CN109472488A - Scheduled production method and device, storage medium and the processor of order - Google Patents

Scheduled production method and device, storage medium and the processor of order Download PDF

Info

Publication number
CN109472488A
CN109472488A CN201811307908.1A CN201811307908A CN109472488A CN 109472488 A CN109472488 A CN 109472488A CN 201811307908 A CN201811307908 A CN 201811307908A CN 109472488 A CN109472488 A CN 109472488A
Authority
CN
China
Prior art keywords
target order
order
raw material
production
target
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811307908.1A
Other languages
Chinese (zh)
Inventor
周勤如
李文彬
王蕊
张兴钙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Zhuhai Gree Intelligent Equipment Co Ltd
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Zhuhai Gree Intelligent Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai, Zhuhai Gree Intelligent Equipment Co Ltd filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201811307908.1A priority Critical patent/CN109472488A/en
Publication of CN109472488A publication Critical patent/CN109472488A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Health & Medical Sciences (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Manufacturing & Machinery (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Abstract

This application discloses scheduled production method and device, storage medium and the processors of a kind of order.This method comprises: obtaining the target order to scheduled production, wherein including at least the product information in the delivery time and target order of target order in the target order;Parse the product information in the target order, raw material needed for determining product;Inventory status of the raw material needed for determining product in raw material storage;Inventory status of the raw material in raw material storage needed for delivery time and product based on target order carries out scheduled production to target order and solves the problems, such as that order planning plan is unreasonable in the related technology by the application.

Description

Scheduled production method and device, storage medium and the processor of order
Technical field
This application involves order processing technical fields, scheduled production method and device, storage in particular to a kind of order Medium and processor.
Background technique
In present workshop, the production planning and sequencing of order is typically stored in the system that workshop uses, if according to row Production plan encounters some emergency cases when carrying out production operation to order, for example, needing to insert the order singly produced, will cause original Production planning and sequencing cause confusion, need to readjust the production of the process of subsequent order and order.Meanwhile the prior art In, about the system of production planning and sequencing and the record in employee's working hour, there are inflexible disadvantages, and therefore, there are order rows for the prior art It produces and plans unreasonable state.
In view of the above problems in the related art, currently no effective solution has been proposed.
Summary of the invention
The main purpose of the application is to provide scheduled production method and device, storage medium and the processor of a kind of order, with Solve the problems, such as that order planning plan is unreasonable in the related technology.
To achieve the goals above, according to the one aspect of the application, a kind of scheduled production method of order is provided.This method It include: the target order obtained to scheduled production, wherein including at least the delivery time of target order and target order in target order In product information;Parse the product information in target order, raw material needed for determining product;Raw material needed for determining product exists Inventory status in raw material storage;Inventory status of the raw material in raw material storage needed for delivery time and product based on target order Scheduled production is carried out to target order.
Further, based on target order delivery time and product needed for inventory status of the raw material in raw material storage After carrying out scheduled production to target order, this method further include: obtain the production planning and sequencing of target order;Scheduled production based on target order Plan produces target order, if detecting the presence of the order for inserting list, adjustment process produces slotting single order, temporarily Stop the production to target order;After the completion of detecting the order for inserting list production, the production to target order is rearranged.
Further, inventory status pair of the raw material in raw material storage needed for the delivery time and product based on target order Target order carries out process needed for scheduled production comprises determining that target order;Needed for delivery time and product based on target order Inventory status of the raw material in raw material storage to each procedure arrangement production plan, obtain production planning and sequencing.
Further, based on target order delivery time and product needed for inventory status of the raw material in raw material storage After carrying out scheduled production to target order, this method further include: the processing progress of target order is obtained according to preset period of time;More The processing progress of fresh target order.
Further, based on target order delivery time and product needed for inventory status of the raw material in raw material storage After carrying out scheduled production to target order, this method further include: the processing progress based on target order judges whether target order surpasses Phase;If target order has exceeded the time limit, triggering order time-out is reminded;Alternatively, super in the corresponding task of process for detecting target order In the case of, triggering task time-out is reminded.
Further, based on target order delivery time and product needed for inventory status of the raw material in raw material storage After carrying out scheduled production to target order, this method further include: the production planning and sequencing based on target order produces target order In the process, the machining period of each process is recorded;After the completion of the production of target order, the processing of target order all process steps is counted Working hour.
To achieve the goals above, according to the another aspect of the application, a kind of scheduled production device of order is provided.The device It include: first acquisition unit, for obtaining the target order to scheduled production, wherein including at least target order in target order Product information in delivery time and target order;First determination unit is determined for parsing the product information in target order Raw material needed for product;Second determination unit, for inventory status of the raw material in raw material storage needed for determining product;Order row Unit is produced, target is ordered for inventory status of the raw material according to needed for the delivery time of target order and product in raw material storage It is single to carry out scheduled production.
Further, which further includes second acquisition unit, for according to target order delivery time and product After inventory status of the required raw material in raw material storage carries out scheduled production to target order, the production planning and sequencing of target order is obtained; Adjustment unit, for being produced according to the production planning and sequencing of target order to target order, if detecting the presence of the order for inserting list, Adjustment process produces slotting single order, suspends the production to target order;Rearrange unit, for detect it is slotting After the completion of single order production, the production to target order is rearranged.
Further, which further includes that order planning unit includes: the first determining subelement, for determining that target is ordered Single required process;Second determination unit, for the raw material according to needed for the delivery time of target order and product in raw material storage In inventory status to each procedure arrangement production plan, obtain production planning and sequencing.
Further, which further includes third acquiring unit, for according to target order delivery time and product After inventory status of the required raw material in raw material storage carries out scheduled production to target order, target is obtained according to preset period of time The processing progress of order;Updating unit, the processing progress for more fresh target order.
By the application, using following steps: obtaining the target order to scheduled production, wherein include at least in target order Product information in the delivery time and target order of target order;The product information in target order is parsed, determines product institute The raw material needed;Inventory status of the raw material needed for determining product in raw material storage;Delivery time and product based on target order Inventory status of the required raw material in raw material storage carries out scheduled production to target order, solves order planning plan in the related technology Unreasonable problem is formulated, and then has reached rational production planning and sequencing, and then improves the effect of Workshop Production efficiency.
Detailed description of the invention
The attached drawing constituted part of this application is used to provide further understanding of the present application, the schematic reality of the application Example and its explanation are applied for explaining the application, is not constituted an undue limitation on the present application.In the accompanying drawings:
Fig. 1 is according to a kind of flow chart of the scheduled production method of order provided by the embodiments of the present application;And
Fig. 2 is according to a kind of schematic diagram of the scheduled production device of order provided by the embodiments of the present application.
Specific embodiment
It should be noted that in the absence of conflict, the features in the embodiments and the embodiments of the present application can phase Mutually combination.The application is described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
In order to make those skilled in the art more fully understand application scheme, below in conjunction in the embodiment of the present application Attached drawing, the technical scheme in the embodiment of the application is clearly and completely described, it is clear that described embodiment is only The embodiment of the application a part, instead of all the embodiments.Based on the embodiment in the application, ordinary skill people Member's every other embodiment obtained without making creative work, all should belong to the model of the application protection It encloses.
It should be noted that the description and claims of this application and term " first " in above-mentioned attached drawing, " Two " etc. be to be used to distinguish similar objects, without being used to describe a particular order or precedence order.It should be understood that using in this way Data be interchangeable under appropriate circumstances, so as to embodiments herein described herein.In addition, term " includes " and " tool Have " and their any deformation, it is intended that cover it is non-exclusive include, for example, containing a series of steps or units Process, method, system, product or equipment those of are not necessarily limited to be clearly listed step or unit, but may include without clear Other step or units listing to Chu or intrinsic for these process, methods, product or equipment.
According to an embodiment of the present application, a kind of scheduled production method of order is provided.
Fig. 1 is the flow chart according to a kind of scheduled production method of order of the embodiment of the present application.As shown in Figure 1, this method packet Include following steps:
Step S101 obtains the target order to scheduled production, wherein when including at least the delivery of target order in target order Between and target order in product information.
Specifically, it obtains first and needs to arrange production order, wherein when including the delivery of order in the information of target order Between and target order in product information, the order of each batch can have an O/No., as long as O/No. is inputted System, so that it may all information for obtaining target order, including: order workshop is produced the date, scheduled production date etc..
Step S102 parses the product information in target order, raw material needed for determining product.
Specifically, the product information in target order is parsed according to target O/No., wherein further include in product information Raw material needed for target order produces.
Step S103, inventory status of the raw material needed for determining product in raw material storage.
Specifically, raw material needed for producing in workshop can be stored in the corresponding raw material storage in workshop, determine target order After required raw materials for production, the inventory status of target material in the raw material storage stored in system can be transferred, wherein inventory status packet The quantity available and target material that include raw material are stored in the more specific location information etc. in raw material storage.
Step S104, inventory status pair of the raw material in raw material storage needed for delivery time and product based on target order Target order carries out scheduled production.
Optionally, inventory status of the raw material in raw material storage needed for the delivery time and product based on target order is to mesh Mark order carries out process needed for scheduled production comprises determining that target order;Needed for delivery time and product based on target order Inventory status of the raw material in raw material storage obtains production planning and sequencing to each procedure arrangement production plan.
Specifically, it is first determined process needed for product in target order, according to the state of target product to target product Formulate production planning and sequencing, wherein the state of target product include target product delivery time and required feed states, there are also targets Order urgency level turns class's situation, attendance situation, inserts one-state etc..
It should be noted that target order planning is in the works, preferentially according to the delivery time of the target order of each batch Be that required principle situation is ranked up, delivery time more forward order preferentially carries out scheduled production.
Optionally, based on target order delivery time and product needed for inventory status pair of the raw material in raw material storage After target order carries out scheduled production, this method further include: obtain the production planning and sequencing of target order;Based on the scheduled production of target order It draws and target order is produced, if detecting the presence of the order for inserting list, adjustment process produces slotting single order, suspends Production to target order;After the completion of detecting the order for inserting list production, the production to target order is rearranged.
Specifically, after getting production planning and sequencing, production planning and sequencing enters workshop and arranges production, if according to production planning and sequencing into During row production, relatively urgent order production task is encountered, that is, encounter the case where needs insert single production, detect vehicle Between lathe whether there is or not the order production task produced, if there is producing for task, suspend the life to target order It produces, urgent order production task is arranged preferentially to be produced, then, the process for adjusting target order.If inserting list encountering In the case of, workshop lathe then directly arranges urgent order to be produced there is no the order for carrying out production task.
It should be noted that forms data is inserted in system typing accordingly, can be manually in the case where encountering promptly slotting list It arranges to insert single plan scheduled production operation in system, free adjustment is carried out to entire production planning and sequencing, and to production planning and sequencing adjusted point Preset time needed for analysing calculated for subsequent.
Optionally, based on target order delivery time and product needed for inventory status pair of the raw material in raw material storage After target order carries out scheduled production, this method further include: the processing progress of target order is obtained according to preset period of time;It updates The processing progress of target order.
Specifically, after production planning and sequencing is scheduled in target order, target order enters workshop according to production planning and sequencing and is produced After operation, the processing of the process velocity and then more fresh target order of target order can be obtained in the predetermined period of target order Progress.
It should be noted that the processing preset time of target order is after production planning and sequencing enters system, system is automatically right The scheduled production process of target order makees the obtained target order of analytical calculation and produces the time used.
Optionally, based on target order delivery time and product needed for inventory status pair of the raw material in raw material storage After target order carries out scheduled production, this method further include: the processing progress based on target order judges whether target order surpasses Phase;If target order has exceeded the time limit, triggering order time-out is reminded;Alternatively, super in the corresponding task of process for detecting target order In the case of, triggering task time-out is reminded.
Specifically, dbjective state is judged according to the preset time of target order and processing progress, if according to pre- If the time is judged, preset time is already expired, but process corresponding to the production and processing of target order does not complete also, then can be true There is the case where exceeding the time limit in the order that sets the goal, trigger order if target order exceeds the time limit and reminded, wherein preferably, remind Mode is to send mail to the special messenger of target order to remind and check in time and processing target order.Alternatively, detecting target Order is within a preset time without completing all process, it is determined that the production task of target order is exceeded the time limit, in this feelings Under condition, same triggering exceeds the time limit to remind to the responsible person of target order, wherein alerting pattern is preferably mail reminder.
Optionally, based on target order delivery time and product needed for inventory status pair of the raw material in raw material storage After target order carries out scheduled production, this method further include: the production planning and sequencing based on target order produced to target order Cheng Zhong records the machining period of each process;After the completion of the production of target order, the processing work of target order all process steps is counted When.
Specifically, after target order enters production, after target order completes production task, according to each of target order The performance of process records the process working hour of target order, and after the completion of the production of target order, statistics target is ordered The time used in all processes and record of work is carried out in list.
Optionally, the production hour of target order production hour and target order process is counted, it can corresponding typing mesh In the order number for marking order, order number includes the production time used in the process of target order and target order as a result,.
It should be noted that the working hour of record target order and the responsible person of target order, it can be according to target order Record of work statistics target order responsible person working hour.
Optionally, the above method is not limited to be arranged in the fixed system terminal in workshop, can be set in various terminals, Improve the working efficiency of the monitoring degree and workshop to resources of production.
The scheduled production method of order provided by the embodiments of the present application, by obtaining the target order to scheduled production, wherein target is ordered Including at least the product information in the delivery time and target order of target order in list;Parse the product letter in target order Breath, raw material needed for determining product;Inventory status of the raw material needed for determining product in raw material storage;Friendship based on target order Inventory status of the raw material in raw material storage needed for paying time and product carries out scheduled production to target order, solves in the related technology The unreasonable problem of order planning plan, and then reached rational production planning and sequencing, and then improve Workshop Production efficiency Effect.
It should be noted that step shown in the flowchart of the accompanying drawings can be in such as a group of computer-executable instructions It is executed in computer system, although also, logical order is shown in flow charts, and it in some cases, can be with not The sequence being same as herein executes shown or described step.
The embodiment of the present application also provides a kind of scheduled production devices of order, it should be noted that the embodiment of the present application is ordered Single scheduled production device can be used for executing a kind of scheduled production method that order is used for provided by the embodiment of the present application.Below to this Shen Please a kind of scheduled production device of order that provides of embodiment be introduced.
Fig. 2 is the schematic diagram according to a kind of scheduled production device of order of the embodiment of the present application.As shown in Fig. 2, the device packet It includes: first acquisition unit 201, for obtaining the target order to scheduled production, wherein including at least target order in target order Product information in delivery time and target order;First determination unit 202, for parsing the product information in target order, Raw material needed for determining product;Second determination unit 203, for inventory shape of the raw material needed for determining product in raw material storage State;Order planning unit 204, for inventory of the raw material according to needed for the delivery time of target order and product in raw material storage State carries out scheduled production to target order.
Optionally, in a kind of scheduled production device of order provided by the embodiments of the present application, the device further include: second obtains list Member, in inventory status of the raw material according to needed for the delivery time of target order and product in raw material storage to target order After carrying out scheduled production, the production planning and sequencing of target order is obtained;Adjustment unit, for according to the production planning and sequencing of target order to target Order is produced, if detecting the presence of the order for inserting list, adjustment process produces slotting single order, and target is ordered in pause Single production;Unit is rearranged, for rearranging the life to target order after the completion of detecting the order for inserting list production It produces.
Optionally, in a kind of scheduled production device of order provided by the embodiments of the present application, order planning unit 204 includes: One determines subelement, for process needed for determining target order;Second determination unit, when for according to the delivery of target order Between and product needed for inventory status of the raw material in raw material storage to each procedure arrangement production plan, obtain production planning and sequencing.
Optionally, in a kind of scheduled production device of order provided by the embodiments of the present application, the device further include: third obtains single Member, in inventory status of the raw material according to needed for the delivery time of target order and product in raw material storage to target order After carrying out scheduled production, the processing progress of target order is obtained according to preset period of time;Updating unit is used for more fresh target order Processing progress.
Optionally, in a kind of scheduled production device of order provided by the embodiments of the present application, the device further include: judging unit, For inventory status of the raw material according to needed for the delivery time of target order and product in raw material storage to target order into After row scheduled production, based on the processing progress of target order, judge whether target order exceeds the time limit;First trigger unit, in mesh In the case that mark order has exceeded the time limit, triggering order time-out is reminded;Alternatively, the second trigger unit, for detecting target order Process corresponding task time-out in the case where, triggering task time-out is reminded.
Optionally, in a kind of scheduled production device of order provided by the embodiments of the present application, the device further include: recording unit, For inventory status of the raw material according to needed for the delivery time of target order and product in raw material storage to target order into After row scheduled production, the production planning and sequencing based on target order carries out target order to record the processing of each process in production process Working hour;Statistic unit, for counting the machining period of target order all process steps after the completion of the production of target order.
The scheduled production device of a kind of order provided by the embodiments of the present application, by first acquisition unit 201, for obtaining wait arrange The target order of production, wherein including at least the product information in the delivery time and target order of target order in target order; First determination unit 202, for parsing the product information in target order, raw material needed for determining product;Second determination unit 203, for inventory status of the raw material in raw material storage needed for determining product;Order planning unit 204, for being ordered according to target Inventory status of the raw material in raw material storage needed for single delivery time and product carries out scheduled production to target order, solves correlation The unreasonable problem of order planning plan in technology, and then reached rational production planning and sequencing, and then it is raw to improve workshop Produce the effect of efficiency.
A kind of scheduled production device of order includes processor and memory, above-mentioned first acquisition unit 201, the first determination unit 202, the second determination unit 203 and order planning unit 204 etc. store in memory as program unit, are held by processor Above procedure unit stored in memory go to realize corresponding function.
Include kernel in processor, is gone in memory to transfer corresponding program unit by kernel.Kernel can be set one Or more, solve the problems, such as that order planning plan is unreasonable in the related technology by adjusting kernel parameter, and then reach Improve the effect of Workshop Production efficiency.
Memory may include the non-volatile memory in computer-readable medium, random access memory (RAM) and/ Or the forms such as Nonvolatile memory, if read-only memory (ROM) or flash memory (flash RAM), memory include that at least one is deposited Store up chip.
The embodiment of the invention provides a kind of storage mediums, are stored thereon with program, real when which is executed by processor A kind of scheduled production method of existing order.
The embodiment of the invention provides a kind of processor, processor is for running program, wherein program executes one when running The scheduled production method of kind order.
The embodiment of the invention provides a kind of equipment, equipment include processor, memory and storage on a memory and can The program run on a processor, processor perform the steps of the target order obtained to scheduled production when executing program, wherein Including at least the product information in the delivery time and target order of target order in target order;Parse the production in target order Product information, raw material needed for determining product;Inventory status of the raw material needed for determining product in raw material storage;Based on target order Delivery time and product needed for inventory status of the raw material in raw material storage to target order carry out scheduled production.
Optionally, based on target order delivery time and product needed for inventory status pair of the raw material in raw material storage After target order carries out scheduled production, this method further include: obtain the production planning and sequencing of target order;Based on the scheduled production of target order It draws and target order is produced, if detecting the presence of the order for inserting list, adjustment process produces slotting single order, suspends Production to target order;After the completion of detecting the order for inserting list production, the production to target order is rearranged.
Optionally, inventory status of the raw material in raw material storage needed for the delivery time and product based on target order is to mesh Mark order carries out process needed for scheduled production comprises determining that target order;Needed for delivery time and product based on target order Inventory status of the raw material in raw material storage obtains production planning and sequencing to each procedure arrangement production plan.
Optionally, based on target order delivery time and product needed for inventory status pair of the raw material in raw material storage After target order carries out scheduled production, this method further include: the processing progress of target order is obtained according to preset period of time;It updates The processing progress of target order.
Optionally, based on target order delivery time and product needed for inventory status pair of the raw material in raw material storage After target order carries out scheduled production, this method further include: the processing progress based on target order judges whether target order surpasses Phase;If target order has exceeded the time limit, triggering order time-out is reminded;Alternatively, super in the corresponding task of process for detecting target order In the case of, triggering task time-out is reminded.
Optionally, based on target order delivery time and product needed for inventory status pair of the raw material in raw material storage After target order carries out scheduled production, this method further include: the production planning and sequencing based on target order produced to target order Cheng Zhong records the machining period of each process;After the completion of the production of target order, the processing work of target order all process steps is counted When.Equipment herein can be server, PC, PAD, mobile phone etc..
Present invention also provides a kind of computer program products, when executing on data processing equipment, are adapted for carrying out just The program of beginningization there are as below methods step: the target order to scheduled production is obtained, wherein target order is included at least in target order Delivery time and target order in product information;Parse the product information in target order, raw material needed for determining product; Inventory status of the raw material needed for determining product in raw material storage;Raw material needed for delivery time and product based on target order Inventory status in raw material storage carries out scheduled production to target order.
Optionally, based on target order delivery time and product needed for inventory status pair of the raw material in raw material storage After target order carries out scheduled production, this method further include: obtain the production planning and sequencing of target order;Based on the scheduled production of target order It draws and target order is produced, if detecting the presence of the order for inserting list, adjustment process produces slotting single order, suspends Production to target order;After the completion of detecting the order for inserting list production, the production to target order is rearranged.
Optionally, inventory status of the raw material in raw material storage needed for the delivery time and product based on target order is to mesh Mark order carries out process needed for scheduled production comprises determining that target order;Needed for delivery time and product based on target order Inventory status of the raw material in raw material storage obtains production planning and sequencing to each procedure arrangement production plan.
Optionally, based on target order delivery time and product needed for inventory status pair of the raw material in raw material storage After target order carries out scheduled production, this method further include: the processing progress of target order is obtained according to preset period of time;It updates The processing progress of target order.
Optionally, based on target order delivery time and product needed for inventory status pair of the raw material in raw material storage After target order carries out scheduled production, this method further include: the processing progress based on target order judges whether target order surpasses Phase;If target order has exceeded the time limit, triggering order time-out is reminded;Alternatively, super in the corresponding task of process for detecting target order In the case of, triggering task time-out is reminded.
Optionally, based on target order delivery time and product needed for inventory status pair of the raw material in raw material storage After target order carries out scheduled production, this method further include: the production planning and sequencing based on target order produced to target order Cheng Zhong records the machining period of each process;After the completion of the production of target order, the processing work of target order all process steps is counted When.
It should be understood by those skilled in the art that, embodiments herein can provide as method, system or computer program Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the application Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the application, which can be used in one or more, The computer program implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) produces The form of product.
The application is referring to method, the process of equipment (system) and computer program product according to the embodiment of the present application Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates, Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one The step of function of being specified in a box or multiple boxes.
In a typical configuration, calculating equipment includes one or more processors (CPU), input/output interface, net Network interface and memory.
Memory may include the non-volatile memory in computer-readable medium, random access memory (RAM) and/ Or the forms such as Nonvolatile memory, such as read-only memory (ROM) or flash memory (flash RAM).Memory is computer-readable Jie The example of matter.
Computer-readable medium includes permanent and non-permanent, removable and non-removable media can be by any method Or technology come realize information store.Information can be computer readable instructions, data structure, the module of program or other data. The example of the storage medium of computer includes, but are not limited to phase change memory (PRAM), static random access memory (SRAM), moves State random access memory (DRAM), other kinds of random access memory (RAM), read-only memory (ROM), electric erasable Programmable read only memory (EEPROM), flash memory or other memory techniques, read-only disc read only memory (CD-ROM) (CD-ROM), Digital versatile disc (DVD) or other optical storage, magnetic cassettes, tape magnetic disk storage or other magnetic storage devices Or any other non-transmission medium, can be used for storage can be accessed by a computing device information.As defined in this article, it calculates Machine readable medium does not include temporary computer readable media (transitory media), such as the data-signal and carrier wave of modulation.
It should also be noted that, the terms "include", "comprise" or its any other variant are intended to nonexcludability It include so that the process, method, commodity or the equipment that include a series of elements not only include those elements, but also to wrap Include other elements that are not explicitly listed, or further include for this process, method, commodity or equipment intrinsic want Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including element There is also other identical elements in process, method, commodity or equipment.
It will be understood by those skilled in the art that embodiments herein can provide as method, system or computer program product. Therefore, complete hardware embodiment, complete software embodiment or embodiment combining software and hardware aspects can be used in the application Form.It is deposited moreover, the application can be used to can be used in the computer that one or more wherein includes computer usable program code The shape for the computer program product implemented on storage media (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) Formula.
The above is only embodiments herein, are not intended to limit this application.To those skilled in the art, Various changes and changes are possible in this application.It is all within the spirit and principles of the present application made by any modification, equivalent replacement, Improve etc., it should be included within the scope of the claims of this application.

Claims (10)

1. a kind of scheduled production method of order characterized by comprising
Obtain the target order to scheduled production, wherein including at least the delivery time of target order and target in the target order Product information in order;
Parse the product information in the target order, raw material needed for determining product;
Inventory status of the raw material needed for determining the product in raw material storage;
Inventory status of the raw material in raw material storage needed for delivery time and the product based on the target order is to described Target order carries out scheduled production.
2. the method according to claim 1, wherein based on the target order delivery time and the production After inventory status of the raw material needed for product in raw material storage carries out scheduled production to the target order, the method also includes:
Obtain the production planning and sequencing of the target order;
Production planning and sequencing based on the target order produces the target order, if detecting the presence of the order for inserting list, Adjustment process produces slotting single order, suspends the production to the target order;
After the completion of detecting that slotting single order produces, the production to the target order is rearranged.
3. the method according to claim 1, wherein delivery time and the product based on the target order Inventory status of the required raw material in raw material storage carries out scheduled production to the target order
Process needed for determining the target order;
Inventory status of the raw material in raw material storage needed for delivery time and the product based on the target order is to each Procedure arrangement production plan, obtains production planning and sequencing.
4. according to the method described in claim 3, it is characterized in that, based on the target order delivery time and the production After inventory status of the raw material needed for product in raw material storage carries out scheduled production to the target order, the method also includes:
The processing progress of the target order is obtained according to preset period of time;
Update the processing progress of the target order.
5. according to the method described in claim 4, it is characterized in that, based on the target order delivery time and the production After inventory status of the raw material needed for product in raw material storage carries out scheduled production to the target order, the method also includes:
Based on the processing progress of the target order, judge whether the target order exceeds the time limit;
If the target order has exceeded the time limit, triggering order time-out is reminded;
Alternatively, detect the target order the corresponding task of process it is overtime in the case where, triggering task time-out is reminded.
6. the method according to claim 1, wherein based on the target order delivery time and the production After inventory status of the raw material needed for product in raw material storage carries out scheduled production to the target order, the method also includes:
Production planning and sequencing based on the target order carries out the target order to record the processing of each process in production process Working hour;
After the completion of target order production, the machining period of the target order all process steps is counted.
7. a kind of scheduled production device of order characterized by comprising
First acquisition unit, for obtaining the target order to scheduled production, wherein target order is included at least in the target order Delivery time and target order in product information;
First determination unit, for parsing the product information in the target order, raw material needed for determining product;
Second determination unit, for inventory status of the raw material in raw material storage needed for determining the product;
Order planning unit, for the raw material according to needed for the delivery time of the target order and the product in raw material storage Inventory status to the target order carry out scheduled production.
8. device according to claim 7, which is characterized in that described device further includes,
Second acquisition unit, in the raw material according to needed for the delivery time of the target order and the product in raw material storage In inventory status to the target order carry out scheduled production after, obtain the production planning and sequencing of the target order;
Adjustment unit is deposited for being produced according to the production planning and sequencing of the target order to the target order if detecting Single order is being inserted, adjustment process produces slotting single order, suspends the production to the target order;
Unit is rearranged, for rearranging to the target order after the completion of detecting that slotting single order produces Production.
9. a kind of storage medium, which is characterized in that the storage medium includes the program of storage, wherein described program right of execution Benefit require any one of 1 to 6 described in a kind of scheduled production method of order.
10. a kind of processor, which is characterized in that the processor is for running program, wherein right of execution when described program is run Benefit require any one of 1 to 6 described in a kind of scheduled production method of order.
CN201811307908.1A 2018-11-05 2018-11-05 Scheduled production method and device, storage medium and the processor of order Pending CN109472488A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811307908.1A CN109472488A (en) 2018-11-05 2018-11-05 Scheduled production method and device, storage medium and the processor of order

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811307908.1A CN109472488A (en) 2018-11-05 2018-11-05 Scheduled production method and device, storage medium and the processor of order

Publications (1)

Publication Number Publication Date
CN109472488A true CN109472488A (en) 2019-03-15

Family

ID=65666556

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811307908.1A Pending CN109472488A (en) 2018-11-05 2018-11-05 Scheduled production method and device, storage medium and the processor of order

Country Status (1)

Country Link
CN (1) CN109472488A (en)

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110276590A (en) * 2019-06-04 2019-09-24 无锡奥特维科技股份有限公司 Clearing items management method, device, equipment and computer storage medium
CN111539610A (en) * 2020-04-17 2020-08-14 上海电气集团股份有限公司 Production management system, method, device, equipment and medium for assembly workshop
CN111932019A (en) * 2020-08-14 2020-11-13 上海当纳利印刷有限公司 Printing ink storage management method, storage medium and terminal
CN112613822A (en) * 2020-12-26 2021-04-06 广东溢达纺织有限公司 Method and device for determining fabric production demand information and computer equipment
CN112722675A (en) * 2020-12-16 2021-04-30 深圳市海柔创新科技有限公司 Order processing method, device, equipment, warehousing system and storage medium
CN112734318A (en) * 2019-10-28 2021-04-30 珠海格力电器股份有限公司 Production scheduling method and device based on inventory allowance of accessories and storage medium
CN112766655A (en) * 2020-12-30 2021-05-07 青岛奥利普自动化控制系统有限公司 Automatic scheduling method, device, equipment and computer readable storage medium
CN112907215A (en) * 2021-03-08 2021-06-04 广东溢达纺织有限公司 Production control method and device for textile order, computer equipment and storage medium
CN112907156A (en) * 2021-04-26 2021-06-04 上海电气集团股份有限公司 Rubber plug production discharge method and device
CN113256171A (en) * 2021-06-29 2021-08-13 湖北亿咖通科技有限公司 Service plan generation method and system
CN113298335A (en) * 2020-07-27 2021-08-24 阿里巴巴集团控股有限公司 Order production system, data processing method, device and storage medium
CN113393092A (en) * 2021-05-26 2021-09-14 青岛奥利普自动化控制系统有限公司 Production scheduling method, equipment, device and storage medium
CN113516419A (en) * 2021-09-13 2021-10-19 深圳市信润富联数字科技有限公司 Die jig management method, system, device and storage medium
CN113592243A (en) * 2021-06-30 2021-11-02 青岛海尔科技有限公司 Sorting method and device for refrigerator production, storage medium and processor
CN113592277A (en) * 2021-07-23 2021-11-02 联宝(合肥)电子科技有限公司 Scheduling method and device for production orders
CN113723730A (en) * 2020-05-26 2021-11-30 大族激光科技产业集团股份有限公司 Task scheduling method and device based on preemption mode
CN113762710A (en) * 2021-07-19 2021-12-07 青岛奥利普自动化控制系统有限公司 Production plan scheduling method and device and storage medium
CN114037247A (en) * 2021-11-03 2022-02-11 珠海采筑电子商务有限公司 Project scheduling risk monitoring system, method, terminal and computing storage medium
CN114663024A (en) * 2022-03-30 2022-06-24 浙江西图盟数字科技有限公司 Complete set of sex verification method and system based on central inventory
WO2022228176A1 (en) * 2021-04-25 2022-11-03 阿里巴巴(中国)有限公司 Order processing method, and device and storage medium
CN117455220A (en) * 2023-12-25 2024-01-26 珠海格力电器股份有限公司 Production task scheduling method and device, electronic equipment and storage medium

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101957954A (en) * 2010-10-18 2011-01-26 上海电机学院 Management and control optimizing method of discrete manufacture production
CN102346888A (en) * 2011-11-17 2012-02-08 杭州开源电脑技术有限公司 Production management system and method adopting order lists as core
CN102542401A (en) * 2011-11-29 2012-07-04 北京景年科技有限公司 Fine management method during a precision production manufacturing process
CN103246950A (en) * 2012-10-30 2013-08-14 中国科学院沈阳自动化研究所 Method for promising order of semiconductor assembly and test enterprise
CN104299107A (en) * 2014-11-03 2015-01-21 叶校然 PCB enterprise order management and production planning system
CN105160439A (en) * 2015-10-08 2015-12-16 桥弘软件开发(上海)有限公司 Production scheduling method and automatic scheduling system
CN106251084A (en) * 2016-08-09 2016-12-21 武汉益模科技股份有限公司 A kind of production schedule used based on computer software performs management system and method
CN106447168A (en) * 2016-08-31 2017-02-22 广州亿澳斯软件股份有限公司 Intelligent reminding system and method
CN107767068A (en) * 2017-11-02 2018-03-06 山东中烟工业有限责任公司 A kind of lean production high-level plan product plan and method

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101957954A (en) * 2010-10-18 2011-01-26 上海电机学院 Management and control optimizing method of discrete manufacture production
CN102346888A (en) * 2011-11-17 2012-02-08 杭州开源电脑技术有限公司 Production management system and method adopting order lists as core
CN102542401A (en) * 2011-11-29 2012-07-04 北京景年科技有限公司 Fine management method during a precision production manufacturing process
CN107341589A (en) * 2011-11-29 2017-11-10 北京景年科技有限公司 Process fine-grained management method is manufactured in Seiko
CN103246950A (en) * 2012-10-30 2013-08-14 中国科学院沈阳自动化研究所 Method for promising order of semiconductor assembly and test enterprise
CN104299107A (en) * 2014-11-03 2015-01-21 叶校然 PCB enterprise order management and production planning system
CN105160439A (en) * 2015-10-08 2015-12-16 桥弘软件开发(上海)有限公司 Production scheduling method and automatic scheduling system
CN106251084A (en) * 2016-08-09 2016-12-21 武汉益模科技股份有限公司 A kind of production schedule used based on computer software performs management system and method
CN106447168A (en) * 2016-08-31 2017-02-22 广州亿澳斯软件股份有限公司 Intelligent reminding system and method
CN107767068A (en) * 2017-11-02 2018-03-06 山东中烟工业有限责任公司 A kind of lean production high-level plan product plan and method

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110276590A (en) * 2019-06-04 2019-09-24 无锡奥特维科技股份有限公司 Clearing items management method, device, equipment and computer storage medium
CN112734318A (en) * 2019-10-28 2021-04-30 珠海格力电器股份有限公司 Production scheduling method and device based on inventory allowance of accessories and storage medium
CN112734318B (en) * 2019-10-28 2022-07-15 珠海格力电器股份有限公司 Production scheduling method and device based on inventory allowance of accessories and storage medium
CN111539610A (en) * 2020-04-17 2020-08-14 上海电气集团股份有限公司 Production management system, method, device, equipment and medium for assembly workshop
CN113723730A (en) * 2020-05-26 2021-11-30 大族激光科技产业集团股份有限公司 Task scheduling method and device based on preemption mode
CN113298335A (en) * 2020-07-27 2021-08-24 阿里巴巴集团控股有限公司 Order production system, data processing method, device and storage medium
CN111932019A (en) * 2020-08-14 2020-11-13 上海当纳利印刷有限公司 Printing ink storage management method, storage medium and terminal
CN112722675B (en) * 2020-12-16 2023-11-07 深圳市海柔创新科技有限公司 Order processing method, device, equipment, warehousing system and storage medium
CN112722675A (en) * 2020-12-16 2021-04-30 深圳市海柔创新科技有限公司 Order processing method, device, equipment, warehousing system and storage medium
CN112613822B (en) * 2020-12-26 2023-01-31 广东溢达纺织有限公司 Method and device for determining fabric production demand information and computer equipment
CN112613822A (en) * 2020-12-26 2021-04-06 广东溢达纺织有限公司 Method and device for determining fabric production demand information and computer equipment
CN112766655A (en) * 2020-12-30 2021-05-07 青岛奥利普自动化控制系统有限公司 Automatic scheduling method, device, equipment and computer readable storage medium
CN112766655B (en) * 2020-12-30 2023-07-14 青岛奥利普奇智智能工业技术有限公司 Automatic scheduling method, device, equipment and computer readable storage medium
CN112907215A (en) * 2021-03-08 2021-06-04 广东溢达纺织有限公司 Production control method and device for textile order, computer equipment and storage medium
WO2022228176A1 (en) * 2021-04-25 2022-11-03 阿里巴巴(中国)有限公司 Order processing method, and device and storage medium
CN112907156A (en) * 2021-04-26 2021-06-04 上海电气集团股份有限公司 Rubber plug production discharge method and device
CN113393092B (en) * 2021-05-26 2023-06-23 青岛奥利普奇智智能工业技术有限公司 Production scheduling method, equipment, device and storage medium
CN113393092A (en) * 2021-05-26 2021-09-14 青岛奥利普自动化控制系统有限公司 Production scheduling method, equipment, device and storage medium
CN113256171A (en) * 2021-06-29 2021-08-13 湖北亿咖通科技有限公司 Service plan generation method and system
CN113592243A (en) * 2021-06-30 2021-11-02 青岛海尔科技有限公司 Sorting method and device for refrigerator production, storage medium and processor
CN113592243B (en) * 2021-06-30 2023-07-21 青岛海尔科技有限公司 Ordering method and device for refrigerator production, storage medium and processor
CN113762710A (en) * 2021-07-19 2021-12-07 青岛奥利普自动化控制系统有限公司 Production plan scheduling method and device and storage medium
CN113592277A (en) * 2021-07-23 2021-11-02 联宝(合肥)电子科技有限公司 Scheduling method and device for production orders
CN113516419A (en) * 2021-09-13 2021-10-19 深圳市信润富联数字科技有限公司 Die jig management method, system, device and storage medium
CN114037247A (en) * 2021-11-03 2022-02-11 珠海采筑电子商务有限公司 Project scheduling risk monitoring system, method, terminal and computing storage medium
CN114663024B (en) * 2022-03-30 2022-12-27 浙江西图盟数字科技有限公司 Complete set of sex verification method and system based on central inventory
CN114663024A (en) * 2022-03-30 2022-06-24 浙江西图盟数字科技有限公司 Complete set of sex verification method and system based on central inventory
CN117455220A (en) * 2023-12-25 2024-01-26 珠海格力电器股份有限公司 Production task scheduling method and device, electronic equipment and storage medium

Similar Documents

Publication Publication Date Title
CN109472488A (en) Scheduled production method and device, storage medium and the processor of order
CN105989155B (en) Identify the method and device of risk behavior
CN109542789B (en) Code coverage rate statistical method and device
CN109032914A (en) Resource occupation data predication method, electronic equipment, storage medium
CN102226890B (en) Monitoring method and device for host batch job data
EP2609501B1 (en) Dynamic calculation of sample profile reports
CN109324878A (en) A kind of control method and relevant device of process CPU usage
CN109299222A (en) Verification of data method and device
CN109284895A (en) Project task distribution method, device, computer equipment and storage medium
CN109560977A (en) Web site traffic monitoring method, device, storage medium, processor and electronic equipment
CN109582543A (en) Data retrogressive method and device
CN109242433A (en) A kind of graphical system and method configured and execute office service process
EP3832576A1 (en) Trajectory determination method and apparatus, and time recommendation method, apparatus and system
CN110187992A (en) Failure analysis methods and device
CN112748993A (en) Task execution method and device, storage medium and electronic equipment
DE60303413D1 (en) Method and computer system for reducing the execution time of a computer program for calculating a required amount of material
CN109284331A (en) Accreditation information acquisition method, terminal device and medium based on business datum resource
CN110069488A (en) A kind of date storage method, method for reading data and its device
CN109656789A (en) IO method for testing performance and system
CN109992470A (en) A kind of threshold adjustment methods and device
CN107797856B (en) Scheduled task management and control method and device based on windows service and storage medium
CN109559083A (en) Date determines method and device
CN109785077A (en) The treating method and apparatus of order
CN110471896A (en) A kind of data processing method, system and server
CN113344493A (en) Intelligent warehouse checking method based on Internet of things perception

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190315