CN109492042A - A kind of strong rammer digitlization construction management plateform system - Google Patents
A kind of strong rammer digitlization construction management plateform system Download PDFInfo
- Publication number
- CN109492042A CN109492042A CN201811330171.5A CN201811330171A CN109492042A CN 109492042 A CN109492042 A CN 109492042A CN 201811330171 A CN201811330171 A CN 201811330171A CN 109492042 A CN109492042 A CN 109492042A
- Authority
- CN
- China
- Prior art keywords
- construction
- data
- construction management
- plateform system
- strong rammer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009430 construction management Methods 0.000 title claims abstract description 17
- 238000010276 construction Methods 0.000 claims abstract description 54
- 238000005516 engineering process Methods 0.000 claims abstract description 7
- 238000013079 data visualisation Methods 0.000 claims abstract description 4
- 238000013500 data storage Methods 0.000 claims description 5
- 238000011161 development Methods 0.000 claims description 3
- 238000012545 processing Methods 0.000 claims description 3
- 238000005070 sampling Methods 0.000 claims description 3
- 238000012544 monitoring process Methods 0.000 abstract description 5
- 238000007726 management method Methods 0.000 description 10
- 238000000034 method Methods 0.000 description 6
- 238000007689 inspection Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005381 potential energy Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Engineering & Computer Science (AREA)
- Tourism & Hospitality (AREA)
- Theoretical Computer Science (AREA)
- Economics (AREA)
- Marketing (AREA)
- Entrepreneurship & Innovation (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Data Mining & Analysis (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Factory Administration (AREA)
Abstract
The present invention provides a kind of strong rammers to digitize construction management plateform system, comprising the following steps: step (1): being based on UDP message transport protocol real-time reception site operation data;Step (2): MySql database purchase construction data information is used;Step (3): java platform framework is built using Spring+SpringMVC+MyBatis technology;Step (4): personalized customization data visualization chart in library is visualized using Echarts;Step (5): using the end Web website mode Building Digital construction management platform, and the present invention realizes round-the-clock monitoring construction in 24 hours, is not necessarily to on-the-spot record personnel, avoids human error, both ensure that construction quality also reduces construction cost.
Description
Technical field
The present invention relates to strong rammers to digitize construction management field, in particular to a kind of strong rammer digitizes construction management platform system
System.
Background technique
There is always personnel monitoring in traditional construction process requirement construction site and records construction information, time-consuming and laborious, there is also
Manual record error;Owner, unit in charge of construction and management can not know construction speed and construction quality at the first time;Owner, construction
Unit and management can only generally know a construction results data, have no way of finding out about it for procedural information.
Summary of the invention
In order to solve above-mentioned insufficient defect, the present invention provides a kind of strong rammers to digitize construction management plateform system, this
Invention realizes round-the-clock monitoring construction in 24 hours, is not necessarily to on-the-spot record personnel, avoids human error, both ensure that construction quality
Also reduce construction cost;Owner, unit in charge of construction and management can be applied by the grasp scene of computer promptly and accurately whenever and wherever possible
Work situation;Owner, unit in charge of construction and management both will appreciate that each tamping point final result information, also will appreciate that the work progress of tamping point
Information;The data exhibition method that chart combines makes the quality of each tamping point and integral construction quality very clear;Construction daily paper
Owner, the inspection declaration demand of unit in charge of construction and management can be met with customized function of reporting.
The present invention provides a kind of strong rammers to digitize construction management plateform system, comprising the following steps:
Step (1): UDP message transport protocol real-time reception site operation data are based on;
Step (2): MySql database purchase construction data information is used;
Step (3): java platform framework is built using Spring+SpringMVC+MyBatis technology;
Step (4): personalized customization data visualization chart in library is visualized using Echarts;
Step (5): the end Web website mode Building Digital construction management platform is used.
Above-mentioned system, wherein based on Centimeter Level Differential positioning base station, Beidou high accuracy positioning antenna, current transformer,
Double-axis tilt sensor, data sampling sensor carry out construction data acquisition and processing, and real-time radio transmits data to backstage and takes
Business device.
Above-mentioned system, wherein be based on existing javaWeb Development Framework, MySql data storage technology realizes web terminal number
According to reading, parsing and displaying.
Above-mentioned system, wherein pass through the construction data of data storage module storage acquisition.
Above-mentioned system, wherein parsed by construction data of the data resolution module to acquisition.
The invention has the following advantages: the 1, present invention realizes round-the-clock monitoring construction in 24 hours, without scene note
Record personnel, avoid human error, both ensure that construction quality also reduces construction cost;Owner, unit in charge of construction and management can be with
Pass through the grasp site operation situation of computer promptly and accurately whenever and wherever possible;Owner, unit in charge of construction and management both will appreciate that each rammer
Point final result information, also will appreciate that the work progress information of tamping point;The data exhibition method that chart combines makes each tamping point
Quality and integral construction quality it is very clear;Construction daily paper and customized function of reporting can meet owner, unit in charge of construction and prison
The inspection declaration demand of reason.
Detailed description of the invention
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, the present invention and its feature, outer
Shape and advantage will become more apparent upon.Identical label indicates identical part in all the attached drawings.Not deliberately proportionally
Draw attached drawing, it is preferred that emphasis is show the gist of the present invention.
Fig. 1 is flow diagram provided by the invention.
Specific embodiment
In the following description, a large amount of concrete details are given so as to provide a more thorough understanding of the present invention.So
And it is obvious to the skilled person that the present invention may not need one or more of these details and be able to
Implement.In other examples, in order to avoid confusion with the present invention, for some technical characteristics well known in the art not into
Row description.
In order to thoroughly understand the present invention, detailed step and detailed structure will be proposed in following description, so as to
Illustrate technical solution of the present invention.Presently preferred embodiments of the present invention is described in detail as follows, however other than these detailed descriptions, this
Invention can also have other embodiments.
Shown in referring to Fig.1, the present invention provides a kind of strong rammers to digitize construction management plateform system, comprising the following steps:
Step (1): UDP message transport protocol real-time reception site operation data are based on;
Step (2): MySql database purchase construction data information is used;
Step (3): java platform framework is built using Spring+SpringMVC+MyBatis technology;
Step (4): personalized customization data visualization chart in library is visualized using Echarts;
Step (5): the end Web website mode Building Digital construction management platform is used.
It is high-precision fixed based on Centimeter Level Differential positioning base station, Beidou in a preferred but unrestricted embodiment of the invention
Position antenna, current transformer, double-axis tilt sensor, data sampling sensor carry out construction data acquisition and processing, real-time nothing
Line transmits data to background server.
In a preferred but unrestricted embodiment of the invention, it is based on existing javaWeb Development Framework, MySql data are deposited
Storage technology realizes web terminal reading data, parsing and displaying.
In a preferred but unrestricted embodiment of the invention, pass through the construction data of data storage module storage acquisition.
In a preferred but unrestricted embodiment of the invention, carried out by construction data of the data resolution module to acquisition
Parsing.
The present invention realizes round-the-clock monitoring construction in 24 hours, is not necessarily to on-the-spot record personnel, avoids human error, both guaranteed
Construction quality also reduces construction cost;Owner, unit in charge of construction and management can whenever and wherever possible by computer promptly and accurately
Grasp site operation situation;Owner, unit in charge of construction and management both will appreciate that each tamping point final result information, also will appreciate that tamping point
Work progress information;The data exhibition method that chart combines makes one mesh of quality and integral construction quality of each tamping point
So;Construction daily paper and customized function of reporting can meet owner, the inspection declaration demand of unit in charge of construction and management.
In the present invention, product is presented to the user with the mode of website;Technical support personnel assists to configure relevant engineering,
Bid section, mechanical information;Home interface, the interface use the current construction speed of the mode real-time exhibition of Echarts chart, when
Day construction tamping point number, every mechanical same day construct tamping point number, the construction details of the same day each tamping point, and history is constructed tamping point number daily
Information, the condition of construction of each tamping point such as statistics are very clear;From different construction dimensions, (such as ramming volume, ramming times are rammed
Hit potential energy etc.) show the construction results information of each tamping point;Ramming volume during curve graph displaying is rammed, hammer lifting height propose hammer speed
The instant situations such as degree;Engineering, bid section also can be switched in client, and date etc. checks required construction information.
Presently preferred embodiments of the present invention is described above.It is to be appreciated that the invention is not limited to above-mentioned
Particular implementation, devices and structures not described in detail herein should be understood as gives reality with the common mode in this field
It applies;Anyone skilled in the art, without departing from the scope of the technical proposal of the invention, all using the disclosure above
Methods and technical content many possible changes and modifications are made to technical solution of the present invention, or be revised as equivalent variations etc.
Embodiment is imitated, this is not affected the essence of the present invention.Therefore, anything that does not depart from the technical scheme of the invention, foundation
Technical spirit of the invention any simple modifications, equivalents, and modifications made to the above embodiment, still fall within the present invention
In the range of technical solution protection.
Claims (5)
1. a kind of strong rammer digitizes construction management plateform system, which comprises the following steps:
Step (1): UDP message transport protocol real-time reception site operation data are based on;
Step (2): MySql database purchase construction data information is used;
Step (3): java platform framework is built using Spring+SpringMVC+MyBatis technology;
Step (4): personalized customization data visualization chart in library is visualized using Echarts;
Step (5): the end Web website mode Building Digital construction management platform is used.
2. a kind of strong rammer as shown in claim 1 digitizes construction management plateform system, which is characterized in that differential based on centimetre
Divide locating base station, Beidou high accuracy positioning antenna, current transformer, double-axis tilt sensor, data sampling sensor is applied
Work data acquisition and processing (DAP), real-time radio transmit data to background server.
3. a kind of strong rammer digitlization construction management plateform system as shown in claim 2, which is characterized in that based on existing
JavaWeb Development Framework, MySql data storage technology realize web terminal reading data, parsing and displaying.
4. a kind of strong rammer as stated in claim 3 digitizes construction management plateform system, which is characterized in that pass through data storage
The construction data of module storage acquisition.
5. a kind of strong rammer digitlization construction management plateform system as shown in claim 4, which is characterized in that parsed by data
Module parses the construction data of acquisition.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811330171.5A CN109492042A (en) | 2018-11-09 | 2018-11-09 | A kind of strong rammer digitlization construction management plateform system |
PCT/CN2019/115787 WO2020094022A1 (en) | 2018-11-09 | 2019-11-05 | Dynamic compaction digital construction management platform system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811330171.5A CN109492042A (en) | 2018-11-09 | 2018-11-09 | A kind of strong rammer digitlization construction management plateform system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109492042A true CN109492042A (en) | 2019-03-19 |
Family
ID=65694188
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811330171.5A Pending CN109492042A (en) | 2018-11-09 | 2018-11-09 | A kind of strong rammer digitlization construction management plateform system |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN109492042A (en) |
WO (1) | WO2020094022A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020094022A1 (en) * | 2018-11-09 | 2020-05-14 | 南京天辰礼达电子科技有限公司 | Dynamic compaction digital construction management platform system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106557820A (en) * | 2016-11-24 | 2017-04-05 | 天津市普迅电力信息技术有限公司 | A kind of power transformation O&M standard operation mobile terminal platform |
CN107368967A (en) * | 2017-07-20 | 2017-11-21 | 北京建工土木工程有限公司 | Engineering safety quality inspection intelligent management based on internet |
CN108460573A (en) * | 2018-01-30 | 2018-08-28 | 广东建海工程项目管理有限公司 | Project supervision manages system |
CN108594684A (en) * | 2018-04-26 | 2018-09-28 | 浙江交工集团股份有限公司 | Cement mixing pile information intelligent managing and control system |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI438593B (en) * | 2009-04-10 | 2014-05-21 | Hon Hai Prec Ind Co Ltd | System and method for remotely monitoring the scene of industry |
US20130253968A1 (en) * | 2012-03-26 | 2013-09-26 | David Frederick Martinez | Facility control system (fcs, c1) to manage assets planning, design, construction, fabrication, operating, maintence and products |
CN106709012A (en) * | 2016-12-26 | 2017-05-24 | 北京锐安科技有限公司 | Method and device for analyzing big data |
CN106802640A (en) * | 2017-03-27 | 2017-06-06 | 天津市水利科学研究院 | Roller compaction construction monitoring system and the method for roller compaction construction monitoring |
CN108306980A (en) * | 2018-03-06 | 2018-07-20 | 北京工业大学 | A kind of engineering flight support big data Log Analysis System |
CN109492042A (en) * | 2018-11-09 | 2019-03-19 | 南京天辰礼达电子科技有限公司 | A kind of strong rammer digitlization construction management plateform system |
-
2018
- 2018-11-09 CN CN201811330171.5A patent/CN109492042A/en active Pending
-
2019
- 2019-11-05 WO PCT/CN2019/115787 patent/WO2020094022A1/en active Application Filing
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106557820A (en) * | 2016-11-24 | 2017-04-05 | 天津市普迅电力信息技术有限公司 | A kind of power transformation O&M standard operation mobile terminal platform |
CN107368967A (en) * | 2017-07-20 | 2017-11-21 | 北京建工土木工程有限公司 | Engineering safety quality inspection intelligent management based on internet |
CN108460573A (en) * | 2018-01-30 | 2018-08-28 | 广东建海工程项目管理有限公司 | Project supervision manages system |
CN108594684A (en) * | 2018-04-26 | 2018-09-28 | 浙江交工集团股份有限公司 | Cement mixing pile information intelligent managing and control system |
Non-Patent Citations (2)
Title |
---|
容建华等: "铁路工程智慧工地管理信息系统设计与实现", 《铁路计算机应用》 * |
李忠权等: "基于SOA的地质灾害实时监测预警平台设计", 《成都理工大学学报(自然科学版)》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020094022A1 (en) * | 2018-11-09 | 2020-05-14 | 南京天辰礼达电子科技有限公司 | Dynamic compaction digital construction management platform system |
Also Published As
Publication number | Publication date |
---|---|
WO2020094022A1 (en) | 2020-05-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100748528B1 (en) | Information update method and the real-time automatic update system for disaster damage investigation using wireless communication technology and web-gis | |
CN105547151B (en) | Point Cloud Data from Three Dimension Laser Scanning acquires the method and system with processing | |
CN104301393B (en) | Laboratory data gathers and management system | |
CN106815439A (en) | Municipal Engineering Construction monitoring method and its system based on BIM | |
CN103942258B (en) | Streetscape image storing method and device based on road codes | |
TW201342960A (en) | Tracking data usage under a schematized data plan | |
CN111260325A (en) | Bridge construction progress management system based on BIM | |
Gamperl et al. | Internet of things geosensor network for cost-effective landslide early warning systems | |
KR101000949B1 (en) | Web-based realtime surveying managing system | |
CN109447487A (en) | A kind of cement mixing pile pile foundation digitlization construction management plateform system | |
CN104637107A (en) | Method for managing attendance card punching operation of watch man by virtue of intelligent offline cabinet | |
TW201546773A (en) | Real-time interactive mobile device for on-site investigation and on-site investigation method | |
Ge et al. | Deformation monitoring of earth fissure hazards using terrestrial laser scanning | |
CN109492042A (en) | A kind of strong rammer digitlization construction management plateform system | |
CN109472548A (en) | A kind of CFG pile foundation digitlization construction management plateform system | |
Vona et al. | An optimized procedure to estimate the economic seismic losses of existing reinforced concrete buildings due to seismic damage | |
CN109408524A (en) | A kind of screw rod pile pile foundation digitlization construction management plateform system | |
WO2015113568A1 (en) | Construction site image management system and method | |
CN110232103A (en) | A kind of method, inspection client and system that highway inspection event obtains | |
CN109597766A (en) | A kind of processing method and system of test report | |
US20150261788A1 (en) | Generating Digital Data From Physical Media | |
Sbrogiò et al. | Multilevel Assessment of Seismic Damage and Vulnerability of Masonry Buildings (MUSE-DV) in Historical Centers: Development of a Mobile Android Application | |
CN109636332A (en) | A kind of subgrade compaction digitlization construction system | |
Baca et al. | Numerical modelling of various aspects of pipe pile static load test | |
Marchiori et al. | Design and evaluation of IoT-enabled instrumentation for a soil-bentonite slurry trench cutoff wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190319 |