using dichotomizing search Machine lower limit CdownIncluding,
S221, will cut machine pre-determined lower limit C0, downGive 0 to be worth, the numerical value for cutting machine amount C is assigned to cut machine preset upper limit C0, up
S222, according to cutting machine pre-determined lower limit C0, downWith cut machine preset upper limit C0, up, calculate machine amount C to be cutx, machine amount C to be cutx Computing formula be
S223, according to machine amount C to be cutx, determining and cut unit, and judges to cut and whether power system is cut after unit in stable;
S2231, if power system is in stable, by machine amount C to be cutxNumerical value be assigned to cut machine pre-determined lower limit C0, down
S2232, if band is cut machine amount C in unstable by power systemxNumerical value is assigned to cut machine preset upper limit C0, up
S224, judges to cut machine pre-determined lower limit C0, downWith cut machine preset upper limit C0, upDifference whether stable judge step more than default Long CSTEP
If so, then return to step S222;
If it is not, then now cut machine pre-determined lower limit C0, downMachine lower limit C is as cutdown, machine pre-determined lower limit C will be cut0, downNumerical value assign Cut machine lower limit Cdown, complete to cut machine lower limit CdownSearch.
CN201611092304.0A 2016-11-30 2016-11-30 One kind cutting machine amount and cuts machine range searching method Active CN106451475B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611092304.0A CN106451475B (en) 2016-11-30 2016-11-30 One kind cutting machine amount and cuts machine range searching method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611092304.0A CN106451475B (en) 2016-11-30 2016-11-30 One kind cutting machine amount and cuts machine range searching method

Publications (2)

Publication Number Publication Date
CN106451475A true CN106451475A (en) 2017-02-22
CN106451475B CN106451475B (en) 2019-09-03

Family

ID=58222469

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611092304.0A Active CN106451475B (en) 2016-11-30 2016-11-30 One kind cutting machine amount and cuts machine range searching method

Country Status (1)

Country Link
CN (1) CN106451475B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109546691A (en) * 2018-11-28 2019-03-29 云南电网有限责任公司 A kind of electric system generator rotor angle Transient Instability cuts the searching method and device of machine automatically

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101299537A (en) * 2007-11-08 2008-11-05 江苏省电力公司 Centralized decision-making real time emergency control method for large electric network overloading
CN101436779A (en) * 2008-12-12 2009-05-20 中国电力科学研究院 Transient, dynamic stabilization aid decision-making automatic searching method based on parallel calculation
CN105279568A (en) * 2014-12-25 2016-01-27 贵州电网公司电力调度控制中心 Electric power system over frequency generator tripping strategy setting method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101299537A (en) * 2007-11-08 2008-11-05 江苏省电力公司 Centralized decision-making real time emergency control method for large electric network overloading
CN101436779A (en) * 2008-12-12 2009-05-20 中国电力科学研究院 Transient, dynamic stabilization aid decision-making automatic searching method based on parallel calculation
CN105279568A (en) * 2014-12-25 2016-01-27 贵州电网公司电力调度控制中心 Electric power system over frequency generator tripping strategy setting method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
任伟: "《天津大学博士学位论文》", 1 April 2009 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109546691A (en) * 2018-11-28 2019-03-29 云南电网有限责任公司 A kind of electric system generator rotor angle Transient Instability cuts the searching method and device of machine automatically
CN109546691B (en) * 2018-11-28 2019-10-25 云南电网有限责任公司 A kind of electric system generator rotor angle Transient Instability cuts the searching method and device of machine automatically

Also Published As

Publication number Publication date
CN106451475B (en) 2019-09-03

Similar Documents

Publication Publication Date Title
CN111368449B (en) Cascading failure evolution path online identification method considering alternating current and direct current influences
CN106058876B (en) Consider the dynamic reactive Site Selection analysis method and system of Enhancement of Transient Voltage Stability
CN109462225B (en) Insulation matching method and system for series compensation device
CN111509753A (en) Method and system for controlling short-circuit current in near zone of converter station
Li et al. Research on HIL-based HVRT and LVRT automated test system for photovoltaic inverters
CN106451475A (en) Searching method for generator tripping value and generator tripping range
CN110135039A (en) Wind-powered electricity generation collects regional non-equilibrium among three phase voltages and determines method and device
CN106599341A (en) Method for generating safe and stable control strategy table containing flexible direct current transmission system
CN112152227A (en) Direct current blocking sending end power grid overvoltage phase calculation method and device considering phase modulator influence
CN114268100B (en) Method and device for analyzing transient stability performance of alternating current-direct current hybrid power system
CN111162557A (en) Sending end system transient stability margin adjusting method and system
CN112366663B (en) Calculation method, device and storage medium for fault limit removal time of power system
CN115000983A (en) Method, device and equipment for evaluating inertia and primary frequency modulation capability of power supply node
CN109103876B (en) Transient stability analysis method based on equivalent impedance
CN115561668A (en) Method and system for testing limit short-circuit ratio of new energy power generation unit
CN111416342A (en) Power grid strength evaluation method, device and medium for power system containing STATCOM
CN110148968A (en) Photovoltaic DC grid-connected system fault recovery control method
CN117239717B (en) Mixed cascade multi-terminal direct current transient overvoltage risk suppression strategy determination method
CN109713677B (en) Power grid optimal power flow model establishing method and device and electronic equipment
CN110797905B (en) Control method and device for low voltage ride through of wind turbine generator and storage medium
CN113258563B (en) Method and device for determining relay protection sensitivity of alternating current power grid accessed by flexible direct island
CN117767399A (en) Temporary overvoltage risk detection method and device for new energy multi-station grid-connected system
CN113625124B (en) Method and device for determining monopole fault line of direct-current power distribution network
CN114614462A (en) Reactive voltage control method and device
CN116106676A (en) Short-circuit current direct-current component calculation method, system and equipment of power system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant