CN109492042A - A kind of strong rammer digitlization construction management plateform system - Google Patents

A kind of strong rammer digitlization construction management plateform system Download PDF

Info

Publication number
CN109492042A
CN109492042A CN201811330171.5A CN201811330171A CN109492042A CN 109492042 A CN109492042 A CN 109492042A CN 201811330171 A CN201811330171 A CN 201811330171A CN 109492042 A CN109492042 A CN 109492042A
Authority
CN
China
Prior art keywords
construction
data
construction management
plateform system
strong rammer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811330171.5A
Other languages
Chinese (zh)
Inventor
沈礼伟
曹顺
朱亚林
姜智耀
许涛涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Tianchen Li Electronic Technology Co Ltd
Original Assignee
Nanjing Tianchen Li Electronic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Tianchen Li Electronic Technology Co Ltd filed Critical Nanjing Tianchen Li Electronic Technology Co Ltd
Priority to CN201811330171.5A priority Critical patent/CN109492042A/en
Publication of CN109492042A publication Critical patent/CN109492042A/en
Priority to PCT/CN2019/115787 priority patent/WO2020094022A1/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Engineering & Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Abstract

The present invention provides a kind of strong rammers to digitize construction management plateform system, comprising the following steps: step (1): being based on UDP message transport protocol real-time reception site operation data;Step (2): MySql database purchase construction data information is used;Step (3): java platform framework is built using Spring+SpringMVC+MyBatis technology;Step (4): personalized customization data visualization chart in library is visualized using Echarts;Step (5): using the end Web website mode Building Digital construction management platform, and the present invention realizes round-the-clock monitoring construction in 24 hours, is not necessarily to on-the-spot record personnel, avoids human error, both ensure that construction quality also reduces construction cost.

