CN109537890A - A kind of through-wall bolt locating system and building template construction method - Google Patents

A kind of through-wall bolt locating system and building template construction method Download PDF

Info

Publication number
CN109537890A
CN109537890A CN201910073586.7A CN201910073586A CN109537890A CN 109537890 A CN109537890 A CN 109537890A CN 201910073586 A CN201910073586 A CN 201910073586A CN 109537890 A CN109537890 A CN 109537890A
Authority
CN
China
Prior art keywords
wall
plate
bolt
sides
wall bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910073586.7A
Other languages
Chinese (zh)
Other versions
CN109537890B (en
Inventor
曹海峰
张灵巧
刘国林
姚奇
李广飞
彭遥
田沙沙
郭金达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Run Lin New Material Science And Technology Ltd
Original Assignee
Hebei Run Lin New Material Science And Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Run Lin New Material Science And Technology Ltd filed Critical Hebei Run Lin New Material Science And Technology Ltd
Priority to CN201910073586.7A priority Critical patent/CN109537890B/en
Publication of CN109537890A publication Critical patent/CN109537890A/en
Application granted granted Critical
Publication of CN109537890B publication Critical patent/CN109537890B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/065Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/065Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
    • E04G17/0655Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts
    • E04G17/0657Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts fully recoverable

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention relates to a kind of through-wall bolt locating system, structure includes typified form, universal plate, bridge cylinder, through-wall bolt, mould top and casing.Assembled formwork is distinguished on wall two sides, and universal plate connects plane template in the parallel face in wall two sides, universal plate two sides.Preset bolt hole is opened in through-wall bolt installation site, and bridge cylinder is put into courtyard portion and is screwed.Through-wall bolt is pierced by from open preset bolt hole through the through-wall bolt hole of wall form to opposite face.Through-wall bolt is penetrated from opposite metope by mould top, casing, mould top and bridge cylinder, and bridge cylinder is screwed.The present invention realizes the integral assembling formwork of whole face template in wall casting process, and guarantee that the template on wall two sides can support both side plate in bolt hole position, coaxial drawknot system can be formed by through-wall bolt and keel again, guarantee wall size, cancel the cement top die roller of traditional template inner support, simplify branch mold process, improves efficiency, reduce cost.

Description

A kind of through-wall bolt locating system and building template construction method
Technical field
The present invention relates to a kind of plastic formwork erecting device, specifically a kind of through-wall bolt locating system and building mould Plate construction method.
Background technique
In construction, wall, the cylinder of building, structures are required to carry out formwork, to make formwork erecting structure Stablize fastening, need to connect the template of two sides using through-wall bolt and is fixed.In previous building structure construction, all it is Then first assembling reinforcement carries out template formwork, and using steel form or aluminum alloy mould plate, by template splicing at required It after shape, needs to punch in template, the through-wall bolt for being socketed with casing is penetrated from punching place then and revolves through-wall bolt It fastens, concrete setting simultaneously takes out through-wall bolt after reaching performance standard.And original template construction can only be combined into Whole big high template on one side, and another side must intert one by one through-wall bolt with resolution model monolithic, never pacify after drilling Casing is put between two templates by the place of decking, and casing is interspersed on hole.Originally plank sheathing punch position pair The inside answered is due to the reinforcing bar that gathers, so that the needs shuttle of split bolt acock leads to the template face on opposite, no in reinforcing bar It is perpendicular to plate face, and has certain inclination, if directly tightening the two sides chevron card of split bolt, is just had inclined It is dangerous.In order to guarantee the depth of parallelism between two planes, it is necessary to it adds and places cement backform support member among two plate faces, But the technical requirements of operation just may require that and be carried out by the experienced worker of profession, it is complicated and take a lot of work.Problem above makes template Formwork process it is complicated, operating difficulties, and template reuse rate is low.
Summary of the invention
It is existing to solve it is an object of the invention to provide a kind of through-wall bolt locating system and building template construction method Form erecting technology complex procedures, operating difficulties, can not whole face formwork, the problem of low efficiency.
The present invention is implemented as follows: a kind of through-wall bolt locating system, including it is typified form, universal plate, bridge cylinder, through walls Bolt, mould top and casing;Several pieces of typified forms are spliced into two blocks of wall forms, between two neighboring typified form by The universal plate is connected and fixed, and the universal plate is identical as the thickness of the typified form, the plane of the typified form and institute The bottom surface flush of universal plate is stated, the plane of two wall forms is oppositely arranged, and the omnipotent Board position on two wall forms It corresponds to each other;The bridge cylinder is cylindric and is distributed on the universal plate, the connection type between bridge cylinder and universal plate For clamping, described sleeve pipe is set between two blocks of wall forms, and the mould top is set to the both ends of described sleeve pipe, the mould tip cutting Connect on the bridge cylinder, the through-wall bolt pass through the universal plate, bridge cylinder, mould top and casing, the two of the through-wall bolt End is fixed on universal plate.
The universal plate includes panel, partition, plate ridge, even hole portion and courtyard portion;The panel is strip plate, Ruo Gansuo Partition is stated to be uniformly distributed along panel length direction, the partition and the panel be mutually perpendicular to and the two sides of partition respectively with face The two sides of plate are overlapped, and the plate ridge is rectangle cylinder, and the plate ridge is distributed in the two corners on the partition top, and the plate The length of ridge is identical as the length of the panel, is a cell cube between two neighboring partition, is equipped at the middle part of cell cube Cell cube is divided into along two parts in panel length direction, respectively described even hole portion and the courtyard portion by scoreboard;The day The front and rear sides in well portion are respectively equipped with side rib, and are provided with handle hole on the side rib, courtyard portion both ends partition with A shoulder is respectively equipped in scoreboard;Be respectively equipped with upper hole muscle and lower opening muscle in the upper and lower surface of the even hole portion, the upper hole muscle and The both ends of lower opening muscle are connected with partition and scoreboard respectively, and the top of the upper hole muscle is connected with the plate ridge of two sides, the upper hole muscle The company of the being formed hole between lower opening muscle;It is equipped on the panel in the courtyard portion and secretly sets bolt hole.
The convex block substantially symmetrical about its central axis about bridge cylinder is equipped in the bottom of bridge cylinder two sides.
The mould top includes that big pipe and tubule, the big pipe are connected with tubule, the internal diameter and described sleeve pipe of the big pipe Outer diameter it is identical, the outer diameter of the tubule is identical as the internal diameter of the bridge cylinder.
A kind of building template construction method based on through-wall bolt locating system, the construction method the following steps are included:
A. it is needing the wall two sides that pour to distinguish assembled formwork, several universal plates is being set in the two sides of wall, and wall two sides Universal plate along metope in parallel to just, in the two sides of universal plate, typified form, the plate face of universal plate and the plate of typified form are set Face is located at approximately the same plane, and the plate face of wall two sides universal plate is arranged both facing on the inside of wall;
B. it will need to wear on the universal plate of wall two sides and connect the bolt hole of secretly setting of through-wall bolt and open, bridge cylinder is put into and open is secretly set In courtyard portion where bolt hole and rotate fixation;
C. prepare one end and be screwed with the through-wall bolt of nut, the one end for the nut that is not screwed on passes through to wall two sides are corresponding to be beaten That opens secretly sets bolt hole;
D. it is successively worn in through-wall bolt traversing through end and connects mould top, casing, mould top and bridge cylinder, and the rotation of bridge cylinder is fixed on universal plate Courtyard portion in;
E. it is screwed on nut in the traversing through end of through-wall bolt, fixes through-wall bolt and in tension.
The through-wall bolt is distributed according to construction requirement, do not wear connect through-wall bolt secretly set bolt hole keep sealing state.
Present invention uses newest universal plate structure and bridge cylinder is cooperated to innovate through-wall bolt system, omnipotent Plate is equipped with courtyard portion, is provided on the bottom surface in courtyard portion and secretly sets bolt hole, and the cylinder shoulder structure of clamping bridge cylinder is arranged in courtyard portion, Bridge cylinder is cylindrical shape, inside can accommodate through-wall bolt and pass through.First ready typified form is passed through in construction omnipotent Plate connects into the metope template of bulk, then integrally installs metope template, and the two sides for the wall for needing to pour are arranged opposite Metope template, and guarantee that the omnipotent Board position in the metope template of two sides corresponds to each other, this makes it possible to by through-wall bolt and casing The casing between two metope templates is fixed across two metope templates, and in courtyard portion mounting bridge cylinder, casing and two bridges Cylinder forms internal support, is finally being tightened the both ends of through-wall bolt using nut, so that through-wall bolt be fixed, nut with wear Wall screw forms external tension.Nut is screwed off after construction, through-wall bolt is extracted out, entire metope template can be torn open Under.This through-wall bolt system is rear-mounted coaxial force structure, and internal support top, external clamping eliminates traditional cement mould Topmast strut, does not generate internal stress.
The present invention realizes the integral assembling formwork of whole face template in wall casting process, and guarantees the mould on wall two sides Plate can support both side plate in bolt hole position and form coaxial drawknot system by through-wall bolt and keel, guarantee metope Size cancels the cement top die roller of traditional template inner support, simplifies branch mold process, improves efficiency, reduce cost.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
Fig. 2 is the structural schematic diagram of bridge cylinder of the present invention.
Fig. 3 is the top view of bridge cylinder of the present invention.
Fig. 4 is the structural schematic diagram of universal plate of the present invention.
Fig. 5 is the perspective view of universal plate of the present invention.
In figure: 1, bridge cylinder;2, mould top;3, through-wall bolt;4, casing;5, universal plate;6, typified form;1-1, cylinder;1- 2, convex block;1-3, tooth engaged;1-4, fin;5-1, panel;5-2, partition;5-3, plate ridge;5-4, even hole portion;5-5, courtyard portion; 5-6, scoreboard;5-7, upper hole muscle;5-8, lower opening muscle;5-9, Lian Kong;5-10, plasma discharge hole;5-11, side rib;5-12, handle hole;5- 13, bolt hole is secretly set;5-14, cylinder shoulder;5-15, ridge ditch;5-16, pedestal;5-17, abutment.
Specific embodiment
As shown in Figure 1, the present invention includes typified form 6, universal plate 5, bridge cylinder 1, through-wall bolt 3, mould top 2 and casing 4. One piece of universal plate is arranged for being spliced into metope template in typified form 6 and universal plate 5 between two pieces of adjacent typified forms 6 5, it is connected and fixed between universal plate 5 and typified form 6 by connector, and the thickness phase of the thickness of universal plate 5 and typified form 6 Together, after universal plate 5 is fixedly connected with typified form 6 bottom surface of universal plate 5 and typified form 6 plane flush.Metope mould Plate has two pieces, and two pieces of metope templates are oppositely arranged, and the plane of two pieces of metope templates is all located inside, while two metope templates On 5 position of universal plate correspond to each other.Cylindric 1 arranged for interval of bridge cylinder on universal plate 5, and bridge cylinder 1 be connected to it is omnipotent On plate 5.Casing 4 is set between two blocks of wall forms, is equipped with mould top 2 at the both ends of casing 4, mould top 2 is plugged on bridge cylinder 1 On.Through-wall bolt 3 passes through universal plate 5, bridge cylinder 1, mould top 2 and casing 4, and the both ends of through-wall bolt 3 are fixed on universal plate 5 On.
As shown in Figure 2 and Figure 3, jackshaft cylinder 1 includes cylinder 1-1, convex block 1-2 and tooth engaged 1-3;In cylinder 1-1 Wall is equipped with screw thread, and convex block 1-2 is set to the lower part of the two sides cylinder 1-1, and tooth engaged 1-3 is set to the upper end of cylinder 1-1.Convex block 1-2 About the substantially symmetrical about its central axis of cylinder 1-1, the right side of convex block 1-2 is along the diametric perpendicular of cylinder 1-1, convex block 1-2 Left side be the tangent perpendicular with cylinder 1-1 outer wall, the upper and lower end face of convex block 1-2 is all horizontal plane, and lower end surface with The lower end surface flush of cylinder 1-1.The medial surface and lateral surface of protrusive board are overlapped with the inner and outer wall of cylinder 1-1 respectively.Occlusion Tooth 1-3 shares several and is uniformly distributed around the central axis of cylinder 1-1, and the space between two neighboring tooth engaged 1-3 can just A tooth engaged 1-3 is enough accommodated to be put into.Vertical fin 1-4, the upper end fin 1-4 and cylinder are additionally provided in the two sides of cylinder 1-1 The lower end of the upper surface flush of 1-1, fin 1-4 is connected with the upper surface of convex block 1-2, and the right side of fin 1-4 with it is convex The right side flush of block 1-2.Tooth engaged 1-3 is located at the position for having fin 1-4.
As shown in Figure 4, Figure 5, wherein universal plate 5 includes panel 5-1, partition 5-2, plate ridge 5-3, even hole portion 5-4 and day Well portion 5-5.Panel 5-1 is strip plate, and several partition 5-2 are uniformly distributed along panel 5-1 length direction, partition 5-2 and panel 5-1 It is mutually perpendicular to and the two sides of partition 5-2 is overlapped with the two sides of panel 5-1 respectively, plate ridge 5-3 is rectangle cylinder, plate ridge 5- 3 are distributed in the two corners on the top partition 5-2, and the length of plate ridge 5-3 is identical as the length of panel 5-1, two neighboring partition 5-2 it Between be a cell cube, be equipped with scoreboard 5-6 at the middle part of cell cube and cell cube be divided into along two portions of panel 5-1 length direction Point, respectively connect hole portion 5-4 and courtyard portion 5-5.The front and rear sides of courtyard portion 5-5 are respectively equipped with side rib 5-11, and in side rib 5- It is provided with handle hole 5-12 on 11, is respectively equipped with a shoulder 5-14 on the partition 5-2 and scoreboard 5-6 at the courtyard portion both ends 5-5.In even hole The upper and lower surface of portion 5-4 be respectively equipped with the both ends of hole muscle 5-7 and lower opening muscle 5-8, upper hole muscle 5-7 and lower opening muscle 5-8 respectively with Partition 5-2 is connected with scoreboard 5-6, and the top of upper hole muscle 5-7 is connected with the plate ridge 5-3 of two sides, upper hole muscle 5-7 and lower opening muscle 5-8 Between formed 5 connecting hole 5-9 of universal plate.The shape of 5 connecting hole 5-9 of universal plate is rectangle, and the height of 5 connecting hole 5-9 of universal plate It spends and identical as the 5 connecting hole 5-9 height of universal plate of typified form 6 that universal plate 5 cooperates.On two, the top of upper hole muscle 5-7 Ridge ditch 5-15 is provided between plate ridge 5-3, the both ends ridge ditch 5-15 are not connected with partition 5-2 and scoreboard 5-6, set in the middle part of ridge ditch 5-15 There is the pedestal 5-16 concordant with the plate upper surface ridge 5-3, the abutment 5-17 of the upper surface protruding plate ridge 5-3 be equipped on pedestal 5-16, Pedestal 5-16 is parallel to each other with partition 5-2.Several plasma discharge hole 5- along institute's panel 5-1 width direction are provided on lower opening muscle 5-8 10.It is equipped on the panel 5-1 of courtyard portion 5-5 and secretly sets bolt hole 5-13.It is provided with vertical elongated slot on cylinder shoulder 5-14, in cylinder shoulder 5- The side of 14 bottoms is provided with notch, and vertical elongated slot is connected with notch, the opposite side each other of the gap position on two cylinder shoulder 5-14.Point The width of plate 5-6 is slightly less than the width of partition 5-2, cover board can be arranged in the two sides of universal plate 5 side of universal plate 5 is close Envelope.
Through-wall bolt 3 includes screw rod, is screwed with nut at the both ends of screw rod, is respectively equipped with gear on the inside of two nuts Piece, screw rod screw the nut at both ends after wall, and nut is contacted with baffle, and baffle is pressed in universal plate 5 and typified form 6 On.Casing 4 is round tube, and length is determined according to the thickness of wall.Mould top 2 includes big pipe and tubule, and big pipe is connected with tubule, The internal diameter of big pipe is identical as the outer diameter of casing 4 for casing 4 to be plugged on inside mould top 2, the outer diameter of tubule and the internal diameter of bridge cylinder 1 It is identical, for bridge cylinder 1 to be inserted on mould top 2.
A kind of building template construction method based on through-wall bolt locating system, the construction method the following steps are included:
A. it is needing the wall two sides that pour to distinguish assembled formwork, several universal plates 5 is being set in the two sides of wall, and wall two sides Universal plate 5 along metope in parallel to just, in the two sides of universal plate, typified form 6, the plate face and typified form 6 of universal plate 5 are set Plate face be located at approximately the same plane, and the plate face of wall two sides universal plate 5 is arranged both facing on the inside of wall.
B. by need to wear on wall two sides universal plate 5 connect through-wall bolt 3 secretly set bolt hole 5-13 open, bridge cylinder 1 is put Enter in the open courtyard portion 5-5 secretly set where bolt hole 5-13 and rotates fixation.
C. prepare the through-wall bolt 3 that one end is screwed with nut, it is opposite that the one end for the nut that is not screwed on is passed through wall two sides The opening answered secretly sets bolt hole 5-13.
D. it is successively worn in 3 traversing through end of through-wall bolt and connects mould top 2, casing 4, mould top 2 and bridge cylinder 1, and bridge cylinder 1 is rotated admittedly It is scheduled in the courtyard portion 5-5 of universal plate 5.
E. it is screwed on nut in the traversing through end of through-wall bolt 3, keeps through-wall bolt 3 fixed and in tension.
Wherein through-wall bolt 3 is uniformly distributed, and is not worn and is met the bolt hole 5-13 that secretly sets of through-wall bolt 3 and do not open holding seal shape State.
Present invention uses newest 5 structure of universal plate and 1 pair of 3 system of through-wall bolt of bridge cylinder is cooperated to be innovated, Universal plate 5 is equipped with courtyard portion 5-5, is provided on the bottom surface of courtyard portion 5-5 and secretly sets bolt hole 5-13, and is arranged in courtyard portion 5-5 Be clamped the cylinder shoulder 5-14 structure of bridge cylinder 1, bridge cylinder 1 is cylindrical shape, inside can accommodate through-wall bolt 3 and pass through.It is first in construction The metope template that ready typified form 6 is connected into bulk by universal plate 5, then integrally installs metope template, needs Opposite metope template is arranged in the two sides for the wall to be poured, and guarantees that 5 position of universal plate in the metope template of two sides is mutually right It answers, this makes it possible to which through-wall bolt 3 and casing 4 are passed through two metope templates, and in courtyard portion 5-5 mounting bridge cylinder 1 by two Casing 4 between metope template is fixed, and casing 4 and two bridge cylinders 1 form internal support, finally in use nut by through-wall bolt 3 both ends are tightened, so that through-wall bolt 3 is fixed, nut and through-wall bolt 3 form external tension.By nut after construction It screws off, through-wall bolt 3 is extracted out, whole face template can not be disassembled to separation and be detached from the concrete wall for pouring completion.
The present invention realizes the assembled formwork of whole face template in wall casting process, simplifies branch mold process, improves effect Rate, and what is used is all general part, can reuse, reduce costs.

Claims (6)

1. a kind of through-wall bolt locating system, which is characterized in that including typified form, universal plate, bridge cylinder, through-wall bolt, mould top And casing;Several pieces of typified forms are spliced into two blocks of wall forms, by described omnipotent between two neighboring typified form Plate is connected and fixed, and the universal plate is identical as the thickness of the typified form, the plane of the typified form and the universal plate Bottom surface flush, the plane of two wall forms is oppositely arranged, and the omnipotent Board position on two wall forms corresponds to each other; The bridge cylinder is cylindric and is distributed on the universal plate that the connection type between bridge cylinder and universal plate is clamping, institute It states casing to be set between two blocks of wall forms, the mould top is set to the both ends of described sleeve pipe, and the mould top is plugged on described On bridge cylinder, the through-wall bolt passes through the universal plate, bridge cylinder, mould top and casing, and the both ends of the through-wall bolt are fixed on On universal plate.
2. through-wall bolt locating system according to claim 1, which is characterized in that the universal plate include panel, partition, Plate ridge, even hole portion and courtyard portion;The panel is strip plate, and several partitions are uniformly distributed along panel length direction, institute It states partition to be mutually perpendicular to the panel, and the two sides of partition are overlapped with the two sides of panel respectively, the plate ridge is rectangular Shape cylinder, the plate ridge is distributed in the two corners on the partition top, and the length of the plate ridge is identical as the length of the panel, It is a cell cube between two neighboring partition, is equipped with scoreboard at the middle part of cell cube and cell cube is divided into along panel length direction Two parts, respectively described even hole portion and the courtyard portion;The front and rear sides in the courtyard portion are respectively equipped with side rib, and It is provided with handle hole on the side rib, is respectively equipped with a shoulder on the partition at courtyard portion both ends and scoreboard;In the even hole portion Upper and lower surface be respectively equipped with hole muscle and lower opening muscle, the both ends of the upper hole muscle and lower opening muscle respectively with partition and scoreboard phase Even, the top of the upper hole muscle is connected with the plate ridge of two sides, the company of being formed hole between the upper hole muscle and lower opening muscle;In the courtyard The panel in portion is equipped with and secretly sets bolt hole.
3. through-wall bolt locating system according to claim 1, which is characterized in that be equipped in the bottom of bridge cylinder two sides The convex block substantially symmetrical about its central axis about bridge cylinder.
4. through-wall bolt locating system according to claim 1, which is characterized in that the mould top includes big pipe and tubule, The big pipe is connected with tubule, and the internal diameter of the big pipe is identical as the outer diameter of described sleeve pipe, the outer diameter of the tubule with it is described The internal diameter of bridge cylinder is identical.
5. a kind of building template construction method based on through-wall bolt locating system, which is characterized in that the construction method include with Lower step:
A. it is needing the wall two sides that pour to distinguish assembled formwork, several universal plates is being set in the two sides of wall, and wall two sides Universal plate along metope in parallel to just, in the two sides of universal plate, typified form, the plate face of universal plate and the plate of typified form are set Face is located at approximately the same plane, and the plate face of wall two sides universal plate is arranged both facing on the inside of wall;
B. it will need to wear on the universal plate of wall two sides and connect the bolt hole of secretly setting of through-wall bolt and open, bridge cylinder is put into and open is secretly set In courtyard portion where bolt hole and rotate fixation;
C. prepare one end and be screwed with the through-wall bolt of nut, the one end for the nut that is not screwed on passes through to wall two sides are corresponding to be beaten That opens secretly sets bolt hole;
D. it is successively worn in through-wall bolt traversing through end and connects mould top, casing, mould top and bridge cylinder, and the rotation of bridge cylinder is fixed on universal plate Courtyard portion in;
E. it is screwed on nut in the traversing through end of through-wall bolt, fixes through-wall bolt and in tension.
6. the building template construction method according to claim 5 based on through-wall bolt locating system, which is characterized in that institute Through-wall bolt is stated to be distributed according to construction requirement, do not wear connect through-wall bolt secretly set bolt hole keep sealing state.
CN201910073586.7A 2019-01-25 2019-01-25 Wall-penetrating bolt positioning system and building template construction method Active CN109537890B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910073586.7A CN109537890B (en) 2019-01-25 2019-01-25 Wall-penetrating bolt positioning system and building template construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910073586.7A CN109537890B (en) 2019-01-25 2019-01-25 Wall-penetrating bolt positioning system and building template construction method

Publications (2)

Publication Number Publication Date
CN109537890A true CN109537890A (en) 2019-03-29
CN109537890B CN109537890B (en) 2023-10-13

Family

ID=65838301

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910073586.7A Active CN109537890B (en) 2019-01-25 2019-01-25 Wall-penetrating bolt positioning system and building template construction method

Country Status (1)

Country Link
CN (1) CN109537890B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110056187A (en) * 2019-05-27 2019-07-26 中建四局第四建筑工程有限公司 A kind of steel gang form sets up structure
CN113585723A (en) * 2021-09-29 2021-11-02 天津仝元材料科技有限公司 Assembling method of building shaped formwork non-right-angle wall formwork
CN113585750A (en) * 2021-09-29 2021-11-02 天津仝元材料科技有限公司 Method for reinforcing end socket structure template based on Tornado

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0128626A2 (en) * 1983-06-08 1984-12-19 Gerardus Van Rijn A spacer for a concrete shuttering
CN2893058Y (en) * 2006-03-03 2007-04-25 林双俤 Concrete shuttering counter-drawing combine external member
CN201144521Y (en) * 2007-12-29 2008-11-05 陕西航天租赁有限公司 Big formwork split bolt capable of positioning wall thickness
CN204590577U (en) * 2015-04-13 2015-08-26 河北润林新材料科技有限公司 Strip plastic formwork
CN204590590U (en) * 2015-04-13 2015-08-26 河北润林新材料科技有限公司 A kind of template bolt hole
CN107268995A (en) * 2017-07-25 2017-10-20 河北润林新材料科技有限公司 Cast template splices bridge plate and its application method
CN209556376U (en) * 2019-01-25 2019-10-29 河北润林新材料科技有限公司 A kind of through-wall bolt locating system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0128626A2 (en) * 1983-06-08 1984-12-19 Gerardus Van Rijn A spacer for a concrete shuttering
CN2893058Y (en) * 2006-03-03 2007-04-25 林双俤 Concrete shuttering counter-drawing combine external member
CN201144521Y (en) * 2007-12-29 2008-11-05 陕西航天租赁有限公司 Big formwork split bolt capable of positioning wall thickness
CN204590577U (en) * 2015-04-13 2015-08-26 河北润林新材料科技有限公司 Strip plastic formwork
CN204590590U (en) * 2015-04-13 2015-08-26 河北润林新材料科技有限公司 A kind of template bolt hole
CN107268995A (en) * 2017-07-25 2017-10-20 河北润林新材料科技有限公司 Cast template splices bridge plate and its application method
CN209556376U (en) * 2019-01-25 2019-10-29 河北润林新材料科技有限公司 A kind of through-wall bolt locating system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110056187A (en) * 2019-05-27 2019-07-26 中建四局第四建筑工程有限公司 A kind of steel gang form sets up structure
CN110056187B (en) * 2019-05-27 2024-05-24 中建四局建设发展有限公司 Building structure of steel combined template
CN113585723A (en) * 2021-09-29 2021-11-02 天津仝元材料科技有限公司 Assembling method of building shaped formwork non-right-angle wall formwork
CN113585750A (en) * 2021-09-29 2021-11-02 天津仝元材料科技有限公司 Method for reinforcing end socket structure template based on Tornado
CN113585750B (en) * 2021-09-29 2022-01-18 天津仝元材料科技有限公司 Method for reinforcing end socket structure template based on Tornado
CN113585723B (en) * 2021-09-29 2022-01-18 天津仝元材料科技有限公司 Assembling method of building shaped formwork non-right-angle wall formwork

Also Published As

Publication number Publication date
CN109537890B (en) 2023-10-13

Similar Documents

Publication Publication Date Title
CN109537890A (en) A kind of through-wall bolt locating system and building template construction method
CN209682479U (en) A kind of assembled architecture mold
CN106836568A (en) A kind of glass fiber cement non-dismantling formwork system, connecting structure and its construction method
CN209556376U (en) A kind of through-wall bolt locating system
CN107724677A (en) Steel bar template positioning constructing structure and its construction method in reinforced concrete member
CN105965672B (en) A kind of fabricated shear wall model structure unitary mould
CN105863263A (en) Ruggedized straight panel clamp, inside corner die clamp and outside corner die clamp
CN209556379U (en) A kind of demoulding system of building template
CN209556373U (en) A kind of bridge cylinder and bridge cylinder linked system
JPS5916621B2 (en) How to build side walls of underground tanks
CN109653489A (en) A kind of multi-use architecture universal plate
CN207954216U (en) Comb teeth shape template for prefabricated bridge
CN219992540U (en) Cable well
CN217843254U (en) Grouting pump connection structure and pressure filling equipment
CN216181460U (en) Thin web beam mold
KR20020087539A (en) center diaphragm wall type tunnel excavation and the steel rib joint
CN214497888U (en) Detachable force transmission assembly partially embedded in concrete
JP3243397U (en) End formwork and formwork systems for prefabricated prestressed box girders
CN213926683U (en) Detachable assembled cantilever beam balcony structure
CN219952689U (en) Wall box device is worn to lateral wall
CN207448745U (en) A kind of prefabricated edges of boards mould connecting clamp device
CN110080219B (en) Socket-type anti-floating anchor steel casing and use method thereof
CN109555315A (en) A kind of the demoulding system and demoulding method of building template
CN219404698U (en) Novel prefabricated simple beam slab end die
JPH09268708A (en) Separator with retaining metal tool for reinforcements

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant