CN109472488A - Scheduled production method and device, storage medium and the processor of order - Google Patents
Scheduled production method and device, storage medium and the processor of order Download PDFInfo
- Publication number
- CN109472488A CN109472488A CN201811307908.1A CN201811307908A CN109472488A CN 109472488 A CN109472488 A CN 109472488A CN 201811307908 A CN201811307908 A CN 201811307908A CN 109472488 A CN109472488 A CN 109472488A
- Authority
- CN
- China
- Prior art keywords
- target order
- order
- raw material
- production
- target
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 200
- 238000003860 storage Methods 0.000 title claims abstract description 85
- 239000002994 raw material Substances 0.000 claims abstract description 145
- 238000000034 method Methods 0.000 claims abstract description 101
- 238000013439 planning Methods 0.000 claims abstract description 53
- 238000012163 sequencing technique Methods 0.000 claims description 40
- 238000012545 processing Methods 0.000 claims description 38
- 238000003754 machining Methods 0.000 claims description 6
- 238000005516 engineering process Methods 0.000 abstract description 7
- 238000004590 computer program Methods 0.000 description 10
- 238000010586 diagram Methods 0.000 description 8
- 230000000694 effects Effects 0.000 description 4
- 230000006870 function Effects 0.000 description 4
- 230000003287 optical effect Effects 0.000 description 3
- 238000004364 calculation method Methods 0.000 description 2
- 239000013077 target material Substances 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/04—Manufacturing
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- General Business, Economics & Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Health & Medical Sciences (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Manufacturing & Machinery (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Factory Administration (AREA)
Abstract
This application discloses scheduled production method and device, storage medium and the processors of a kind of order.This method comprises: obtaining the target order to scheduled production, wherein including at least the product information in the delivery time and target order of target order in the target order;Parse the product information in the target order, raw material needed for determining product;Inventory status of the raw material needed for determining product in raw material storage;Inventory status of the raw material in raw material storage needed for delivery time and product based on target order carries out scheduled production to target order and solves the problems, such as that order planning plan is unreasonable in the related technology by the application.
Description
Technical field
This application involves order processing technical fields, scheduled production method and device, storage in particular to a kind of order
Medium and processor.
Background technique
In present workshop, the production planning and sequencing of order is typically stored in the system that workshop uses, if according to row
Production plan encounters some emergency cases when carrying out production operation to order, for example, needing to insert the order singly produced, will cause original
Production planning and sequencing cause confusion, need to readjust the production of the process of subsequent order and order.Meanwhile the prior art
In, about the system of production planning and sequencing and the record in employee's working hour, there are inflexible disadvantages, and therefore, there are order rows for the prior art
It produces and plans unreasonable state.
In view of the above problems in the related art, currently no effective solution has been proposed.
Summary of the invention
The main purpose of the application is to provide scheduled production method and device, storage medium and the processor of a kind of order, with
Solve the problems, such as that order planning plan is unreasonable in the related technology.
To achieve the goals above, according to the one aspect of the application, a kind of scheduled production method of order is provided.This method
It include: the target order obtained to scheduled production, wherein including at least the delivery time of target order and target order in target order
In product information;Parse the product information in target order, raw material needed for determining product;Raw material needed for determining product exists
Inventory status in raw material storage;Inventory status of the raw material in raw material storage needed for delivery time and product based on target order
Scheduled production is carried out to target order.
Further, based on target order delivery time and product needed for inventory status of the raw material in raw material storage
After carrying out scheduled production to target order, this method further include: obtain the production planning and sequencing of target order;Scheduled production based on target order
Plan produces target order, if detecting the presence of the order for inserting list, adjustment process produces slotting single order, temporarily
Stop the production to target order;After the completion of detecting the order for inserting list production, the production to target order is rearranged.
Further, inventory status pair of the raw material in raw material storage needed for the delivery time and product based on target order
Target order carries out process needed for scheduled production comprises determining that target order;Needed for delivery time and product based on target order
Inventory status of the raw material in raw material storage to each procedure arrangement production plan, obtain production planning and sequencing.
Further, based on target order delivery time and product needed for inventory status of the raw material in raw material storage
After carrying out scheduled production to target order, this method further include: the processing progress of target order is obtained according to preset period of time;More
The processing progress of fresh target order.
Further, based on target order delivery time and product needed for inventory status of the raw material in raw material storage
After carrying out scheduled production to target order, this method further include: the processing progress based on target order judges whether target order surpasses
Phase;If target order has exceeded the time limit, triggering order time-out is reminded;Alternatively, super in the corresponding task of process for detecting target order
In the case of, triggering task time-out is reminded.
Further, based on target order delivery time and product needed for inventory status of the raw material in raw material storage
After carrying out scheduled production to target order, this method further include: the production planning and sequencing based on target order produces target order
In the process, the machining period of each process is recorded;After the completion of the production of target order, the processing of target order all process steps is counted
Working hour.
To achieve the goals above, according to the another aspect of the application, a kind of scheduled production device of order is provided.The device
It include: first acquisition unit, for obtaining the target order to scheduled production, wherein including at least target order in target order
Product information in delivery time and target order;First determination unit is determined for parsing the product information in target order
Raw material needed for product;Second determination unit, for inventory status of the raw material in raw material storage needed for determining product;Order row
Unit is produced, target is ordered for inventory status of the raw material according to needed for the delivery time of target order and product in raw material storage
It is single to carry out scheduled production.
Further, which further includes second acquisition unit, for according to target order delivery time and product
After inventory status of the required raw material in raw material storage carries out scheduled production to target order, the production planning and sequencing of target order is obtained;
Adjustment unit, for being produced according to the production planning and sequencing of target order to target order, if detecting the presence of the order for inserting list,
Adjustment process produces slotting single order, suspends the production to target order;Rearrange unit, for detect it is slotting
After the completion of single order production, the production to target order is rearranged.
Further, which further includes that order planning unit includes: the first determining subelement, for determining that target is ordered
Single required process;Second determination unit, for the raw material according to needed for the delivery time of target order and product in raw material storage
In inventory status to each procedure arrangement production plan, obtain production planning and sequencing.
Further, which further includes third acquiring unit, for according to target order delivery time and product
After inventory status of the required raw material in raw material storage carries out scheduled production to target order, target is obtained according to preset period of time
The processing progress of order;Updating unit, the processing progress for more fresh target order.
By the application, using following steps: obtaining the target order to scheduled production, wherein include at least in target order
Product information in the delivery time and target order of target order;The product information in target order is parsed, determines product institute
The raw material needed;Inventory status of the raw material needed for determining product in raw material storage;Delivery time and product based on target order
Inventory status of the required raw material in raw material storage carries out scheduled production to target order, solves order planning plan in the related technology
Unreasonable problem is formulated, and then has reached rational production planning and sequencing, and then improves the effect of Workshop Production efficiency.
Detailed description of the invention
The attached drawing constituted part of this application is used to provide further understanding of the present application, the schematic reality of the application
Example and its explanation are applied for explaining the application, is not constituted an undue limitation on the present application.In the accompanying drawings:
Fig. 1 is according to a kind of flow chart of the scheduled production method of order provided by the embodiments of the present application;And
Fig. 2 is according to a kind of schematic diagram of the scheduled production device of order provided by the embodiments of the present application.
Specific embodiment
It should be noted that in the absence of conflict, the features in the embodiments and the embodiments of the present application can phase
Mutually combination.The application is described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
In order to make those skilled in the art more fully understand application scheme, below in conjunction in the embodiment of the present application
Attached drawing, the technical scheme in the embodiment of the application is clearly and completely described, it is clear that described embodiment is only
The embodiment of the application a part, instead of all the embodiments.Based on the embodiment in the application, ordinary skill people
Member's every other embodiment obtained without making creative work, all should belong to the model of the application protection
It encloses.
It should be noted that the description and claims of this application and term " first " in above-mentioned attached drawing, "
Two " etc. be to be used to distinguish similar objects, without being used to describe a particular order or precedence order.It should be understood that using in this way
Data be interchangeable under appropriate circumstances, so as to embodiments herein described herein.In addition, term " includes " and " tool
Have " and their any deformation, it is intended that cover it is non-exclusive include, for example, containing a series of steps or units
Process, method, system, product or equipment those of are not necessarily limited to be clearly listed step or unit, but may include without clear
Other step or units listing to Chu or intrinsic for these process, methods, product or equipment.
According to an embodiment of the present application, a kind of scheduled production method of order is provided.
Fig. 1 is the flow chart according to a kind of scheduled production method of order of the embodiment of the present application.As shown in Figure 1, this method packet
Include following steps:
Step S101 obtains the target order to scheduled production, wherein when including at least the delivery of target order in target order
Between and target order in product information.
Specifically, it obtains first and needs to arrange production order, wherein when including the delivery of order in the information of target order
Between and target order in product information, the order of each batch can have an O/No., as long as O/No. is inputted
System, so that it may all information for obtaining target order, including: order workshop is produced the date, scheduled production date etc..
Step S102 parses the product information in target order, raw material needed for determining product.
Specifically, the product information in target order is parsed according to target O/No., wherein further include in product information
Raw material needed for target order produces.
Step S103, inventory status of the raw material needed for determining product in raw material storage.
Specifically, raw material needed for producing in workshop can be stored in the corresponding raw material storage in workshop, determine target order
After required raw materials for production, the inventory status of target material in the raw material storage stored in system can be transferred, wherein inventory status packet
The quantity available and target material that include raw material are stored in the more specific location information etc. in raw material storage.
Step S104, inventory status pair of the raw material in raw material storage needed for delivery time and product based on target order
Target order carries out scheduled production.
Optionally, inventory status of the raw material in raw material storage needed for the delivery time and product based on target order is to mesh
Mark order carries out process needed for scheduled production comprises determining that target order;Needed for delivery time and product based on target order
Inventory status of the raw material in raw material storage obtains production planning and sequencing to each procedure arrangement production plan.
Specifically, it is first determined process needed for product in target order, according to the state of target product to target product
Formulate production planning and sequencing, wherein the state of target product include target product delivery time and required feed states, there are also targets
Order urgency level turns class's situation, attendance situation, inserts one-state etc..
It should be noted that target order planning is in the works, preferentially according to the delivery time of the target order of each batch
Be that required principle situation is ranked up, delivery time more forward order preferentially carries out scheduled production.
Optionally, based on target order delivery time and product needed for inventory status pair of the raw material in raw material storage
After target order carries out scheduled production, this method further include: obtain the production planning and sequencing of target order;Based on the scheduled production of target order
It draws and target order is produced, if detecting the presence of the order for inserting list, adjustment process produces slotting single order, suspends
Production to target order;After the completion of detecting the order for inserting list production, the production to target order is rearranged.
Specifically, after getting production planning and sequencing, production planning and sequencing enters workshop and arranges production, if according to production planning and sequencing into
During row production, relatively urgent order production task is encountered, that is, encounter the case where needs insert single production, detect vehicle
Between lathe whether there is or not the order production task produced, if there is producing for task, suspend the life to target order
It produces, urgent order production task is arranged preferentially to be produced, then, the process for adjusting target order.If inserting list encountering
In the case of, workshop lathe then directly arranges urgent order to be produced there is no the order for carrying out production task.
It should be noted that forms data is inserted in system typing accordingly, can be manually in the case where encountering promptly slotting list
It arranges to insert single plan scheduled production operation in system, free adjustment is carried out to entire production planning and sequencing, and to production planning and sequencing adjusted point
Preset time needed for analysing calculated for subsequent.
Optionally, based on target order delivery time and product needed for inventory status pair of the raw material in raw material storage
After target order carries out scheduled production, this method further include: the processing progress of target order is obtained according to preset period of time;It updates
The processing progress of target order.
Specifically, after production planning and sequencing is scheduled in target order, target order enters workshop according to production planning and sequencing and is produced
After operation, the processing of the process velocity and then more fresh target order of target order can be obtained in the predetermined period of target order
Progress.
It should be noted that the processing preset time of target order is after production planning and sequencing enters system, system is automatically right
The scheduled production process of target order makees the obtained target order of analytical calculation and produces the time used.
Optionally, based on target order delivery time and product needed for inventory status pair of the raw material in raw material storage
After target order carries out scheduled production, this method further include: the processing progress based on target order judges whether target order surpasses
Phase;If target order has exceeded the time limit, triggering order time-out is reminded;Alternatively, super in the corresponding task of process for detecting target order
In the case of, triggering task time-out is reminded.
Specifically, dbjective state is judged according to the preset time of target order and processing progress, if according to pre-
If the time is judged, preset time is already expired, but process corresponding to the production and processing of target order does not complete also, then can be true
There is the case where exceeding the time limit in the order that sets the goal, trigger order if target order exceeds the time limit and reminded, wherein preferably, remind
Mode is to send mail to the special messenger of target order to remind and check in time and processing target order.Alternatively, detecting target
Order is within a preset time without completing all process, it is determined that the production task of target order is exceeded the time limit, in this feelings
Under condition, same triggering exceeds the time limit to remind to the responsible person of target order, wherein alerting pattern is preferably mail reminder.
Optionally, based on target order delivery time and product needed for inventory status pair of the raw material in raw material storage
After target order carries out scheduled production, this method further include: the production planning and sequencing based on target order produced to target order
Cheng Zhong records the machining period of each process;After the completion of the production of target order, the processing work of target order all process steps is counted
When.
Specifically, after target order enters production, after target order completes production task, according to each of target order
The performance of process records the process working hour of target order, and after the completion of the production of target order, statistics target is ordered
The time used in all processes and record of work is carried out in list.
Optionally, the production hour of target order production hour and target order process is counted, it can corresponding typing mesh
In the order number for marking order, order number includes the production time used in the process of target order and target order as a result,.
It should be noted that the working hour of record target order and the responsible person of target order, it can be according to target order
Record of work statistics target order responsible person working hour.
Optionally, the above method is not limited to be arranged in the fixed system terminal in workshop, can be set in various terminals,
Improve the working efficiency of the monitoring degree and workshop to resources of production.
The scheduled production method of order provided by the embodiments of the present application, by obtaining the target order to scheduled production, wherein target is ordered
Including at least the product information in the delivery time and target order of target order in list;Parse the product letter in target order
Breath, raw material needed for determining product;Inventory status of the raw material needed for determining product in raw material storage;Friendship based on target order
Inventory status of the raw material in raw material storage needed for paying time and product carries out scheduled production to target order, solves in the related technology
The unreasonable problem of order planning plan, and then reached rational production planning and sequencing, and then improve Workshop Production efficiency
Effect.
It should be noted that step shown in the flowchart of the accompanying drawings can be in such as a group of computer-executable instructions
It is executed in computer system, although also, logical order is shown in flow charts, and it in some cases, can be with not
The sequence being same as herein executes shown or described step.
The embodiment of the present application also provides a kind of scheduled production devices of order, it should be noted that the embodiment of the present application is ordered
Single scheduled production device can be used for executing a kind of scheduled production method that order is used for provided by the embodiment of the present application.Below to this Shen
Please a kind of scheduled production device of order that provides of embodiment be introduced.
Fig. 2 is the schematic diagram according to a kind of scheduled production device of order of the embodiment of the present application.As shown in Fig. 2, the device packet
It includes: first acquisition unit 201, for obtaining the target order to scheduled production, wherein including at least target order in target order
Product information in delivery time and target order;First determination unit 202, for parsing the product information in target order,
Raw material needed for determining product;Second determination unit 203, for inventory shape of the raw material needed for determining product in raw material storage
State;Order planning unit 204, for inventory of the raw material according to needed for the delivery time of target order and product in raw material storage
State carries out scheduled production to target order.
Optionally, in a kind of scheduled production device of order provided by the embodiments of the present application, the device further include: second obtains list
Member, in inventory status of the raw material according to needed for the delivery time of target order and product in raw material storage to target order
After carrying out scheduled production, the production planning and sequencing of target order is obtained;Adjustment unit, for according to the production planning and sequencing of target order to target
Order is produced, if detecting the presence of the order for inserting list, adjustment process produces slotting single order, and target is ordered in pause
Single production;Unit is rearranged, for rearranging the life to target order after the completion of detecting the order for inserting list production
It produces.
Optionally, in a kind of scheduled production device of order provided by the embodiments of the present application, order planning unit 204 includes:
One determines subelement, for process needed for determining target order;Second determination unit, when for according to the delivery of target order
Between and product needed for inventory status of the raw material in raw material storage to each procedure arrangement production plan, obtain production planning and sequencing.
Optionally, in a kind of scheduled production device of order provided by the embodiments of the present application, the device further include: third obtains single
Member, in inventory status of the raw material according to needed for the delivery time of target order and product in raw material storage to target order
After carrying out scheduled production, the processing progress of target order is obtained according to preset period of time;Updating unit is used for more fresh target order
Processing progress.
Optionally, in a kind of scheduled production device of order provided by the embodiments of the present application, the device further include: judging unit,
For inventory status of the raw material according to needed for the delivery time of target order and product in raw material storage to target order into
After row scheduled production, based on the processing progress of target order, judge whether target order exceeds the time limit;First trigger unit, in mesh
In the case that mark order has exceeded the time limit, triggering order time-out is reminded;Alternatively, the second trigger unit, for detecting target order
Process corresponding task time-out in the case where, triggering task time-out is reminded.
Optionally, in a kind of scheduled production device of order provided by the embodiments of the present application, the device further include: recording unit,
For inventory status of the raw material according to needed for the delivery time of target order and product in raw material storage to target order into
After row scheduled production, the production planning and sequencing based on target order carries out target order to record the processing of each process in production process
Working hour;Statistic unit, for counting the machining period of target order all process steps after the completion of the production of target order.
The scheduled production device of a kind of order provided by the embodiments of the present application, by first acquisition unit 201, for obtaining wait arrange
The target order of production, wherein including at least the product information in the delivery time and target order of target order in target order;
First determination unit 202, for parsing the product information in target order, raw material needed for determining product;Second determination unit
203, for inventory status of the raw material in raw material storage needed for determining product;Order planning unit 204, for being ordered according to target
Inventory status of the raw material in raw material storage needed for single delivery time and product carries out scheduled production to target order, solves correlation
The unreasonable problem of order planning plan in technology, and then reached rational production planning and sequencing, and then it is raw to improve workshop
Produce the effect of efficiency.
A kind of scheduled production device of order includes processor and memory, above-mentioned first acquisition unit 201, the first determination unit
202, the second determination unit 203 and order planning unit 204 etc. store in memory as program unit, are held by processor
Above procedure unit stored in memory go to realize corresponding function.
Include kernel in processor, is gone in memory to transfer corresponding program unit by kernel.Kernel can be set one
Or more, solve the problems, such as that order planning plan is unreasonable in the related technology by adjusting kernel parameter, and then reach
Improve the effect of Workshop Production efficiency.
Memory may include the non-volatile memory in computer-readable medium, random access memory (RAM) and/
Or the forms such as Nonvolatile memory, if read-only memory (ROM) or flash memory (flash RAM), memory include that at least one is deposited
Store up chip.
The embodiment of the invention provides a kind of storage mediums, are stored thereon with program, real when which is executed by processor
A kind of scheduled production method of existing order.
The embodiment of the invention provides a kind of processor, processor is for running program, wherein program executes one when running
The scheduled production method of kind order.
The embodiment of the invention provides a kind of equipment, equipment include processor, memory and storage on a memory and can
The program run on a processor, processor perform the steps of the target order obtained to scheduled production when executing program, wherein
Including at least the product information in the delivery time and target order of target order in target order;Parse the production in target order
Product information, raw material needed for determining product;Inventory status of the raw material needed for determining product in raw material storage;Based on target order
Delivery time and product needed for inventory status of the raw material in raw material storage to target order carry out scheduled production.
Optionally, based on target order delivery time and product needed for inventory status pair of the raw material in raw material storage
After target order carries out scheduled production, this method further include: obtain the production planning and sequencing of target order;Based on the scheduled production of target order
It draws and target order is produced, if detecting the presence of the order for inserting list, adjustment process produces slotting single order, suspends
Production to target order;After the completion of detecting the order for inserting list production, the production to target order is rearranged.
Optionally, inventory status of the raw material in raw material storage needed for the delivery time and product based on target order is to mesh
Mark order carries out process needed for scheduled production comprises determining that target order;Needed for delivery time and product based on target order
Inventory status of the raw material in raw material storage obtains production planning and sequencing to each procedure arrangement production plan.
Optionally, based on target order delivery time and product needed for inventory status pair of the raw material in raw material storage
After target order carries out scheduled production, this method further include: the processing progress of target order is obtained according to preset period of time;It updates
The processing progress of target order.
Optionally, based on target order delivery time and product needed for inventory status pair of the raw material in raw material storage
After target order carries out scheduled production, this method further include: the processing progress based on target order judges whether target order surpasses
Phase;If target order has exceeded the time limit, triggering order time-out is reminded;Alternatively, super in the corresponding task of process for detecting target order
In the case of, triggering task time-out is reminded.
Optionally, based on target order delivery time and product needed for inventory status pair of the raw material in raw material storage
After target order carries out scheduled production, this method further include: the production planning and sequencing based on target order produced to target order
Cheng Zhong records the machining period of each process;After the completion of the production of target order, the processing work of target order all process steps is counted
When.Equipment herein can be server, PC, PAD, mobile phone etc..
Present invention also provides a kind of computer program products, when executing on data processing equipment, are adapted for carrying out just
The program of beginningization there are as below methods step: the target order to scheduled production is obtained, wherein target order is included at least in target order
Delivery time and target order in product information;Parse the product information in target order, raw material needed for determining product;
Inventory status of the raw material needed for determining product in raw material storage;Raw material needed for delivery time and product based on target order
Inventory status in raw material storage carries out scheduled production to target order.
Optionally, based on target order delivery time and product needed for inventory status pair of the raw material in raw material storage
After target order carries out scheduled production, this method further include: obtain the production planning and sequencing of target order;Based on the scheduled production of target order
It draws and target order is produced, if detecting the presence of the order for inserting list, adjustment process produces slotting single order, suspends
Production to target order;After the completion of detecting the order for inserting list production, the production to target order is rearranged.
Optionally, inventory status of the raw material in raw material storage needed for the delivery time and product based on target order is to mesh
Mark order carries out process needed for scheduled production comprises determining that target order;Needed for delivery time and product based on target order
Inventory status of the raw material in raw material storage obtains production planning and sequencing to each procedure arrangement production plan.
Optionally, based on target order delivery time and product needed for inventory status pair of the raw material in raw material storage
After target order carries out scheduled production, this method further include: the processing progress of target order is obtained according to preset period of time;It updates
The processing progress of target order.
Optionally, based on target order delivery time and product needed for inventory status pair of the raw material in raw material storage
After target order carries out scheduled production, this method further include: the processing progress based on target order judges whether target order surpasses
Phase;If target order has exceeded the time limit, triggering order time-out is reminded;Alternatively, super in the corresponding task of process for detecting target order
In the case of, triggering task time-out is reminded.
Optionally, based on target order delivery time and product needed for inventory status pair of the raw material in raw material storage
After target order carries out scheduled production, this method further include: the production planning and sequencing based on target order produced to target order
Cheng Zhong records the machining period of each process;After the completion of the production of target order, the processing work of target order all process steps is counted
When.
It should be understood by those skilled in the art that, embodiments herein can provide as method, system or computer program
Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the application
Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the application, which can be used in one or more,
The computer program implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) produces
The form of product.
The application is referring to method, the process of equipment (system) and computer program product according to the embodiment of the present application
Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions
The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs
Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce
A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real
The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy
Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates,
Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or
The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting
Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or
The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one
The step of function of being specified in a box or multiple boxes.
In a typical configuration, calculating equipment includes one or more processors (CPU), input/output interface, net
Network interface and memory.
Memory may include the non-volatile memory in computer-readable medium, random access memory (RAM) and/
Or the forms such as Nonvolatile memory, such as read-only memory (ROM) or flash memory (flash RAM).Memory is computer-readable Jie
The example of matter.
Computer-readable medium includes permanent and non-permanent, removable and non-removable media can be by any method
Or technology come realize information store.Information can be computer readable instructions, data structure, the module of program or other data.
The example of the storage medium of computer includes, but are not limited to phase change memory (PRAM), static random access memory (SRAM), moves
State random access memory (DRAM), other kinds of random access memory (RAM), read-only memory (ROM), electric erasable
Programmable read only memory (EEPROM), flash memory or other memory techniques, read-only disc read only memory (CD-ROM) (CD-ROM),
Digital versatile disc (DVD) or other optical storage, magnetic cassettes, tape magnetic disk storage or other magnetic storage devices
Or any other non-transmission medium, can be used for storage can be accessed by a computing device information.As defined in this article, it calculates
Machine readable medium does not include temporary computer readable media (transitory media), such as the data-signal and carrier wave of modulation.
It should also be noted that, the terms "include", "comprise" or its any other variant are intended to nonexcludability
It include so that the process, method, commodity or the equipment that include a series of elements not only include those elements, but also to wrap
Include other elements that are not explicitly listed, or further include for this process, method, commodity or equipment intrinsic want
Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including element
There is also other identical elements in process, method, commodity or equipment.
It will be understood by those skilled in the art that embodiments herein can provide as method, system or computer program product.
Therefore, complete hardware embodiment, complete software embodiment or embodiment combining software and hardware aspects can be used in the application
Form.It is deposited moreover, the application can be used to can be used in the computer that one or more wherein includes computer usable program code
The shape for the computer program product implemented on storage media (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.)
Formula.
The above is only embodiments herein, are not intended to limit this application.To those skilled in the art,
Various changes and changes are possible in this application.It is all within the spirit and principles of the present application made by any modification, equivalent replacement,
Improve etc., it should be included within the scope of the claims of this application.
Claims (10)
1. a kind of scheduled production method of order characterized by comprising
Obtain the target order to scheduled production, wherein including at least the delivery time of target order and target in the target order
Product information in order;
Parse the product information in the target order, raw material needed for determining product;
Inventory status of the raw material needed for determining the product in raw material storage;
Inventory status of the raw material in raw material storage needed for delivery time and the product based on the target order is to described
Target order carries out scheduled production.
2. the method according to claim 1, wherein based on the target order delivery time and the production
After inventory status of the raw material needed for product in raw material storage carries out scheduled production to the target order, the method also includes:
Obtain the production planning and sequencing of the target order;
Production planning and sequencing based on the target order produces the target order, if detecting the presence of the order for inserting list,
Adjustment process produces slotting single order, suspends the production to the target order;
After the completion of detecting that slotting single order produces, the production to the target order is rearranged.
3. the method according to claim 1, wherein delivery time and the product based on the target order
Inventory status of the required raw material in raw material storage carries out scheduled production to the target order
Process needed for determining the target order;
Inventory status of the raw material in raw material storage needed for delivery time and the product based on the target order is to each
Procedure arrangement production plan, obtains production planning and sequencing.
4. according to the method described in claim 3, it is characterized in that, based on the target order delivery time and the production
After inventory status of the raw material needed for product in raw material storage carries out scheduled production to the target order, the method also includes:
The processing progress of the target order is obtained according to preset period of time;
Update the processing progress of the target order.
5. according to the method described in claim 4, it is characterized in that, based on the target order delivery time and the production
After inventory status of the raw material needed for product in raw material storage carries out scheduled production to the target order, the method also includes:
Based on the processing progress of the target order, judge whether the target order exceeds the time limit;
If the target order has exceeded the time limit, triggering order time-out is reminded;
Alternatively, detect the target order the corresponding task of process it is overtime in the case where, triggering task time-out is reminded.
6. the method according to claim 1, wherein based on the target order delivery time and the production
After inventory status of the raw material needed for product in raw material storage carries out scheduled production to the target order, the method also includes:
Production planning and sequencing based on the target order carries out the target order to record the processing of each process in production process
Working hour;
After the completion of target order production, the machining period of the target order all process steps is counted.
7. a kind of scheduled production device of order characterized by comprising
First acquisition unit, for obtaining the target order to scheduled production, wherein target order is included at least in the target order
Delivery time and target order in product information;
First determination unit, for parsing the product information in the target order, raw material needed for determining product;
Second determination unit, for inventory status of the raw material in raw material storage needed for determining the product;
Order planning unit, for the raw material according to needed for the delivery time of the target order and the product in raw material storage
Inventory status to the target order carry out scheduled production.
8. device according to claim 7, which is characterized in that described device further includes,
Second acquisition unit, in the raw material according to needed for the delivery time of the target order and the product in raw material storage
In inventory status to the target order carry out scheduled production after, obtain the production planning and sequencing of the target order;
Adjustment unit is deposited for being produced according to the production planning and sequencing of the target order to the target order if detecting
Single order is being inserted, adjustment process produces slotting single order, suspends the production to the target order;
Unit is rearranged, for rearranging to the target order after the completion of detecting that slotting single order produces
Production.
9. a kind of storage medium, which is characterized in that the storage medium includes the program of storage, wherein described program right of execution
Benefit require any one of 1 to 6 described in a kind of scheduled production method of order.
10. a kind of processor, which is characterized in that the processor is for running program, wherein right of execution when described program is run
Benefit require any one of 1 to 6 described in a kind of scheduled production method of order.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811307908.1A CN109472488A (en) | 2018-11-05 | 2018-11-05 | Scheduled production method and device, storage medium and the processor of order |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811307908.1A CN109472488A (en) | 2018-11-05 | 2018-11-05 | Scheduled production method and device, storage medium and the processor of order |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109472488A true CN109472488A (en) | 2019-03-15 |
Family
ID=65666556
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811307908.1A Pending CN109472488A (en) | 2018-11-05 | 2018-11-05 | Scheduled production method and device, storage medium and the processor of order |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109472488A (en) |
Cited By (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110276590A (en) * | 2019-06-04 | 2019-09-24 | 无锡奥特维科技股份有限公司 | Clearing items management method, device, equipment and computer storage medium |
CN111539610A (en) * | 2020-04-17 | 2020-08-14 | 上海电气集团股份有限公司 | Production management system, method, device, equipment and medium for assembly workshop |
CN111932019A (en) * | 2020-08-14 | 2020-11-13 | 上海当纳利印刷有限公司 | Printing ink storage management method, storage medium and terminal |
CN112613822A (en) * | 2020-12-26 | 2021-04-06 | 广东溢达纺织有限公司 | Method and device for determining fabric production demand information and computer equipment |
CN112722675A (en) * | 2020-12-16 | 2021-04-30 | 深圳市海柔创新科技有限公司 | Order processing method, device, equipment, warehousing system and storage medium |
CN112734318A (en) * | 2019-10-28 | 2021-04-30 | 珠海格力电器股份有限公司 | Production scheduling method and device based on inventory allowance of accessories and storage medium |
CN112766655A (en) * | 2020-12-30 | 2021-05-07 | 青岛奥利普自动化控制系统有限公司 | Automatic scheduling method, device, equipment and computer readable storage medium |
CN112907215A (en) * | 2021-03-08 | 2021-06-04 | 广东溢达纺织有限公司 | Production control method and device for textile order, computer equipment and storage medium |
CN112907156A (en) * | 2021-04-26 | 2021-06-04 | 上海电气集团股份有限公司 | Rubber plug production discharge method and device |
CN113256171A (en) * | 2021-06-29 | 2021-08-13 | 湖北亿咖通科技有限公司 | Service plan generation method and system |
CN113298335A (en) * | 2020-07-27 | 2021-08-24 | 阿里巴巴集团控股有限公司 | Order production system, data processing method, device and storage medium |
CN113393092A (en) * | 2021-05-26 | 2021-09-14 | 青岛奥利普自动化控制系统有限公司 | Production scheduling method, equipment, device and storage medium |
CN113516419A (en) * | 2021-09-13 | 2021-10-19 | 深圳市信润富联数字科技有限公司 | Die jig management method, system, device and storage medium |
CN113592243A (en) * | 2021-06-30 | 2021-11-02 | 青岛海尔科技有限公司 | Sorting method and device for refrigerator production, storage medium and processor |
CN113592277A (en) * | 2021-07-23 | 2021-11-02 | 联宝(合肥)电子科技有限公司 | Scheduling method and device for production orders |
CN113723730A (en) * | 2020-05-26 | 2021-11-30 | 大族激光科技产业集团股份有限公司 | Task scheduling method and device based on preemption mode |
CN113762710A (en) * | 2021-07-19 | 2021-12-07 | 青岛奥利普自动化控制系统有限公司 | Production plan scheduling method and device and storage medium |
CN114037247A (en) * | 2021-11-03 | 2022-02-11 | 珠海采筑电子商务有限公司 | Project scheduling risk monitoring system, method, terminal and computing storage medium |
CN114663024A (en) * | 2022-03-30 | 2022-06-24 | 浙江西图盟数字科技有限公司 | Complete set of sex verification method and system based on central inventory |
WO2022228176A1 (en) * | 2021-04-25 | 2022-11-03 | 阿里巴巴(中国)有限公司 | Order processing method, and device and storage medium |
CN117455220A (en) * | 2023-12-25 | 2024-01-26 | 珠海格力电器股份有限公司 | Production task scheduling method and device, electronic equipment and storage medium |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101957954A (en) * | 2010-10-18 | 2011-01-26 | 上海电机学院 | Management and control optimizing method of discrete manufacture production |
CN102346888A (en) * | 2011-11-17 | 2012-02-08 | 杭州开源电脑技术有限公司 | Production management system and method adopting order lists as core |
CN102542401A (en) * | 2011-11-29 | 2012-07-04 | 北京景年科技有限公司 | Fine management method during a precision production manufacturing process |
CN103246950A (en) * | 2012-10-30 | 2013-08-14 | 中国科学院沈阳自动化研究所 | Method for promising order of semiconductor assembly and test enterprise |
CN104299107A (en) * | 2014-11-03 | 2015-01-21 | 叶校然 | PCB enterprise order management and production planning system |
CN105160439A (en) * | 2015-10-08 | 2015-12-16 | 桥弘软件开发(上海)有限公司 | Production scheduling method and automatic scheduling system |
CN106251084A (en) * | 2016-08-09 | 2016-12-21 | 武汉益模科技股份有限公司 | A kind of production schedule used based on computer software performs management system and method |
CN106447168A (en) * | 2016-08-31 | 2017-02-22 | 广州亿澳斯软件股份有限公司 | Intelligent reminding system and method |
CN107767068A (en) * | 2017-11-02 | 2018-03-06 | 山东中烟工业有限责任公司 | A kind of lean production high-level plan product plan and method |
-
2018
- 2018-11-05 CN CN201811307908.1A patent/CN109472488A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101957954A (en) * | 2010-10-18 | 2011-01-26 | 上海电机学院 | Management and control optimizing method of discrete manufacture production |
CN102346888A (en) * | 2011-11-17 | 2012-02-08 | 杭州开源电脑技术有限公司 | Production management system and method adopting order lists as core |
CN102542401A (en) * | 2011-11-29 | 2012-07-04 | 北京景年科技有限公司 | Fine management method during a precision production manufacturing process |
CN107341589A (en) * | 2011-11-29 | 2017-11-10 | 北京景年科技有限公司 | Process fine-grained management method is manufactured in Seiko |
CN103246950A (en) * | 2012-10-30 | 2013-08-14 | 中国科学院沈阳自动化研究所 | Method for promising order of semiconductor assembly and test enterprise |
CN104299107A (en) * | 2014-11-03 | 2015-01-21 | 叶校然 | PCB enterprise order management and production planning system |
CN105160439A (en) * | 2015-10-08 | 2015-12-16 | 桥弘软件开发(上海)有限公司 | Production scheduling method and automatic scheduling system |
CN106251084A (en) * | 2016-08-09 | 2016-12-21 | 武汉益模科技股份有限公司 | A kind of production schedule used based on computer software performs management system and method |
CN106447168A (en) * | 2016-08-31 | 2017-02-22 | 广州亿澳斯软件股份有限公司 | Intelligent reminding system and method |
CN107767068A (en) * | 2017-11-02 | 2018-03-06 | 山东中烟工业有限责任公司 | A kind of lean production high-level plan product plan and method |
Cited By (28)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110276590A (en) * | 2019-06-04 | 2019-09-24 | 无锡奥特维科技股份有限公司 | Clearing items management method, device, equipment and computer storage medium |
CN112734318A (en) * | 2019-10-28 | 2021-04-30 | 珠海格力电器股份有限公司 | Production scheduling method and device based on inventory allowance of accessories and storage medium |
CN112734318B (en) * | 2019-10-28 | 2022-07-15 | 珠海格力电器股份有限公司 | Production scheduling method and device based on inventory allowance of accessories and storage medium |
CN111539610A (en) * | 2020-04-17 | 2020-08-14 | 上海电气集团股份有限公司 | Production management system, method, device, equipment and medium for assembly workshop |
CN113723730A (en) * | 2020-05-26 | 2021-11-30 | 大族激光科技产业集团股份有限公司 | Task scheduling method and device based on preemption mode |
CN113298335A (en) * | 2020-07-27 | 2021-08-24 | 阿里巴巴集团控股有限公司 | Order production system, data processing method, device and storage medium |
CN111932019A (en) * | 2020-08-14 | 2020-11-13 | 上海当纳利印刷有限公司 | Printing ink storage management method, storage medium and terminal |
CN112722675B (en) * | 2020-12-16 | 2023-11-07 | 深圳市海柔创新科技有限公司 | Order processing method, device, equipment, warehousing system and storage medium |
CN112722675A (en) * | 2020-12-16 | 2021-04-30 | 深圳市海柔创新科技有限公司 | Order processing method, device, equipment, warehousing system and storage medium |
CN112613822B (en) * | 2020-12-26 | 2023-01-31 | 广东溢达纺织有限公司 | Method and device for determining fabric production demand information and computer equipment |
CN112613822A (en) * | 2020-12-26 | 2021-04-06 | 广东溢达纺织有限公司 | Method and device for determining fabric production demand information and computer equipment |
CN112766655A (en) * | 2020-12-30 | 2021-05-07 | 青岛奥利普自动化控制系统有限公司 | Automatic scheduling method, device, equipment and computer readable storage medium |
CN112766655B (en) * | 2020-12-30 | 2023-07-14 | 青岛奥利普奇智智能工业技术有限公司 | Automatic scheduling method, device, equipment and computer readable storage medium |
CN112907215A (en) * | 2021-03-08 | 2021-06-04 | 广东溢达纺织有限公司 | Production control method and device for textile order, computer equipment and storage medium |
WO2022228176A1 (en) * | 2021-04-25 | 2022-11-03 | 阿里巴巴(中国)有限公司 | Order processing method, and device and storage medium |
CN112907156A (en) * | 2021-04-26 | 2021-06-04 | 上海电气集团股份有限公司 | Rubber plug production discharge method and device |
CN113393092B (en) * | 2021-05-26 | 2023-06-23 | 青岛奥利普奇智智能工业技术有限公司 | Production scheduling method, equipment, device and storage medium |
CN113393092A (en) * | 2021-05-26 | 2021-09-14 | 青岛奥利普自动化控制系统有限公司 | Production scheduling method, equipment, device and storage medium |
CN113256171A (en) * | 2021-06-29 | 2021-08-13 | 湖北亿咖通科技有限公司 | Service plan generation method and system |
CN113592243A (en) * | 2021-06-30 | 2021-11-02 | 青岛海尔科技有限公司 | Sorting method and device for refrigerator production, storage medium and processor |
CN113592243B (en) * | 2021-06-30 | 2023-07-21 | 青岛海尔科技有限公司 | Ordering method and device for refrigerator production, storage medium and processor |
CN113762710A (en) * | 2021-07-19 | 2021-12-07 | 青岛奥利普自动化控制系统有限公司 | Production plan scheduling method and device and storage medium |
CN113592277A (en) * | 2021-07-23 | 2021-11-02 | 联宝(合肥)电子科技有限公司 | Scheduling method and device for production orders |
CN113516419A (en) * | 2021-09-13 | 2021-10-19 | 深圳市信润富联数字科技有限公司 | Die jig management method, system, device and storage medium |
CN114037247A (en) * | 2021-11-03 | 2022-02-11 | 珠海采筑电子商务有限公司 | Project scheduling risk monitoring system, method, terminal and computing storage medium |
CN114663024B (en) * | 2022-03-30 | 2022-12-27 | 浙江西图盟数字科技有限公司 | Complete set of sex verification method and system based on central inventory |
CN114663024A (en) * | 2022-03-30 | 2022-06-24 | 浙江西图盟数字科技有限公司 | Complete set of sex verification method and system based on central inventory |
CN117455220A (en) * | 2023-12-25 | 2024-01-26 | 珠海格力电器股份有限公司 | Production task scheduling method and device, electronic equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109472488A (en) | Scheduled production method and device, storage medium and the processor of order | |
CN105989155B (en) | Identify the method and device of risk behavior | |
CN109542789B (en) | Code coverage rate statistical method and device | |
CN109032914A (en) | Resource occupation data predication method, electronic equipment, storage medium | |
CN102226890B (en) | Monitoring method and device for host batch job data | |
EP2609501B1 (en) | Dynamic calculation of sample profile reports | |
CN109324878A (en) | A kind of control method and relevant device of process CPU usage | |
CN109299222A (en) | Verification of data method and device | |
CN109284895A (en) | Project task distribution method, device, computer equipment and storage medium | |
CN109560977A (en) | Web site traffic monitoring method, device, storage medium, processor and electronic equipment | |
CN109582543A (en) | Data retrogressive method and device | |
CN109242433A (en) | A kind of graphical system and method configured and execute office service process | |
EP3832576A1 (en) | Trajectory determination method and apparatus, and time recommendation method, apparatus and system | |
CN110187992A (en) | Failure analysis methods and device | |
CN112748993A (en) | Task execution method and device, storage medium and electronic equipment | |
DE60303413D1 (en) | Method and computer system for reducing the execution time of a computer program for calculating a required amount of material | |
CN109284331A (en) | Accreditation information acquisition method, terminal device and medium based on business datum resource | |
CN110069488A (en) | A kind of date storage method, method for reading data and its device | |
CN109656789A (en) | IO method for testing performance and system | |
CN109992470A (en) | A kind of threshold adjustment methods and device | |
CN107797856B (en) | Scheduled task management and control method and device based on windows service and storage medium | |
CN109559083A (en) | Date determines method and device | |
CN109785077A (en) | The treating method and apparatus of order | |
CN110471896A (en) | A kind of data processing method, system and server | |
CN113344493A (en) | Intelligent warehouse checking method based on Internet of things perception |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190315 |