Description

A kind of strong rammer digitlization construction management plateform system
Technical field
The present invention relates to strong rammers to digitize construction management field, in particular to a kind of strong rammer digitizes construction management platform system System.
Background technique
There is always personnel monitoring in traditional construction process requirement construction site and records construction information, time-consuming and laborious, there is also Manual record error;Owner, unit in charge of construction and management can not know construction speed and construction quality at the first time;Owner, construction Unit and management can only generally know a construction results data, have no way of finding out about it for procedural information.
Summary of the invention
In order to solve above-mentioned insufficient defect, the present invention provides a kind of strong rammers to digitize construction management plateform system, this Invention realizes round-the-clock monitoring construction in 24 hours, is not necessarily to on-the-spot record personnel, avoids human error, both ensure that construction quality Also reduce construction cost;Owner, unit in charge of construction and management can be applied by the grasp scene of computer promptly and accurately whenever and wherever possible Work situation;Owner, unit in charge of construction and management both will appreciate that each tamping point final result information, also will appreciate that the work progress of tamping point Information;The data exhibition method that chart combines makes the quality of each tamping point and integral construction quality very clear;Construction daily paper Owner, the inspection declaration demand of unit in charge of construction and management can be met with customized function of reporting.
The present invention provides a kind of strong rammers to digitize construction management plateform system, comprising the following steps:
Step (1): UDP message transport protocol real-time reception site operation data are based on;
Step (2): MySql database purchase construction data information is used;
Step (3): java platform framework is built using Spring+SpringMVC+MyBatis technology;
Step (4): personalized customization data visualization chart in library is visualized using Echarts;
Step (5): the end Web website mode Building Digital construction management platform is used.
Above-mentioned system, wherein based on Centimeter Level Differential positioning base station, Beidou high accuracy positioning antenna, current transformer, Double-axis tilt sensor, data sampling sensor carry out construction data acquisition and processing, and real-time radio transmits data to backstage and takes Business device.
Above-mentioned system, wherein be based on existing javaWeb Development Framework, MySql data storage technology realizes web terminal number According to reading, parsing and displaying.
Above-mentioned system, wherein pass through the construction data of data storage module storage acquisition.
Above-mentioned system, wherein parsed by construction data of the data resolution module to acquisition.
The invention has the following advantages: the 1, present invention realizes round-the-clock monitoring construction in 24 hours, without scene note Record personnel, avoid human error, both ensure that construction quality also reduces construction cost;Owner, unit in charge of construction and management can be with Pass through the grasp site operation situation of computer promptly and accurately whenever and wherever possible;Owner, unit in charge of construction and management both will appreciate that each rammer Point final result information, also will appreciate that the work progress information of tamping point;The data exhibition method that chart combines makes each tamping point Quality and integral construction quality it is very clear;Construction daily paper and customized function of reporting can meet owner, unit in charge of construction and prison The inspection declaration demand of reason.
Detailed description of the invention
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, the present invention and its feature, outer Shape and advantage will become more apparent upon.Identical label indicates identical part in all the attached drawings.Not deliberately proportionally Draw attached drawing, it is preferred that emphasis is show the gist of the present invention.
Fig. 1 is flow diagram provided by the invention.
Specific embodiment
In the following description, a large amount of concrete details are given so as to provide a more thorough understanding of the present invention.So And it is obvious to the skilled person that the present invention may not need one or more of these details and be able to Implement.In other examples, in order to avoid confusion with the present invention, for some technical characteristics well known in the art not into Row description.
In order to thoroughly understand the present invention, detailed step and detailed structure will be proposed in following description, so as to Illustrate technical solution of the present invention.Presently preferred embodiments of the present invention is described in detail as follows, however other than these detailed descriptions, this Invention can also have other embodiments.
Shown in referring to Fig.1, the present invention provides a kind of strong rammers to digitize construction management plateform system, comprising the following steps:
Step (1): UDP message transport protocol real-time reception site operation data are based on;
Step (2): MySql database purchase construction data information is used;
Step (3): java platform framework is built using Spring+SpringMVC+MyBatis technology;
Step (4): personalized customization data visualization chart in library is visualized using Echarts;
Step (5): the end Web website mode Building Digital construction management platform is used.
It is high-precision fixed based on Centimeter Level Differential positioning base station, Beidou in a preferred but unrestricted embodiment of the invention Position antenna, current transformer, double-axis tilt sensor, data sampling sensor carry out construction data acquisition and processing, real-time nothing Line transmits data to background server.
In a preferred but unrestricted embodiment of the invention, it is based on existing javaWeb Development Framework, MySql data are deposited Storage technology realizes web terminal reading data, parsing and displaying.
In a preferred but unrestricted embodiment of the invention, pass through the construction data of data storage module storage acquisition.
In a preferred but unrestricted embodiment of the invention, carried out by construction data of the data resolution module to acquisition Parsing.
The present invention realizes round-the-clock monitoring construction in 24 hours, is not necessarily to on-the-spot record personnel, avoids human error, both guaranteed Construction quality also reduces construction cost;Owner, unit in charge of construction and management can whenever and wherever possible by computer promptly and accurately Grasp site operation situation;Owner, unit in charge of construction and management both will appreciate that each tamping point final result information, also will appreciate that tamping point Work progress information;The data exhibition method that chart combines makes one mesh of quality and integral construction quality of each tamping point So;Construction daily paper and customized function of reporting can meet owner, the inspection declaration demand of unit in charge of construction and management.
In the present invention, product is presented to the user with the mode of website;Technical support personnel assists to configure relevant engineering, Bid section, mechanical information;Home interface, the interface use the current construction speed of the mode real-time exhibition of Echarts chart, when Day construction tamping point number, every mechanical same day construct tamping point number, the construction details of the same day each tamping point, and history is constructed tamping point number daily Information, the condition of construction of each tamping point such as statistics are very clear;From different construction dimensions, (such as ramming volume, ramming times are rammed Hit potential energy etc.) show the construction results information of each tamping point;Ramming volume during curve graph displaying is rammed, hammer lifting height propose hammer speed The instant situations such as degree;Engineering, bid section also can be switched in client, and date etc. checks required construction information.
Presently preferred embodiments of the present invention is described above.It is to be appreciated that the invention is not limited to above-mentioned Particular implementation, devices and structures not described in detail herein should be understood as gives reality with the common mode in this field It applies;Anyone skilled in the art, without departing from the scope of the technical proposal of the invention, all using the disclosure above Methods and technical content many possible changes and modifications are made to technical solution of the present invention, or be revised as equivalent variations etc. Embodiment is imitated, this is not affected the essence of the present invention.Therefore, anything that does not depart from the technical scheme of the invention, foundation Technical spirit of the invention any simple modifications, equivalents, and modifications made to the above embodiment, still fall within the present invention In the range of technical solution protection.

Claims (5)

1. a kind of strong rammer digitizes construction management plateform system, which comprises the following steps:
Step (1): UDP message transport protocol real-time reception site operation data are based on;
Step (2): MySql database purchase construction data information is used;
Step (3): java platform framework is built using Spring+SpringMVC+MyBatis technology;
Step (4): personalized customization data visualization chart in library is visualized using Echarts;
Step (5): the end Web website mode Building Digital construction management platform is used.
2. a kind of strong rammer as shown in claim 1 digitizes construction management plateform system, which is characterized in that differential based on centimetre Divide locating base station, Beidou high accuracy positioning antenna, current transformer, double-axis tilt sensor, data sampling sensor is applied Work data acquisition and processing (DAP), real-time radio transmit data to background server.
3. a kind of strong rammer digitlization construction management plateform system as shown in claim 2, which is characterized in that based on existing JavaWeb Development Framework, MySql data storage technology realize web terminal reading data, parsing and displaying.
4. a kind of strong rammer as stated in claim 3 digitizes construction management plateform system, which is characterized in that pass through data storage The construction data of module storage acquisition.
5. a kind of strong rammer digitlization construction management plateform system as shown in claim 4, which is characterized in that parsed by data Module parses the construction data of acquisition.
CN201811330171.5A 2018-11-09 2018-11-09 A kind of strong rammer digitlization construction management plateform system Pending CN109492042A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201811330171.5A CN109492042A (en) 2018-11-09 2018-11-09 A kind of strong rammer digitlization construction management plateform system
PCT/CN2019/115787 WO2020094022A1 (en) 2018-11-09 2019-11-05 Dynamic compaction digital construction management platform system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811330171.5A CN109492042A (en) 2018-11-09 2018-11-09 A kind of strong rammer digitlization construction management plateform system

Publications (1)

Publication Number Publication Date
CN109492042A true CN109492042A (en) 2019-03-19

Family

ID=65694188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811330171.5A Pending CN109492042A (en) 2018-11-09 2018-11-09 A kind of strong rammer digitlization construction management plateform system

Country Status (2)

Country Link
CN (1) CN109492042A (en)
WO (1) WO2020094022A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020094022A1 (en) * 2018-11-09 2020-05-14 南京天辰礼达电子科技有限公司 Dynamic compaction digital construction management platform system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106557820A (en) * 2016-11-24 2017-04-05 天津市普迅电力信息技术有限公司 A kind of power transformation O&M standard operation mobile terminal platform
CN107368967A (en) * 2017-07-20 2017-11-21 北京建工土木工程有限公司 Engineering safety quality inspection intelligent management based on internet
CN108460573A (en) * 2018-01-30 2018-08-28 广东建海工程项目管理有限公司 Project supervision manages system
CN108594684A (en) * 2018-04-26 2018-09-28 浙江交工集团股份有限公司 Cement mixing pile information intelligent managing and control system

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI438593B (en) * 2009-04-10 2014-05-21 Hon Hai Prec Ind Co Ltd System and method for remotely monitoring the scene of industry
US20130253968A1 (en) * 2012-03-26 2013-09-26 David Frederick Martinez Facility control system (fcs, c1) to manage assets planning, design, construction, fabrication, operating, maintence and products
CN106709012A (en) * 2016-12-26 2017-05-24 北京锐安科技有限公司 Method and device for analyzing big data
CN106802640A (en) * 2017-03-27 2017-06-06 天津市水利科学研究院 Roller compaction construction monitoring system and the method for roller compaction construction monitoring
CN108306980A (en) * 2018-03-06 2018-07-20 北京工业大学 A kind of engineering flight support big data Log Analysis System
CN109492042A (en) * 2018-11-09 2019-03-19 南京天辰礼达电子科技有限公司 A kind of strong rammer digitlization construction management plateform system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106557820A (en) * 2016-11-24 2017-04-05 天津市普迅电力信息技术有限公司 A kind of power transformation O&M standard operation mobile terminal platform
CN107368967A (en) * 2017-07-20 2017-11-21 北京建工土木工程有限公司 Engineering safety quality inspection intelligent management based on internet
CN108460573A (en) * 2018-01-30 2018-08-28 广东建海工程项目管理有限公司 Project supervision manages system
CN108594684A (en) * 2018-04-26 2018-09-28 浙江交工集团股份有限公司 Cement mixing pile information intelligent managing and control system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
容建华等: "铁路工程智慧工地管理信息系统设计与实现", 《铁路计算机应用》 *
李忠权等: "基于SOA的地质灾害实时监测预警平台设计", 《成都理工大学学报(自然科学版)》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020094022A1 (en) * 2018-11-09 2020-05-14 南京天辰礼达电子科技有限公司 Dynamic compaction digital construction management platform system

Also Published As

Publication number Publication date
WO2020094022A1 (en) 2020-05-14

Similar Documents

Publication Publication Date Title
KR100748528B1 (en) Information update method and the real-time automatic update system for disaster damage investigation using wireless communication technology and web-gis
CN105547151B (en) Point Cloud Data from Three Dimension Laser Scanning acquires the method and system with processing
CN104301393B (en) Laboratory data gathers and management system
CN106815439A (en) Municipal Engineering Construction monitoring method and its system based on BIM
CN103942258B (en) Streetscape image storing method and device based on road codes
TW201342960A (en) Tracking data usage under a schematized data plan
CN111260325A (en) Bridge construction progress management system based on BIM
Gamperl et al. Internet of things geosensor network for cost-effective landslide early warning systems
KR101000949B1 (en) Web-based realtime surveying managing system
CN109447487A (en) A kind of cement mixing pile pile foundation digitlization construction management plateform system
CN104637107A (en) Method for managing attendance card punching operation of watch man by virtue of intelligent offline cabinet
TW201546773A (en) Real-time interactive mobile device for on-site investigation and on-site investigation method
Ge et al. Deformation monitoring of earth fissure hazards using terrestrial laser scanning
CN109492042A (en) A kind of strong rammer digitlization construction management plateform system
CN109472548A (en) A kind of CFG pile foundation digitlization construction management plateform system
Vona et al. An optimized procedure to estimate the economic seismic losses of existing reinforced concrete buildings due to seismic damage
CN109408524A (en) A kind of screw rod pile pile foundation digitlization construction management plateform system
WO2015113568A1 (en) Construction site image management system and method
CN110232103A (en) A kind of method, inspection client and system that highway inspection event obtains
CN109597766A (en) A kind of processing method and system of test report
US20150261788A1 (en) Generating Digital Data From Physical Media
Sbrogiò et al. Multilevel Assessment of Seismic Damage and Vulnerability of Masonry Buildings (MUSE-DV) in Historical Centers: Development of a Mobile Android Application
CN109636332A (en) A kind of subgrade compaction digitlization construction system
Baca et al. Numerical modelling of various aspects of pipe pile static load test
Marchiori et al. Design and evaluation of IoT-enabled instrumentation for a soil-bentonite slurry trench cutoff wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190319