CN109458151A - A kind of device for being completed at the same time sub-sea drilled wells cutting and salvaging with capping operation - Google Patents

A kind of device for being completed at the same time sub-sea drilled wells cutting and salvaging with capping operation Download PDF

Info

Publication number
CN109458151A
CN109458151A CN201811559937.7A CN201811559937A CN109458151A CN 109458151 A CN109458151 A CN 109458151A CN 201811559937 A CN201811559937 A CN 201811559937A CN 109458151 A CN109458151 A CN 109458151A
Authority
CN
China
Prior art keywords
section
salvaging
cutting
cutter
casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811559937.7A
Other languages
Chinese (zh)
Other versions
CN109458151B (en
Inventor
洪德强
沈赤卫
郑廷碧
补声军
王凌
郑波强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Gaofeng Petroleum Machinery Co Ltd
Original Assignee
Guizhou Gaofeng Petroleum Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Gaofeng Petroleum Machinery Co Ltd filed Critical Guizhou Gaofeng Petroleum Machinery Co Ltd
Priority to CN201811559937.7A priority Critical patent/CN109458151B/en
Publication of CN109458151A publication Critical patent/CN109458151A/en
Application granted granted Critical
Publication of CN109458151B publication Critical patent/CN109458151B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B31/00Fishing for or freeing objects in boreholes or wells
    • E21B31/12Grappling tools, e.g. tongs or grabs
    • E21B31/16Grappling tools, e.g. tongs or grabs combined with cutting or destroying means
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/08Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods
    • E21B19/09Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods specially adapted for drilling underwater formations from a floating support using heave compensators supporting the drill string
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B29/00Cutting or destroying pipes, packers, plugs, or wire lines, located in boreholes or wells, e.g. cutting of damaged pipes, of windows; Deforming of pipes in boreholes or wells; Reconditioning of well casings while in the ground
    • E21B29/002Cutting, e.g. milling, a pipe with a cutter rotating along the circumference of the pipe
    • E21B29/005Cutting, e.g. milling, a pipe with a cutter rotating along the circumference of the pipe with a radially-expansible cutter rotating inside the pipe, e.g. for cutting an annular window
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B31/00Fishing for or freeing objects in boreholes or wells
    • E21B31/12Grappling tools, e.g. tongs or grabs
    • E21B31/20Grappling tools, e.g. tongs or grabs gripping internally, e.g. fishing spears
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices, or the like

Abstract

The invention discloses a kind of devices for being completed at the same time sub-sea drilled wells cutting and salvaging with capping operation, including salvaging section, flexible compensation section, righting section and the cut length being from top to bottom threadedly coupled;It salvages section and is equipped with the slips for being used for locking sleeve, salvaged casing by slips;Flexible compensation section is equipped with sliding sleeve and spline, so that flexible compensation section is changed length according to the fluctuating automatic telescopic of wave by sliding axially for sliding sleeve, to eliminate influence of the wave to device;Torque is transmitted by spline simultaneously;Righting section is equipped with the righting board for righting drill string, ensures that cutter will not be eccentric in cutting process by righting board;Cut length is equipped with the cutter for Casing-Cutting;Above-mentioned each section is hollow tubular structure, the power transmitting and the grout channels for shut-in well that each section of hollow tube collectively forms device.The configuration of the present invention is simple, low manufacture cost are reliable for operation.Especially suitable for seabed capping operation.

Description

A kind of device for being completed at the same time sub-sea drilled wells cutting and salvaging with capping operation
Technical field
The present invention relates to a kind of devices for being completed at the same time sub-sea drilled wells cutting and salvaging with capping operation, belong to offshore drilling's envelope Well technical field.
Background technique
As offshore oil exploration and exploitation is to deep-water developments, the mankind increase marine environmental protection dynamics, it is desirable that discarded Offshore oil facility carries out abandoned well operation, and abandoned well operation is firstly the need of by the casing of wellhead installation and disused well middle and upper part certain depth Come from casing program design with conduit, with collided when preventing passing ships by well head seabed waste petroleum facility and casing and Conduit causes the accident.Then cement slurry is injected in disused well by grouting equipment again and closes disused well, to prevent long-time The oil and gas of accumulation is gushed out well head and is polluted to ocean.
The capping operation on existing ground is usually to be carried out in two steps, and the first step is by cutting and marine salvage equipment by oil well In casing cutting, salvaged out of oil well together with the conduit outside casing come.Second step is infused cement slurry using grouting equipment Enter in disused well, completes capping operation.
The cutting and marine salvage equipment that existing ground uses mostly use the cutter or slips of hydraulic system driving equipment.Due to liquid It presses drive system to require hydrophthalmia diameter too big, certain pressure could be formed in drilling rod by section difference in drilling rod in this way Power is poor, to ensure to cut the normal work with marine salvage equipment.Due to the hydrophthalmia very little in existing equipment drilling rod.Hydrophthalmia is exactly when sealing The channel of cement slurry.When passing through small hydrophthalmia, not reaching predetermined depth cement slurry will also solidify cement slurry, lead to nothing when shut-in well Method is further continued for injection cement slurry, influences quality of shunting in a well.It therefore can only be using two steps shut-in well mode using existing ground shut-in well equipment.
Two steps shut-in well mode is not suitable for seabed capping operation.Casing and conduit are salvaged from disused well when having cut casing When out, the silt in seabed can quickly be buried disused well well head, when needing to carry out capping operation again, be difficult to find original well Mouthful.If drilling platforms needs back port to hide when encountering typhoon or billow, back after can not find original well head at all, can only Selection is abandoned shunting in a well.The oil and gas of long-time accumulation in this way, which is possible to gush out well head, pollutes ocean.
There is also drilling platforms to float across the sea with land shut-in well for ocean shut-in well, is influenced by wave, drilling well is flat Platform can be with wave dipping and heaving, while driving drill string also while dipping and heaving, and the dipping and heaving of drill string will affect cutting for cutter Cut position.Therefore the prior art is unable to satisfy seabed capping operation demand.
Summary of the invention
It is completed at the same time sub-sea drilled wells cutting the purpose of the present invention is to provide a kind of and salvages and the device of capping operation, it can one Be drilled under secondary and cut off casing, and casing and conduit are come from casing program design, it is upper mention drilling rod when, while being injected into well Cement slurry completes capping operation;Seabed capping operation requirement can not only be met, be also greatly improved and improve seabed capping operation effect Rate reduces energy consumption, thus overcome the deficiencies in the prior art.
To achieve the above object, the present invention adopts the following technical scheme:
A kind of device for being completed at the same time sub-sea drilled wells cutting and salvaging with capping operation of the invention, including be from top to bottom threadedly coupled Salvaging section, flexible compensation section, righting section and cut length;Salvaging section, flexible compensation section, righting section and cut length is hollow tube Structure collectively forms grout channels;Cut length is used to cut the casing of underground;Casing of the section for that will cut off is salvaged out of well It salvages;Righting section is for preventing cutter from cutting casing partially;Flexible compensation section eliminates wave while ensuring power transmitting The influence to rise and fall to device.
In aforementioned device, the salvaging section includes the salvaging section top connection being from top to bottom threadedly coupled, middle cylinder and salvaging section The grout channels that lower contact is constituted;Grout channels outer circle is equipped with J groove drum, adjustment barrel and the elasticity being from top to bottom threadedly coupled Set;Bayonet connection is used between J groove drum and salvaging section top connection;Adjustment barrel outer circle is equipped with positioning ring;Resilient sleeve lower end is set There is slips;It salvages section lower contact outer circle and is equipped with card cone;Control slips, which is bored, by card expands outwardly locking sleeve or to contract pair Casing unlock.
In aforementioned device, the flexible compensation section includes compensator section top connection;Compensator section top connection lower end and lower limit set It is threadedly coupled;Compensator section top connection outer circle is slidably connected through spline and sliding sleeve;Sliding sleeve upper end is connect with upper limit external threading;Sliding sleeve Lower end is threadedly coupled with compensator section lower contact;Make flexible compensation by the sliding between compensator section top connection and compensator section lower contact Section length with wave variation automatic telescopic;Simultaneous retractable compensator section transmits torque by spline;Compensator section top connection and benefit Repaying the inner hole among section lower contact is grout channels.
In aforementioned device, the righting section includes the connecting tube that both ends are connect with flexible compensation section and cut length respectively, even One group of righting blade being uniformly distributed along the circumference is equipped in the middle part of adapter tube outer circle;Connecting tube inner tube is transmitted as power and grout channels.
In aforementioned device, the cut length includes outer tube;Outer tube upper end is connect with cut length top connection;Outer tube upper end with cut Cut a section lower contact connection;Outer tube is equipped with one group of cutter being uniformly distributed along the circumference, and cutter is hinged with outer tube;Piston is equipped in outer tube, Outside piston is slidably connected with outer pipe orifice;Outside piston is connect through alligator and tooth socket with knife drive;When piston is in outer tube Slide downward and when rotating, piston driving cutter is flared out abutting internal surface of sleeve pipe, is completed at the same time the cutting to casing;Cut length Top connection lower end via pins are connect with ball seat;Current limliting after cutter cuts off casing, on ball seat investment steel ball closure piston Hole path cuts pin by cement slurry pressure, and ball seat moves down opening bypass channel, piston upper and lower ends pressure is made to reach flat Weighing apparatus pushes piston to move up, cutter is contracted in the cutter groove of outer tube under the action of piston base spring.
By adopting the above-described technical solution, the pure machine of the cutter course of work of the invention using card key and the cooperation of J-shaped slot Tool driving method can to greatly expand the through-current capacity of grout channels instead of the hydraulic driving mode of the prior art Slow down setting time of the cement slurry in channel.To which once lower bore sea can be completed at the same time with the cooperation of submarine fishing well-sealing device The salvaging of the casing-pipe cutting of base oil well, casing and conduit and the capping operation of oil well.Compared with prior art, it has solved Seabed silt buries wellbore after brill, wellbore before being difficult to find when lower drilling row capping operation again or can not find wellbore Technical problem.The configuration of the present invention is simple, it is economical and practical, the artificial and energy consumption to make a trip repeatedly can be reduced.Also avoid because It can not find the direct abandoned well of wellbore, cause the oil and gas accumulated for a long time in well to return out well head and ocean is polluted, prevented also from ship The waste petroleum facility that seabed is collided when only passing through causes the accident.The present invention has structure simple, and low manufacture cost, operation can By the characteristics of.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
In the figure, it is marked as 1- casing, 2- grout channels, 3- steel ball, 10- salvaging section, 11- slips, 12- are salvaged and are connect in section Cylinder, 14- salvage section lower contact, 15-J groove drum, 16- adjustment barrel, 17- resilient sleeve, 18- positioning ring, 19- card cone, 20- in head, 13- Flexible compensation section, 21- sliding sleeve, 22- spline, the top connection of 23- compensator section, 24- lower limit set, 25- upper limit set, 26- compensator section Lower contact, 31- righting board, 32- connecting tube, 40- cut length, 41- cutter, 42- outer tube, connects in 43- cut length 30- righting section Head, the lower contact of 44- cut length, 45- piston, 46- pin, 47- ball seat, 48- metering hole, 49- spring.
Specific embodiment
The present invention is described in further detail with reference to the accompanying drawings and examples.
A kind of device for being completed at the same time sub-sea drilled wells cutting and salvaging with capping operation of the invention, as shown in Figure 1, the device Including salvaging section 10, flexible compensation section 20, righting section 30 and the cut length 40 being from top to bottom threadedly coupled;It salvages section 10 and is equipped with use In the slips 11 of locking sleeve 1, casing 1 is salvaged by slips 11;Flexible compensation section 20 is equipped with sliding sleeve 21 and spline 22, Flexible compensation section 20 is set to change length according to the fluctuating automatic telescopic of wave by sliding axially for sliding sleeve 21, to eliminate wave pair The influence of device;Simultaneous retractable compensator section 20 transmits torque by spline 22;Righting section 30 is equipped with the righting for righting drill string Plate 31 ensures that cutter will not be eccentric in cutting process by righting board 31;Cut length 40 is equipped with cutting for Casing-Cutting 1 Knife 41;Above-mentioned each section is hollow tubular structure, and each section of hollow tube collectively forms the power transmitting of device and for shut-in well Grout channels 2.Salvaging section 10 includes the salvaging section top connection 12 being from top to bottom threadedly coupled, middle cylinder 13 and salvaging section lower contact 14 grout channels 2 constituted;2 outer circle of grout channels is equipped with J groove drum 15, adjustment barrel 16 and the bullet being from top to bottom threadedly coupled Property set 17;Bayonet connection is used between J groove drum 15 and salvaging section top connection 12;16 outer circle of adjustment barrel is equipped with positioning ring 18; 17 lower end of resilient sleeve is equipped with slips 11;It salvages 14 outer circle of section lower contact and is equipped with card cone 19;It is outside by 19 control slips 11 of card cone It expands locking sleeve 1 or casing 1 is unlocked to contract.Flexible compensation section 20 includes compensator section top connection 23;It is connect on compensator section First 23 lower end is threadedly coupled with lower limit set 24;23 outer circle of compensator section top connection is slidably connected through spline 22 and sliding sleeve 21;Sliding sleeve 21 upper ends are threadedly coupled with upper limit set 25;21 lower end of sliding sleeve is threadedly coupled with compensator section lower contact 26;By being connect on compensator section Sliding between first 23 and compensator section lower contact 26 makes the length of flexible compensation section 20 with the variation automatic telescopic of wave;It stretches simultaneously Contracting compensator section 20 transmits torque by spline 22;Inner hole among compensator section top connection 23 and compensator section lower contact 26 is cement slurry Channel 2.Righting section 30 includes the connecting tube 32 that both ends are connect with flexible compensation section 20 and cut length 40 respectively, 32 outer circle of connecting tube Middle part is equipped with one group of righting blade 31 being uniformly distributed along the circumference;32 inner tube of connecting tube is as power transmitting and grout channels 2.Cutting Section 40 includes outer tube 42;42 upper end of outer tube is connect with cut length top connection 43;42 upper end of outer tube is connect with cut length lower contact 44; Outer tube 42 is equipped with one group of cutter 41 being uniformly distributed along the circumference, and cutter 41 and outer tube 42 are hinged;Piston 45, piston are equipped in outer tube 42 45 outer circles are slidably connected with 42 inner hole of outer tube;45 outer circle of piston is sequentially connected through alligator and tooth socket and cutter 41;When piston 45 exists Slide downward and when rotating in outer tube 42, piston 45 drives cutter 41 to be flared out and pushes against 1 inner wall of casing, is completed at the same time to casing 1 cutting;43 lower end via pins 46 of cut length top connection are connect with ball seat 47;After cutter 41 cuts off casing 1, to ball seat 47 48 channel of metering hole on 3 closure piston 45 of steel ball is put into, pin 46 is cut by cement slurry pressure, it is other that ball seat 47 moves down opening Paths make 45 upper and lower ends pressure of piston reach balance, push piston 45 to move up under the action of 45 bottom spring 49 of piston, Cutter 41 is contracted in the cutter groove of outer tube 42.
Embodiment
This example is completed at the same time the device of sub-sea drilled wells cutting salvaging and capping operation, as shown in Figure 1.The device of this example is by upper It can be divided under and salvage section 10, flexible compensation section 20, righting section 30 and cut length 40.The above each section of head and the tail are connected through a screw thread For entirety.
The fishing that section 10 is responsible for shut-in procedures is salvaged, after salvaging 10 lower end sleeve pipe of section, positioning ring 18 is located at Cannula tip plays the role of positioning, and positioning ring 18 can be adjusted according to 1 inner card cage position of casing.By the slips 11 for salvaging section 10 It is caught in the card slot of casing 1 and blocks casing 1.
Cut length 40 is responsible for before shut-in well cutting off casing 1.The cutter 21 of cut length 40 is suppressed by cement slurry, makes cutter 21 open, and rotary drill column cutter 21 can cut casing 1.Steel ball is put into after the completion of cutting, cut length 40 is additionally formed Grout channels enable cement slurry to be additionally formed grout channels between piston 45 and outer tube 42 by carrying out shut-in well work Industry.Cutter 21 is exercised on piston 45 simultaneously to be contracted in the cutter groove of outer tube 42.
The variation that flexible compensation section 20 passes through length, it is ensured that effect be during Casing-Cutting 1, it is ensured that cut Knife 21 will not be such that cutter 21 is cut always in same position, keep cutting process unaffected with wave dipping and heaving.
Righting section 30 is used for righting drill string, makes cutter 21 will not be eccentric in cutting process.
The course of work and principle of the invention is described as follows:
After the device of the invention tripping in oil well, by salvaging the slips 11 in section 10 for 1 clamping of casing.Then it is beaten by cement slurry Pressure expands outwardly the cutter 41 in cut length 40, and rotary drill column can cut casing 1.Flexible compensation in cutting process Section 20 can automotive resistance drill string fluctuating, so that cutter is remained at same position.Righting section 30 can righting drill string make cutter 41 It will not be eccentric when cutting.After casing is cut off, steel ball 3 is put into the grout channels of drill string, steel ball 3 falls into cut length 40 Ball seat 47 aperture after, close cut state when 48 channel of metering hole, during 45 downlink of piston open piston 45 with Another channel cement slurry between outer tube 42, cement slurry are no longer pass through 48 channel of metering hole, and cutter 41 automatically retracts outer tube 42 Cutter groove in.Due to the flow area of metering hole 48 when the grout channels flow area newly opened is far longer than cutting, can make Cement slurry passes through.Cut-off casing 1 is mentioned upwards on one side at this time, and cement slurry is injected in grout channels on one side can complete to seal Well operations.
By adopting the above-described technical solution, the pure machine of the cutter course of work of the invention using card key and the cooperation of J-shaped slot Tool driving method can to greatly expand the through-current capacity of grout channels instead of the hydraulic driving mode of the prior art Slow down setting time of the cement slurry in channel.To which once lower bore sea can be completed at the same time with the cooperation of submarine fishing well-sealing device The salvaging of the casing-pipe cutting of base oil well, casing and conduit and the capping operation of oil well.Compared with prior art, it has solved Seabed silt buries wellbore after brill, wellbore before being difficult to find when lower drilling row capping operation again or can not find wellbore Technical problem.The configuration of the present invention is simple, it is economical and practical, the artificial and energy consumption to make a trip repeatedly can be reduced.Also avoid because It can not find the direct abandoned well of wellbore, cause the oil and gas accumulated for a long time in well to return out well head and ocean is polluted, prevented also from ship The waste petroleum facility that seabed is collided when only passing through causes the accident.The present invention has structure simple, and low manufacture cost, operation can By the characteristics of.

Claims (5)

1. a kind of device for being completed at the same time sub-sea drilled wells cutting and salvaging with capping operation, it is characterised in that: the device includes by upper To the salvaging section (10) of lower threaded connection, flexible compensation section (20), righting section (30) and cut length (40);It salvages section (10), stretch Contracting compensator section (20), righting section (30) and cut length (40) are hollow tubular structure, collectively form grout channels (2);Cutting Section (40) is used to cut the casing (1) of underground;Section (10) are salvaged for salvaging the casing cut off;Righting section (30) is used for Prevent cutter from cutting casing (1) partially;Flexible compensation section (20) eliminates the heave of waves to device while ensuring power transmitting It influences.
2. being completed at the same time the device of sub-sea drilled wells cutting salvaging and capping operation according to claim 1, it is characterised in that: institute Stating and salvaging section (10) includes the salvaging section top connection (12) being from top to bottom threadedly coupled, middle cylinder (13) and salvaging section lower contact (14) The grout channels (2) of composition;Grout channels (2) outer circle is equipped with the J groove drum (15) being from top to bottom threadedly coupled, adjustment barrel (16) and resilient sleeve (17);Bayonet connection is used between J groove drum (15) and salvaging section top connection (12);Adjustment barrel (16) is outside Circle is equipped with positioning ring (18);Resilient sleeve (17) lower end is equipped with slips (11);It salvages section lower contact (14) outer circle and is equipped with card cone (19); Locking sleeve (1) is expanded outwardly by card cone (19) control slips (11) or casing (1) is unlocked to contract.
3. being completed at the same time the device of sub-sea drilled wells cutting salvaging and capping operation according to claim 1, it is characterised in that: institute Stating flexible compensation section (20) includes compensator section top connection (23);Compensator section top connection (23) lower end and lower limit set (24) screw thread connect It connects;Compensator section top connection (23) outer circle is slidably connected through spline (22) and sliding sleeve (21);Sliding sleeve (21) upper end and upper limit set (25) it is threadedly coupled;Sliding sleeve (21) lower end is threadedly coupled with compensator section lower contact (26);By compensator section top connection (23) and mend Repaying the sliding between a section lower contact (26) makes the length of flexible compensation section (20) with the variation automatic telescopic of wave;Simultaneous retractable is mended It repays section (20) and transmits torque by spline (22);Inner hole among compensator section top connection (23) and compensator section lower contact (26) is water Slurry channel (2).
4. being completed at the same time the device of sub-sea drilled wells cutting salvaging and capping operation according to claim 1, it is characterised in that: institute Stating righting section (30) includes the connecting tube (32) that both ends are connect with flexible compensation section (20) and cut length (40) respectively, connecting tube (32) one group of righting blade (31) being uniformly distributed along the circumference is equipped in the middle part of outer circle;Connecting tube (32) inner tube is transmitted as power and cement It starches channel (2).
5. being completed at the same time the device of sub-sea drilled wells cutting salvaging and capping operation according to claim 1, it is characterised in that: institute Stating cut length (40) includes outer tube (42);Outer tube (42) upper end is connect with cut length top connection (43);Outer tube (42) upper end with cut Cut a section lower contact (44) connection;Outer tube (42) is equipped with one group of cutter (41) being uniformly distributed along the circumference, cutter (41) and outer tube (42) Hingedly;Piston (45) are equipped in outer tube (42), piston (45) outer circle is slidably connected with outer tube (42) inner hole;Piston (45) outer circle warp Alligator and tooth socket and cutter (41) are sequentially connected;When piston (45) is in the interior slide downward of outer tube (42) and when rotating, piston (45) It drives cutter (41) to be flared out and pushes against casing (1) inner wall, be completed at the same time the cutting to casing (1);Cut length top connection (43) Lower end via pins (46) are connect with ball seat (47);After cutter (41) cuts off casing (1), steel ball (3) are put into ball seat (47) Pin (46) are cut by cement slurry pressure in metering hole (48) channel on closure piston (45), and it is other that ball seat (47) moves down opening Paths make piston (45) upper and lower ends pressure reach balance, push piston under the action of spring (49) of piston (45) bottom (45) it moves up, cutter (41) is contracted in the cutter groove of outer tube (42).
CN201811559937.7A 2018-12-19 2018-12-19 Device for simultaneously completing submarine oil well cutting, fishing and well sealing operation Active CN109458151B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811559937.7A CN109458151B (en) 2018-12-19 2018-12-19 Device for simultaneously completing submarine oil well cutting, fishing and well sealing operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811559937.7A CN109458151B (en) 2018-12-19 2018-12-19 Device for simultaneously completing submarine oil well cutting, fishing and well sealing operation

Publications (2)

Publication Number Publication Date
CN109458151A true CN109458151A (en) 2019-03-12
CN109458151B CN109458151B (en) 2024-04-09

Family

ID=65613887

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811559937.7A Active CN109458151B (en) 2018-12-19 2018-12-19 Device for simultaneously completing submarine oil well cutting, fishing and well sealing operation

Country Status (1)

Country Link
CN (1) CN109458151B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114198042A (en) * 2021-07-26 2022-03-18 中海油能源发展股份有限公司 Ball throwing type cutting and fishing integrated tool and using method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB0911805D0 (en) * 2008-07-09 2009-08-19 Smith International Methods of making multiple casing cuts
CN205503073U (en) * 2016-02-17 2016-08-24 辽河石油勘探局 Horizontal well can move back can interior cutting device of formula of dragging for
CN206016739U (en) * 2016-08-31 2017-03-15 李钰 Drilling tool is reclaimed in a kind of deep water well head system cutting
CN206205835U (en) * 2016-10-25 2017-05-31 深圳市远东石油钻采工程有限公司 A kind of telescopic compensator for hanging cutting tool under water
CN207436983U (en) * 2017-10-11 2018-06-01 中国石油化工股份有限公司 A kind of oil pipe hydraulic cuts fishing tool
CN207960555U (en) * 2018-02-27 2018-10-12 中石化石油工程技术服务有限公司 A kind of fishing sleeve milling integrated apparatus
CN209838357U (en) * 2018-12-19 2019-12-24 贵州高峰石油机械股份有限公司 Device for simultaneously completing cutting, salvaging and sealing operation of submarine oil well

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB0911805D0 (en) * 2008-07-09 2009-08-19 Smith International Methods of making multiple casing cuts
CN205503073U (en) * 2016-02-17 2016-08-24 辽河石油勘探局 Horizontal well can move back can interior cutting device of formula of dragging for
CN206016739U (en) * 2016-08-31 2017-03-15 李钰 Drilling tool is reclaimed in a kind of deep water well head system cutting
CN206205835U (en) * 2016-10-25 2017-05-31 深圳市远东石油钻采工程有限公司 A kind of telescopic compensator for hanging cutting tool under water
CN207436983U (en) * 2017-10-11 2018-06-01 中国石油化工股份有限公司 A kind of oil pipe hydraulic cuts fishing tool
CN207960555U (en) * 2018-02-27 2018-10-12 中石化石油工程技术服务有限公司 A kind of fishing sleeve milling integrated apparatus
CN209838357U (en) * 2018-12-19 2019-12-24 贵州高峰石油机械股份有限公司 Device for simultaneously completing cutting, salvaging and sealing operation of submarine oil well

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114198042A (en) * 2021-07-26 2022-03-18 中海油能源发展股份有限公司 Ball throwing type cutting and fishing integrated tool and using method thereof
CN114198042B (en) * 2021-07-26 2024-01-02 中海油能源发展股份有限公司 Ball throwing type cutting and fishing integrated tool and application method thereof

Also Published As

Publication number Publication date
CN109458151B (en) 2024-04-09

Similar Documents

Publication Publication Date Title
CN209687445U (en) A kind of device being completed at the same time seabed Casing-Cutting and capping operation
CN109441386A (en) A kind of device being completed at the same time seabed Casing-Cutting and capping operation
US20170152718A1 (en) Casing windowing method and tool using coiled tubing
US3797255A (en) Under-water anchor apparatus and methods of installation
CN102296950B (en) Hydraulic shearing type sampling drilling tool
CA2890269C (en) Drilling and grouting method and apparatus
NO333069B1 (en) Method of cementing a borehole
CN103470242A (en) Oilfield horizontal well volume fracturing method
CN207686692U (en) Horizontal well separate injection tubing string
CN106368607B (en) Implement the method for kill-job using the system for implementing kill-job in deepwater dual gradient drilling
CN209838357U (en) Device for simultaneously completing cutting, salvaging and sealing operation of submarine oil well
CN109458151A (en) A kind of device for being completed at the same time sub-sea drilled wells cutting and salvaging with capping operation
CN109763784B (en) Split bridge plug hydraulic setting tool and setting method thereof
CN109505557B (en) Device for simultaneously completing fishing and well sealing operation of submarine oil well
CN109681144A (en) A kind of integral type deep-sea casing-pipe cutting fishing device
CN102747977A (en) Internal cutting device of hydraulic sleeve
CN202745782U (en) Internal cutting device of hydraulic sleeve
CN203729929U (en) Expansion pipe completing tool
CN209761384U (en) Device for simultaneously completing fishing and sealing operations of submarine oil well
CN106468154B (en) Cementing plug for sub-sea drilled wells
CN211115979U (en) Low-disturbance sampling device for various ocean stratums
CN201620887U (en) Machine-acquiring testing pipe-string for floating drilling rig
CN113513294A (en) While-drilling water injection fracturing device and method
NO318594B1 (en) Well stabilization tool and method of stabilizing unstable zone or formation.
CN202220601U (en) Pressure adjustable hydraulic sampling drilling tool

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant