CN109537709A - Tailings Dam closes library system and method, photovoltaic generating system, ecological restoring method - Google Patents

Tailings Dam closes library system and method, photovoltaic generating system, ecological restoring method Download PDF

Info

Publication number
CN109537709A
CN109537709A CN201811589860.8A CN201811589860A CN109537709A CN 109537709 A CN109537709 A CN 109537709A CN 201811589860 A CN201811589860 A CN 201811589860A CN 109537709 A CN109537709 A CN 109537709A
Authority
CN
China
Prior art keywords
library
barren rock
beach face
tailings
gutter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811589860.8A
Other languages
Chinese (zh)
Other versions
CN109537709B (en
Inventor
陈贶
王旭
宋会彬
蔡幼忠
朱光辉
何新春
谢金亮
岑建
周积果
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China ENFI Engineering Corp
Original Assignee
China ENFI Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China ENFI Engineering Corp filed Critical China ENFI Engineering Corp
Priority to CN201811589860.8A priority Critical patent/CN109537709B/en
Publication of CN109537709A publication Critical patent/CN109537709A/en
Application granted granted Critical
Publication of CN109537709B publication Critical patent/CN109537709B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/04Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01BSOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
    • A01B79/00Methods for working soil
    • A01B79/02Methods for working soil combined with other agricultural processing, e.g. fertilising, planting
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G17/00Cultivation of hops, vines, fruit trees, or like trees
    • A01G17/005Cultivation methods
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G22/00Cultivation of specific crops or plants not otherwise provided for
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02SGENERATION OF ELECTRIC POWER BY CONVERSION OF INFRARED RADIATION, VISIBLE LIGHT OR ULTRAVIOLET LIGHT, e.g. USING PHOTOVOLTAIC [PV] MODULES
    • H02S20/00Supporting structures for PV modules
    • H02S20/30Supporting structures being movable or adjustable, e.g. for angle adjustment
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P60/00Technologies relating to agriculture, livestock or agroalimentary industries
    • Y02P60/12Technologies relating to agriculture, livestock or agroalimentary industries using renewable energies, e.g. solar water pumping

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Environmental Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Botany (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Paleontology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Soil Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Photovoltaic Devices (AREA)

Abstract

The invention discloses a kind of Tailings Dams to close library system and method, photovoltaic generating system, ecological restoring method, wherein, it is related to closing Tailings Dam into library system, photovoltaic generating system and restoration of the ecosystem triplicity, the dam body in library is closed by Tailings Dam, deposit the regulation of beach face and drainage system, it recycles discarded stone and tailings is used as and closes library material, photovoltaic generating system is installed in closing library system, CHARACTERISTICS OF TAILINGS SAND matrix is improved as planting matrix and breeding suitable species simultaneously, realize Tailings Dam, rejected ore, goaf, collapse the safety improvement that discarded place has been polluted in decanting zone etc., comprehensive utilization and ecological protection.

Description

Tailings Dam closes library system and method, photovoltaic generating system, ecological restoring method
Technical field
The present invention relates to the present invention relates to Tailings Dam Treatment process fields, and in particular to a kind of Tailings Dam closes library system and side Method, photovoltaic generating system, ecological restoring method.
Background technique
Currently, the Tailings Dam in some mines, abandoned mine library, dregs stockyard, goaf, to collapse the large area such as decanting zone idle. When Tailings Dam closes library improvement at present, ore resources comprehensive utilization in tail library is insufficient.Library is closed to administer and subsequent comprehensive utilization and life safely State reparation is kept completely separate, or does not carry out comprehensive utilization and restoration of the ecosystem.
Summary of the invention
The present invention is directed at least solve one of the technical problems existing in the prior art.For this purpose, one object of the present invention It is to propose that a kind of Tailings Dam closes library system, reasonably takes full advantage of the obsolete material of Tailings Dam, saved resource, realize The safety of Tailings Dam is administered.
The present invention also proposes that a kind of Tailings Dam closes library method, reasonably takes full advantage of the obsolete material of Tailings Dam, saves Resource, the safety for realizing Tailings Dam are administered.
The present invention also proposes a kind of photovoltaic generating system, realizes the comprehensive utilization that Tailings Dam closes library and photovoltaic power generation.
The present invention also proposes a kind of ecological restoring method, realizes and carries out ecology improvement and recovery after closing library to Tailings Dam; Or it realizes Tailings Dam and closes the comprehensive utilization of resources that library, photovoltaic power generation and restoration of the ecosystem combine.
The Tailings Dam of embodiment closes library system according to a first aspect of the present invention, comprising:
Beach face coating is deposited, the deposition beach face coating is laid on the deposition beach face using tailings and is formed Tailings layer;
Dam body, the dam body are disposed around the outside of the deposition beach face coating;The dam body includes outer slope protection layer, The outer slope protection layer is not produce the slope protection layer that sour barren rock is built into using coarse grain diameter;
Gutter, the gutter include library week gutter and library internal drainage ditch;The library week gutter be looped around it is described The outside of dam body and adjacent with the dam body;The library internal drainage ditch is located at the deposition beach face coating and the dam body Surface on, and intersect with library week gutter and be connected to, pass through the convergence gutter row being located on the outside of library week gutter Out.
The Tailings Dam of embodiment closes library system according to a first aspect of the present invention, and deposition beach face coating is being deposited using tailings Beach face is laid with, and dam body, which encloses, to be built in the outside of deposition beach face coating, and the outer slope protection layer of dam body is not produced using coarse grain diameter Sour barren rock is built into, and the surface layer for depositing beach face coating and dam body is equipped with library internal drainage ditch and is connected to library week gutter, passes through position Convergence gutter discharge on the outside of library week gutter.Any facility for not changing and destroying Tailings Dam not only as a result, also increases Tailings warehouse dam body regulation, deposition beach face improvement, gutter facility etc., and reasonably take full advantage of the discarded material of Tailings Dam Material, has saved resource, is conducive to restoration of the ecosystem, closes that library system is safe and reliable, so that the safety for realizing Tailings Dam is administered.
The coarse grain diameter of one embodiment according to a first aspect of the present invention, the outer slope protection layer does not produce sour barren rock Partial size is greater than 200mm.
One embodiment according to a first aspect of the present invention, the outer slope protection layer with a thickness of 0.4~0.6m.
One embodiment according to a first aspect of the present invention, the gutter are not produce sour mine barren rock and water using fine grain Gutter made of cement mortar mixing is built.
Further embodiment according to a first aspect of the present invention, the fine grain do not produce sour mine barren rock partial size be 5mm~ 60mm。
The Tailings Dam of embodiment closes library method according to a second aspect of the present invention, includes the following steps:
The processing of mine barren rock;According to the physicochemical characteristics of mine barren rock, selection does not produce sour mine barren rock and carries out break process, obtains Coarse grain diameter does not produce that sour barren rock, fine grain do not produce sour barren rock, middle fine grain does not produce sour barren rock, closes library material as Tailings Dam and uses;
Deposit beach face processing: it is smooth to deposition beach face progress, then it is laid with tailings in deposition beach face, it forms deposition beach face and covers Layer;
It builds dam body: dam body being built using native stone in the outside of deposition beach face, slope is not produced using coarse grain diameter outside dam body Sour mine barren rock is built into slope protection layer;
It builds gutter: building library week gutter in dam body outside and with dam body adjacent;In deposition beach face coating Library internal drainage ditch is built into using fine grain not produce sour barren rock and mix with cement mortar on the surface of dam body, the library internal drainage Ditch intersects with library week gutter to be connected to, the convergence gutter discharge on the outside of library week gutter.
The tailing of embodiment closes library method according to a second aspect of the present invention, is laid with to form deposition using tailings in deposition beach face Beach face coating encloses body of building a dam in the outside of deposition beach face coating, and the outer slope protection layer of dam body does not produce acid using coarse grain diameter Barren rock is built into, and the surface layer for depositing beach face coating and dam body is equipped with library internal drainage ditch and is connected to library week gutter, by being located at Convergence gutter discharge on the outside of library week gutter.Do not change and destroy any facility of Tailings Dam not only as a result, also increase tail The regulation of mine library dam body, deposition beach face improvement, gutter facility etc., and reasonably take full advantage of the mine barren rock of Tailings Dam and give up Tail dropping sand has saved resource as library material is closed, and is conducive to restoration of the ecosystem, so that finally obtained library system of closing is repaired conducive to ecology It is multiple, securely and reliably.
One embodiment according to a second aspect of the present invention, further comprises the steps of:
The arrangement of PHC concrete prefabricated pipe: multiple PHC coagulations are arranged vertically in deposition beach face covering layer region Native prefabricated pipe is used for installation photovoltaic component bracket.
Further embodiment according to a second aspect of the present invention further comprises the steps of:
Maintenance constructing road: it according to the deployment scenarios of PHC concrete prefabricated pipe, is used on the deposition beach face coating Middle fine grain does not produce sour barren rock and builds maintenance road.
One embodiment according to a second aspect of the present invention, the coarse grain diameter do not produce sour barren rock partial size be greater than 200mm, The fine grain do not produce sour barren rock partial size be 5mm~60mm, the middle fine grain do not produce sour barren rock partial size be 30mm~ 100mm。
One embodiment according to a second aspect of the present invention, further comprises the steps of:
Earth material layer is laid with: the earth material layer for being used for planting plants is laid on the deposition beach face coating.
The photovoltaic generating system of embodiment according to a third aspect of the present invention is applied in above-mentioned first aspect any embodiment Tailings Dam closes in the system of library, comprising:
Multiple PHC concrete prefabricated pipes, multiple PHC concrete prefabricated pipes are linearly spaced apart vertical array, multiple The PHC concrete prefabricated pipe includes connected lower section prefabricated pipe and upper section prefabricated pipe, and the lower section prefabricated pipe is buried solid in institute It states in deposition beach face coating, the upper section prefabricated pipe extends vertically upward;
Photovoltaic module support, the photovoltaic module support are fixed on the upper section of multiple PHC concrete prefabricated pipes In prefabricated pipe;
Photovoltaic module, the photovoltaic module are mounted on the photovoltaic module support.
The photovoltaic generating system of embodiment according to a third aspect of the present invention, since PHC concrete prefabricated pipe is with higher Support strength, multiple PHC concrete prefabricated pipes can carry photovoltaic module support disposed thereon and be mounted on photovoltaic module branch The sum of weight of photovoltaic module on frame.Electric energy can be converted light energy by photovoltaic module, is utilized closes library system as a result, Place carries out photovoltaic power generation, can increase point off supply to bargh's distribution, increase renewable sources of energy ratio, reduce electric cost, The utilization of resources is abundant.Therefore, the photovoltaic generating system of third aspect present invention embodiment have the advantages that first, do not cut into a mountain, It is not take up arable land, economizes on resources, build photovoltaic plant using waste land.The second, photovoltaic plant is realized nearby simultaneously close to mining area Net power supply, electricity, which is marketed one's own products, has consumption advantage, reduces bargh's electric cost.Third, the construction of photovoltaic plant are complete According to the original geography of Tailings Dam, and with close library design and the synchronous progress of construction, do not change and destroy Tailings Dam not only Any facility, the also regulation of increase tailings warehouse dam body, deposition beach face improvement, gutter facility etc. realize safety and close library, photovoltaic hair The comprehensive utilization of electricity.4th, the comprehensive utilization on the idle discarded ground in mine is realized, the environment comprehensive for facilitating Mine land is controlled Reason.
One embodiment according to a third aspect of the present invention, the photovoltaic module support are the fixed bracket of dip-adjustable type.
One embodiment according to a third aspect of the present invention, the photovoltaic module support include frame and the PHC coagulation The corresponding multiple columns of native prefabricated pipe, the upper end of multiple columns is connect with the frame, under multiple columns End is fixed with the upper end of corresponding multiple upper section prefabricated pipes.
Further embodiment according to a third aspect of the present invention, the photovoltaic module support further include very heavy head piece and thousand Jin top, the very heavy head piece are secured transverse in two PHC concrete prefabricated pipes, and the jack is angularly disposed, institute The lower end for stating jack is connected on the very heavy head piece, the upper end of the jack hingedly on said frame, Duo Gesuo The upper end of column is stated with the frame articulation, makes the inclination angle of the frame can with the length by the adjusting jack It adjusts.
One embodiment according to a third aspect of the present invention further includes inverter and substation, and the substation, which is equipped with, to be become Depressor, the inverter are connected electrically between the photovoltaic module and the transformer.
Further embodiment according to a third aspect of the present invention, the inverter be connected electrically in the photovoltaic module with it is described Between transformer specifically: multiple photovoltaic module series connection accumulate a component string, and component string described in multiple groups is collected into one A header box, multiple header boxs collect into the inverter, and the DC current of input is reverse into three by the inverter Phase alternating current, and high-voltage electricity is converted by the change device and is sent into electric system.
Further embodiment according to a third aspect of the present invention, the inverter and the substation are arranged in the dam body Periphery at frame concrete on the basis of.
One embodiment according to a third aspect of the present invention is additionally provided with fine grain in use on the deposition beach face coating The maintenance road that sour barren rock is built is not produced.
Further embodiment according to a third aspect of the present invention, the middle particulate do not produce sour mine barren rock partial size be 30mm~ 100mm。
One embodiment according to a third aspect of the present invention, the concrete in the PHC concrete prefabricated pipe is added with resistance to The additive of acid and alkali corrosion.
One embodiment according to a third aspect of the present invention, further includes catch basin and water cell, and the catch basin is located at It is set below the photovoltaic module, for receiving the rainwater flowed down from photovoltaic module and clean water, the catch basin and water storage Unit connection, so that the water in the catch basin flows into water cell.
The ecological restoring method of embodiment according to a fourth aspect of the present invention is applied in above-mentioned first aspect any embodiment Tailings Dam closes in the system of library, includes the following steps:
Planting matrix improvement: organic matter, humic acid, metallic stabilizer, soil improvement are added in deposition beach face coating One or more of agent, water-retaining agent, or the earth material layer for being used for planting plants is directly laid on deposition beach face coating;To changing Well-founded matter is tested, it is ensured that the pH value and nutrient content of matrix reach the standard of planting technique soil;
Species breeding: according to the physicochemical characteristics of mine barren rock, the plant cultivation of resistance to heavy metal is selected to plant, or/and selected Impoverishment tolerant plant;
Vegetation plantation: planning as a whole arrangement planting area at the planting matrix of improvement, plants selected species in planting area and plants Object.
The ecological restoring method of embodiment according to a fourth aspect of the present invention closes library system 100 to Tailings Dam and carries out ecology and repairs It is multiple, be conducive to the improvement and recovery of closing the ecological environment of library system.
One embodiment according to a fourth aspect of the present invention, the Plant choosing of the resistance to heavy metal ciliate desert-grass, alfalfa, quotient At least one of land, vetiver, penny cress, three-coloured amaranth and shrub plant;The impoverishment tolerant Plant choosing sainfoin, fescue grass, dog At least one of root of the tooth, rye grass, paspalum notatum, shrub lespedeza, rose, leapfrog, rose, sea-buckthorn and shrub plant.
One embodiment according to a fourth aspect of the present invention, in the step of testing improvement mechanism, first test kind PH, organic matter, hydrolyzable nitrogen, available phosphorus and the quick-acting potassium content of phytyl matter, re-test calcium oxide, organic fertilizer, bentonite, zeolite and Compound fertilizer.
The ecological restoring method of embodiment according to a fifth aspect of the present invention is applied in above-mentioned third aspect any embodiment In photovoltaic generating system, include the following steps:
Planting matrix improvement: organic matter, humic acid, metallic stabilizer, soil improvement are added in deposition beach face coating One or more of agent, water-retaining agent, or the earth material layer for being used for planting plants is directly laid on deposition beach face coating;To changing Well-founded matter is tested, it is ensured that the pH value and nutrient content of matrix reach the standard of planting technique soil;
Species breeding: according to the physicochemical characteristics of mine barren rock, the plant cultivation of resistance to heavy metal is selected to plant, or/and selected Impoverishment tolerant plant;
Vegetation plantation: planning as a whole arrangement planting area at the planting matrix of improvement, plants selected species in planting area and plants Object.
The ecological restoring method of embodiment according to a fifth aspect of the present invention closes library system and photovoltaic power generation system in conjunction with Tailings Dam System carries out restoration of the ecosystem, has the advantage that first, does not cut into a mountain, be not take up arable land, economize on resources and obtain waste land To realize the reparation of ecological environment.The second, photovoltaic plant realizes grid-connected power supply nearby, electricity, which is marketed one's own products, to be had close to mining area Consumption advantage reduces bargh's electric cost.The construction of third, photovoltaic plant is completely according to the original geographical shape of Tailings Dam Gesture, and with close library design and construction it is synchronous progress, do not change and destroy any facility of Tailings Dam not only, also increase tailing dam The regulation of body 2, deposition beach face improvement, gutter facility etc. realize the comprehensive benefit that safety closes library, photovoltaic power generation and restoration of the ecosystem With.4th, the comprehensive utilization for realizing the idle discarded ground in mine, facilitates the comprehensive environmental improvement of Mine land.
One embodiment according to a fifth aspect of the present invention, the Plant choosing of the resistance to heavy metal ciliate desert-grass, alfalfa, quotient At least one of land, vetiver, penny cress, three-coloured amaranth and shrub plant;The impoverishment tolerant Plant choosing sainfoin, fescue grass, dog At least one of root of the tooth, rye grass, paspalum notatum, shrub lespedeza, rose, leapfrog, rose, sea-buckthorn and shrub plant.
One embodiment according to a fifth aspect of the present invention, in the step of testing improvement mechanism, first test kind PH, organic matter, hydrolyzable nitrogen, available phosphorus and the quick-acting potassium content of phytyl matter, re-test calcium oxide, organic fertilizer, bentonite, zeolite and Compound fertilizer.
Additional aspect and advantage of the invention will be set forth in part in the description, and will partially become from the following description Obviously, or practice through the invention is recognized.
Detailed description of the invention
Above-mentioned and/or additional aspect of the invention and advantage will become from the description of the embodiment in conjunction with the following figures Obviously and it is readily appreciated that, in which:
Fig. 1 is that the Tailings Dam of first aspect present invention embodiment closes the floor map of library system.
Fig. 2 is the diagrammatic cross-section in Fig. 1 at A-A.
Fig. 3 is the diagrammatic cross-section in Fig. 1 at B-B.
Fig. 4 is the amplification schematic cross-section in gutter in Fig. 1.
Fig. 5 is that the Tailings Dam of second aspect of the present invention embodiment closes the flow diagram of library method.
Fig. 6 is one of equipment component schematic diagram of the photovoltaic generating system of third aspect present invention embodiment.
Fig. 7 is the two of the equipment component schematic diagram of the photovoltaic generating system of third aspect present invention embodiment.
Fig. 8 is the flow diagram of the ecological restoring method of fourth aspect present invention or the 5th aspect embodiment.
Appended drawing reference:
Tailings Dam closes library system 100
Deposit beach face coating 1
The outer slope protection layer 21 of dam body 2
3 library week of gutter gutter 31 library internal drainage ditch 32 converge gutter 33
Earth material layer 4
Photovoltaic generating system 200
5 upper section prefabricated pipe 51 of PHC concrete prefabricated pipe
Very heavy 63 jack 64 of head piece of 6 frame of photovoltaic module support, 61 column 62
Specific embodiment
The embodiment of the present invention is described in detail below, examples of the embodiments are shown in the accompanying drawings, wherein from beginning to end Same or similar label indicates same or similar element or element with the same or similar functions.Below with reference to attached The embodiment of figure description is to show routinely, for explaining only the invention, and is not considered as limiting the invention.
The present invention using build novel ecological industrialization mine, Green Mine as target, in line with development of resources with optimize the environment It combines, comprehensive utilization of resources is combined with environmental protection, improves development of resources economic benefit and ecological environment synchronized construction phase In conjunction with principle, the Item Sets new energy, waste stone utilization, tailing close library, land, ecological recovery and go sightseeing etc. more The integrated project in position, the transition of power-assisted tradition old mine enterprise upgrading sufficiently practice energy conservation and environmental protection and Green Development theory, solve part Employee's re-employment, generates good social effect, ecological effect and economic benefits, has important demonstration meaning.
Tailings Dam according to an embodiment of the present invention is described below with reference to Fig. 1 to Fig. 8 closes library system and method, photovoltaic power generation System, ecological restoring method.
As shown in Figures 1 to 4, the Tailings Dam of embodiment closes library system 100, including deposition beach according to a first aspect of the present invention Face coating 1, dam body 2 and gutter 3.Wherein, deposition beach face coating 1 is laid on deposition beach face using tailings and is formed Tailings layer;Dam body 2 is disposed around the outside of deposition beach face coating 1;Dam body 2 includes outer slope protection layer 21, outer slope protection layer 21 Not produce the slope protection layer that sour barren rock is built into using coarse grain diameter;Gutter 3 includes library week gutter 31 and library internal drainage ditch 32;Library week Gutter 31 is looped around the outside of dam body 2 and adjacent with dam body 2;Library internal drainage ditch 32 is located at deposition 1 He of beach face coating On the surface of dam body 2, and intersect with library week gutter 31 and be connected to, by the convergence gutter 33 for being located at 31 outside of library week gutter Discharge.
Specifically, deposition beach face coating 1 is to be laid on the tailings layer formed on deposition beach face using tailings.As a result, The tailings discarded at Tailings Dam is taken full advantage of, is economized on resources, restoration of the ecosystem is conducive to.
Dam body 2 is disposed around the outside of deposition beach face coating 1;Dam body 2 includes outer slope protection layer 21, outer slope protection layer 21 Not produce the slope protection layer that sour barren rock is built into using coarse grain diameter.As a result, by setting dam body 2, prevent under deposition beach face coating 1 It collapses.The outer slope protection layer 21 of dam body 2 does not produce sour barren rock using coarse grain diameter and is built into, and on the one hand ensure that dam body 2 will not glide, prevents The earth flow of dam body 2 loses, so that it is safe and reliable to close library system, is conducive to restoration of the ecosystem;On the other hand, it is also fully utilized by tail library mine On mine barren rock, saved resource.
Gutter 3 includes library week gutter 31 and library internal drainage ditch 32;Library week, gutter 31 was looped around the outside of dam body 2 And it is adjacent with dam body 2;Library internal drainage ditch 32 be located at deposition beach face coating 1 and dam body 2 surface on, and with library week gutter 31 intersect connection, and the convergence gutter 33 by being located at 31 outside of library week gutter is discharged.It, can as a result, by setting gutter 3 To avoid depositing on beach face coating 1 because rainwater weather generates rainwater ponding, be conducive to restoration of the ecosystem.
The Tailings Dam of embodiment closes library system 100 according to a first aspect of the present invention, and deposition beach face coating 1 is existed using tailings Deposition beach face is laid with, and dam body 2, which encloses, to be built in the outside of deposition beach face coating 1, and the outer slope protection layer 21 of dam body 2 is using thick Partial size does not produce sour barren rock and is built into, deposit beach face coating 1 and dam body 2 surface layer be equipped with library internal drainage ditch 32 and with library week gutter 31 connections, the convergence gutter 33 by being located at 31 outside of library week gutter are discharged.Do not change and destroy Tailings Dam not only as a result, Any facility, the also regulation of increase tailings warehouse dam body 2, deposition beach face improvements, 3 facility of gutter etc., and reasonably sufficiently sharp With the obsolete material of Tailings Dam, resource has been saved, has been conducive to restoration of the ecosystem, it is safe and reliable to close library system, to realize tailing The safety in library is administered.
One embodiment according to a first aspect of the present invention, the partial size that the coarse grain diameter of outer slope protection layer 21 does not produce sour barren rock are Greater than 200mm.Be conducive to sufficiently and reasonably protect dam body 2 not stay sliding using resource as a result,.
One embodiment according to a first aspect of the present invention, outer slope protection layer 21 with a thickness of 0.4~0.6m.As a result, both Build cost can be taken into account, and can preferably protect dam body 2.
One embodiment according to a first aspect of the present invention, gutter 3 are not produce sour mine barren rock and cement using fine grain Gutter 3 made of mortar mixing is built.Be conducive to sufficiently and reasonably utilize resource as a result,.
Further embodiment according to a first aspect of the present invention, the partial size that fine grain does not produce sour mine barren rock is 5mm~60mm. Be conducive to sufficiently and reasonably utilize resource as a result,.
In conjunction with shown in Fig. 1 to Fig. 5, the Tailings Dam of embodiment closes library method according to a second aspect of the present invention, including walks as follows It is rapid:
S1: the processing of mine barren rock: according to the physicochemical characteristics of mine barren rock, selection does not produce sour mine barren rock and carries out break process, It obtains coarse grain diameter and does not produce that sour barren rock, fine grain do not produce sour barren rock, middle fine grain does not produce sour barren rock, closing library material as Tailings Dam makes With;
S2: deposition beach face processing: it is smooth to deposition beach face progress, then it is laid with tailings in deposition beach face, form deposition beach face Coating 1;
S3: it builds dam body: dam body 2 being built using native stone in the outside of deposition beach face, uses coarse grain diameter on the outer slope of dam body 2 Sour mine barren rock is not produced is built into slope protection layer;
S4: it builds gutter: building library week gutter 31 in 2 outside of dam body and with 2 adjacent of dam body;In deposition beach face Sour barren rock is not produced mix with cement mortar build into library internal drainage ditch 32, library on the surface of coating 1 and dam body 2 using fine grain Internal drainage ditch 32 intersects with library week gutter 31 to be connected to, and the convergence gutter 33 positioned at 31 outside of library week gutter is discharged.
The tailing of embodiment closes library method according to a second aspect of the present invention, is laid with to form deposition using tailings in deposition beach face Beach face coating 1 builds dam body 2 in the outside of deposition beach face coating 1, and the outer slope protection layer 21 of dam body 2 uses coarse grain diameter It does not produce sour barren rock to be built into, the surface layer for depositing beach face coating 1 and dam body 2 is equipped with library internal drainage ditch 32 and connects with library week gutter 31 Logical, the convergence gutter 33 by being located at 31 outside of library week gutter is discharged.Do not change not only as a result, and destroys appointing for Tailings Dam What facility, the also regulation of increase tailings warehouse dam body 2, deposition beach face improvement, 3 facility of gutter etc., and reasonably take full advantage of The mine barren rock of Tailings Dam and discarded tailings have saved resource as library material is closed, and are conducive to restoration of the ecosystem, so that finally obtained close Library system is conducive to restoration of the ecosystem, securely and reliably.
One embodiment according to a second aspect of the present invention, further comprises the steps of:
The arrangement of S5:PHC concrete prefabricated pipe 5: multiple PHC concrete are arranged vertically in deposition 1 region of beach face coating Prefabricated pipe 5 is used for installation photovoltaic component bracket 6.As a result, by vertically arranged for installing in deposition 1 region of beach face coating Multiple PHC concrete prefabricated pipes 5 of photovoltaic module support 6 are conducive to the photovoltaics such as installation photovoltaic component bracket 6 and photovoltaic module hair Some equipment of electricity can increase point off supply, increase using library system place progress photovoltaic power generation is being closed to bargh's distribution Add renewable sources of energy ratio, reduces electric cost.
Further embodiment according to a second aspect of the present invention further comprises the steps of:
S6: it maintenance constructing road: according to the deployment scenarios of PHC concrete prefabricated pipe 5, is adopted on deposition beach face coating 1 Sour barren rock is not produced with middle fine grain builds maintenance road.Road is overhauled by setting, is convenient to maintenance photovoltaic apparatus.Overhaul road Fine grain does not produce sour barren rock and builds in, takes full advantage of mine barren rock resource.
One embodiment according to a second aspect of the present invention, the partial size that coarse grain diameter does not produce sour barren rock is greater than 200mm, particulate The partial size that diameter does not produce sour barren rock is 5mm~60mm, and the partial size that middle fine grain does not produce sour barren rock is 30mm~100mm.Pass through as a result, Sour barren rock is not produced by do not produce that sour mine barren rock is broken into different-grain diameter, is classified according to library material requested is closed, sufficiently reasonable benefit With not producing sour mine barren rock resource.
One embodiment according to a second aspect of the present invention, further comprises the steps of:
S7: earth material layer 4 is laid with: the earth material layer 4 for being used for planting plants is laid on deposition beach face coating 1.Thus, it is possible to The planting plants in the region for closing library system realize that ecology improves and restores, improve the ecological environment for closing library system.
As shown in Figure 6 to 7, the photovoltaic generating system 200 of embodiment according to a third aspect of the present invention, is applied above-mentioned The Tailings Dam of one side any embodiment closes in library system 100, including multiple PHC concrete prefabricated pipes 5, photovoltaic module support 6 With photovoltaic module (not shown).Wherein, multiple PHC concrete prefabricated pipes 5 vertical array linearly spaced apart, multiple PHC Concrete prefabricated pipe 5 includes connected lower section prefabricated pipe (not shown) and upper section prefabricated pipe 51, and lower section prefabricated pipe is buried solid In deposition beach face coating 1, upper section prefabricated pipe 51 extends vertically upward;Photovoltaic module support 6 is fixed on multiple PHC concrete In the upper section prefabricated pipe 51 of prefabricated pipe 5;Photovoltaic module is mounted on photovoltaic module support 6.
The photovoltaic generating system 200 of embodiment according to a third aspect of the present invention, due to PHC concrete prefabricated pipe 5 have compared with High support strength, multiple PHC concrete prefabricated pipes 5 can carry photovoltaic module support 6 disposed thereon and be mounted on photovoltaic The sum of the weight of photovoltaic module on assembly support 6.Electric energy can be converted light energy by photovoltaic module, is utilized as a result, It closes library system place and carries out photovoltaic power generation, can increase point off supply to bargh's distribution, increase renewable sources of energy ratio, reduce Electric cost, the utilization of resources are abundant.Therefore, the photovoltaic generating system 200 of third aspect present invention embodiment has the advantages that The first, it does not cut into a mountain, is not take up arable land, economizes on resources, building photovoltaic plant using waste land.The second, photovoltaic plant is close to mine Area realizes grid-connected power supply nearby, and electricity, which is marketed one's own products, has consumption advantage, reduces bargh's electric cost.Third, photovoltaic electric The construction stood completely according to the original geography of Tailings Dam, and with close library design and the synchronous progress of construction, do not change not only with Any facility of Tailings Dam is destroyed, also the regulation of increase tailings warehouse dam body, deposition beach face improvement, 3 facility of gutter etc., realizes peace The comprehensive utilization in fully closed library, photovoltaic power generation.4th, the comprehensive utilization for realizing the idle discarded ground in mine, facilitates Mine land Comprehensive environmental improvement.
One embodiment according to a third aspect of the present invention, photovoltaic module support 6 are dip-adjustable type photovoltaic module support 6.By using dip-adjustable type photovoltaic module support 6, the adjustable photovoltaic module being mounted on photovoltaic module support 6 inclines Even if the direction of angle photovoltaic module, so that photovoltaic module direction is in optimum state, such as keeps light vertical with photovoltaic module, obtain Obtain optimum total power.
One embodiment according to a third aspect of the present invention, photovoltaic module support 6 include the frame for installation photovoltaic component Frame 61 and multiple columns 62 corresponding with PHC concrete prefabricated pipe 5, the upper end of multiple columns 62 is connect with frame 61, more The lower end of a column 62 is fixed with the upper end of corresponding multiple upper section prefabricated pipes 51.Wherein, the upper end of 62 columns and frame Connection type can specifically be fixed using welding or bolt fixing method.Photovoltaic module support 6 will by setting column 62 as a result, Frame 61 is connected in PHC concrete prefabricated pipe 5, easy installation and reliable by 61 installation photovoltaic component of frame.
Further embodiment according to a third aspect of the present invention, photovoltaic module support 6 further include very heavy head piece 63 and thousand Jin top 64, very heavy head piece 63 is secured transverse in two PHC concrete prefabricated pipes 5, and jack 64 is angularly disposed, jack 64 Lower end be connected on very heavy head piece 63, the upper end of jack 64 is hinged on frame 61, the upper end of multiple columns 62 with Frame 61 is hinged, to make the tilt adjustable of frame 61 by the length for adjusting jack 64.It is vertical by the way that frame 61 to be hinged on On column 62 and the jack of inclined setting 64 and multiple columns 62, with the mandril length for overregulating jack 64, such as same mistake Hand mode adjusts the mandril length of jack 64, can have and be conveniently adjusted the photovoltaic group that 61 machine of frame is mounted on frame 61 The inclination angle of part makes photovoltaic module towards in optimum position, obtains optimum total power.Here, it needs to illustrate a bit, photovoltaic module It is maintained at 1.2m or more as far as possible apart from ground level, there are enough growths empty with the plant for ensuring to plant below photovoltaic module Between.
One embodiment according to a third aspect of the present invention further includes inverter and substation (inverter and substation's figure In be not shown), substation is equipped with transformer, and inverter is connected electrically between photovoltaic module and transformer.It is same as a result, to cross inverter The direct current that photovoltaic module inputs can be converted into alternating current, then be converted to the alternating current that inverter inputs by transformer The alternating current of required specification and output.
Further embodiment according to a third aspect of the present invention, inverter, which is connected electrically between photovoltaic module and transformer, to be had Body are as follows: multiple photovoltaic module series connection accumulate a component string, and multi-grade module string collects into a header box, and multiple header boxs converge Collection enters inverter, and the DC current of input is reverse into three-phase alternating current by inverter, and is converted into high-voltage electricity by change device and is sent Enter electric system.
Further embodiment according to a third aspect of the present invention, inverter and substation are arranged at the periphery of dam body 2 On the basis of frame concrete.Thus, it is possible to avoid Tailings Dam from settling and damage relevant device, such as inverter and substation set It is standby.
One embodiment according to a third aspect of the present invention, deposit beach face coating 1 on be additionally provided with use in fine grain not Produce the maintenance road that sour barren rock is built.Road is overhauled by setting, can be convenient to photovoltaic apparatus such as photovoltaic module, photovoltaic group Part bracket 6 etc. is overhauled.Fine grain does not produce sour barren rock and builds in maintenance road use, and it is useless reasonably to take full advantage of mine Stone resource.
Further embodiment according to a third aspect of the present invention, middle particulate do not produce sour mine barren rock partial size be 30mm~ 100mm.Mine barren rock resource is reasonably taken full advantage of as a result,.
One embodiment according to a third aspect of the present invention, the concrete in PHC concrete prefabricated pipe 5 are added with acid and alkali-resistance The additive of corrosion.Thus, it is possible to avoid PHC concrete prefabricated pipe 5 be deposited beach face coating 1 acid and alkali substance corruption Erosion, improves the service life of PHC concrete prefabricated pipe 5.
One embodiment according to a third aspect of the present invention further includes catch basin and water cell (catch basin and water storage list Member is not shown), catch basin is located at below photovoltaic module and sets, for receiving the rainwater flowed down from photovoltaic module or clean water, Catch basin is connected to water cell, so that the water in catch basin flows into water cell.Collected by being arranged in the lower section of photovoltaic module Sink can collect the rainwater flowed down from photovoltaic module or clean water, and be flowed to water cell, to be planted in deposition The plant of beach covering layer region is watered in due course, and watering mode can be realized using sprinkling irrigation or drip irrigation.Hereby it is achieved that water-saving It irrigates.
As shown in figure 8, the ecological restoring method of embodiment according to a fourth aspect of the present invention, applies and appoints in above-mentioned first aspect The Tailings Dam of one embodiment closes in library system 100 (as shown in Figure 1 to Figure 3), includes the following steps:
S11: organic matter, humic acid, metallic stabilizer, soil planting matrix improvement: are added in deposition beach face coating 1 One or more of modifying agent, water-retaining agent, or the earth material layer for being used for planting plants is directly laid on deposition beach face coating 1 4;Improvement planting matrix is tested, it is ensured that the pH value and nutrient content of matrix reach the standard of planting technique soil;
S12: species breeding: according to the physicochemical characteristics of mine barren rock, selecting the plant cultivation of resistance to heavy metal to plant, or/and Select impoverishment tolerant plant;
S13: vegetation plantation: planning as a whole arrangement planting area at the planting matrix of improvement, plants selected object in planting area Kind plant.
Specifically, in the planting matrix improvement of step S11, a kind of mode be to deposition beach face coating 1 relatively on One of organic matter, humic acid, metallic stabilizer, soil conditioner, water-retaining agent or a variety of, example are added in the tailings at position Such as, a kind of soil conditioner is added, or improve planting matrix simultaneously added with machine matter, humic acid, metallic stabilizer and water-retaining agent The quality of matter, then improvement planting matrix is tested, it is ensured that the pH value and nutrient content of planting matrix reach planting technique soil The standard of earth, to be suitable for plant growth;Another middle mode is directly directly to be laid with one layer on deposition beach face coating 1 to be used for The dope layer of planting plants, then improvement planting matrix is tested, it is ensured that the pH value and nutrient content of planting matrix reach green Change the standard of planting soil, to be suitable for plant growth.
In terms of the species breeding of step S12, since deposition beach face coating 1 is spread using the discarded tailings of Tailings Dam If forming, content of beary metal is higher in tailings, and nutritional ingredient needed for plant is barren in tailings, and therefore, it is necessary to select a resistance to huge sum of money Platymiscium or impoverishment tolerant planting.
It in terms of the vegetation plantation of step S13, rationally chooses seeds, plans as a whole arrangement plantation at the planting matrix of improvement.For Cultivation is broadcasted sowing using surface or gone to herbaceous plant.It when surface is broadcasted sowing, first scatters seeds, then in surface earthing;When row is planted, first dig Furrow is sowed in furrow, then in earthing.For perennial shrub plant, planted using cave.
The ecological restoring method of embodiment according to a fourth aspect of the present invention closes library system 100 to Tailings Dam and carries out ecology and repairs It is multiple, be conducive to the improvement and recovery of closing the ecological environment of library system.
An implementation according to a fourth aspect of the present invention, the Plant choosing of resistance to heavy metal ciliate desert-grass, alfalfa, Phytolacca acinosa, perfume (or spice) At least one of root grass, penny cress, three-coloured amaranth and shrub plant;Impoverishment tolerant Plant choosing sainfoin, fescue grass, Bermuda grass, rye At least one of grass, paspalum notatum, shrub lespedeza, rose, leapfrog, rose, sea-buckthorn and shrub plant.As a result, by rationally choosing seeds, The plant grew well for ensuring to close the plantation of library system, is conducive to the improvement and recovery of closing the ecological environment of library system.
One embodiment according to a fourth aspect of the present invention, in the step of testing improvement mechanism, first test kind PH, organic matter, hydrolyzable nitrogen, available phosphorus and the quick-acting potassium content of phytyl matter, re-test calcium oxide, organic fertilizer, bentonite, zeolite and Compound fertilizer.Thus, it is ensured that the pH value and nutrient content of planting matrix reach the standard of planting technique soil, it is raw to be suitable for plant It is long.
As shown in figure 8, the ecological restoring method of embodiment according to a fifth aspect of the present invention, applies and appoints in the above-mentioned third aspect In the photovoltaic generating system 200 (as shown in Figure 6 and Figure 7) of one embodiment, include the following steps:
S21: organic matter, humic acid, metallic stabilizer, soil planting matrix improvement: are added in deposition beach face coating 1 One or more of modifying agent, water-retaining agent, or the earth material layer for being used for planting plants is directly laid on deposition beach face coating 1 4;Improvement matrix is tested, it is ensured that the pH value and nutrient content of matrix reach the standard of planting technique soil;
S22: species breeding: according to the physicochemical characteristics of mine barren rock, selecting the plant cultivation of resistance to heavy metal to plant, or/and Select impoverishment tolerant plant;
S23: vegetation plantation: planning as a whole arrangement planting area at the planting matrix of improvement, plants selected object in planting area Kind plant.
Specifically, in the planting matrix improvement of step S21, a kind of mode be to deposition beach face coating 1 relatively on One of organic matter, humic acid, metallic stabilizer, soil conditioner, water-retaining agent or a variety of, example are added in the tailings at position Such as, a kind of soil conditioner is added, or improve planting matrix simultaneously added with machine matter, humic acid, metallic stabilizer and water-retaining agent The quality of matter, then improvement planting matrix is tested, it is ensured that the pH value and nutrient content of planting matrix reach planting technique soil The standard of earth, to be suitable for plant growth;Another middle mode is directly directly to be laid with one layer on deposition beach face coating 1 to be used for The dope layer of planting plants, then improvement planting matrix is tested, it is ensured that the pH value and nutrient content of planting matrix reach green Change the standard of planting soil, to be suitable for plant growth.
In terms of the species breeding of step S22, since deposition beach face coating 1 is spread using the discarded tailings of Tailings Dam If forming, content of beary metal is higher in tailings, and nutritional ingredient needed for plant is barren in tailings, and therefore, it is necessary to select a resistance to huge sum of money Platymiscium or impoverishment tolerant planting.
It in terms of the vegetation plantation of step S23, rationally chooses seeds, plans as a whole arrangement plantation at the planting matrix of improvement.For Cultivation is broadcasted sowing using surface or gone to herbaceous plant.It when surface is broadcasted sowing, first scatters seeds, then in surface earthing;When row is planted, first dig Furrow is sowed in furrow, then in earthing.For perennial shrub plant, planted using cave.
The ecological restoring method of embodiment according to a fifth aspect of the present invention incorporates light while Tailings Dam closes library and administers Volt power generation, and ecological restoration and management is carried out, realize that seamless connection and comprehensive benefit are maximum.Specifically have the advantage that first, The reparation for not cutting into a mountain, being not take up arable land, economizing on resources and waste land is made to be achieved ecological environment.The second, photovoltaic plant is tight Grid-connected power supply nearby is realized in adjacent mining area, and electricity, which is marketed one's own products, has consumption advantage, reduces bargh's electric cost.Third, light The construction of overhead utility completely according to the original geography of Tailings Dam, and with close library design and the synchronous progress of construction, do not change not only Become and destroy any facility of Tailings Dam, also the regulation of increase tailings warehouse dam body 2, deposition beach face improvement, 3 facility of gutter etc., it is real The comprehensive utilization that safety closes library, photovoltaic power generation and restoration of the ecosystem is showed.4th, the comprehensive benefit on the idle discarded ground in mine is realized With facilitating the comprehensive environmental improvement of Mine land.
One embodiment according to a fifth aspect of the present invention, the Plant choosing of resistance to heavy metal ciliate desert-grass, alfalfa, Phytolacca acinosa, At least one of vetiver, penny cress, three-coloured amaranth and shrub plant;It is impoverishment tolerant Plant choosing sainfoin, fescue grass, Bermuda grass, black At least one of wheat straw, paspalum notatum, shrub lespedeza, rose, leapfrog, rose, sea-buckthorn and shrub plant.As a result, by rationally selecting Kind, it is ensured that the plant grew well for closing the plantation of library system is conducive to the improvement and recovery of closing the ecological environment of library system.
One embodiment according to a fifth aspect of the present invention, in the step of testing improvement mechanism, first test kind PH, organic matter, hydrolyzable nitrogen, available phosphorus and the quick-acting potassium content of phytyl matter, re-test calcium oxide, organic fertilizer, bentonite, zeolite and Compound fertilizer.Thus, it is ensured that the pH value and nutrient content of planting matrix reach the standard of planting technique soil, it is raw to be suitable for plant It is long.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " illustrative examples ", The description of " example ", " specific example " or " some examples " etc. means specific features described in conjunction with this embodiment or example, knot Structure, material or feature are included at least one embodiment or example of the invention.In the present specification, to above-mentioned term Schematic representation may not refer to the same embodiment or example.Moreover, specific features, structure, material or the spy of description Point can be combined in any suitable manner in any one or more of the embodiments or examples.
Although an embodiment of the present invention has been shown and described, it will be understood by those skilled in the art that: not A variety of change, modification, replacement and modification can be carried out to these embodiments in the case where being detached from the principle of the present invention and objective, this The range of invention is defined by the claims and their equivalents.

Claims (27)

1. a kind of Tailings Dam closes library system characterized by comprising
Beach face coating is deposited, the deposition beach face coating is that the tailings formed on the deposition beach face is laid on using tailings Layer;
Dam body, the dam body are disposed around the outside of the deposition beach face coating;The dam body includes outer slope protection layer, described Outer slope protection layer is not produce the slope protection layer that sour barren rock is built into using coarse grain diameter;
Gutter, the gutter include library week gutter and library internal drainage ditch;The library week, gutter was looped around the dam body Outside and adjacent with the dam body;The library internal drainage ditch is located at the table of deposition the beach face coating and the dam body On face, and intersect with library week gutter and be connected to, is discharged by being located at the convergence gutter on the outside of library week gutter.
2. Tailings Dam according to claim 1 closes library system, which is characterized in that the coarse grain diameter of the outer slope protection layer The partial size for not producing sour barren rock is greater than 200mm.
3. Tailings Dam according to claim 1 closes library system, which is characterized in that the outer slope protection layer with a thickness of 0.4 ~0.6m.
4. Tailings Dam according to claim 1 closes library system, which is characterized in that the gutter is not produced using fine grain Sour mine barren rock is mixed with cement mortar build made of gutter.
5. Tailings Dam according to claim 4 closes library system, which is characterized in that the fine grain does not produce the grain of sour mine barren rock Diameter is 5mm~60mm.
6. a kind of Tailings Dam closes library method, which comprises the steps of:
The processing of mine barren rock;According to the physicochemical characteristics of mine barren rock, selection does not produce sour mine barren rock and carries out break process, obtains coarse grain Diameter does not produce that sour barren rock, fine grain do not produce sour barren rock, middle fine grain does not produce sour barren rock, closes library material as Tailings Dam and uses;
Deposit beach face processing: it is smooth to deposition beach face progress, then it is laid with tailings in deposition beach face, form deposition beach face coating;
It builds dam body: dam body being built using native stone in the outside of deposition beach face, slope does not produce sour mine using coarse grain diameter outside dam body Barren rock is built into slope protection layer;
It builds gutter: building library week gutter in dam body outside and with dam body adjacent;On deposition beach face coating and dam Do not produce sour barren rock using fine grain on the surface of body and mixed with cement mortar and build into library internal drainage ditch, the library internal drainage ditch and Library week gutter intersects connection, the convergence gutter discharge on the outside of library week gutter.
7. Tailings Dam according to claim 6 closes library method, which is characterized in that further comprise the steps of:
The arrangement of PHC concrete prefabricated pipe: multiple PHC concrete are arranged vertically in deposition beach face covering layer region
Prefabricated pipe is used for installation photovoltaic component bracket.
8. Tailings Dam according to claim 7 closes library method, which is characterized in that further comprise the steps of:
Overhaul constructing road: according to the deployment scenarios of PHC concrete prefabricated pipe, used on the deposition beach face coating in carefully Partial size does not produce sour barren rock and builds maintenance road.
9. Tailings Dam according to claim 6 closes library method, which is characterized in that the coarse grain diameter does not produce the partial size of sour barren rock For greater than 200mm, the partial size that the fine grain does not produce sour barren rock is 5mm~60mm, and the middle fine grain does not produce the grain of sour barren rock Diameter is 30mm~100mm.
10. tailing according to claim 6 closes library method, which is characterized in that further comprise the steps of:
Earth material layer is laid with: the earth material layer for being used for planting plants is laid on the deposition beach face coating.
11. a kind of photovoltaic generating system, which is characterized in that the Tailings Dam described in any one of claim 1-5 is applied to close In the system of library, comprising:
Multiple PHC concrete prefabricated pipes, multiple PHC concrete prefabricated pipes are linearly spaced apart vertical array, multiple described PHC concrete prefabricated pipe includes connected lower section prefabricated pipe and upper section prefabricated pipe, and the lower section prefabricated pipe is buried solid described heavy In product beach face coating, the upper section prefabricated pipe extends vertically upward;
Photovoltaic module support, the upper section that the photovoltaic module support is fixed on multiple PHC concrete prefabricated pipes are prefabricated Guan Shang;
Photovoltaic module, the photovoltaic module are mounted on the photovoltaic module support.
12. photovoltaic generating system according to claim 11, which is characterized in that the photovoltaic module support is tilt adjustable Formula fixes bracket.
13. photovoltaic generating system according to claim 11, which is characterized in that the photovoltaic module support include frame, Multiple columns corresponding with the PHC concrete prefabricated pipe, the upper end of multiple columns is connect with the frame, multiple The lower end of the column is fixed with the upper end of corresponding multiple upper section prefabricated pipes.
14. photovoltaic generating system according to claim 13, which is characterized in that the photovoltaic module support further includes very heavy Head piece and jack, the very heavy head piece are secured transverse in two PHC concrete prefabricated pipes, and the jack is oblique To setting, the lower end of the jack is connected on the very heavy head piece, and the upper end of the jack is hinged on the frame On, the upper end of multiple columns with the frame articulation, makes the frame with the length by the adjusting jack Tilt adjustable.
15. photovoltaic generating system according to claim 11, which is characterized in that it further include inverter and substation, it is described Substation is equipped with transformer, and the inverter is connected electrically between the photovoltaic module and the transformer.
16. photovoltaic generating system according to claim 15, which is characterized in that the inverter is connected electrically in the photovoltaic Between component and the transformer specifically: multiple photovoltaic module series connection accumulate a component string, component described in multiple groups String collects into a header box, and multiple header boxs collect into the inverter, and the inverter is by the direct current of input Stream is reverse into three-phase alternating current, and is converted into high-voltage electricity by the change device and is sent into electric system.
17. photovoltaic generating system according to claim 15, which is characterized in that the inverter and substation setting On the basis of frame concrete at the periphery of the dam body.
18. photovoltaic generating system according to claim 11, which is characterized in that be additionally provided on the deposition beach face coating Fine grain does not produce the maintenance road that sour barren rock is built in.
19. photovoltaic generating system according to claim 18, which is characterized in that the middle particulate does not produce the grain of sour mine barren rock Diameter is 30mm~100mm.
20. photovoltaic generating system according to claim 11, which is characterized in that mixed in the PHC concrete prefabricated pipe Solidifying soil is added with the additive of acid-alkali-corrosive-resisting.
21. photovoltaic generating system described in Arbitrary Term in 1 according to claim 1, which is characterized in that further include catch basin and water storage Unit, the catch basin is located at below the photovoltaic module and sets, for receiving the rainwater flowed down from photovoltaic module and cleaning Water, the catch basin are connected to water cell, so that the water in the catch basin flows into water cell.
22. a kind of ecological restoring method, which is characterized in that the Tailings Dam described in any one of claim 1-5 is applied to close In the system of library, include the following steps:
Planting matrix improvement: organic matter, humic acid, metallic stabilizer, soil conditioner, guarantor are added in deposition beach face coating One or more of aqua, or the earth material layer for being used for planting plants is directly laid on deposition beach face coating;To improvement base Matter is tested, it is ensured that the pH value and nutrient content of matrix reach the standard of planting technique soil;
Species breeding: according to the physicochemical characteristics of mine barren rock, the plant cultivation of resistance to heavy metal is selected to plant, or/and selected resistance to poor Lean plant;
Vegetation plantation: planning as a whole arrangement planting area at the planting matrix of improvement, plants selected species in planting area.
23. ecological restoring method according to claim 22, which is characterized in that the Plant choosing of the resistance to heavy metal centipede At least one of grass, alfalfa, Phytolacca acinosa, vetiver, penny cress, three-coloured amaranth and shrub plant;The impoverishment tolerant Plant choosing In sainfoin, fescue grass, Bermuda grass, rye grass, paspalum notatum, shrub lespedeza, rose, leapfrog, rose, sea-buckthorn and shrub plant at least It is a kind of.
24. ecological restoring method according to claim 22, which is characterized in that in the step of testing improvement mechanism In, first test PH, organic matter, hydrolyzable nitrogen, available phosphorus and the quick-acting potassium content of planting matrix, it is re-test calcium oxide, organic fertilizer, swollen Profit soil, zeolite and compound fertilizer.
25. a kind of ecological restoring method, which is characterized in that apply the photovoltaic power generation described in Arbitrary Term in claim 11-21 In system, include the following steps:
Planting matrix improvement: organic matter, humic acid, metallic stabilizer, soil conditioner, guarantor are added in deposition beach face coating One or more of aqua, or the earth material layer for being used for planting plants is directly laid on deposition beach face coating;To improvement base Matter is tested, it is ensured that the pH value and nutrient content of matrix reach the standard of planting technique soil;
Species breeding: according to the physicochemical characteristics of mine barren rock, the plant cultivation of resistance to heavy metal is selected to plant, or/and selected resistance to poor Lean plant;
Vegetation plantation: planning as a whole arrangement planting area at the planting matrix of improvement, plants selected species in planting area.
26. ecological restoring method according to claim 25, which is characterized in that the Plant choosing of the resistance to heavy metal centipede At least one of grass, alfalfa, Phytolacca acinosa, vetiver, penny cress, three-coloured amaranth and shrub plant;The impoverishment tolerant Plant choosing In sainfoin, fescue grass, Bermuda grass, rye grass, paspalum notatum, shrub lespedeza, rose, leapfrog, rose, sea-buckthorn and shrub plant at least It is a kind of.
27. ecological restoring method according to claim 25, which is characterized in that in the step of testing improvement mechanism In, first test PH, organic matter, hydrolyzable nitrogen, available phosphorus and the quick-acting potassium content of planting matrix, it is re-test calcium oxide, organic fertilizer, swollen Profit soil, zeolite and compound fertilizer.
CN201811589860.8A 2018-12-25 2018-12-25 Tailing pond closing system and method, photovoltaic power generation system and ecological restoration method Active CN109537709B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811589860.8A CN109537709B (en) 2018-12-25 2018-12-25 Tailing pond closing system and method, photovoltaic power generation system and ecological restoration method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811589860.8A CN109537709B (en) 2018-12-25 2018-12-25 Tailing pond closing system and method, photovoltaic power generation system and ecological restoration method

Publications (2)

Publication Number Publication Date
CN109537709A true CN109537709A (en) 2019-03-29
CN109537709B CN109537709B (en) 2024-06-14

Family

ID=65858037

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811589860.8A Active CN109537709B (en) 2018-12-25 2018-12-25 Tailing pond closing system and method, photovoltaic power generation system and ecological restoration method

Country Status (1)

Country Link
CN (1) CN109537709B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110280575A (en) * 2019-06-20 2019-09-27 江苏萤火虫环境科技有限公司 The screening technique of heavy metal pollution arable land surrogate outcomes plant under photovoltaic power generation facility

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101992209A (en) * 2009-08-28 2011-03-30 中国科学院地理科学与资源研究所 Bioremediation method for arsenic-containing tailings or waste residue
CN102041845A (en) * 2010-11-18 2011-05-04 中钢集团马鞍山矿山研究院有限公司 United draining system for effectively lowering seepage lines in fill dam of tailing reservoir
CN102671908A (en) * 2011-03-11 2012-09-19 河北农业大学 Improvement method for biological environment of tailing pond
CN104092431A (en) * 2014-07-02 2014-10-08 苏州威恩斯光电科技有限公司 Fixed photovoltaic support with adjustable elevation angle
CN104711953A (en) * 2015-02-10 2015-06-17 太原钢铁(集团)有限公司 Tailing dam built through barren rock
CN104831678A (en) * 2015-01-30 2015-08-12 王健 Ecological restoration method for tailing depot reclamation after tailing depot closure
CN104987260A (en) * 2015-06-11 2015-10-21 北京矿冶研究总院 Ecological restoration matrix for lead-zinc tailing pond and preparation method and application thereof
CN204928674U (en) * 2015-08-06 2015-12-30 华电电力科学研究院 Build solar photovoltaic power station on tailing storehouse
CN205352381U (en) * 2016-01-26 2016-06-29 河南工程学院 Beach length real -time supervision platform is done in movable tailing storehouse
CN108380382A (en) * 2018-02-05 2018-08-10 珲春紫金矿业有限公司 A kind of dry heap of fine tailings is built a dam the heap discharge method being combined with wet row
CN207727532U (en) * 2018-01-14 2018-08-14 袁朝 A kind of flat type Tailings Dam closes the structure of drainning off floodwaters in library
CN108668553A (en) * 2018-04-17 2018-10-19 桂林理工大学 A kind of reclamation method suitable for Karst area heavy metal tailings library
CN208201941U (en) * 2018-05-04 2018-12-07 魏德宁 A kind of tailings warehouse dam body piping improvement slope protection
CN209523280U (en) * 2018-12-25 2019-10-22 中国恩菲工程技术有限公司 Tailings Dam closes library system and photovoltaic generating system

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101992209A (en) * 2009-08-28 2011-03-30 中国科学院地理科学与资源研究所 Bioremediation method for arsenic-containing tailings or waste residue
CN102041845A (en) * 2010-11-18 2011-05-04 中钢集团马鞍山矿山研究院有限公司 United draining system for effectively lowering seepage lines in fill dam of tailing reservoir
CN102671908A (en) * 2011-03-11 2012-09-19 河北农业大学 Improvement method for biological environment of tailing pond
CN104092431A (en) * 2014-07-02 2014-10-08 苏州威恩斯光电科技有限公司 Fixed photovoltaic support with adjustable elevation angle
CN104831678A (en) * 2015-01-30 2015-08-12 王健 Ecological restoration method for tailing depot reclamation after tailing depot closure
CN104711953A (en) * 2015-02-10 2015-06-17 太原钢铁(集团)有限公司 Tailing dam built through barren rock
CN104987260A (en) * 2015-06-11 2015-10-21 北京矿冶研究总院 Ecological restoration matrix for lead-zinc tailing pond and preparation method and application thereof
CN204928674U (en) * 2015-08-06 2015-12-30 华电电力科学研究院 Build solar photovoltaic power station on tailing storehouse
CN205352381U (en) * 2016-01-26 2016-06-29 河南工程学院 Beach length real -time supervision platform is done in movable tailing storehouse
CN207727532U (en) * 2018-01-14 2018-08-14 袁朝 A kind of flat type Tailings Dam closes the structure of drainning off floodwaters in library
CN108380382A (en) * 2018-02-05 2018-08-10 珲春紫金矿业有限公司 A kind of dry heap of fine tailings is built a dam the heap discharge method being combined with wet row
CN108668553A (en) * 2018-04-17 2018-10-19 桂林理工大学 A kind of reclamation method suitable for Karst area heavy metal tailings library
CN208201941U (en) * 2018-05-04 2018-12-07 魏德宁 A kind of tailings warehouse dam body piping improvement slope protection
CN209523280U (en) * 2018-12-25 2019-10-22 中国恩菲工程技术有限公司 Tailings Dam closes library system and photovoltaic generating system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110280575A (en) * 2019-06-20 2019-09-27 江苏萤火虫环境科技有限公司 The screening technique of heavy metal pollution arable land surrogate outcomes plant under photovoltaic power generation facility

Also Published As

Publication number Publication date
CN109537709B (en) 2024-06-14

Similar Documents

Publication Publication Date Title
Kangas et al. Nutrient removal from agricultural drainage water using algal turf scrubbers and solar power
CN106358694A (en) Method for quickly greening stony deserted mountain
CN206713664U (en) Mountain area field water fertilizer drip irrigation system based on solar photovoltaic generating
CN107494206A (en) A kind of intelligent drip-irrigation device and drip irrigation method
CN105724226A (en) Water-saving building elevation greening structure and construction method
CN106359019A (en) Cloud computing based intelligent garden management equipment
CN106358477A (en) Sand discharging and sand controlling system of secondary saline and alkaline land of Hetao irrigation area
CN113875344A (en) Ecological restoration method for coal mine mountain geological environment
CN101690460B (en) Turf substrate produced by construction waste and sludge
CN104541641A (en) Method of thinning, eliminating soil salt and increasing yield by arranging crushed ridge bind drain system
CN209523280U (en) Tailings Dam closes library system and photovoltaic generating system
CN107896548A (en) A kind of method and irrigation system suitable for Karst stony mountain areas steep cliff section ecological management
CN109537709A (en) Tailings Dam closes library system and method, photovoltaic generating system, ecological restoring method
CN104663225A (en) Planting, cultivating and culturing system utilizing territorial air space farmland-building land
CN103374904B (en) Farmland discharging-irrigating patten transformation saves land water-saving method
CN204498997U (en) Solar energy remote control system for irrigation
CN205712016U (en) A kind of ecological trench system of water level real-time monitoring
CN206395937U (en) Intelligent remote monitoring solar direct current is aerated artificial wet land system
CN210470287U (en) Efficient watering, fertilizing and conservation system for mine restoration
CN101300943A (en) Method for treating land desertification
CN204510932U (en) A kind of farmland planting system of five in one
CN104737662B (en) A kind of efficient reclamation method of house site
CN104563137B (en) A kind of heavy grade rock side-slope nursing structure based on rainwater-collecting bag
CN209073131U (en) A kind of automation can adjust the irrigation rig of water spraying time according to temperature
CN207022779U (en) A kind of photovoltaic generation hybrid system integrated with water saving irrigation facility

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant