CN109473974A - A kind of power grid regulation operation self-adapting program operating method and system - Google Patents
A kind of power grid regulation operation self-adapting program operating method and system Download PDFInfo
- Publication number
- CN109473974A CN109473974A CN201811058701.5A CN201811058701A CN109473974A CN 109473974 A CN109473974 A CN 109473974A CN 201811058701 A CN201811058701 A CN 201811058701A CN 109473974 A CN109473974 A CN 109473974A
- Authority
- CN
- China
- Prior art keywords
- transmission line
- electricity
- switch
- state
- status
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000005540 biological transmission Effects 0.000 claims abstract description 115
- 230000005611 electricity Effects 0.000 claims abstract description 95
- 238000006243 chemical reaction Methods 0.000 claims abstract description 22
- 230000003044 adaptive effect Effects 0.000 claims abstract description 15
- 238000011017 operating method Methods 0.000 claims abstract description 12
- 238000000034 method Methods 0.000 claims abstract description 8
- 230000008569 process Effects 0.000 claims abstract description 6
- 230000002265 prevention Effects 0.000 claims description 3
- 238000012545 processing Methods 0.000 claims description 3
- 230000011664 signaling Effects 0.000 claims description 3
- 230000008859 change Effects 0.000 abstract description 2
- 238000012163 sequencing technique Methods 0.000 description 22
- 238000012544 monitoring process Methods 0.000 description 4
- 238000007689 inspection Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000010354 integration Effects 0.000 description 2
- 230000032258 transport Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00001—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
-
- H02J13/0006—
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2203/00—Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
- H02J2203/20—Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
- Y04S10/52—Outage or fault management, e.g. fault detection or location
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/12—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
- Y04S40/128—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment involving the use of Internet protocol
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- General Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Entrepreneurship & Innovation (AREA)
- General Physics & Mathematics (AREA)
- Power Engineering (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Human Computer Interaction (AREA)
- Educational Administration (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The present invention relates to a kind of power grid regulation operation self-adapting program operating method and system, including by EMS system data carry out real time scan, judge transmission line of electricity operating status, generation transmission line status conversion operation task with operating procedure, by five anti-check logics and safety check logic rules checking to operational order.The present invention provides a kind of power grid regulation operation self-adapting program operating method and systems, realize that transmission line status dispatching terminal adaptive judgement, intelligence generate operating procedure, one key operation of dispatching terminal and overall process actual time safety and check, and for line change group, multistation T connects, multistation series connection etc. optimizes, meets the needs of power network wiring diversification of forms, operating efficiency and safety is substantially improved, shorten equipment power off time, provides effective support for good service.
Description
Technical field
The invention belongs to electric system dispatching of power netwoks running technology field more particularly to a kind of operation of power grid regulation are adaptive
Programming operations method further relates to a kind of power grid regulation operation self-adapting program operating system.
Background technique
As power grid regulation integration is pushed forward comprehensively, dispatching of power netwoks, monitoring, control business depth integration, operation amount well
Spray formula increases, and operation content is also increasingly complicated, and peak period dispatching desk operation bottleneck effect highlights.It is run in current power grid regulation
Under mode, report link is more, and time-consuming, and operating efficiency is low, and there is the person and maloperation risk, has been unable to satisfy bulk power grid essence
Beneficial management and running demand is unfavorable for further level of customer service and is promoted.
Summary of the invention
In order to overcome under above-mentioned power grid regulation operational mode, report link is more, and time-consuming, the low problem of operating efficiency.
The present invention proposes that a kind of power grid regulation operation self-adapting program operating method, the present invention also propose that a kind of power grid regulation is run certainly
Adapt to programming operations system.
A kind of power grid regulation operation self-adapting program operating method, comprising the following steps:
S1: by carrying out real time scan to EMS system data: data acquisition is carried out to transmission line of electricity switch state, secondly to defeated
Electric line voltage, active and reactive, electric current the remote signalling of switch, telemetry amount are acquired;
S2: according to the transmission line of electricity data of acquisition, judge transmission line of electricity operating status;
S3: according to transmission line of electricity operating status, adaptive generation transmission line status conversion operation task;
S4: according to the transmission line status conversion operation task of generation, establishing conversion operation correct operation step logical base, adaptive
Operating procedure should be generated;
S5: the five anti-check logics and safety check logic rules for being suitable for network are formulated according to five prevention logic;
S6: in operating process, the checking to operational order by five anti-check logics and safety check logic rules passes through
Check then allows to operate, and does not otherwise allow to be operated.
Preferably, the criterion of transmission line of electricity switch state is regular in the S1 specifically:
When switch state criterion is operation, the position of the switch is to close a floodgate, and transmission line of electricity side tool lock closes, and bus bar side disconnecting link closes, and patrols
Volume condition be with;
When switch state criterion is stand-by heat, the position of the switch is separating brake, and transmission line of electricity side tool lock closes, and bus bar side disconnecting link closes,
Logical condition be with;
When switch state criterion is cold standby, the position of the switch is separating brake, and transmission line of electricity side tool lock pulls open, and bus bar side disconnecting link pulls open,
Logical condition be with.
Preferably, the criterion of transmission line status is regular in the S1 specifically:
When side each on transmission line of electricity switchs at least one switch in operating status, transmission line of electricity voltage > 40kV, switch it is active >=
0kw switchs idle >=0kvar, switching current >=0kA, and it is operation that logical condition, which is with, transmission line of electricity criterion,;
When side each on transmission line of electricity switchs at least one switch in hot stand-by duty, transmission line of electricity voltage < 1kV, switch it is active <
1kV switchs idle < 1kvar, switching current < 1kA, and it is stand-by heat that logical condition, which is with, transmission line of electricity criterion,;
When side each on transmission line of electricity switch is in cold standby state, transmission line of electricity voltage < 1kV switchs active < 1kV, switchs idle
< 1kvar, switching current < 1kA, it is cold standby that logical condition, which is with, transmission line of electricity criterion,;
When side each on transmission line of electricity switch is in cold standby state, transmission line of electricity voltage < 1kV switchs active < 1kV, switchs idle
< 1kvar, switching current < 1kA, it is inspecting state that logical condition, which is with, transmission line of electricity criterion,.
Preferably, the state convert task of transmission line of electricity operating status is corresponding in the S2 specifically:
Possible convert task has cold standby state and inspecting state to transmission line of electricity under operation;Transmission line of electricity is in stand-by heat
Possible convert task has cold standby state and inspecting state under state;Transmission line of electricity possible conversion under cold standby state is appointed
Business has inspecting state, hot stand-by duty and operating status;Transmission line of electricity possible convert task under inspecting state has cold standby
State, hot stand-by duty and operating status.
The present invention also provides a kind of power grid regulations to run self-adapting program operating system, including
Acquisition module, for acquiring each side switch of transmission line of electricity, voltage, active and reactive, electric current the state of switch;
Message processing module judges the operating status of transmission line of electricity according to the data that acquisition module acquires;
Task output module, according to the operating status of transmission line of electricity, adaptive generation transmission line status conversion operation task;
Operating procedure output module establishes conversion operation correct operation according to the transmission line status conversion operation task of generation
Step logical base, adaptive generation operating procedure checking module;
Module is checked, various operational orders are executed to the five anti-check logics and safety check logic for being required to and being suitable for network
Rule check.
Compared with prior art, the beneficial effect of technical solution of the present invention is:
The present invention provides a kind of power grid regulation operation self-adapting program operating method and systems, realize transmission line status tune
It spends end adaptive judgement, intelligence generation operating procedure, one key operation of dispatching terminal and overall process actual time safety to check, and is directed to line
Change group, multistation T connect, multistation series connection etc. optimizes, and meets the needs of power network wiring diversification of forms, operation is substantially improved
Efficiency and safety shorten equipment power off time, provide effective support for good service.
Detailed description of the invention
Fig. 1 is the flow chart that power grid regulation provided by the invention runs self-adapting program operating method;
Fig. 2 is the module map that power grid regulation provided by the invention runs self-adapting program operating system.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, only for illustration, Bu Nengli
Solution is the limitation to this patent.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative labor
Every other embodiment obtained under the premise of dynamic, shall fall within the protection scope of the present invention.
The following further describes the technical solution of the present invention with reference to the accompanying drawings and examples.
Embodiment 1
A kind of power grid regulation operation self-adapting program operating method, comprising the following steps:
S1: by carrying out real time scan to EMS system data: data acquisition is carried out to transmission line of electricity switch state, secondly to defeated
Electric line voltage, active and reactive, electric current the remote signalling of switch, telemetry amount are acquired;
S2: according to the transmission line of electricity data of acquisition, judge transmission line of electricity operating status;
S3: according to transmission line of electricity operating status, adaptive generation transmission line status conversion operation task;
S4: according to the transmission line status conversion operation task of generation, establishing conversion operation correct operation step logical base, adaptive
Operating procedure should be generated;
S5: the five anti-check logics and safety check logic rules for being suitable for network are formulated according to five prevention logic;
S6: in operating process, the checking to operational order by five anti-check logics and safety check logic rules passes through
Check then allows to operate, and does not otherwise allow to be operated.
Wherein, the criterion of transmission line of electricity switch state is regular in the S1 specifically:
When switch state criterion is operation, the position of the switch is to close a floodgate, and transmission line of electricity side tool lock closes, and bus bar side disconnecting link closes, and patrols
Volume condition be with;
When switch state criterion is stand-by heat, the position of the switch is separating brake, and transmission line of electricity side tool lock closes, and bus bar side disconnecting link closes,
Logical condition be with;
When switch state criterion is cold standby, the position of the switch is separating brake, and transmission line of electricity side tool lock pulls open, and bus bar side disconnecting link pulls open,
Logical condition be with.
Wherein, the criterion of transmission line status is regular in the S1 specifically:
When side each on transmission line of electricity switchs at least one switch in operating status, transmission line of electricity voltage > 40kV, switch it is active >=
0kw switchs idle >=0kvar, switching current >=0kA, and it is operation that logical condition, which is with, transmission line of electricity criterion,;
When side each on transmission line of electricity switchs at least one switch in hot stand-by duty, transmission line of electricity voltage < 1kV, switch it is active <
1kV switchs idle < 1kvar, switching current < 1kA, and it is stand-by heat that logical condition, which is with, transmission line of electricity criterion,;
When side each on transmission line of electricity switch is in cold standby state, transmission line of electricity voltage < 1kV switchs active < 1kV, switchs idle
< 1kvar, switching current < 1kA, it is cold standby that logical condition, which is with, transmission line of electricity criterion,;
When side each on transmission line of electricity switch is in cold standby state, transmission line of electricity voltage < 1kV switchs active < 1kV, switchs idle
< 1kvar, switching current < 1kA, it is inspecting state that logical condition, which is with, transmission line of electricity criterion,.
Wherein, the state convert task of transmission line of electricity operating status is corresponding in the S2 specifically:
Possible convert task has cold standby state and inspecting state to transmission line of electricity under operation;Transmission line of electricity is in stand-by heat
Possible convert task has cold standby state and inspecting state under state;Transmission line of electricity possible conversion under cold standby state is appointed
Business has inspecting state, hot stand-by duty and operating status;Transmission line of electricity possible convert task under inspecting state has cold standby
State, hot stand-by duty and operating status.
Embodiment 2
The present invention also provides a kind of power grid regulations to run self-adapting program operating system, including
Acquisition module, for acquiring each side switch of transmission line of electricity, voltage, active and reactive, electric current the state of switch;
Message processing module judges the operating status of transmission line of electricity according to the data that acquisition module acquires;
Task output module, according to the operating status of transmission line of electricity, adaptive generation transmission line status conversion operation task;
Operating procedure output module establishes conversion operation correct operation according to the transmission line status conversion operation task of generation
Step logical base, adaptive generation operating procedure checking module;
Module is checked, various operational orders are executed to the five anti-check logics and safety check logic for being required to and being suitable for network
Rule check.
Further, on the basis of above-mentioned technical proposal, power grid regulation operation self-adapting programization operation system is completed
The exploitation of system, establish in an operating system transmission line of electricity operating status, hot stand-by duty, cold standby state, between inspecting state
Switch process it is as follows:
The step of transmission line of electricity operating status turns inspecting state is as follows:
(1) load side switch is disconnected;
(2) disconnect source-side switches (route switchs to stand-by heat by running at this time);
(3) each side switching circuit side tool lock (no sequencing) is pulled open;
(4) each side switch bus side tool lock (no sequencing) is pulled open;
(5) suspend, and provide " instruct each side tool gate position of site inspection route correct, and route is identified on the display module
No electricity can be grounded, scene investment line-to-ground switch operation power supply " reminding window, after need to confirming and input monitoring password could continue
It operates in next step;
(6) each side earthing knife-switch of route (no sequencing) is closed.
It is as follows that power transmission lines overhauling state transports row state step:
(1) each side earthing knife-switch of route (no sequencing) is pulled open;
(2) each side switch bus side tool lock (no sequencing) is closed;
(3) each side switching circuit side tool lock (no sequencing) is closed;
(4) suspend, and provide and " instruct each side tool lock of site inspection route and grounding switch position correct, have combined floodgate power transmission item
Part " reminding window, after need to confirming and input monitoring password could continue in next step operate;
(5) power turn-on side switchs.
Transmission line of electricity operating status turns cold standby state, and steps are as follows:
(1) load side switch is disconnected;
(2) disconnect source-side switches (route switchs to stand-by heat by running at this time);
(3) each side switching circuit side tool lock (no sequencing) is pulled open;
(4) each side switch bus side tool lock (no sequencing) is pulled open.
It is as follows that transmission line of electricity cold standby state transports row state step:
(1) each side switch bus side tool lock (no sequencing) is closed;
(2) each side switching circuit side tool lock (no sequencing) (route switchs to stand-by heat by cold standby at this time) is closed;
(3) power turn-on side switchs.
Transmission line of electricity hot stand-by duty turns cold standby state, and steps are as follows:
(1) each side switching circuit side tool lock (no sequencing) is pulled open;
(2) each side switch bus side tool lock (no sequencing) is pulled open.
Transmission line of electricity cold standby state turns hot stand-by duty, and steps are as follows:
(1) each side switch bus side tool lock (no sequencing) is closed;
(2) each side switching circuit side tool lock (no sequencing) is closed.
Transmission line of electricity hot stand-by duty turns inspecting state, and steps are as follows:
(1) each side switching circuit side tool lock (no sequencing) is pulled open;
(2) each side switch bus side tool lock (no sequencing) is pulled open;
(3) suspend, and provide " instruct each side tool gate position of site inspection route correct, and route identification can be grounded without electricity, it is existing
Investment line-to-ground switch operation power supply " reminding window, after need to confirming and input monitoring password could continue in next step operate;
(4) each side earthing knife-switch of route (no sequencing) is closed.
Power transmission lines overhauling state turns hot stand-by duty, and steps are as follows:
(1) each side earthing knife-switch of route (no sequencing) is pulled open;
(2) each side switch bus side tool lock (no sequencing) is closed;
(3) each side switching circuit side tool lock (no sequencing) is closed.
Transmission line of electricity cold standby state turns inspecting state, and steps are as follows:
Close each side earthing knife-switch of route (no sequencing).
Power transmission lines overhauling state turns cold standby state, and steps are as follows:
Pull open each side earthing knife-switch of route (no sequencing).
Obviously, the above embodiment of the present invention be only to clearly illustrate example of the present invention, and not be pair
The restriction of embodiments of the present invention.For those of ordinary skill in the art, may be used also on the basis of the above description
To make other variations or changes in different ways.There is no necessity and possibility to exhaust all the enbodiments.It is all this
Made any modifications, equivalent replacements, and improvements etc., should be included in the claims in the present invention within the spirit and principle of invention
Protection scope within.
Claims (5)
1. a kind of power grid regulation runs self-adapting program operating method, which comprises the following steps:
S1: by carrying out real time scan to EMS system data: data acquisition is carried out to transmission line of electricity switch state, secondly to defeated
Electric line voltage, active and reactive, electric current the remote signalling of switch, telemetry amount are acquired;
S2: according to the transmission line of electricity data of acquisition, judge transmission line of electricity operating status;
S3: according to transmission line of electricity operating status, adaptive generation transmission line status conversion operation task;
S4: according to the transmission line status conversion operation task of generation, establishing conversion operation correct operation step logical base, adaptive
Operating procedure should be generated;
S5: the five anti-check logics and safety check logic rules for being suitable for network are formulated according to five prevention logic;
S6: in operating process, the checking to operational order by five anti-check logics and safety check logic rules passes through
Check then allows to operate, and does not otherwise allow to be operated.
2. power grid regulation according to claim 1 runs self-adapting program operating method, which is characterized in that the S1
The criterion rule of middle transmission line of electricity switch state specifically:
When switch state criterion is operation, the position of the switch is to close a floodgate, and transmission line of electricity side tool lock closes, and bus bar side disconnecting link closes, and patrols
Volume condition be with;
When switch state criterion is stand-by heat, the position of the switch is separating brake, and transmission line of electricity side tool lock closes, and bus bar side disconnecting link closes,
Logical condition be with;
When switch state criterion is cold standby, the position of the switch is separating brake, and transmission line of electricity side tool lock pulls open, and bus bar side disconnecting link pulls open,
Logical condition be with.
3. power grid regulation according to claim 2 runs self-adapting program operating method, which is characterized in that the S1
The criterion rule of middle transmission line status specifically:
When side each on transmission line of electricity switchs at least one switch in operating status, transmission line of electricity voltage > 40kV, switch it is active >=
0kw switchs idle >=0kvar, switching current >=0kA, and it is operation that logical condition, which is with, transmission line of electricity criterion,;
When side each on transmission line of electricity switchs at least one switch in hot stand-by duty, transmission line of electricity voltage < 1kV, switch it is active <
1kV switchs idle < 1kvar, switching current < 1kA, and it is stand-by heat that logical condition, which is with, transmission line of electricity criterion,;
When side each on transmission line of electricity switch is in cold standby state, transmission line of electricity voltage < 1kV switchs active < 1kV, switchs idle
< 1kvar, switching current < 1kA, it is cold standby that logical condition, which is with, transmission line of electricity criterion,;
When side each on transmission line of electricity switch is in cold standby state, transmission line of electricity voltage < 1kV switchs active < 1kV, switchs idle
< 1kvar, switching current < 1kA, it is inspecting state that logical condition, which is with, transmission line of electricity criterion,.
4. power grid regulation according to claim 1 runs self-adapting program operating method, which is characterized in that the S2
The state convert task of middle transmission line of electricity operating status is corresponding specifically:
Possible convert task has cold standby state and inspecting state to transmission line of electricity under operation;Transmission line of electricity is in stand-by heat
Possible convert task has cold standby state and inspecting state under state;Transmission line of electricity possible conversion under cold standby state is appointed
Business has inspecting state, hot stand-by duty and operating status;Transmission line of electricity possible convert task under inspecting state has cold standby
State, hot stand-by duty and operating status.
5. a kind of power grid regulation runs self-adapting program operating system characterized by comprising
Acquisition module, for acquiring each side switch of transmission line of electricity, voltage, active and reactive, electric current the state of switch;
Message processing module judges the operating status of transmission line of electricity according to the data that acquisition module acquires;
Task output module, according to the operating status of transmission line of electricity, adaptive generation transmission line status conversion operation task;
Operating procedure output module establishes conversion operation correct operation according to the transmission line status conversion operation task of generation
Step logical base, adaptive generation operating procedure checking module;
Module is checked, various operational orders are executed to the five anti-check logics and safety check logic for being required to and being suitable for network
Rule check.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811058701.5A CN109473974B (en) | 2018-09-11 | 2018-09-11 | Power grid regulation and control operation self-adaptive programmed operation method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811058701.5A CN109473974B (en) | 2018-09-11 | 2018-09-11 | Power grid regulation and control operation self-adaptive programmed operation method and system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109473974A true CN109473974A (en) | 2019-03-15 |
CN109473974B CN109473974B (en) | 2022-08-16 |
Family
ID=65664259
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811058701.5A Active CN109473974B (en) | 2018-09-11 | 2018-09-11 | Power grid regulation and control operation self-adaptive programmed operation method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109473974B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112332534A (en) * | 2020-10-21 | 2021-02-05 | 宁波大家小家网络科技有限公司 | Automatic control method and device for power distribution system |
CN114400696A (en) * | 2022-01-28 | 2022-04-26 | 广东电网有限责任公司广州供电局 | Sequential control method and system for back-to-back direct current transmission system |
CN116094176A (en) * | 2023-03-09 | 2023-05-09 | 烟台开发区德联软件有限责任公司 | One-key programmed control method and device based on comprehensive error proof check |
CN117411188A (en) * | 2023-11-30 | 2024-01-16 | 中国长江电力股份有限公司 | Automatic operation flow of hydropower station 500kV outgoing line route overhaul transfer operation monitoring system |
CN117411188B (en) * | 2023-11-30 | 2024-06-11 | 中国长江电力股份有限公司 | Automatic operation method of hydropower station 500kV outgoing line route overhaul transfer operation monitoring system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101594002A (en) * | 2009-07-03 | 2009-12-02 | 河海大学 | The self-healing control method of operation of urban distribution network |
WO2011008944A2 (en) * | 2009-07-16 | 2011-01-20 | General Cybernation Group, Inc. | Smart and scalable power inverters |
CN102508059A (en) * | 2011-10-18 | 2012-06-20 | 北京科东电力控制系统有限责任公司 | Topology error-preventing checking method based on intelligent identification of state of equipment |
CN107591892A (en) * | 2017-08-07 | 2018-01-16 | 许继集团有限公司 | A kind of intelligent substation O&M method and system |
CN107644118A (en) * | 2017-08-04 | 2018-01-30 | 天津大学 | A kind of intelligent power distribution Sofe Switch timing optimization method of integrated energy storage |
CN108416689A (en) * | 2018-01-16 | 2018-08-17 | 华北电力大学 | A kind of universal method automatically generating operation order task |
-
2018
- 2018-09-11 CN CN201811058701.5A patent/CN109473974B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101594002A (en) * | 2009-07-03 | 2009-12-02 | 河海大学 | The self-healing control method of operation of urban distribution network |
WO2011008944A2 (en) * | 2009-07-16 | 2011-01-20 | General Cybernation Group, Inc. | Smart and scalable power inverters |
CN102508059A (en) * | 2011-10-18 | 2012-06-20 | 北京科东电力控制系统有限责任公司 | Topology error-preventing checking method based on intelligent identification of state of equipment |
CN107644118A (en) * | 2017-08-04 | 2018-01-30 | 天津大学 | A kind of intelligent power distribution Sofe Switch timing optimization method of integrated energy storage |
CN107591892A (en) * | 2017-08-07 | 2018-01-16 | 许继集团有限公司 | A kind of intelligent substation O&M method and system |
CN108416689A (en) * | 2018-01-16 | 2018-08-17 | 华北电力大学 | A kind of universal method automatically generating operation order task |
Non-Patent Citations (2)
Title |
---|
倪鹏: ""智能化操作票系统的开发及应用"", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 * |
张勇等: ""基于EMS的智能调度操作票系统"", 《现代电力》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112332534A (en) * | 2020-10-21 | 2021-02-05 | 宁波大家小家网络科技有限公司 | Automatic control method and device for power distribution system |
CN114400696A (en) * | 2022-01-28 | 2022-04-26 | 广东电网有限责任公司广州供电局 | Sequential control method and system for back-to-back direct current transmission system |
CN114400696B (en) * | 2022-01-28 | 2023-06-20 | 广东电网有限责任公司广州供电局 | Sequential control method and system of back-to-back direct current transmission system |
CN116094176A (en) * | 2023-03-09 | 2023-05-09 | 烟台开发区德联软件有限责任公司 | One-key programmed control method and device based on comprehensive error proof check |
CN117411188A (en) * | 2023-11-30 | 2024-01-16 | 中国长江电力股份有限公司 | Automatic operation flow of hydropower station 500kV outgoing line route overhaul transfer operation monitoring system |
CN117411188B (en) * | 2023-11-30 | 2024-06-11 | 中国长江电力股份有限公司 | Automatic operation method of hydropower station 500kV outgoing line route overhaul transfer operation monitoring system |
Also Published As
Publication number | Publication date |
---|---|
CN109473974B (en) | 2022-08-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7868621B2 (en) | Power line communication based aircraft power distribution system with real time wiring integrity monitoring capability | |
US7301738B2 (en) | Method and apparatus for minimally invasive network monitoring | |
CN109459658B (en) | Method for power distribution master station to judge local feeder automation line fault section | |
KR102145266B1 (en) | System and method for monitoring power system | |
CN109473974A (en) | A kind of power grid regulation operation self-adapting program operating method and system | |
CN102037630A (en) | Feeder automation system and method for operating the same | |
CN104106056A (en) | Transformer substation automation system and automatic recognition method for terminal | |
CN104518564A (en) | Backup automatic switching apparatus with area automatic switching function, and backup automatic switching method | |
CN105680566B (en) | The rebooting device and method for restarting of fault wave recording device based on dispatch data net | |
CN103236362A (en) | PLC-based (programmable logic controller-based) knife switch control method and system | |
CN102263438B (en) | Intelligent running system for distribution substation and control method thereof | |
CN110932395B (en) | Communication system of low-voltage intelligent spare power automatic switching | |
Hajian-Hoseinabadi | Availability comparison of various power substation automation architectures | |
CN105391030B (en) | The plan isolated island division methods of polymerization are gradually loaded based on network topology structure load | |
CN113162234B (en) | Direct current combined-hop system based on GOOSE communication and monitoring method | |
CN109460896A (en) | A kind of power grid 110kV route N-1 risk automatically scanning analysis method | |
JP4656639B2 (en) | Communication network for distribution network monitoring and control | |
CN202121381U (en) | Intelligent operation system of variable power distribution station | |
CN208461463U (en) | Rail traffic online tri-station isolating switch and monitoring system | |
CN101436777A (en) | Relay protection monitoring system and method based on sensor network | |
CN103219802A (en) | Grid fault recovery system | |
CN111426975A (en) | Intelligent on-line monitoring system for switching station | |
CN112701001B (en) | Grounding method and device of contact net | |
CN110492466B (en) | Urban rail transit direct-current traction power supply isolating switch interlocking system and method | |
CN112736875B (en) | Hybrid self-healing method for input and commissioning equipment of power distribution network |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||