CN109457972A CN201811596582.9A CN201811596582A CN109457972A CN 109457972 A CN109457972 A CN 109457972A CN 201811596582 A CN201811596582 A CN 201811596582A CN 109457972 A CN109457972 A CN 109457972A
Authority
CN
China
Prior art keywords
construction
steel
upper cover
crossbeam
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811596582.9A
Other languages
Chinese (zh)
Inventor
蔡伟阳
陆秋平
方思倩
周吉
王杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai No 7 Construction Co Ltd
Original Assignee
Shanghai No 7 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No 7 Construction Co Ltd filed Critical Shanghai No 7 Construction Co Ltd
Priority to CN201811596582.9A priority Critical patent/CN109457972A/en
Publication of CN109457972A publication Critical patent/CN109457972A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Abstract

The present invention relates to a kind of steel platforms and its application construction method for the construction of subway entrance upper cover.The steel platform for the construction of subway entrance upper cover includes: more concrete fins disposed in parallel;More root posts are vertically installed in concrete fin and connect with concrete fin;More stringers are arranged positioned at the top of column and along the direction perpendicular to concrete fin, and stringer is connect with column;More crossbeams are arranged positioned at the top of stringer and along the direction for being parallel to concrete fin, and crossbeam is connect with stringer;More channel steels are arranged positioned at the top of crossbeam and along the direction perpendicular to crossbeam, and channel steel is connect with crossbeam, and the notch of channel steel is far from crossbeam.Above-mentioned steel platform both can guarantee that subway entrance personnel entered and left safety, but also it is upper cover construction safety, firm, it ensure that the construction period.In addition, the application construction method step of the above-mentioned steel platform for the construction of subway entrance upper cover is simple, and it is easy to operate, it is suitable for popularization and application.

Description

Steel platform and its application construction method for the construction of subway entrance upper cover
Technical field
The present invention relates to the realm of building construction, more particularly to the steel platform constructed for subway entrance upper cover and its answer Use construction method.
Background technique
Currently, many city underground routes are more, especially in some large size cities, subway is densely distributed.Increasingly More project constructions will also meet the construction of subway upper cover close in the case where subway, needing both to guarantee that personnel enter and leave safety Requirement.However, conventional protection channel is set up and has been unable to satisfy above-mentioned needs, if without suitable construction method, it will Influence the progress of site operation.
Summary of the invention
Based on this, it is necessary to be unable to satisfy construction needs for conventional setting up, and then influence asking for site operation progress Topic, provide it is a kind of be not only able to satisfy construction need and can guarantee the duration the steel platform constructed for subway entrance upper cover and its Application construction method.
A kind of steel platform for the construction of subway entrance upper cover, comprising:
More concrete fins, the more concrete fins are arranged in parallel;
More root posts are vertically installed in the concrete fin and connect with the concrete fin;
More stringers are arranged, the stringer positioned at the top of the column and along the direction perpendicular to the concrete fin It is connect with the column;
More crossbeams are arranged, the crossbeam positioned at the top of the stringer and along the direction for being parallel to the concrete fin It is connect with the stringer;
More channel steels are arranged, the channel steel and institute positioned at the top of the crossbeam and along the direction perpendicular to the crossbeam Crossbeam connection is stated, the notch of the channel steel is far from the crossbeam.
In one embodiment, further include channel steel angle brace, channel steel angle brace one end is connect with the column, the other end with The crossbeam connection.
In one embodiment, two channel steel angle braces, two channel steel angle braces are connected on the every column It is located at the two sides of the stringer.
In one embodiment, the column is set to the junction of the stringer Yu the crossbeam.
In one embodiment, the stringer is I-steel.
In one embodiment, the crossbeam is Two bors d's oeuveres I-steel.
In one embodiment, steel tube fastener bracket is erected on the channel steel.
In one embodiment, the column is steel pipe, and the outer diameter of the steel pipe is 609mm, with a thickness of 12mm.
The application construction method of the above-mentioned steel platform for the construction of subway entrance upper cover, comprising the following steps:
Make the concrete fin;
The column is installed on the concrete fin;
The crossbeam and the stringer are installed on the column;
The channel steel is installed on the crossbeam, forms the steel platform for the construction of subway entrance upper cover.
The above-mentioned steel platform for the construction of subway entrance upper cover on the ground of original hardening in use, directly pour Then more root posts are arranged in concrete fin on concrete fin, more stringers and Duo Gen crossbeam are arranged in a mutually vertical manner, and form one Then channel steel is arranged in supporting surface on crossbeam, complete setting up for steel platform.It, can be in steel platform after steel platform is set up Upper framed bent is set up, formwork, wire-ties, final casting concrete.The above-mentioned steel platform for the construction of subway entrance upper cover is stood Personnel's Vomitory is formed between column, bent structure can be installed in channel steel.Therefore, above-mentioned to be applied for subway entrance upper cover The steel platform of work both can guarantee that subway entrance personnel entered and left safety, but also upper cover construction is able to safe, firm, ensure that and applies The work duration, meanwhile, security performance is also greatly improved.In addition, the above-mentioned steel platform for the construction of subway entrance upper cover Application construction method step it is simple, it is easy to operate, be suitable for popularization and application.
Detailed description of the invention
Fig. 1 is the front view of the steel platform for the construction of subway entrance upper cover of an embodiment;
Fig. 2 is the side view of the steel platform shown in FIG. 1 for the construction of subway entrance upper cover;
Fig. 3 is the enlarged drawing of a-quadrant in Fig. 2;
Fig. 4 is the top view of the steel platform for the construction of subway entrance upper cover of an embodiment;
Fig. 5 is the flow chart of the application construction method of the steel platform for the construction of subway entrance upper cover of an embodiment.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts all other Embodiment shall fall within the protection scope of the present invention.
As Figure 1-Figure 4, the steel platform 1 for the construction of subway entrance upper cover of an embodiment includes: more mixed Solidifying soil item 10, more root posts 12, more stringers 14, more crossbeams 16 and Duo Gen channel steel 18.More concrete fins 10 are arranged in parallel, More root posts 12 are vertically installed in concrete fin 10 and connect with concrete fin 10, and stringer 14 is located at the top of column 12 and along vertical Directly it is arranged in the direction of concrete fin 10, stringer 14 is connect with column 12;More crossbeams 16 are located at the top of stringer 14 and along flat Row is arranged in the direction of concrete fin 10, and crossbeam 16 is connect with stringer 14;More channel steels 18 are located at the top of crossbeam 16 and along vertical Directly it is arranged in the direction of crossbeam 16, channel steel 18 is connect with crossbeam 16, and the notch of channel steel 18 is far from crossbeam 16.
The above-mentioned steel platform 1 for the construction of subway entrance upper cover on the ground of original hardening in use, directly pour Concrete fin 10 is built, then more root posts 12 are set on concrete fin 10, more stringers 14 and Duo Gen crossbeam 16 are mutually perpendicular to Setting, forms a supporting surface, and channel steel 18 is then arranged on crossbeam 16, completes setting up for steel platform 1.It is set up in steel platform 1 After, framed bent it can set up, formwork, wire-tie in steel platform 1, final casting concrete.It is above-mentioned to be used for subway entrance Personnel's Vomitory is formed between the column 12 of the steel platform 1 of upper cover construction, bent structure can be installed in channel steel 18.Cause This, the above-mentioned steel platform 1 for the construction of subway entrance upper cover both can guarantee that subway entrance personnel entered and left safety, but also on Lid construction is able to safe, firm, ensure that the construction period, meanwhile, security performance is also greatly improved.
Please refer to Fig. 1 and Fig. 2, the steel platform 1 for the construction of subway entrance upper cover successively includes mixed from top to bottom Solidifying soil item 10, column 12, stringer 14, crossbeam 16 and channel steel 18.According to the volume size of upper cover, concrete fin 10, is indulged column 12 Beam 14, crossbeam 16 and channel steel 18 are more, for ease of description, only show four concrete fins 10, columns in Fig. 1 and Fig. 2 12 and stringer 14.Concrete fin 10 is that the steel platform 1 constructed for subway entrance upper cover provides basis, so as to steel platform 1 It sets up.In construction, concrete fin 10 is directly cast on original hardened ground.In the present embodiment, more concrete fins 10 It is placed equidistant with.Concrete fin 10 is C30 armored concrete item 10, upper and lower level main reinforcement in the concrete strip footing of armored concrete item 10 Use outer diameter for the reinforcing bar of 20mm, spacing 150mm;Stirrup uses outer diameter for the reinforcing bar of 12mm, spacing 200mm.
Column 12 is easy for the formation of personnel's Vomitory, and column 12 is arranged perpendicular to concrete fin 10, is located at concrete Between item 10 and stringer 14, so that a certain distance is formed between steel platform 1 and ground, in order to the discrepancy of personnel.Column 12 Position can be configured according to the position of structural column.The connection of column 12 and concrete fin 10 can be welded connecting.Such as Shown in Fig. 4, in the present embodiment, column 12 is set to the junction of stringer 14 Yu crossbeam 16.Column 12 is connect with stringer 14, is indulged Beam 14 is connect with crossbeam 16, can simultaneously be connected column 12 and stringer 14, stringer 14 and crossbeam 16, be saved in construction The set-up time of steel platform 1.As depicted in figs. 1 and 2, more root posts 12 are placed equidistant on the concrete column.In addition, at this In embodiment, column 12 is steel pipe, and the outer diameter of steel pipe is 609mm, with a thickness of 12mm.
Please continue to refer to Fig. 4, more crossbeams 16 and Duo Gen stringer 14 are interconnected to form a reticular structure, are on subway The construction of lid provides a supporting plane.More crossbeams 16 and Duo Gen stringer 14 are placed equidistant with and are connected with each other.In this implementation In example, stringer 14 is 45# I-steel.Crossbeam 16 is Two bors d's oeuveres I-steel.Stringer 14 and crossbeam 16 are to be welded to connect.
As shown in Fig. 2, in the present embodiment, the steel platform 1 for the construction of subway entrance upper cover further includes channel steel angle brace 20,20 one end of channel steel angle brace is connect with column 12, and the other end is connect with crossbeam 16.Channel steel angle brace 20 and 14 shape of crossbeam 16 and stringer At triangle, the stability of steel platform 1 is improved.Further, in the present embodiment, two slots are connected in each column 12 Steel angle brace 20, two channel steel angle braces 20 are located at the two sides of stringer 14.That is, two channel steels 18 and crossbeam 16 form triangle, Increase the stability that column 12 supports, and then guarantees construction safety.In the present embodiment, channel steel 18 is 10# channel steel 18.
As shown in figure 3, channel steel 18 is connect with crossbeam 16, the notch of channel steel 18 is far from crossbeam 16.The notch of channel steel 18 back to Crossbeam 16, with the superstructure for accommodating and installing subway entrance upper cover.When steel platform 1 after the installation is completed, can be in steel Framed bent, formwork are set up on platform 1, are wire-tie and casting concrete.As depicted in figs. 1 and 2, it has been set up on two layers in steel platform 1 Portion's structure and gravity framed bent 2.In addition, in the present embodiment, steel tube fastener bracket is erected on channel steel 18.When in steel platform 1 On when setting up gravity framed bent 2, can be directly connected in steel platform 1, be set up conveniently by steel tube fastener, be conducive to shorten construction Duration.
The material of above-mentioned steel platform 1 is Q235 steel, and intensity with higher guarantees the fastness of steel platform 1.It is answering Used time, the top of steel platform 1 can carry out the construction of subway upper cover, and lower section can enter and leave for personnel, ensure that the same of duration When also improve the safety of construction.
The application construction method for the steel platform 1 for being used for the construction of subway entrance upper cover will be illustrated below.
Please refer to Fig. 1-Fig. 5, the application and construction of the steel platform for the construction of subway entrance upper cover of an embodiment Method the following steps are included:
Step S500 makes concrete fin 10.Concrete fin 10 is used as Extended chemotherapy, can be directly by bar shaped reinforced concrete base Plinth is cast on original hardened ground.Wherein, upper and lower level main reinforcement uses 20@150 of Φ in bar shaped reinforced concrete base;Stirrup uses Φ 12@200.According to the volume of upper cover and construction needs, more concrete fins 10 can be set, more concrete fins 10 are equidistantly set It sets.
Step S502 installs column 12 on concrete fin 10.Column 12 is installed according to the position of structural column in upper cover, is stood Column 12 is connect with the reinforcement welding in concrete fin 10.In the present embodiment, column 12 has more, and more root posts 12 are placed equidistant with On concrete fin 10.In addition, in the present embodiment, column 12 is 609 steel pipe post 12 of Φ.
Step S504 installs crossbeam 16 and stringer 14 on column 12.Crossbeam 16 and stringer 14 are located at the top of column 12, More crossbeams 16 and Duo Gen stringer 14 form a support platform, provide basis for the construction of upper cover.In the present embodiment, crossbeam 16 and stringer 14 be I-steel, crossbeam 16 and stringer 14 are to be welded to connect.
Step S506 installs channel steel 18 on crossbeam 16, forms the steel platform 1 for the construction of subway entrance upper cover.Slot The opening of steel 18 is back to crossbeam 16, in order to accommodate and install the other structures of upper cover.When steel platform 1 after the installation is completed, can be with The construction of superstructure is carried out in steel platform 1.
The application construction method step of the above-mentioned steel platform 1 for the construction of subway entrance upper cover is simple, and operation is easy, and is fitted In popularization and application.
Each technical characteristic of embodiment described above can be combined arbitrarily, for simplicity of description, not to above-mentioned reality It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, all should be considered as described in this specification.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection of the invention Range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (9)

1. a kind of steel platform for the construction of subway entrance upper cover characterized by comprising
More concrete fins, the more concrete fins are arranged in parallel;
More root posts are vertically installed in the concrete fin and connect with the concrete fin;
More stringers are arranged, the stringer and institute positioned at the top of the column and along the direction perpendicular to the concrete fin State column connection;
More crossbeams are arranged, the crossbeam and institute positioned at the top of the stringer and along the direction for being parallel to the concrete fin State stringer connection;
More channel steels are arranged, the channel steel and the cross positioned at the top of the crossbeam and along the direction perpendicular to the crossbeam Beam connection, the notch of the channel steel is far from the crossbeam.
2. the steel platform according to claim 1 for the construction of subway entrance upper cover, which is characterized in that further include channel steel Angle brace, channel steel angle brace one end are connect with the column, and the other end is connect with the crossbeam.
3. the steel platform according to claim 2 for the construction of subway entrance upper cover, which is characterized in that every described vertical Two channel steel angle braces are connected on column, two channel steel angle braces are located at the two sides of the stringer.
4. the steel platform according to claim 1 for the construction of subway entrance upper cover, which is characterized in that the column is set It is placed in the junction of the stringer Yu the crossbeam.
5. the steel platform according to claim 1 for the construction of subway entrance upper cover, which is characterized in that the stringer is I-steel.
6. the steel platform according to claim 1 for the construction of subway entrance upper cover, which is characterized in that the crossbeam is Two bors d's oeuveres I-steel.
7. the steel platform according to claim 1 for the construction of subway entrance upper cover, which is characterized in that on the channel steel It is erected with steel tube fastener bracket.
8. the steel platform according to claim 1 for the construction of subway entrance upper cover, which is characterized in that the column is The outer diameter of steel pipe, the steel pipe is 609mm, with a thickness of 12mm.
9. the application and construction side of the steel platform according to claim 1-8 for the construction of subway entrance upper cover Method, which comprises the following steps:
Make the concrete fin;
The column is installed on the concrete fin;
The crossbeam and the stringer are installed on the column;
The channel steel is installed on the crossbeam, forms the steel platform for the construction of subway entrance upper cover.
CN201811596582.9A 2018-12-26 2018-12-26 Steel platform and its application construction method for the construction of subway entrance upper cover Pending CN109457972A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811596582.9A CN109457972A (en) 2018-12-26 2018-12-26 Steel platform and its application construction method for the construction of subway entrance upper cover

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811596582.9A CN109457972A (en) 2018-12-26 2018-12-26 Steel platform and its application construction method for the construction of subway entrance upper cover

Publications (1)

Publication Number Publication Date
CN109457972A true CN109457972A (en) 2019-03-12

Family

ID=65614737

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811596582.9A Pending CN109457972A (en) 2018-12-26 2018-12-26 Steel platform and its application construction method for the construction of subway entrance upper cover

Country Status (1)

Country Link
CN (1) CN109457972A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114876246A (en) * 2022-05-31 2022-08-09 中铁第四勘察设计院集团有限公司 Subway station entrance and exit ground structure and construction method thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060829A (en) * 2014-05-22 2014-09-24 中国建筑第四工程局有限公司 Construction method and construction device for house beam pillar
CN204000885U (en) * 2014-08-13 2014-12-10 中铁十局集团第二工程有限公司 Metro Deep Excavation concrete support hangs mould mould
CN205116776U (en) * 2015-10-10 2016-03-30 中国建筑第八工程局有限公司 Support access structure
CN105544506A (en) * 2016-01-29 2016-05-04 上海建工二建集团有限公司 Detachable fixed-modulus double-layer channel steel supporting frame for section butt joint of retention wall reinforced cages
CN205638490U (en) * 2016-05-26 2016-10-12 中国电建集团铁路建设有限公司 A portable platform truck that is used for subway station tread wind channel to pour
CN206189283U (en) * 2016-11-22 2017-05-24 中交第二航务工程局有限公司 Novel sectional shelf -unit structure based on tidewater beach
CN106930599A (en) * 2015-12-31 2017-07-07 王圣玉 The steel structure platform that steel structure platform frame unit and assembling build
CN109024708A (en) * 2018-07-09 2018-12-18 天津城建大学 A kind of isolation mounting for building and subway upper cover vertical vibration isolation wave building structure
CN209620610U (en) * 2018-12-26 2019-11-12 上海建工七建集团有限公司 Steel platform for the construction of subway entrance upper cover

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060829A (en) * 2014-05-22 2014-09-24 中国建筑第四工程局有限公司 Construction method and construction device for house beam pillar
CN204000885U (en) * 2014-08-13 2014-12-10 中铁十局集团第二工程有限公司 Metro Deep Excavation concrete support hangs mould mould
CN205116776U (en) * 2015-10-10 2016-03-30 中国建筑第八工程局有限公司 Support access structure
CN106930599A (en) * 2015-12-31 2017-07-07 王圣玉 The steel structure platform that steel structure platform frame unit and assembling build
CN105544506A (en) * 2016-01-29 2016-05-04 上海建工二建集团有限公司 Detachable fixed-modulus double-layer channel steel supporting frame for section butt joint of retention wall reinforced cages
CN205638490U (en) * 2016-05-26 2016-10-12 中国电建集团铁路建设有限公司 A portable platform truck that is used for subway station tread wind channel to pour
CN206189283U (en) * 2016-11-22 2017-05-24 中交第二航务工程局有限公司 Novel sectional shelf -unit structure based on tidewater beach
CN109024708A (en) * 2018-07-09 2018-12-18 天津城建大学 A kind of isolation mounting for building and subway upper cover vertical vibration isolation wave building structure
CN209620610U (en) * 2018-12-26 2019-11-12 上海建工七建集团有限公司 Steel platform for the construction of subway entrance upper cover

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114876246A (en) * 2022-05-31 2022-08-09 中铁第四勘察设计院集团有限公司 Subway station entrance and exit ground structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN101775844B (en) Connecting joint of ring beam of steel core concrete column used for topdown construction method foundation pit engineering
KR100571102B1 (en) Device of Innovative Prestressed Scaffolding System for Improving Workability
CN102733606A (en) Construction method of high large cantilever structure
CN109057321B (en) Integral steel platform mould bases super large bearing capacity attached wall system and construction method
CN104929047B (en) A kind of V-type pier outer support construction method
KR20160001216A (en) Rahmen using hinge type pc wall and method for constructing the same
CN209620610U (en) Steel platform for the construction of subway entrance upper cover
CN109457972A (en) Steel platform and its application construction method for the construction of subway entrance upper cover
CN108532939A (en) Shear wall single side formwork method
CN208486272U (en) A kind of constructing structure of two-tube diagonal brace deep basal pit
CN110424455A (en) The underground confined space is without fertile slot structure side wall big steel form plate system and construction method
CN206220534U (en) The pump line support meanss of concrete pumping equipment
CN108797607A (en) A kind of construction method of two-tube diagonal brace deep basal pit
CN201598734U (en) Concrete filled steel tubular column ring beam joint for topdown construction method foundation pit engineering
JP2009046942A (en) Foundation block for retaining wall
CN209082534U (en) Hanging operating platform sets up device in a kind of more piece open caisson
CN211815605U (en) Construction device for pile column type pier tie beam and capping beam
JP2002242164A (en) Civil engineering structure such as sediment control weir and levee or the like using steel sheet pile and thinning member or the like and construction method therefor
KR0171873B1 (en) Constructive method of a high building
CN208685457U (en) Cast-in-place box beam bracket device
JP2000257088A (en) Earth retaining wall and its construction method
JP3208100U (en) Scaffolding device for construction of underground structures
KR20100092609A (en) Precast form structure for gutter and construction method using the same
JP2013040538A (en) Retaining wall block, support for retaining wall block, and fixing method of retaining wall block
CN211524190U (en) Foundation pit packway ladder cage fixing base

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190312