CN109514118A - A kind of big gooseneck container side plate welding procedure - Google Patents

A kind of big gooseneck container side plate welding procedure Download PDF

Info

Publication number
CN109514118A
CN109514118A CN201811578350.0A CN201811578350A CN109514118A CN 109514118 A CN109514118 A CN 109514118A CN 201811578350 A CN201811578350 A CN 201811578350A CN 109514118 A CN109514118 A CN 109514118A
Authority
CN
China
Prior art keywords
side plate
welding
weld seam
container side
outside
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811578350.0A
Other languages
Chinese (zh)
Inventor
张玉新
商建波
艾敬伟
贾宏达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Zhongwang Special Vehicle Manufacturing Co Ltd
Original Assignee
Liaoning Zhongwang Special Vehicle Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Zhongwang Special Vehicle Manufacturing Co Ltd filed Critical Liaoning Zhongwang Special Vehicle Manufacturing Co Ltd
Priority to CN201811578350.0A priority Critical patent/CN109514118A/en
Publication of CN109514118A publication Critical patent/CN109514118A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K31/00Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
    • B23K31/02Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The invention belongs to aluminum alloy solder technology fields, it is related to a kind of big gooseneck container side plate welding procedure, the welding sequence taken is first two road length weld seams on the inside of side plate solid point, then two road length weld seams on the outside of solid point, the twice weld seam in outside is welded again, side plate will be carried out after the completion of side bar welding up and down on the outside of side plate being broken weld seam between reversible deformation weld side profile material, finally the lower-edge beam of side plate lower end and lower-edge beam decorative panel are welded and side plate is fixedly mounted by fastener and becomes reinforcer at neck, solves container lateral plate welding method overturning in the prior art often, it wastes time and manpower, the low problem of production efficiency.

Description

A kind of big gooseneck container side plate welding procedure
Technical field
The invention belongs to aluminum alloy solder technology fields, are related to a kind of big gooseneck container side plate welding procedure.
Background technique
Aluminium alloy density 2.7g/cm3, only the 1/3 of steel, aluminium alloy corrosion resisting property is good, is not required to any safeguard procedures Long-term to maintain any surface finish, in addition aluminium alloy also has good welding and moulding processing performance.To meet wanting for energy-saving and emission-reduction Ask, automotive light weight technology has become the common recognition of automobile industry, and largely using aluminium alloy element be automobile lightweight the most Feasible mode.However, intensity of aluminum alloy is low compared with steel, thus use is somewhat limited.
Semitrailer is a kind of widely used heavy duty transport vehicles, and to meet intensity requirement, semitrailer is adopted more at present Use steel component;Though all aluminium alloy semitrailer product also appears in the newspapers, in the level for also predominantly staying in tank truck and van, It can not be extended to framework type container semi-trailer, this is primarily due to the left and right sides when assembling of framework type container semi-trailer vehicle Side plate leads to assembly difficulty because deformation is larger.
Container side plate is made of upper lower-edge beam and intermediate carriage profile, in original container side plate welding production In, since the weld seam of side plate is long straight weld and asymmetric weld seam (such as attached drawing 1), the bad control of welding process, post welding distortion is super Difference, in vehicle assembling later, side plate leads to container side plate assembly difficulty because deformation is larger.And there are larger welding changes After the container side plate assembly of shape, it is also easy to produce stress concentration, welding bead at the serious influence container side plate docking carriage profile of meeting Quality.
Since container side plate welding bead is longer, mechanical adjusting can only be available using flame repairing, and flame repairing Range is larger, very high to operator's requirement, if not controlling the temperature and speed of adjusting, can largely reduce base material machine Tool performance, and under severe welding condition, operator are easy fatigue, it is difficult to the long period keep welding stability and Consistency will result in low efficiency, energy consumption height and unstable quality of welding etc., and it is poor to weld rear surface finish.
The welding sequence that initial stage takes is first side plate front and back sides solid point, and then the long weld seam in welding inside, overturning are welded again Then the long weld seam in outside is broken weld seam on the inside of reverse welding again;Entire welding process overturning number is more, wastes time manpower, Influence production efficiency.
Summary of the invention
In view of this, the present invention wastes to solve container lateral plate welding method overturning in the prior art often Time and manpower, the low problem of production efficiency provide a kind of big gooseneck container side plate welding procedure.
In order to achieve the above objectives, the present invention provides a kind of big gooseneck container side plate welding procedure, comprising the following steps:
A, it is integrally organized according to drawing pair, container side plate is placed on tooling platform, it is on the outside of container side plate upward, interior Side downward, before upper lower-edge beam on the outside of container side plate and the welding of side plate weld seam, long weld seam on the inside of first solid point twice, then solid point Long weld seam on the outside of twice finally welds two road length weld seams of outside according to welding parameter, and wherein welding current is 120~140A, weldering Connecing voltage is 19.7~22.0V, and speed of welding 90cm/min, after the completion of weld seam welding, two road length weld seams on the inside of reconditioning make to weld Road is smooth and uniform;
B, side plate is subjected to reversible deformation after the completion of the side bar welding up and down on the outside of side plate, by cushion block pad in tooling when reversible deformation Between platform and side plate, so that the arc-shaped shape of side plate, maximum height≤125mm of the side plate apart from tooling platform, then weld side Weld seam is broken between profile material, carries out the welding of lower section weld seam after upper sections weld seam is cooling when welding etc. again;
C, the lower-edge beam of side plate lower end and lower-edge beam decorative panel are welded, welding current is 120~140A, and weldingvoltage is 19.7~22.0V, postwelding polish weld seam;
D, side plate is become at neck and reinforcer at side plate change neck is fixedly mounted by fastener.
Further, the long weld seam in inside and each solid point length of the long weld seam in outside are between upper lower-edge beam and side plate in step A 40mm, between two solid point weld seams between be divided into 500mm.
Further, the weld seam that is broken between step B latus inframedium profile is 4 sections, and every segment length is 200mm, is broken weld seam weldering Using the welding sequence of first intermediate and then both sides when connecing.
Further, the height of cushion block is followed successively by 125mm, 85mm and 50mm from centre to both sides in step B, wherein 85mm high The distance between cushion block be 6000mm, the distance between cushion block of 50mm high is 11000mm.
Further, it is 70~90 that step B, which interrupts welding line number,.
Further, step B is broken gap≤2mm between weld seam and adjacent side plates.
Further, step D side plate becomes the fixed form of reinforcer at neck as riveting, and institute is followed successively by interior hexagonal using fastener Flat cheese head screw, plain washer and nylon are anti-to send hex nut.
The beneficial effects of the present invention are:
1, big gooseneck container side plate welding procedure disclosed in this invention, guarantees weld seam on the basis of original welding procedure Welding deformation is substantially reduced under the premise of quality;Prestrain method is used in the welding process, reduces welding deformation amount;Improve weldering Sequence is connect, left plate is reduced and overturns number, improve production efficiency, yield rate, reduce production cost.
2, big gooseneck container side plate welding procedure disclosed in this invention, it is original to determine welding procedure welding parameter just for electricity Flow 140-160A, 19.7~22.0V of voltage, speed of welding 75cm/min.Since speed of welding is slower, the heat of generation can not be fast Speed dissipates, and causes plate-side plate welding deformation larger.Under the premise of meeting weldquality, requiring suitably to mention within the scope of welding current High bonding power improves speed of welding to 90cm/min, accelerates the dissipation speed of weld seam ambient heat, to reduce welding deformation Amount, and improve production efficiency.
Detailed description of the invention
In order to keep the purpose of the present invention, technical scheme and beneficial effects clearer, the present invention provides following attached drawing and carries out Illustrate:
Fig. 1 is the structural schematic diagram of the big gooseneck container lateral plate welding seams distribution of semitrailer of the present invention;
Fig. 2 is the structural schematic diagram of the big gooseneck container side plate welding sequence of semitrailer of the present invention;
Fig. 3 is the structural schematic diagram after the big gooseneck container side plate reversible deformation of semitrailer of the present invention;
Fig. 4 is the big gooseneck container lower-edge beam decorative panel welding structure schematic diagram of semitrailer of the present invention;
Fig. 5 is that the big gooseneck container side plate of semitrailer of the present invention becomes reinforcement soldering structure schematic diagram at neck.
Specific embodiment
Below by a preferred embodiment of the present invention will be described in detail.
Appended drawing reference in Figure of description includes:
Container side plate 1, tooling platform 2, roof side rail 3, lower-edge beam 4, cushion block 5, lower-edge beam decorative panel 6, the long weld seam in outside 7, the long weld seam 8 in inside, be broken weld seam 9, side plate become neck at reinforcer 10.
A kind of big gooseneck container side plate welding procedure as shown in Fig. 1~5, comprising the following steps:
A, it integrally organizes pair, container side plate 1 is placed on tooling platform 2,1 outside court of container side plate according to drawing On, inside downward, before the roof side rail 3 in the outside of container side plate 1, lower-edge beam 4 and the welding of 1 weld seam of container side plate, first solid point two Long weld seam 8 on the inside of road, then long weld seam 7 on the outside of solid point twice, inside is long between roof side rail 3, lower-edge beam 4 and container side plate 1 Weld seam 8 and the outside each solid point length of long weld seam 7 are 40mm, between two solid point weld seams between be divided into 500mm, finally according to welding Two road length weld seams of parameter welding outside, wherein welding current is 120~140A, and weldingvoltage is 19.7~22.0V, speed of welding For 90cm/min, after the completion of weld seam welding, two road length weld seams on the inside of reconditioning keep welding bead smooth and uniform;
B, container side plate 1 is subjected to reversible deformation after the completion of roof side rail 3, the lower-edge beam 4 in 1 outside of container side plate weld, When reversible deformation by the pad of cushion block 5 between tooling platform 2 and container side plate 1, so that the arc-shaped shape of container side plate 1, container The height of cushion block 5 of the side plate 1 apart from tooling platform 2 is followed successively by 125mm, 85mm and 50mm from centre to both sides, wherein 85mm high The distance between cushion block 5 be 6000mm, the distance between cushion block 5 of 50mm high is 11000mm, then weld side profile material it Between be broken weld seam 9, be broken 9 Shuo Wei 80 of weld seam, the weld seam 9 that is broken between side plate profile is 4 sections, and every segment length is 200mm, the gap≤2mm being broken between weld seam 9 and adjacent container side plate 1 are broken when weld seam 9 welds using behind first centre two The welding sequence on side carries out the welding of lower section weld seam again after upper sections weld seam is cooling when welding etc.;
C, the lower-edge beam 4 of side plate lower end is welded with lower-edge beam decorative panel 6, welding current is 120~140A, weldingvoltage For 19.7~22.0V, postwelding polishes weld seam;
D, side plate is become at neck and reinforcer 10 at side plate change neck is fixedly mounted by fastener, side plate becomes reinforcer 10 at neck Fixed form be riveting, institute is followed successively by the flat cheese head screw of interior hexagonal using fastener, plain washer and nylon is anti-send hex nut.
Finally, it is stated that preferred embodiment above is only used to illustrate the technical scheme of the present invention and not to limit it, although logical It crosses above preferred embodiment the present invention is described in detail, however, those skilled in the art should understand that, can be Various changes are made to it in form and in details, without departing from claims of the present invention limited range.

Claims (7)

1. a kind of big gooseneck container side plate welding procedure, which comprises the following steps:
A, it is integrally organized according to drawing pair, container side plate is placed on tooling platform, on the outside of container side plate upward, inside court Under, before upper lower-edge beam on the outside of container side plate and the welding of side plate weld seam, long weld seam on the inside of first solid point twice, then solid point twice The long weld seam in outside finally welds two road length weld seams of outside according to welding parameter, and wherein welding current is 120~140A, welding electricity Pressure is 19.7~22.0V, speed of welding 90cm/min, and after the completion of weld seam welding, two road length weld seams on the inside of reconditioning keep welding bead flat It is whole and uniform;
B, side plate is subjected to reversible deformation after the completion of the side bar welding up and down on the outside of side plate, by cushion block pad in tooling platform when reversible deformation Between side plate, so that the arc-shaped shape of side plate, maximum height≤125mm of the side plate apart from tooling platform, then weld side template Weld seam is broken between material, carries out the welding of lower section weld seam after upper sections weld seam is cooling when welding etc. again;
C, the lower-edge beam of side plate lower end and lower-edge beam decorative panel are welded, welding current is 120~140A, weldingvoltage 19.7 ~22.0V, postwelding polish weld seam;
D, side plate is become at neck and reinforcer at side plate change neck is fixedly mounted by fastener.
2. gooseneck container side plate welding procedure as described in claim 1 big, which is characterized in that in step A upper lower-edge beam with The long weld seam in inside and each solid point length of the long weld seam in outside are 40mm between side plate, between two solid point weld seams between be divided into 500mm.
3. gooseneck container side plate welding procedure as described in claim 1 big, which is characterized in that step B latus inframedium profile it Between be broken weld seam be 4 sections, every segment length be 200mm, be broken weld seam welding when using first intermediate and then both sides welding sequence.
4. big gooseneck container side plate welding procedure as described in claim 1, which is characterized in that the height of cushion block in step B 125mm, 85mm and 50mm are followed successively by from centre to both sides, wherein the distance between cushion block of 85mm high is 6000mm, 50mm high The distance between cushion block be 11000mm.
5. big gooseneck container side plate welding procedure as described in claim 1, which is characterized in that step B interrupts welding line Number is 70~90.
6. big gooseneck container side plate welding procedure as described in claim 1, which is characterized in that step B is broken weld seam and phase Gap≤2mm between adjacent side plate.
7. big gooseneck container side plate welding procedure as described in claim 1, which is characterized in that step D side plate, which becomes at neck, to be added The fixed form of strong part is riveting, and institute is followed successively by the flat cheese head screw of interior hexagonal using fastener, and plain washer and nylon are prevented sending hexagonal Nut.
CN201811578350.0A 2018-12-21 2018-12-21 A kind of big gooseneck container side plate welding procedure Pending CN109514118A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811578350.0A CN109514118A (en) 2018-12-21 2018-12-21 A kind of big gooseneck container side plate welding procedure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811578350.0A CN109514118A (en) 2018-12-21 2018-12-21 A kind of big gooseneck container side plate welding procedure

Publications (1)

Publication Number Publication Date
CN109514118A true CN109514118A (en) 2019-03-26

Family

ID=65797109

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811578350.0A Pending CN109514118A (en) 2018-12-21 2018-12-21 A kind of big gooseneck container side plate welding procedure

Country Status (1)

Country Link
CN (1) CN109514118A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102107337A (en) * 2011-03-21 2011-06-29 南京雷尔伟新技术有限公司 Vehicle body draft, bolster and buffer assembling and welding process
CN102275044A (en) * 2011-07-13 2011-12-14 铁道部运输局 Method for welding plate materials
CN102672359A (en) * 2012-05-14 2012-09-19 福建荣盛钢结构实业有限公司 Process for manufacturing rectangular box pipe
CN105269167A (en) * 2015-11-20 2016-01-27 辽宁忠旺特种车辆制造有限公司 Full-load van front body plate welding process
CN105345322A (en) * 2015-11-20 2016-02-24 辽宁忠旺特种车辆制造有限公司 Welding technology of lateral board of full-loading van
CN107999987A (en) * 2017-12-14 2018-05-08 辽宁忠旺特种车辆制造有限公司 A kind of welding procedure of container side plate
CN108296609A (en) * 2018-02-08 2018-07-20 辽宁忠旺铝合金精深加工有限公司 A kind of anti-welding procedure for sidewindering multi-functional cabinet of totally enclosed type aluminium alloy

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102107337A (en) * 2011-03-21 2011-06-29 南京雷尔伟新技术有限公司 Vehicle body draft, bolster and buffer assembling and welding process
CN102275044A (en) * 2011-07-13 2011-12-14 铁道部运输局 Method for welding plate materials
CN102672359A (en) * 2012-05-14 2012-09-19 福建荣盛钢结构实业有限公司 Process for manufacturing rectangular box pipe
CN105269167A (en) * 2015-11-20 2016-01-27 辽宁忠旺特种车辆制造有限公司 Full-load van front body plate welding process
CN105345322A (en) * 2015-11-20 2016-02-24 辽宁忠旺特种车辆制造有限公司 Welding technology of lateral board of full-loading van
CN107999987A (en) * 2017-12-14 2018-05-08 辽宁忠旺特种车辆制造有限公司 A kind of welding procedure of container side plate
CN108296609A (en) * 2018-02-08 2018-07-20 辽宁忠旺铝合金精深加工有限公司 A kind of anti-welding procedure for sidewindering multi-functional cabinet of totally enclosed type aluminium alloy

Similar Documents

Publication Publication Date Title
CN106736138B (en) A kind of the group mounted welder and assembly welding technique method of the splicing of arc aluminium alloy extrusions
CN108723578A (en) The friction stir welding method of hollow aluminium section bar split arc plate
CN109501867A (en) Frame-type vehicle body structure of rear cabin and welding method
CN201997847U (en) Welding tool for friction stir welding
CN206200431U (en) A kind of car side wall frame welding tooling
CN104384740B (en) EMUs drivers' cab constructed of aluminium roof assembly-welding processing method
CN106607638A (en) A railway vehicle chassis floor welding process
CN109822198B (en) Welding process of lightweight new energy all-aluminum passenger car
CN104722883A (en) Novel method and novel device for ultrasonically controlling hot cracks along with welding
CN105345322B (en) Full carrying van side carriage plate welding procedure
CN108857127A (en) The welding method of frame-type car body of aluminum alloy top cover
CN205414817U (en) A upset platform machine for welding channel -section steel gusset
CN109514118A (en) A kind of big gooseneck container side plate welding procedure
CN109514055A (en) A kind of low plate stringer assembly welding procedure
CN103042357B (en) A kind of processing method of Aluminum alloy crossbeam and processing tool
CN105269167B (en) It is complete to carry van-type front part of the carriage plate weld technique
CN207723768U (en) A kind of fork truck gear shelf manipulator tool for welding mold
CN208977131U (en) A kind of single-side welding double-side forming welding tooling
CN206998136U (en) Framework welds anti-deformation strut bar
CN109604849A (en) A kind of welding structure and technique of semi-trailer longitudinal beam
CN109263732A (en) Vehicle body occupant cabin device and welding method
CN207416956U (en) The section bar side bar and its vehicle frame of a kind of aluminium alloy side curtain semitrailer
CN106346648A (en) Composite material male die structure and male die manufacturing method
CN207205651U (en) A kind of large-scale steel welding tooling
CN101293468A (en) Welding process for rear overhang rack

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190326

RJ01 Rejection of invention patent application after publication