CN209556376U - A kind of through-wall bolt locating system - Google Patents

A kind of through-wall bolt locating system Download PDF

Info

Publication number
CN209556376U
CN209556376U CN201920131138.3U CN201920131138U CN209556376U CN 209556376 U CN209556376 U CN 209556376U CN 201920131138 U CN201920131138 U CN 201920131138U CN 209556376 U CN209556376 U CN 209556376U
Authority
CN
China
Prior art keywords
wall
plate
bolt
sides
wall bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920131138.3U
Other languages
Chinese (zh)
Inventor
曹海峰
张灵巧
刘国林
姚奇
李广飞
彭遥
田沙沙
郭金达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Run Lin New Material Science And Technology Ltd
Original Assignee
Hebei Run Lin New Material Science And Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Run Lin New Material Science And Technology Ltd filed Critical Hebei Run Lin New Material Science And Technology Ltd
Priority to CN201920131138.3U priority Critical patent/CN209556376U/en
Application granted granted Critical
Publication of CN209556376U publication Critical patent/CN209556376U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a kind of through-wall bolt locating system, structure includes typified form, universal plate, bridge cylinder, through-wall bolt, mould top and casing.Assembled formwork is distinguished on wall two sides, and universal plate connects plane template in the parallel face in wall two sides, universal plate two sides.Preset bolt hole is opened in through-wall bolt installation site, and bridge cylinder is put into courtyard portion and is screwed.Through-wall bolt is pierced by from open preset bolt hole through the through-wall bolt hole of wall form to opposite face.Through-wall bolt is penetrated from opposite metope by mould top, casing, mould top and bridge cylinder, and bridge cylinder is screwed.The utility model realizes the integral assembling formwork of whole face template in wall casting process, and guarantee that the template on wall two sides can support both side plate in bolt hole position, coaxial drawknot system can be formed by through-wall bolt and keel again, guarantee wall size, cancel the cement top die roller of traditional template inner support, simplify branch mold process, improves efficiency, reduce cost.

Description

A kind of through-wall bolt locating system
Technical field
The utility model relates to a kind of plastic formwork erecting device, specifically a kind of through-wall bolt locating system.
Background technique
In construction, wall, the cylinder of building, structures are required to carry out formwork, to make formwork erecting structure Stablize fastening, need to connect the template of two sides using through-wall bolt and is fixed.In previous building structure construction, all it is Then first assembling reinforcement carries out template formwork, and using steel form or aluminum alloy mould plate, by template splicing at required It after shape, needs to punch in template, the through-wall bolt for being socketed with casing is penetrated from punching place then and revolves through-wall bolt It fastens, concrete setting simultaneously takes out through-wall bolt after reaching performance standard.And original template construction can only be combined into Whole big high template on one side, and another side must intert one by one through-wall bolt with resolution model monolithic, never pacify after drilling Casing is put between two templates by the place of decking, and casing is interspersed on hole.Originally plank sheathing punch position pair The inside answered is due to the reinforcing bar that gathers, so that the needs shuttle of split bolt acock leads to the template face on opposite, no in reinforcing bar It is perpendicular to plate face, and has certain inclination, if directly tightening the two sides chevron card of split bolt, is just had inclined It is dangerous.In order to guarantee the depth of parallelism between two planes, it is necessary to it adds and places cement backform support member among two plate faces, But the technical requirements of operation just may require that and be carried out by the experienced worker of profession, it is complicated and take a lot of work.Problem above makes template Formwork process it is complicated, operating difficulties, and template reuse rate is low.
Utility model content
The purpose of this utility model is just to provide a kind of through-wall bolt locating system, multiple to solve existing form erecting technology process It is miscellaneous, operating difficulties, can not whole face formwork, the problem of low efficiency.
The utility model is realized in this way: a kind of through-wall bolt locating system, including typified form, universal plate, bridge cylinder, Through-wall bolt, mould top and casing;Several pieces of typified forms are spliced into two blocks of wall forms, two neighboring typified form it Between be connected and fixed by the universal plate, the universal plate is identical as the thickness of the typified form, the plane of the typified form With the bottom surface flush of the universal plate, the plane of two wall forms is oppositely arranged, and the universal plate on two wall forms Position corresponds to each other;The bridge cylinder is cylindric and is distributed on the universal plate, the connection between bridge cylinder and universal plate Mode is clamping, and described sleeve pipe is set between two blocks of wall forms, and the mould top is set to the both ends of described sleeve pipe, the mould Top is plugged on the bridge cylinder, and the through-wall bolt passes through the universal plate, bridge cylinder, mould top and casing, the through-wall bolt Both ends be fixed on universal plate.
The universal plate includes panel, partition, plate ridge, even hole portion and courtyard portion;The panel is strip plate, Ruo Gansuo Partition is stated to be uniformly distributed along panel length direction, the partition and the panel be mutually perpendicular to and the two sides of partition respectively with face The two sides of plate are overlapped, and the plate ridge is rectangle cylinder, and the plate ridge is distributed in the two corners on the partition top, and the plate The length of ridge is identical as the length of the panel, is a cell cube between two neighboring partition, is equipped at the middle part of cell cube Cell cube is divided into along two parts in panel length direction, respectively described even hole portion and the courtyard portion by scoreboard;The day The front and rear sides in well portion are respectively equipped with side rib, and are provided with handle hole on the side rib, courtyard portion both ends partition with A shoulder is respectively equipped in scoreboard;Be respectively equipped with upper hole muscle and lower opening muscle in the upper and lower surface of the even hole portion, the upper hole muscle and The both ends of lower opening muscle are connected with partition and scoreboard respectively, and the top of the upper hole muscle is connected with the plate ridge of two sides, the upper hole muscle The company of the being formed hole between lower opening muscle;It is equipped on the panel in the courtyard portion and secretly sets bolt hole.
The convex block substantially symmetrical about its central axis about bridge cylinder is equipped in the bottom of bridge cylinder two sides.
The mould top includes that big pipe and tubule, the big pipe are connected with tubule, the internal diameter and described sleeve pipe of the big pipe Outer diameter it is identical, the outer diameter of the tubule is identical as the internal diameter of the bridge cylinder.
A kind of building template construction method based on through-wall bolt locating system, the construction method the following steps are included:
A. it is needing the wall two sides that pour to distinguish assembled formwork, several universal plates is being set in the two sides of wall, and wall Along metope, in parallel to just, typified form, the plate face and typified form of universal plate is arranged in the two sides of universal plate in the universal plate of two sides Plate face be located at approximately the same plane, and the plate face of wall two sides universal plate is arranged both facing on the inside of wall;
B. by need to wear on the universal plate of wall two sides connect through-wall bolt secretly set bolt hole open, bridge cylinder is put into open It secretly sets in the courtyard portion where bolt hole and rotates fixation;
C. prepare the through-wall bolt that one end is screwed with nut, it is corresponding that the one end for the nut that is not screwed on is passed through wall two sides Opening secretly set bolt hole;
D. it is successively worn in through-wall bolt traversing through end and connects mould top, casing, mould top and bridge cylinder, and the rotation of bridge cylinder is fixed on ten thousand In the courtyard portion of energy plate;
E. it is screwed on nut in the traversing through end of through-wall bolt, fixes through-wall bolt and in tension.
The through-wall bolt is distributed according to construction requirement, do not wear connect through-wall bolt secretly set bolt hole keep sealing state.
The utility model has used newest universal plate structure and bridge cylinder is cooperated to innovate through-wall bolt system, In Universal plate is equipped with courtyard portion, is provided on the bottom surface in courtyard portion and secretly sets bolt hole, and the cylinder shoulder of clamping bridge cylinder is arranged in courtyard portion Structure, bridge cylinder are cylindrical shape, inside can accommodate through-wall bolt and pass through.First ready typified form is passed through in construction Universal plate connects into the metope template of bulk, then integrally installs metope template, and phase is arranged in the two sides for the wall for needing to pour Pair metope template, and guarantee that the omnipotent Board position in the metope template of two sides corresponds to each other, this makes it possible to by through-wall bolt and Casing passes through two metope templates, and fixes the casing between two metope templates in courtyard portion mounting bridge cylinder, casing and two A bridge cylinder forms internal support, is finally being tightened the both ends of through-wall bolt using nut, to through-wall bolt be fixed, nut External tension is formed with through-wall bolt.Nut is screwed off after construction, through-wall bolt is extracted out, it can be by entire metope template It removes.This through-wall bolt system is rear-mounted coaxial force structure, and internal support top, external clamping eliminates traditional cement Mould topmast strut, does not generate internal stress.
The utility model realizes the integral assembling formwork of whole face template in wall casting process, and guarantees wall two sides Template can support both side plate in bolt hole position and form coaxial drawknot system by through-wall bolt and keel, guarantee Wall size cancels the cement top die roller of traditional template inner support, simplifies branch mold process, improves efficiency, reduce cost.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the structural schematic diagram of the utility model bridge cylinder.
Fig. 3 is the top view of the utility model bridge cylinder.
Fig. 4 is the structural schematic diagram of the utility model universal plate.
Fig. 5 is the perspective view of the utility model universal plate.
In figure: 1, bridge cylinder;2, mould top;3, through-wall bolt;4, casing;5, universal plate;6, typified form;1-1, cylinder;1- 2, convex block;1-3, tooth engaged;1-4, fin;5-1, panel;5-2, partition;5-3, plate ridge;5-4, even hole portion;5-5, courtyard portion; 5-6, scoreboard;5-7, upper hole muscle;5-8, lower opening muscle;5-9, Lian Kong;5-10, plasma discharge hole;5-11, side rib;5-12, handle hole;5- 13, bolt hole is secretly set;5-14, cylinder shoulder;5-15, ridge ditch;5-16, pedestal;5-17, abutment.
Specific embodiment
As shown in Figure 1, the utility model includes typified form 6, universal plate 5, bridge cylinder 1, through-wall bolt 3, mould top 2 and set Pipe 4.Typified form 6 and universal plate 5 are arranged one piece ten thousand for being spliced into metope template between two pieces of adjacent typified forms 6 Energy plate 5, is connected and fixed between universal plate 5 and typified form 6 by connector, and the thickness of the thickness of universal plate 5 and typified form 6 Spend identical, the plane flush of the bottom surface of universal plate 5 and typified form 6 after universal plate 5 is fixedly connected with typified form 6.Wall Face die plate has two pieces, and two pieces of metope templates are oppositely arranged, and the plane of two pieces of metope templates is all located inside, while two metopes 5 position of universal plate in template corresponds to each other.Cylindric 1 arranged for interval of bridge cylinder is on universal plate 5, and bridge cylinder 1 is to be connected to On universal plate 5.Casing 4 is set between two blocks of wall forms, is equipped with mould top 2 at the both ends of casing 4, mould top 2 is plugged on On bridge cylinder 1.Through-wall bolt 3 pass through universal plate 5, bridge cylinder 1, mould top 2 and casing 4, and the both ends of through-wall bolt 3 be fixed on it is omnipotent On plate 5.
As shown in Figure 2 and Figure 3, jackshaft cylinder 1 includes cylinder 1-1, convex block 1-2 and tooth engaged 1-3;In cylinder 1-1 Wall is equipped with screw thread, and convex block 1-2 is set to the lower part of the two sides cylinder 1-1, and tooth engaged 1-3 is set to the upper end of cylinder 1-1.Convex block 1-2 About the substantially symmetrical about its central axis of cylinder 1-1, the right side of convex block 1-2 is along the diametric perpendicular of cylinder 1-1, convex block 1-2 Left side be the tangent perpendicular with cylinder 1-1 outer wall, the upper and lower end face of convex block 1-2 is all horizontal plane, and lower end surface with The lower end surface flush of cylinder 1-1.The medial surface and lateral surface of protrusive board are overlapped with the inner and outer wall of cylinder 1-1 respectively.Occlusion Tooth 1-3 shares several and is uniformly distributed around the central axis of cylinder 1-1, and the space between two neighboring tooth engaged 1-3 can just A tooth engaged 1-3 is enough accommodated to be put into.Vertical fin 1-4, the upper end fin 1-4 and cylinder are additionally provided in the two sides of cylinder 1-1 The lower end of the upper surface flush of 1-1, fin 1-4 is connected with the upper surface of convex block 1-2, and the right side of fin 1-4 with it is convex The right side flush of block 1-2.Tooth engaged 1-3 is located at the position for having fin 1-4.
As shown in Figure 4, Figure 5, wherein universal plate 5 includes panel 5-1, partition 5-2, plate ridge 5-3, even hole portion 5-4 and day Well portion 5-5.Panel 5-1 is strip plate, and several partition 5-2 are uniformly distributed along panel 5-1 length direction, partition 5-2 and panel 5-1 It is mutually perpendicular to and the two sides of partition 5-2 is overlapped with the two sides of panel 5-1 respectively, plate ridge 5-3 is rectangle cylinder, plate ridge 5- 3 are distributed in the two corners on the top partition 5-2, and the length of plate ridge 5-3 is identical as the length of panel 5-1, two neighboring partition 5-2 it Between be a cell cube, be equipped with scoreboard 5-6 at the middle part of cell cube and cell cube be divided into along two portions of panel 5-1 length direction Point, respectively connect hole portion 5-4 and courtyard portion 5-5.The front and rear sides of courtyard portion 5-5 are respectively equipped with side rib 5-11, and in side rib 5- It is provided with handle hole 5-12 on 11, is respectively equipped with a shoulder 5-14 on the partition 5-2 and scoreboard 5-6 at the courtyard portion both ends 5-5.In even hole The upper and lower surface of portion 5-4 be respectively equipped with the both ends of hole muscle 5-7 and lower opening muscle 5-8, upper hole muscle 5-7 and lower opening muscle 5-8 respectively with Partition 5-2 is connected with scoreboard 5-6, and the top of upper hole muscle 5-7 is connected with the plate ridge 5-3 of two sides, upper hole muscle 5-7 and lower opening muscle 5-8 Between formed 5 connecting hole 5-9 of universal plate.The shape of 5 connecting hole 5-9 of universal plate is rectangle, and the height of 5 connecting hole 5-9 of universal plate It spends and identical as the 5 connecting hole 5-9 height of universal plate of typified form 6 that universal plate 5 cooperates.On two, the top of upper hole muscle 5-7 Ridge ditch 5-15 is provided between plate ridge 5-3, the both ends ridge ditch 5-15 are not connected with partition 5-2 and scoreboard 5-6, set in the middle part of ridge ditch 5-15 There is the pedestal 5-16 concordant with the plate upper surface ridge 5-3, the abutment 5-17 of the upper surface protruding plate ridge 5-3 be equipped on pedestal 5-16, Pedestal 5-16 is parallel to each other with partition 5-2.Several plasma discharge hole 5- along institute's panel 5-1 width direction are provided on lower opening muscle 5-8 10.It is equipped on the panel 5-1 of courtyard portion 5-5 and secretly sets bolt hole 5-13.It is provided with vertical elongated slot on cylinder shoulder 5-14, in cylinder shoulder 5- The side of 14 bottoms is provided with notch, and vertical elongated slot is connected with notch, the opposite side each other of the gap position on two cylinder shoulder 5-14.Point The width of plate 5-6 is slightly less than the width of partition 5-2, cover board can be arranged in the two sides of universal plate 5 side of universal plate 5 is close Envelope.
Through-wall bolt 3 includes screw rod, is screwed with nut at the both ends of screw rod, is respectively equipped with gear on the inside of two nuts Piece, screw rod screw the nut at both ends after wall, and nut is contacted with baffle, and baffle is pressed in universal plate 5 and typified form 6 On.Casing 4 is round tube, and length is determined according to the thickness of wall.Mould top 2 includes big pipe and tubule, and big pipe is connected with tubule, The internal diameter of big pipe is identical as the outer diameter of casing 4 for casing 4 to be plugged on inside mould top 2, the outer diameter of tubule and the internal diameter of bridge cylinder 1 It is identical, for bridge cylinder 1 to be inserted on mould top 2.
A kind of building template construction method based on through-wall bolt locating system, the construction method the following steps are included:
A. it is needing the wall two sides that pour to distinguish assembled formwork, several universal plates 5 is being set in the two sides of wall, and wall Along metope, in parallel to just, typified form 6, the plate face and sizing of universal plate 5 is arranged in the two sides of universal plate in the universal plate 5 of two sides The plate face of template 6 is located at approximately the same plane, and the plate face of wall two sides universal plate 5 is arranged both facing on the inside of wall.
B. by need to wear on wall two sides universal plate 5 connect through-wall bolt 3 secretly set bolt hole 5-13 open, bridge cylinder 1 is put Enter in the open courtyard portion 5-5 secretly set where bolt hole 5-13 and rotates fixation.
C. prepare the through-wall bolt 3 that one end is screwed with nut, it is opposite that the one end for the nut that is not screwed on is passed through wall two sides The opening answered secretly sets bolt hole 5-13.
D. it is successively worn in 3 traversing through end of through-wall bolt and connects mould top 2, casing 4, mould top 2 and bridge cylinder 1, and bridge cylinder 1 is rotated admittedly It is scheduled in the courtyard portion 5-5 of universal plate 5.
E. it is screwed on nut in the traversing through end of through-wall bolt 3, keeps through-wall bolt 3 fixed and in tension.
Wherein through-wall bolt 3 is uniformly distributed, and is not worn and is met the bolt hole 5-13 that secretly sets of through-wall bolt 3 and do not open holding seal shape State.
The utility model has used newest 5 structure of universal plate and 1 pair of 3 system of through-wall bolt of bridge cylinder is cooperated to be created Newly, it is equipped with courtyard portion 5-5 on universal plate 5, is provided on the bottom surface of courtyard portion 5-5 and secretly sets bolt hole 5-13, and in courtyard portion 5-5 The cylinder shoulder 5-14 structure of clamping bridge cylinder 1 is set, bridge cylinder 1 is cylindrical shape, inside can accommodate through-wall bolt 3 and pass through.It is constructing When ready typified form 6 is first connected into the metope template of bulk by universal plate 5, then metope template is integrally propped up If opposite metope template is arranged in the two sides for the wall for needing to pour, and guarantees the 5 position phase of universal plate in the metope template of two sides Mutually correspondence this makes it possible to which through-wall bolt 3 and casing 4 are passed through two metope templates, and is incited somebody to action in courtyard portion 5-5 mounting bridge cylinder 1 Casing 4 between two metope templates is fixed, and casing 4 and two bridge cylinders 1 form internal support, finally use nut will be through walls The both ends of bolt 3 are tightened, so that through-wall bolt 3 is fixed, nut and through-wall bolt 3 form external tension.It will after construction Nut screws off, and through-wall bolt 3 is extracted out, and whole face template can not be disassembled to separation and be detached from the concrete wall for pouring completion.
The utility model realizes the assembled formwork of whole face template in wall casting process, simplifies branch mold process, improves Efficiency, and what is used is all general part, can reuse, reduce costs.

Claims (4)

1. a kind of through-wall bolt locating system, which is characterized in that including typified form, universal plate, bridge cylinder, through-wall bolt, mould top And casing;Several pieces of typified forms are spliced into two blocks of wall forms, by described omnipotent between two neighboring typified form Plate is connected and fixed, and the universal plate is identical as the thickness of the typified form, the plane of the typified form and the universal plate Bottom surface flush, the plane of two wall forms is oppositely arranged, and the omnipotent Board position on two wall forms corresponds to each other; The bridge cylinder is cylindric and is distributed on the universal plate that the connection type between bridge cylinder and universal plate is clamping, institute It states casing to be set between two blocks of wall forms, the mould top is set to the both ends of described sleeve pipe, and the mould top is plugged on described On bridge cylinder, the through-wall bolt passes through the universal plate, bridge cylinder, mould top and casing, and the both ends of the through-wall bolt are fixed on On universal plate.
2. through-wall bolt locating system according to claim 1, which is characterized in that the universal plate include panel, partition, Plate ridge, even hole portion and courtyard portion;The panel is strip plate, and several partitions are uniformly distributed along panel length direction, institute It states partition to be mutually perpendicular to the panel, and the two sides of partition are overlapped with the two sides of panel respectively, the plate ridge is rectangular Shape cylinder, the plate ridge is distributed in the two corners on the partition top, and the length of the plate ridge is identical as the length of the panel, It is a cell cube between two neighboring partition, is equipped with scoreboard at the middle part of cell cube and cell cube is divided into along panel length direction Two parts, respectively described even hole portion and the courtyard portion;The front and rear sides in the courtyard portion are respectively equipped with side rib, and It is provided with handle hole on the side rib, is respectively equipped with a shoulder on the partition at courtyard portion both ends and scoreboard;In the even hole portion Upper and lower surface be respectively equipped with hole muscle and lower opening muscle, the both ends of the upper hole muscle and lower opening muscle respectively with partition and scoreboard phase Even, the top of the upper hole muscle is connected with the plate ridge of two sides, the company of being formed hole between the upper hole muscle and lower opening muscle;In the courtyard The panel in portion is equipped with and secretly sets bolt hole.
3. through-wall bolt locating system according to claim 1, which is characterized in that be equipped in the bottom of bridge cylinder two sides The convex block substantially symmetrical about its central axis about bridge cylinder.
4. through-wall bolt locating system according to claim 1, which is characterized in that the mould top includes big pipe and tubule, The big pipe is connected with tubule, and the internal diameter of the big pipe is identical as the outer diameter of described sleeve pipe, the outer diameter of the tubule with it is described The internal diameter of bridge cylinder is identical.
CN201920131138.3U 2019-01-25 2019-01-25 A kind of through-wall bolt locating system Active CN209556376U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920131138.3U CN209556376U (en) 2019-01-25 2019-01-25 A kind of through-wall bolt locating system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920131138.3U CN209556376U (en) 2019-01-25 2019-01-25 A kind of through-wall bolt locating system

Publications (1)

Publication Number Publication Date
CN209556376U true CN209556376U (en) 2019-10-29

Family

ID=68307702

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920131138.3U Active CN209556376U (en) 2019-01-25 2019-01-25 A kind of through-wall bolt locating system

Country Status (1)

Country Link
CN (1) CN209556376U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537890A (en) * 2019-01-25 2019-03-29 河北润林新材料科技有限公司 A kind of through-wall bolt locating system and building template construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537890A (en) * 2019-01-25 2019-03-29 河北润林新材料科技有限公司 A kind of through-wall bolt locating system and building template construction method
CN109537890B (en) * 2019-01-25 2023-10-13 河北润林新材料科技有限公司 Wall-penetrating bolt positioning system and building template construction method

Similar Documents

Publication Publication Date Title
CN109537890A (en) A kind of through-wall bolt locating system and building template construction method
CN209682479U (en) A kind of assembled architecture mold
EA034756B1 (en) Formwork panel for concreting formworks
CN209568705U (en) A kind of constructional column regularization template formwork erecting structure
CN209556376U (en) A kind of through-wall bolt locating system
CN107724677A (en) Steel bar template positioning constructing structure and its construction method in reinforced concrete member
CN105863263A (en) Ruggedized straight panel clamp, inside corner die clamp and outside corner die clamp
CN209260960U (en) It is a kind of to facilitate the wall for installing interim bearing diagonal
JP4606603B2 (en) Method for constructing formwork for concrete wall and steel formwork used therefor
CN109653489A (en) A kind of multi-use architecture universal plate
KR100812243B1 (en) Self-surporting form system for constructing concrete walls
JPS5916621B2 (en) How to build side walls of underground tanks
CN209556373U (en) A kind of bridge cylinder and bridge cylinder linked system
CN211818008U (en) Assembled construction formwork of assembled building
CN106149922A (en) A kind of dismantled and assembled stealthy partition wall system and assembly and disassembly methods thereof
CN111677325B (en) A building reinforcing apparatus for city planning
CN2873941Y (en) Positioning fastening device for building formwork
CN210315527U (en) Socket joint type anti-floating anchor rod steel casing
CN207700525U (en) Reinforced concrete combination formula girt strip and assembled girt strip structure
CN111677286A (en) Concrete pouring and vibrating device assembly for closed space and vibrating method
CN206753034U (en) The box-like inner corner trim overlap joint building template of tool group
CN213926683U (en) Detachable assembled cantilever beam balcony structure
CN217843254U (en) Grouting pump connection structure and pressure filling equipment
CN219992540U (en) Cable well
CN110080219B (en) Socket-type anti-floating anchor steel casing and use method thereof