CN109519124A - A kind of oil drilling two-dimensional guide tool assembly and guidance method - Google Patents

A kind of oil drilling two-dimensional guide tool assembly and guidance method Download PDF

Info

Publication number
CN109519124A
CN109519124A CN201811530477.5A CN201811530477A CN109519124A CN 109519124 A CN109519124 A CN 109519124A CN 201811530477 A CN201811530477 A CN 201811530477A CN 109519124 A CN109519124 A CN 109519124A
Authority
CN
China
Prior art keywords
tapered stabilizer
minutes
pipe nipple
preposition
oil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811530477.5A
Other languages
Chinese (zh)
Other versions
CN109519124B (en
Inventor
李晓明
薛让平
宋顺平
丛成
杨森
李录科
王万庆
李德波
何璟彬
李冠英
武立
朱建武
陈伟林
白秀丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
Changqing Drilling Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changqing Drilling Co of CNPC Chuanqing Drilling Engineering Co Ltd filed Critical Changqing Drilling Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority to CN201811530477.5A priority Critical patent/CN109519124B/en
Publication of CN109519124A publication Critical patent/CN109519124A/en
Application granted granted Critical
Publication of CN109519124B publication Critical patent/CN109519124B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/10Wear protectors; Centralising devices, e.g. stabilisers
    • E21B17/1078Stabilisers or centralisers for casing, tubing or drill pipes

Abstract

The present invention relates to oil drilling tool technical field more particularly to a kind of oil drilling two-dimensional guide tool assembly and its application methods.The present invention is by screw rod and the preposition tapered stabilizer of screw rod upper and lower ends and the Technical Design of postposition tapered stabilizer is arranged in, by the way that two-dimensional guide tool assembly to be connect with drill bit, the judgement of drilling construction, well track, well track reduces sag construction, well track needs to stablize sag construction and well track needs to increase sag six steps of construction, the efficiency for improving construction on the basis of cost reduction can complete well track using the same drilling tool and reduce sag, stablizes sag and increase the construction of sag.

Description

A kind of oil drilling two-dimensional guide tool assembly and guidance method
Technical field
The present invention relates to oil drilling tool technical field more particularly to a kind of oil drilling two-dimensional guide tool assemblies And guidance method.
Background technique
In horizontal well construction, to the control of well track mainly based on hold angle, existing drilling tool structure is in screw rod and brill Stiff stability device is used between head, TRAJECTORY CONTROL is mostly increasing hole angle, and reach hold angle and a large amount of slipping drilling is needed to adjust, construction effect Rate is low, and cost can not further decrease, and realizes that a brill technology barrier is obvious.
Summary of the invention
A kind of the object of the present invention is to provide construction efficiency high, oil drilling at low cost two-dimensional guide tool assembly and Guidance method.
To achieve the above object, the technical solution adopted by the present invention is that: a kind of oil drilling two-dimensional guide tool assembly, Include:
Preposition tapered stabilizer is connect with the lower end of screw rod, is adjusted by changing the size of preposition tapered stabilizer outer diameter Save well-drilling borehole sag;
Postposition tapered stabilizer is connect with the upper end of screw rod, is adjusted by changing the size of postposition tapered stabilizer outer diameter Save well-drilling borehole sag.
The preposition tapered stabilizer includes: that preposition tapered stabilizer ontology, oil cylinder, the pipe nipple that surges, the first battery are short Section, the first circuit pipe nipple oil pipe road and the first fulgurite road;The oil cylinder is connected to preposition tapered stabilizer outer body wall, and Connect with the one end for the oil pipe line being arranged in preposition this body sidewall of tapered stabilizer, the other end of oil pipe line be connected to it is preposition The pipe nipple connection of surging of tapered stabilizer outer body wall;First battery short section and the first circuit pipe nipple are arranged at preposition variable diameter Stabilizer outer body wall is steady in preposition variable diameter by being arranged between the pipe nipple that surges, the first battery short section and the first circuit pipe nipple Determine the first electric piping connection in this body sidewall of device.
The preposition tapered stabilizer outer body wall is radially even to be provided with multiple oil cylinders, and each oil cylinder top is equal Contact connectio has first rib, and the first rib is flexibly connected with preposition tapered stabilizer outer body wall.
The pipe nipple that surges includes at least pipe nipple shell, has oil pocket in pipe nipple shell, is connected with dummy piston in oil pocket, One end of oil pocket is connected with breathing cover board, and the other end of oil pocket is connected with the solenoid valve being fixed on valve body frame, and valve body frame is fixed Be connected on pipe nipple case inside wall, solenoid valve is connect with one end of oil pocket opposite side and check valve, the other end of check valve with One end of plunger pump is connected with, and the other end of plunger pump is connect by shaft coupling with the one end for the motor being connected on motor rack, The other end of motor is connect by being provided with the control cable of cross core with wire and plug;The motor rack and pipe nipple shell Inner sidewall is fixedly connected;There is O-ring seal between valve body frame and pipe nipple shell;Check valve is connect with the oil pipe line.
The postposition tapered stabilizer includes at least postposition tapered stabilizer shell, postposition tapered stabilizer shell inner sleeve It is connected to central tube, one end of central tube is connected with positive pressure ring, and the other end of central tube is connected with back of the body cap by reset spring;Center The lower end connection on the lateral wall of positive pressure ring one end postposition tapered stabilizer shell through the groove and piston that open up is managed, it is living The upper-end contact of plug is connected with the second rib, and the second rib is flexibly connected with the lateral wall of postposition tapered stabilizer shell;It is close It is short that locking pipe nipple, the second battery short section and second circuit are connected in postposition tapered stabilizer hull outside wall at reset spring Section, by being arranged in postposition tapered stabilizer shell between the locking pipe nipple, the second battery short section and second circuit pipe nipple The second electric piping connection in side wall;Opening respectively on the lateral wall of locking pipe nipple both ends two sides for central tube is first annular recessed Slot and second annular groove.
Groove shapes that the central tube is opened up on the lateral wall of positive pressure ring one end by lateral wall and piston Lower end shape matches;The piston is uniformly connected with multiple on the side wall of postposition tapered stabilizer shell.
The back of the body cap is made of locking cap and locking cap, and one end of the locking cap and one end of reset spring connect It connects, the other end of locking cap is connect with locking cap;Locking cap and locking cap are removably attachable to postposition tapered stabilizer shell Inner sidewall.
The locking pipe nipple is energy storage type locking pipe nipple;One end of locking pipe nipple is connected with the first lock tongue, the first lock tongue Inside connect with one end of the first solenoid valve by the first oil pipeline, the one of the other end of the first solenoid valve and the first check valve End connection;The other end of first check valve is connected by one end of the first branch and fuel tank, and the other end of fuel tank passes through second Road and one end of second one-way valve connect, and the other end of second one-way valve and one end of second solenoid valve connect, second solenoid valve The other end connect with the second lock tongue by the second oil pipeline;There are two the energy storage dummy pistons connected side by side for connection in fuel tank; Fuel tank top is equipped with matrix plug, and matrix plug is connect with the first solenoid valve and second solenoid valve line;Described first Lock tongue, the second lock tongue, the first solenoid valve, second solenoid valve, the first check valve, second one-way valve and energy storage dummy piston with lock The slot only to match on the inner sidewall of shell or hole connection.
A kind of oil drilling guidance method of two-dimensional guide tool assembly, includes the following steps
A kind of oil drilling guidance method of two-dimensional guide tool assembly, includes the following steps
Two-dimensional guide tool assembly is connect by the first step with drill bit
The front end of preposition tapered stabilizer is connect with drill bit afterbody;
Second step, drilling construction
Horizontal well construction drilling is carried out using the drilling tool that step 1 connects, is pumped according to one start-stop of coding pre-established;
Third step, well track judgement
When well track needs to reduce sag, four are entered step;When well track needs to stablize sag, five are entered step; When well track needs to increase sag, six are entered step;
4th step, well track reduce the construction of sag
Regular four start-stop of the coding pump to have pre-established in ground;
5th step, well track stablize the construction of sag
Regular three start-stop of the coding pump to have pre-established in ground;
6th step, well track increase the construction of sag
Regular two start-stop of the coding pump to have pre-established in ground.
Described
Coding vibrates a minutes first is that by static, a minutes static, vibrates a minutes, a minutes static, vibrates a minutes, static Terminate;
Coding vibrates a minutes second is that by static, a minutes static, vibrates a minutes, a minutes static, vibrates b minutes, static Terminate;
Coding vibrates a minutes third is that by static, a minutes static, vibrates b minutes, a minutes static, vibrates a minutes, static Terminate;
Coding vibrates b minutes fourth is that by static, a minutes static, vibrates a minutes, a minutes static, vibrates a minutes, static Terminate;
Ground issues the preposition tapered stabilizer outer diameter in coding a period of time underground and increases, and postposition tapered stabilizer outer diameter is constant;
The preposition tapered stabilizer reduced diameter in underground, postposition tapered stabilizer outer diameter are constant when ground issues coding two;
When ground issues coding three, the preposition tapered stabilizer outer diameter in underground is constant, and postposition tapered stabilizer outer diameter increases;
When ground issues coding four, the preposition tapered stabilizer outer diameter in underground is constant, postposition tapered stabilizer reduced diameter.
The utility model has the advantages that the present invention passes through screw rod and the preposition tapered stabilizer and postposition variable diameter of screw rod upper and lower ends is arranged in The Technical Design of stabilizer adjusts preposition tapered stabilizer and postposition becomes by starting four kinds pre-established codings The outer diameter of diameter stabilizer achievees the purpose that change drilling well sag.The present invention improves construction on the basis of cost reduction Efficiency, using the same drilling tool, it will be able to complete well track reduce sag, stablize sag and increase sag construction.
The above description is only an overview of the technical scheme of the present invention, in order to better understand technology hand of the invention Section, and can be implemented in accordance with the contents of the specification, and with presently preferred embodiments of the present invention and attached drawing be cooperated to be described in detail such as below Afterwards.
Detailed description of the invention
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention Example, for those of ordinary skill in the art, without creative efforts, can also obtain according to these attached drawings Obtain other attached drawings.
Fig. 1 is two-dimensional guide tool assembly schematic diagram of the invention;
Fig. 2 is forward type tapered stabilizer structural schematic diagram of the invention;
Fig. 3 is the pipe nipple schematic diagram that surges of the invention;
Fig. 4 is postposition tapered stabilizer structural schematic diagram of the invention;
Fig. 5 is energy storage type locking pipe nipple schematic diagram of the invention;
Fig. 6 is coding schematic diagram of the invention;
Fig. 7 is partial structural diagram of the invention.
In figure, 1- drill bit;The preposition tapered stabilizer of 2-;3- screw rod;4- postposition tapered stabilizer;The preposition variable diameter of 201- is stablized Device ontology;202- oil cylinder;The first rib of 203-;204- surges pipe nipple;The first battery short section of 205-;206- the first circuit pipe nipple; 207- oil pipe line;The first fulgurite of 208- road;20401- pipe nipple shell;20402- breathes cover board;20403- dummy piston;20404- Oil pocket;20405- solenoid valve;20406- valve body frame;20407-O type sealing ring;20408- check valve;20409- plunger pump; 20410- shaft coupling;20411- motor;20412- motor rack;20413- controls cable;20414- wire and plug;401- postposition becomes Diameter stabilizer shell;The positive pressure ring of 402-;403- central tube;404- piston;The second rib of 405-;406- locking pipe nipple;407- Two battery short sections;408- second circuit pipe nipple;409- reset spring;410- locking cap;411- locking cap;The second fulgurite of 412- Road;413- first annular groove;414- second annular groove;40601- locking shell;The first lock tongue of 40602A-;40602B- Two lock tongues;The first solenoid valve of 40603A-;40603B- second solenoid valve;The first check valve of 40604A-;40604B- second is unidirectional Valve;The first oil pipeline of 40605A-;The second oil pipeline of 40605B-;The 40606A- first branch;40606B- second branch;40607- Energy storage dummy piston;40608- matrix plug;40609- fuel tank.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiment is only a part of the embodiments of the present invention, instead of all the embodiments.Base Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts it is all its His embodiment, shall fall within the protection scope of the present invention.
Embodiment one:
According to a kind of Fig. 1-oil drilling two-dimensional guide tool assembly shown in fig. 5, including screw rod 3, preposition tapered stabilizer 2, it is connect with the lower end of screw rod 3, it is steady by changing preposition variable diameter
The size of 2 outer diameter of device is determined to adjust well-drilling borehole sag;
Postposition tapered stabilizer 4 is connect with the upper end of screw rod 3, is adjusted by changing the size of 4 outer diameter of postposition tapered stabilizer Well-drilling borehole sag.
In actual use, drill bit 1 is mounted on preposition 2 front end of tapered stabilizer first, then carries out applying for horizontal well Work drilling, in construction, the outer diameter of preposition tapered stabilizer 2 and postposition tapered stabilizer 4 can be according to the shake pre-established Dynamic coding works.When horizontal well construction drilling, need to reduce sag according to well track, stable sag still increases sag The corresponding component of three kinds of situations, preposition tapered stabilizer 2 and postposition tapered stabilizer 4 carries out corresponding operating, and completion is applied accordingly Work process.
The present invention is by screw rod and is arranged in the preposition tapered stabilizer and postposition tapered stabilizer of screw rod upper and lower ends Technical Design improves the efficiency of construction on the basis of cost reduction, can complete wellbore using the same drilling tool Track reduces sag, stablizes sag and increases the construction of sag.
Embodiment two:
According to fig. 2 with a kind of oil drilling two-dimensional guide tool assembly shown in Fig. 7, with embodiment one the difference is that: The preposition tapered stabilizer 2 includes: preposition tapered stabilizer ontology 201, oil cylinder 202, the pipe nipple 204 that surges, the first battery Pipe nipple 205,206 oil pipe line 207 of the first circuit pipe nipple and the first fulgurite road 208;It is steady that the oil cylinder 202 is connected to preposition variable diameter Determine 201 lateral wall of device ontology, and connect with the one end for the oil pipe line 207 being arranged in preposition 201 side wall of tapered stabilizer ontology, The other end of oil pipe line 207 is connect with the pipe nipple 204 that surges for being connected to preposition 201 lateral wall of tapered stabilizer ontology;First electricity Pond pipe nipple 205 and the first circuit pipe nipple 206 are arranged at preposition 201 lateral wall of tapered stabilizer ontology, the pipe nipple 204 that surges, Pass through first be arranged in preposition 201 side wall of tapered stabilizer ontology between one battery short section 205 and the first circuit pipe nipple 206 Fulgurite road 208 connects.
Preferably preposition 201 lateral wall of tapered stabilizer ontology is radially even is provided with multiple oil cylinders 202, Each 202 top of oil cylinder is respectively connected with first rib 203, the first rib 203 and preposition 201 outside of tapered stabilizer ontology Wall is flexibly connected.
As shown in Fig. 2, ground passes through start-stop when live drilling engineer needs to adjust well track according to actual condition Slush pump issues preposition 2 outer diameter of tapered stabilizer and becomes larger signal.First circuit of 205 powered operation of the first battery short section of underground Pipe nipple 206 receives signal, is passed to the pipe nipple 204 that surges by the first fulgurite road 208, and the pipe nipple 204 that surges is started to work, and passes through oil Into three oil cylinders 202, oil cylinder 202 rises 207 fuel feeding of pipeline, opens the first rib 203, makes preposition 2 outer diameter of tapered stabilizer Become larger.It surges 204 pressure maintaining of pipe nipple, oil cylinder 202 and the first rib 203 keep working condition, and preposition 2 outer diameter of tapered stabilizer is always It is maintained at the state that becomes larger.
As shown in Fig. 2, ground passes through start-stop when live drilling engineer needs to adjust well track according to actual condition Slush pump issues preposition 2 outer diameter of tapered stabilizer and becomes smaller signal.First circuit of 205 powered operation of the first battery short section of underground Pipe nipple 206 receives signal, is passed to the pipe nipple 204 that surges by the first fulgurite road 208, and the pipe nipple 204 that surges starts draining, oil cylinder Oil in 202 is returned in the pipe nipple 204 that surges by oil pipe line 207, and the first rib 203 is withdrawn, and makes preposition 2 outer diameter of tapered stabilizer Become smaller.
The number that oil cylinder 202 is arranged, can be arranged corresponding number according to the actual needs of construction.
Embodiment three:
A kind of oil drilling two-dimensional guide tool assembly according to Fig.3, with embodiment two
The difference is that: the pipe nipple 204 that surges includes at least pipe nipple shell 20401, has oil pocket in pipe nipple shell 20401 20404, dummy piston 20403 is connected in oil pocket 20404, one end of oil pocket 20404 is connected with breathing cover board 20402, oil pocket 20404 other end is connected with the solenoid valve 20405 being fixed on valve body frame 20406, and valve body frame 20406 is fixedly connected on pipe nipple On 20401 inner sidewall of shell, solenoid valve 20405 is connect with 20404 opposite side of oil pocket with one end of check valve 20408, check valve One end of 20408 other end and plunger pump 20409 is connected with, and the other end of plunger pump 20409 is by shaft coupling 20410 and even Connect one end connection of the motor 20411 on motor rack 20412, the other end of motor 20411 is by being provided with the control of cross core Cable 20413 processed is connect with wire and plug 20414;The inner sidewall of the motor rack 20412 and pipe nipple shell 20401 is fixed to be connected It connects;There is O-ring seal 20407 between valve body frame 20406 and pipe nipple shell 20401;Check valve 20408 and the oil pipe line 207 connections.
In actual use, when the described pipe nipple 204 that surges receives instruction and starts fuel feeding, wire and plug 20414 obtains the One battery short section 205 supplies electricity to the start-up operation of motor 20411, and motor 20411 transfers torque to plunger pump by shaft coupling 20410 20409, plunger pump 20409 draws the oil of oil pocket 20404, and fuel feeding flows into oil pipe line 207 by check valve 20408.
As shown in figure 3, it is short that wire and plug 20414 obtains battery when the pipe nipple 204 that surges receives instruction beginning emptying Section 205 supplies electricity to solenoid valve 20405, and 20405 channel of solenoid valve is opened, and the oil in oil pipe line 207 is flowed back by solenoid valve 20405 Into oil pocket 20404.
By the technical solution of the above-mentioned pipe nipple 204 that surges, the pipe nipple 204 that makes to surge preferably completes operating process.
Example IV:
A kind of oil drilling two-dimensional guide tool assembly according to Fig.4, with embodiment one
The difference is that: the postposition tapered stabilizer 4 includes at least postposition tapered stabilizer shell 401, postposition variable diameter Be socketed with central tube 403 in stabilizer shell 401, one end of central tube 403 is connected with positive pressure ring 402, central tube 403 it is another End is connected with back of the body cap by reset spring 409;Central tube 403 is close to positive 402 one end postposition tapered stabilizer shell 401 of pressure ring It being connect by the groove opened up with the lower end of piston 404 on lateral wall, the upper-end contact of piston 404 is connected with the second rib 405, Second rib 405 is flexibly connected with the lateral wall of postposition tapered stabilizer shell 401;Postposition at reset spring 409 becomes Locking pipe nipple 406, the second battery short section 407 and second circuit pipe nipple 408 are connected in 401 lateral wall of diameter stabilizer shell, it is described Locking pipe nipple 406, between the second battery short section 407 and second circuit pipe nipple 408 by being arranged in postposition tapered stabilizer shell The second fulgurite road 412 connection in 401 side wall of body;Central tube 403 divides on the lateral wall of 406 both ends two sides of locking pipe nipple First annular groove 413 and second annular groove 414 are not opened.
Preferably the central tube 403 is opened up on the lateral wall of positive 402 one end of pressure ring by lateral wall recessed Groove shape and the lower end shape of piston 404 match;The piston 404 is on the side wall of postposition tapered stabilizer shell 401 It is uniformly connected with multiple.
Preferably the locking pipe nipple 406 is energy storage type locking pipe nipple.
The preferably described back of the body cap is made of locking cap 410 and locking cap 411, one end of the locking cap 410 with One end of reset spring 409 connects, and the other end of locking cap 410 is connect with locking cap 411;Locking cap 410 and locking cap 411 can Disassembly is connected to 401 inner sidewall of postposition tapered stabilizer shell.
When live drilling engineer needs to adjust well track according to actual condition, ground is issued by start-stop slush pump 2 outer diameter of postposition tapered stabilizer becomes larger signal.The second circuit pipe nipple 408 of 407 powered operation of the second battery short section of underground is received To signal, energy storage type locking pipe nipple 406, the start-up operation of energy storage type locking pipe nipple 406 first are passed to by the second fulgurite road 412 Lock tongue 40602A is withdrawn in advance.When slush pump is opened, high-pressure slurry, which flows through, to be set in tapered stabilizer 4, and positive pressure ring 402 passes through throttling Effect generates thrust, is transmitted on central tube 403, and central tube 403 moves downward, since central tube 403 and three pistons 404 are oblique Face contact makes piston 404 stretch out postposition tapered stabilizer shell 401, opens and be mounted on postposition tapered stabilizer shell 401 Second rib 405,2 outer diameter of postposition tapered stabilizer become larger.Reset spring 409 is fixed on locking cap 410 and locking cap 411 1 End.While central tube 403 moves, compression reseting spring 409 starts energy storage.When central tube 403 moves to lower dead center, storage The second lock tongue 40602B that energy formula locking pipe nipple 406 stretches out is stuck in the second annular groove 414 on central tube 403, central tube 403, piston 404 and 405 position of the second rib are locked, and postposition tapered stabilizer 2 keeps outer diameter to become larger state.
As shown in figure 4, ground passes through start-stop when live drilling engineer needs to adjust well track according to actual condition Slush pump issues 2 outer diameter of postposition tapered stabilizer and becomes smaller signal.The second circuit of 407 powered operation of the second battery short section of underground Pipe nipple 408 receives signal, is passed to energy storage type locking pipe nipple 406 by the second fulgurite road 412, energy storage type locking pipe nipple 406 is opened Beginning work, the second lock tongue 40602B are withdrawn in advance.Diastole is started by compression reseting spring 409, central tube 403 is in reset spring 409 It is moved up under thrust, the second lock tongue 40602B disengages the second annular groove 414 on central tube 403.Piston 404 and the second rib 405 It resets, 2 outer diameter of postposition tapered stabilizer becomes smaller.When central tube 403 moves to top dead centre, energy storage type locking pipe nipple 406 stretches out The first lock tongue 40602A be stuck in the first annular annular groove 413 of central tube 403.Central tube 403, piston 404 and second wing 405 position of rib is locked, and postposition tapered stabilizer 2 preferably maintains outer diameter and becomes smaller state.
In actual use, the setting number of piston 404 can be set according to actual needs.
Embodiment five:
A kind of oil drilling two-dimensional guide tool assembly according to figure 5, with example IV
The difference is that: one end of the locking pipe nipple 406 is connected with the first lock tongue 40602A, the first lock tongue 40602A's Inside is connect by the first oil pipeline 40605A with one end of the first solenoid valve 40603A, the other end of the first solenoid valve 40603A It is connect with one end of the first check valve 40604A;The other end of first check valve 40604A passes through first branch 40606A and fuel tank The other end of 40609 one end connection, fuel tank 40609 is connected by one end of second branch 40606B and second one-way valve 40604B It connects, the other end of second one-way valve 40604B is connect with one end of second solenoid valve 40603B, and second solenoid valve 40603B's is another One end is connect by the second oil pipeline 40605B with the second lock tongue 40602B;It is connected side by side there are two connections in fuel tank 40609 Energy storage dummy piston 40607;40609 top of fuel tank is equipped with matrix plug 40608, matrix plug 40608 and the first electricity Magnet valve 40603A is connected with second solenoid valve 40603B line;The first lock tongue 40602A, the second lock tongue 40602B, the first electricity Magnet valve 40603A, second solenoid valve 40603B, the first check valve 40604A, second one-way valve 40604B and energy storage dummy piston 40607 slots or hole to match with the inner sidewall of locking shell 40601 are connect.
In actual use, two energy storage dummy pistons 40607 of energy storage type locking pipe nipple 406 be band pressure condition, first Check valve 40604A and second one-way valve 40604B is fuel tank 40609 to the first oil pipeline 40605A and the second oil pipeline 40605B One-way conduction.First solenoid valve 40603A and second solenoid valve 40603B is normally closed, first branch 40606A and second branch 40606B closing can not oil return.The first lock tongue 40602A and the second lock tongue 40602B is set to be in outside stretching state with pressure always.
When energy storage type locking pipe nipple 406 needs locked-center 403 lower dead center of pipe, electric current is transferred to the first solenoid valve 40603A, the first solenoid valve 40603A work conducting branches 40606A oil return, the first lock tongue 40602A are free.Second solenoid valve 40603B power-off is closed, second branch 40606B close can not oil return, fuel tank 40609 passes through under 40607 pressure of dummy piston Second one-way valve 40604B and the second oil pipeline 40605B is to the second lock tongue 40602B fuel feeding, and the second lock tongue 40602B is with pressure stretch Out.
When energy storage type locking pipe nipple 406 needs locked-center 403 top dead centre of pipe, electric current is transferred to second solenoid valve 40603B, second solenoid valve 40603B work conducting second branch 40606B oil return, the second lock tongue 40602B are free.First electricity Magnet valve 40603A power-off close, first branch 40606A close can not oil return, fuel tank 40609 is under 40607 pressure of dummy piston By the first check valve 40604A and the first oil pipeline 40605A to the first lock tongue 40602A fuel feeding, the first lock tongue 40602A band Pressure stretch goes out.
The present invention preferably realizes horizontal well construction drilling.
Embodiment six:
A kind of oil drilling guidance method of two-dimensional guide tool assembly as shown in figures 1 to 6, includes the following steps
Two-dimensional guide tool assembly is connect by the first step with drill bit 1
The front end of preposition tapered stabilizer 2 is connect with 1 tail portion of drill bit;
Second step, drilling construction
Horizontal well construction drilling is carried out using the drilling tool that step 1 connects, is pumped according to one start-stop of coding pre-established;
Third step, well track judgement
When well track needs to reduce sag, four are entered step;When well track needs to stablize sag, five are entered step; When well track needs to increase sag, six are entered step;
4th step, well track reduce the construction of sag
Regular four start-stop of the coding pump to have pre-established in ground;
5th step, well track stablize the construction of sag
Regular three start-stop of the coding pump to have pre-established in ground;
6th step, well track increase the construction of sag
Regular two start-stop of the coding pump to have pre-established in ground.
Preferably described
Coding vibrates a minutes first is that by static, a minutes static, vibrates a minutes, a minutes static, vibrates a minutes, static Terminate;
Coding vibrates a minutes second is that by static, a minutes static, vibrates a minutes, a minutes static, vibrates b minutes, static Terminate;
Coding vibrates a minutes third is that by static, a minutes static, vibrates b minutes, a minutes static, vibrates a minutes, static Terminate;
Coding vibrates b minutes fourth is that by static, a minutes static, vibrates a minutes, a minutes static, vibrates a minutes, static Terminate;
Ground issues the preposition tapered stabilizer outer diameter in coding a period of time underground and increases, and postposition tapered stabilizer outer diameter is constant;
The preposition tapered stabilizer reduced diameter in underground, postposition tapered stabilizer outer diameter are constant when ground issues coding two;
When ground issues coding three, the preposition tapered stabilizer outer diameter in underground is constant, and postposition tapered stabilizer outer diameter increases;
When ground issues coding four, the preposition tapered stabilizer outer diameter in underground is constant, postposition tapered stabilizer reduced diameter.
In actual use, two-dimensional guide tool assembly is connect with drill bit 1 first, it will be preposition
The front end of tapered stabilizer 2 is connect with 1 tail portion of drill bit;Then horizontal well construction drilling is carried out using the drilling tool connected, According to one start-stop of the coding pump pre-established;When well track needs to reduce sag, carries out well track and reduce sag Construction is regular four start-stop of the coding pump to have pre-established in ground, and drilling tool detects periodic vibration in underground, preceding The first rib 203 for setting tapered stabilizer 2 stretches out, and outer diameter becomes larger;Second rib 405 of postposition tapered stabilizer 4 is withdrawn, Outer diameter becomes smaller;Entire drilling tool structure is adjusted to increase structure by force, and turn on pump is crept into again, and making well track, gradually angle becomes larger, Reduce sag.When well track needs to stablize sag, the construction, that is, ground for carrying out the stable sag of well track is regular With three start-stop of the coding pump pre-established, tool detects periodic vibration in underground, the first of preposition tapered stabilizer 2 Rib 203 stretches out, and outer diameter becomes larger;Second rib 405 of postposition tapered stabilizer 4 stretches out, and outer diameter becomes larger;It is entire to bore Lamps structure is adjusted to hold angle structure, and turn on pump is crept into again, remains unchanged well track angle, stabilizes sag.When wellbore rail When mark needs to increase sag, carry out well track to increase the construction of sag being the regular coding two to have pre-established in ground Start-stop pump, tool detect periodic vibration in underground, and the first rib 203 of preposition tapered stabilizer 2 is withdrawn, outer diameter Become smaller;Second rib 405 of postposition tapered stabilizer 4 stretches out, and outer diameter becomes larger;Entire drilling tool structure is adjusted to drop angle knot Structure, turn on pump is crept into again, and making well track, gradually angle becomes smaller, and increases sag.
Coding in the present embodiment is vibrated 1 minute, static 1 minute, is vibrated 1 minute, static 1 point first is that by static Clock vibrates 1 minute, static end.Board recognition, which goes out to encode, makes a response, and exports corresponding electric signal.
Coding two in the present embodiment is vibrated 1 minute, static 1 minute, is vibrated 1 minute, static 1 point by static Clock vibrates 2 minutes, static end.Board recognition, which goes out to encode, makes a response, and exports corresponding electric signal.
Coding three in the present embodiment is vibrated 1 minute, static 1 minute, is vibrated 2 minutes, static 1 point by static Clock vibrates 1 minute, static end.Board recognition, which goes out to encode, makes a response, and exports corresponding electric signal.
Coding four in the present embodiment is by static, vibration 2 minutes, and static 1 minute, vibration 1 minute, static 1 minute, Vibration 1 minute, static end.Board recognition, which goes out to encode, makes a response, and exports corresponding electric signal.
In conclusion the present invention passes through screw rod and the preposition tapered stabilizer and postposition variable diameter of screw rod upper and lower ends is arranged in The Technical Design of stabilizer, by the way that two-dimensional guide tool assembly is connect with drill bit, drilling construction, well track judgement, Six steps that well track reduces sag construction, well track stablizes sag construction and well track increase sag is constructed, pass through It pre-establishes and encodes, adjust the outer diameter of preposition tapered stabilizer and postposition tapered stabilizer, reach and change drilling well sag Purpose.The present invention improves the efficiency of construction on the basis of cost reduction, can complete wellbore rail using the same drilling tool Mark reduces sag, stablizes sag and increases the construction of sag.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.
It is to be appreciated that the directional instruction of institute is only used for explaining each component under a certain particular pose in the embodiment of the present invention Between relative positional relationship, motion conditions etc., if the particular pose changes, directionality instruction is also correspondingly It changes correspondingly.
In addition, the description for being related to " first ", " second " etc. in the present invention is used for description purposes only, and should not be understood as Its relative importance of indication or suggestion or the quantity for implicitly indicating indicated technical characteristic.Define as a result, " first ", " The second " feature can explicitly or implicitly include at least one of the features.
In the absence of conflict, those skilled in the art can according to the actual situation will be relevant in above-mentioned each example Technical characteristic is combined with each other, and to reach corresponding technical effect, will not repeat them here particularly for various combined situations.
The above, near-sighted presently preferred embodiments of the present invention, the present invention be not intended to be limited to it is shown in this article this A little embodiments, 20 will meet the widest scope consistent with principles disclosed herein and novel features.According to this hair Bright technical spirit any simple modification, equivalent change and modification to the above embodiments, still fall within the technology of the present invention In the range of scheme.

Claims (10)

1. a kind of oil drilling two-dimensional guide tool assembly, it is characterised in that: including
Screw rod,
Preposition tapered stabilizer is connect with the lower end of screw rod, is bored by changing the size of preposition tapered stabilizer outer diameter to adjust Well wellbore sag;
Postposition tapered stabilizer is connect with the upper end of screw rod, is bored by changing the size of postposition tapered stabilizer outer diameter to adjust Well wellbore sag.
2. a kind of oil drilling two-dimensional guide tool assembly as described in claim 1, it is characterised in that: the preposition change Diameter stabilizer includes: preposition tapered stabilizer ontology, oil cylinder, the pipe nipple that surges, the first battery short section, the first circuit pipe nipple, oil pipe Road and the first fulgurite road;The oil cylinder is connected to preposition tapered stabilizer outer body wall, and steady in preposition variable diameter with being arranged One end connection for determining the oil pipe line in this body sidewall of device, the other end of oil pipe line and is connected to preposition tapered stabilizer outer body The pipe nipple connection of surging of wall;First battery short section and the first circuit pipe nipple are arranged at preposition tapered stabilizer outer body wall, Surge between pipe nipple, the first battery short section and the first circuit pipe nipple by be arranged in preposition this body sidewall of tapered stabilizer the One electric piping connection.
3. a kind of oil drilling two-dimensional guide tool assembly as claimed in claim 2, it is characterised in that: the preposition change Diameter stabilizer outer body wall is radially even to be provided with multiple oil cylinders, and each oil cylinder top, which connects, first wing Rib, the first rib are flexibly connected with preposition tapered stabilizer outer body wall.
4. a kind of oil drilling two-dimensional guide tool assembly as claimed in claim 2, it is characterised in that: described surging is short Section includes at least pipe nipple shell, has oil pocket in pipe nipple shell, dummy piston is connected in oil pocket, one end of oil pocket is connected with breathing Cover board, the other end of oil pocket are connected with the solenoid valve being fixed on valve body frame, and valve body frame is fixedly connected on pipe nipple case inside wall On, solenoid valve is connect with one end of oil pocket opposite side and check valve, and the other end of check valve and one end of plunger pump connect, plunger The other end of pump is connect by shaft coupling with the one end for the motor being connected on motor rack, and the other end of motor passes through control cable It is connect with wire and plug;The motor rack is fixedly connected with the inner sidewall of pipe nipple shell;Have between valve body frame and pipe nipple shell There is O-ring seal;Check valve is connect with the oil pipe line.
5. a kind of oil drilling two-dimensional guide tool assembly as described in claim 1, it is characterised in that: the postposition becomes Diameter stabilizer includes at least postposition tapered stabilizer shell, is socketed with central tube in postposition tapered stabilizer shell, central tube One end is connected with positive pressure ring, and the other end of central tube is connected with back of the body cap by reset spring;Central tube is behind positive pressure ring one end The lower end connection on the lateral wall of tapered stabilizer shell by the groove and piston that open up is set, the upper-end contact of piston is connected with Second rib, the second rib are flexibly connected with the lateral wall of postposition tapered stabilizer shell;Postposition at reset spring becomes Locking pipe nipple, the second battery short section and second circuit pipe nipple, the locking pipe nipple, are connected in diameter stabilizer hull outside wall Connected between two battery short sections and second circuit pipe nipple by the second fulgurite road being arranged in postposition tapered stabilizer housing sidewall It connects;Central tube opens first annular groove and second annular groove on the lateral wall of locking pipe nipple both ends two sides respectively.
6. a kind of oil drilling two-dimensional guide tool assembly as claimed in claim 5, it is characterised in that: the central tube The lower end shape of the groove shapes and piston that are opened up on the lateral wall of positive pressure ring one end by lateral wall matches;Described Piston is uniformly connected with multiple on the side wall of postposition tapered stabilizer shell.
7. a kind of oil drilling two-dimensional guide tool assembly as claimed in claim 5, it is characterised in that: the back of the body cap by Locking cap and locking cap composition, one end of the locking cap and one end of reset spring connect, the other end and lock of locking cap Only cap connects;Locking cap and locking cap are removably attachable to postposition tapered stabilizer case inside wall.
8. a kind of oil drilling two-dimensional guide tool assembly as claimed in claim 5, it is characterised in that: the locking is short Section is energy storage type locking pipe nipple;One end of the locking pipe nipple is connected with the first lock tongue, and the inside of the first lock tongue passes through first Oil pipeline is connect with one end of the first solenoid valve, and the other end of the first solenoid valve is connect with one end of the first check valve;First is single It is connected to the other end of valve by one end of the first branch and fuel tank, the other end of fuel tank passes through second branch and second one-way valve One end connection, one end of the other end of second one-way valve and second solenoid valve connects, and the other end of second solenoid valve passes through the Two oil pipelines are connect with the second lock tongue;There are two the energy storage dummy pistons connected side by side for connection in fuel tank;Fuel tank top is equipped with Matrix plug, matrix plug are connect with the first solenoid valve and second solenoid valve line;First lock tongue, the second lock tongue, The inner sidewall of first solenoid valve, second solenoid valve, the first check valve, second one-way valve and energy storage dummy piston with locking shell On the slot that matches or hole connection.
9. a kind of guidance method of oil drilling two-dimensional guide tool assembly as described in claim 1-8 any one, It is characterized in that: including the following steps
Two-dimensional guide tool assembly connect with drill bit and connect the front end of preposition tapered stabilizer with drill bit afterbody by the first step;
Second step, drilling construction
Horizontal well construction drilling is carried out using the drilling tool that step 1 connects, is pumped according to one start-stop of coding pre-established;
Third step, well track judgement
When well track needs to reduce sag, four are entered step;When well track needs to stablize sag, five are entered step; When well track needs to increase sag, six are entered step;
4th step, well track reduce the construction of sag
Regular four start-stop of the coding pump to have pre-established in ground;
5th step, well track stablize the construction of sag
Regular three start-stop of the coding pump to have pre-established in ground;
6th step, well track increase the construction of sag
Regular two start-stop of the coding pump to have pre-established in ground.
10. a kind of guidance method of oil drilling two-dimensional guide tool assembly as claimed in claim 9, it is characterised in that: Described
Coding vibrates a minutes first is that by static, a minutes static, vibrates a minutes, a minutes static, vibrates a minutes, static Terminate;
Coding vibrates a minutes second is that by static, a minutes static, vibrates a minutes, a minutes static, vibrates b minutes, static Terminate;
Coding vibrates a minutes third is that by static, a minutes static, vibrates b minutes, a minutes static, vibrates a minutes, static Terminate;
Coding vibrates b minutes fourth is that by static, a minutes static, vibrates a minutes, a minutes static, vibrates a minutes, static Terminate;
Ground issues the preposition tapered stabilizer outer diameter in coding a period of time underground and increases, and postposition tapered stabilizer outer diameter is constant;
The preposition tapered stabilizer reduced diameter in underground, postposition tapered stabilizer outer diameter are constant when ground issues coding two;
When ground issues coding three, the preposition tapered stabilizer outer diameter in underground is constant, and postposition tapered stabilizer outer diameter increases;
When ground issues coding four, the preposition tapered stabilizer outer diameter in underground is constant, postposition tapered stabilizer reduced diameter.
CN201811530477.5A 2018-12-14 2018-12-14 Two-dimensional guiding tool assembly and guiding method for petroleum drilling Active CN109519124B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811530477.5A CN109519124B (en) 2018-12-14 2018-12-14 Two-dimensional guiding tool assembly and guiding method for petroleum drilling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811530477.5A CN109519124B (en) 2018-12-14 2018-12-14 Two-dimensional guiding tool assembly and guiding method for petroleum drilling

Publications (2)

Publication Number Publication Date
CN109519124A true CN109519124A (en) 2019-03-26
CN109519124B CN109519124B (en) 2024-01-23

Family

ID=65796823

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811530477.5A Active CN109519124B (en) 2018-12-14 2018-12-14 Two-dimensional guiding tool assembly and guiding method for petroleum drilling

Country Status (1)

Country Link
CN (1) CN109519124B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6158533A (en) * 1998-04-09 2000-12-12 Halliburton Energy Services, Inc. Adjustable gauge downhole drilling assembly
GB2355275A (en) * 1999-10-08 2001-04-18 Halliburton Energy Serv Inc Adjustable gauge for downhole drilling assembly
US20150144401A1 (en) * 2013-11-27 2015-05-28 Smith International, Inc. Hydraulically actuated tool with electrical throughbore
CN106368621A (en) * 2016-11-28 2017-02-01 长江大学 Multi-stage diameter variable stabilizer
CN106609659A (en) * 2015-10-27 2017-05-03 中石化石油工程技术服务有限公司 Hydraulic expansion type remote-control variable-diameter stabilizer
CN209430114U (en) * 2018-12-14 2019-09-24 中国石油集团川庆钻探工程有限公司长庆钻井总公司 A kind of oil drilling two-dimensional guide tool assembly

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6158533A (en) * 1998-04-09 2000-12-12 Halliburton Energy Services, Inc. Adjustable gauge downhole drilling assembly
GB2355275A (en) * 1999-10-08 2001-04-18 Halliburton Energy Serv Inc Adjustable gauge for downhole drilling assembly
US20150144401A1 (en) * 2013-11-27 2015-05-28 Smith International, Inc. Hydraulically actuated tool with electrical throughbore
CN106609659A (en) * 2015-10-27 2017-05-03 中石化石油工程技术服务有限公司 Hydraulic expansion type remote-control variable-diameter stabilizer
CN106368621A (en) * 2016-11-28 2017-02-01 长江大学 Multi-stage diameter variable stabilizer
CN209430114U (en) * 2018-12-14 2019-09-24 中国石油集团川庆钻探工程有限公司长庆钻井总公司 A kind of oil drilling two-dimensional guide tool assembly

Also Published As

Publication number Publication date
CN109519124B (en) 2024-01-23

Similar Documents

Publication Publication Date Title
CN209430114U (en) A kind of oil drilling two-dimensional guide tool assembly
CN103075123B (en) A kind of electric liquid drives setting tool
CN202483565U (en) Pressurized short section of negative impulse measurement apparatus while drilling
CN202745837U (en) Natural energy circular gas-lift well completion tubular column
CN104612944B (en) A kind of thick oil pump
CN109519124A (en) A kind of oil drilling two-dimensional guide tool assembly and guidance method
CN109138856A (en) Coiled tubing connector
CN201103360Y (en) Underground falling objects salvaging barrel
CN209687414U (en) A kind of multi-stage reducing enlarging while drilling drilling tool based on Radio Frequency Identification Technology
CN110821452B (en) Same well extracting and injecting underground pump
CN204344428U (en) A kind of thick oil pump
CN208220752U (en) Spherically seated fills the water sliding sleeve
CN202370512U (en) Large particle drilling type borehole wall coring device
CN204851096U (en) Automatically controlled reducing stabilizer
CN206190258U (en) Special spray gun of annotating of oil field wellhead sealing device
CN204532295U (en) One takes over extracting device of oil of calming the anger
CN203626832U (en) Internal and external pressure balance cylinder suitable for side-wall coring instrument
CN204782834U (en) Novel continuous outside of tubes slips connector
CN207245666U (en) A kind of companion's note well head
CN202659218U (en) Oil lubrication oil-pumping device
CN209817975U (en) Expansion pipe pressurization supercharging device
CN208416490U (en) Fraclional well cementing well repairing device
CN207673282U (en) Helicoid hydraulic motor semi-open type hydraulic oscillation system
CN213116201U (en) Hydraulic control reducing stabilizer
CN205382921U (en) Oil of diving directly drives screw pump oil production device that takes in and send out

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20201030

Address after: 100007 Dongcheng District, Dongzhimen, China, North Street, No. 9 Oil Mansion, No.

Applicant after: CHINA NATIONAL PETROLEUM Corp.

Applicant after: CHINA NATIONAL PETROLEUM CORPORATION CHUANQING DRILLING ENGINEERING Co.

Address before: Weiyang road 710018 Shaanxi city of Xi'an province Changqing No. 151 building room 1902

Applicant before: CNPC CHUANQING DRILLING ENGINEERING CO., LTD. CHANGQING WELL DRILLING GENERAL Co.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant