CN109444674A - A kind of Distribution Network Failure method for rapidly positioning - Google Patents
A kind of Distribution Network Failure method for rapidly positioning Download PDFInfo
- Publication number
- CN109444674A CN109444674A CN201811648301.XA CN201811648301A CN109444674A CN 109444674 A CN109444674 A CN 109444674A CN 201811648301 A CN201811648301 A CN 201811648301A CN 109444674 A CN109444674 A CN 109444674A
- Authority
- CN
- China
- Prior art keywords
- platform server
- distribution network
- distribution
- failure
- distribution device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 21
- 238000001514 detection method Methods 0.000 claims abstract description 17
- 230000005611 electricity Effects 0.000 claims description 5
- 238000004891 communication Methods 0.000 claims description 3
- 230000004888 barrier function Effects 0.000 claims 1
- 238000012544 monitoring process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 230000004807 localization Effects 0.000 description 1
- 238000012913 prioritisation Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/08—Locating faults in cables, transmission lines, or networks
- G01R31/081—Locating faults in cables, transmission lines, or networks according to type of conductors
- G01R31/086—Locating faults in cables, transmission lines, or networks according to type of conductors in power transmission or distribution networks, i.e. with interconnected conductors
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/06—Management of faults, events, alarms or notifications
- H04L41/0631—Management of faults, events, alarms or notifications using root cause analysis; using analysis of correlation between notifications, alarms or events based on decision criteria, e.g. hierarchy, tree or time analysis
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/06—Management of faults, events, alarms or notifications
- H04L41/0677—Localisation of faults
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W4/00—Services specially adapted for wireless communication networks; Facilities therefor
- H04W4/30—Services specially adapted for particular environments, situations or purposes
- H04W4/38—Services specially adapted for particular environments, situations or purposes for collecting sensor information
Abstract
A kind of Distribution Network Failure method for rapidly positioning of the present invention, the method step are as follows: after step 1, live sensing detection device detect that related distribution device breaks down, the identification number of the distribution device and the voltage value detected are sent to Platform Server together;And the sensing detection device persistently uses the voltage value of the failure distribution device with certain frequency and is sent to Platform Server;Step 2, Platform Server obtain the identification number and voltage value of the distribution device to break down, when persistently obtaining the voltage value within a preset time period, show that failure persistently exists, not report by mistake, Platform Server opens corresponding distribution network figure according to the identification number of the failure distribution device at this time, and is labeled to failure distribution device.A kind of Distribution Network Failure method for rapidly positioning of the present invention, can fast and effectively position abort situation.
Description
Technical field
The present invention relates to a kind of localization methods, carry out more particularly, to one kind person of being convenient to operation to Distribution Network Failure position fast
The method of speed positioning, belongs to technical field of electric power.
Background technique
Electric system in the process of running, the power outage as caused by Distribution Network Failure account for about the 95% of total power outage with
On, in order to realize the quickly isolating to reduce its influence to periphery power distribution network of distribution network systems failure, restore distribution network systems as early as possible
Normal operation, need quickly and accurately to position the failure of power distribution network.
Since distribution regulation personnel lack the monitoring means to distribution fault, accident under traditional network distributing failure emergency repair mode
The monitoring information that electric substation automation system can only be often received after generation, such as 10kV bus single-phase earthing or certain 10kV line
Road emergency stop valve trip, scheduling person on duty can only tentatively judge incident area and range, notice distribution repairing according to the above accident phenomenon
Personnel, and after distribution repair personnel can only passively wait failure to occur, it by virtue of experience goes to the controller switching equipment that may be broken down
It maked an inspection tour, searched, confirm failure;To delay the breakdown repair time, it is unfavorable for that failure is discharged early.
Summary of the invention
The purpose of the present invention is to overcome the above shortcomings and to provide a kind of Distribution Network Failure method for rapidly positioning, can be effective
Quickly abort situation is positioned.
The object of the present invention is achieved like this:
A kind of Distribution Network Failure method for rapidly positioning, the method are based on electricity information disclosure shared platform, the power information hair
Cloth shared platform includes live sensing detection device, Platform Server and information centre's computer,
The scene sensing detection device includes live microprocessor, the wireless module being connected with live microprocessor and more
A sensor, sensor is connected with distribution device detects it, and live microprocessor is built-in with and each sensor phase
Connect unique ID identifier of distribution device;
Information centre's computer is stored with multiple distribution network figures, and the device ID identification number in distribution network figure it is unique and with
The ID number of the distribution device at scene corresponds;
The Platform Server is connected by communication by wireless network and live sensing detection device, and the Platform Server passes through net
Network is communicated by network with information centre computer and is connect;All ID numbers of distribution device are stored in the Platform Server,
And the distribution network figure of information centre's computer is downloaded on local storage by Platform Server, and is built inside Platform Server
A vertical contingency table, by ID number with include that the designation of drawing of distribution network figure of the ID number is corresponding;Hyperlink is established simultaneously, it will
The designation of drawing of electric network figure is associated with the distribution network figure being downloaded on Platform Server;
The method step are as follows:
After step 1, live sensing detection device detect that related distribution device breaks down, by the identification number of the distribution device with
And the voltage value detected is sent to Platform Server together;And the sensing detection device continues to use with certain frequency to be somebody's turn to do
The voltage value of failure distribution device is simultaneously sent to Platform Server;
Step 2, Platform Server obtain the identification number and voltage value of the distribution device to break down, when in the preset period
When inside persistently obtaining the voltage value, show that failure persistently exists, not report by mistake, Platform Server matches wire stitcher according to the failure at this time
The identification number of part opens corresponding distribution network figure, and is labeled to failure distribution device;
Step 3, operator check the distribution network figure in the display device of Platform Server, so as to quick disengagement failure
Circuit where distribution device;Or distribution network figure screenshot is sent to the terminal receiving device of relevant person in charge by Platform Server
Upper (such as mobile phone, plate), consequently facilitating debugging in time.
Compared with prior art, the beneficial effects of the present invention are:
The present invention conveniently can obtain the distribution device to break down according to scene feedback, and can be certainly according to distribution device
It is dynamic to open and push distribution network figure used in the distribution device, consequently facilitating the quick fault point of operating personnel, so as to
Isolated path is planned easily and fast, to repair as early as possible, reduces influence of the failure to periphery power consumer.
Specific embodiment
A kind of Distribution Network Failure method for rapidly positioning of the present invention, it is shared flat that the method is based on electricity information disclosure
Platform, the electricity information disclosure shared platform include live sensing detection device, Platform Server and information centre's computer,
The scene sensing detection device includes live microprocessor, the wireless module being connected with live microprocessor and more
A sensor, sensor is connected with distribution device detects it, and live microprocessor is built-in with and each sensor phase
Connect unique ID identifier of distribution device;
Information centre's computer is stored with multiple distribution network figures, and the device ID identification number in distribution network figure it is unique and with
The ID number of the distribution device at scene corresponds;
The Platform Server is connected by communication by wireless network and live sensing detection device, and the Platform Server passes through net
Network is communicated by network with information centre computer and is connect;All ID numbers of distribution device are stored in the Platform Server,
And the distribution network figure of information centre's computer is downloaded on local storage by Platform Server, and is built inside Platform Server
A vertical contingency table, by ID number with include that the designation of drawing of distribution network figure of the ID number is corresponding;Hyperlink is established simultaneously, it will
The designation of drawing of electric network figure is associated with the distribution network figure being downloaded on Platform Server;
The method step are as follows:
After step 1, live sensing detection device detect that related distribution device breaks down, by the identification number of the distribution device with
And the voltage value detected is sent to Platform Server together;And the sensing detection device continues to use with certain frequency to be somebody's turn to do
The voltage value of failure distribution device is simultaneously sent to Platform Server;
Step 2, Platform Server obtain the identification number and voltage value of the distribution device to break down, when in the preset period
When inside persistently obtaining the voltage value, show that failure persistently exists, not report by mistake, Platform Server matches wire stitcher according to the failure at this time
The identification number of part opens corresponding distribution network figure, and is labeled to failure distribution device;
Step 3, operator check the distribution network figure in the display device of Platform Server, so as to quick disengagement failure
Circuit where distribution device;Or distribution network figure screenshot is sent to the terminal receiving device of relevant person in charge by Platform Server
Upper (such as mobile phone, plate), consequently facilitating debugging in time;
Preferably, Platform Server converts thereof into after the distribution network figure of information centre's computer is downloaded on local storage
CAD formatted file, consequently facilitating the cross-platform opening of operator.
In addition: it should be noted that above-mentioned specific embodiment is only a prioritization scheme of this patent, the skill of this field
Any change or improvement that art personnel are done according to above-mentioned design, within the protection domain of this patent..
Claims (3)
1. a kind of Distribution Network Failure method for rapidly positioning, it is characterised in that: the method is based on electricity information disclosure shared platform, institute
Stating electricity information disclosure shared platform includes live sensing detection device, Platform Server and information centre's computer,
The scene sensing detection device includes live microprocessor, the wireless module being connected with live microprocessor and more
A sensor, sensor is connected with distribution device detects it, and live microprocessor is built-in with and each sensor phase
Connect unique ID identifier of distribution device;
Information centre's computer is stored with multiple distribution network figures, and the device ID identification number in distribution network figure it is unique and with
The ID number of the distribution device at scene corresponds;
The Platform Server is connected by communication by wireless network and live sensing detection device, and the Platform Server passes through net
Network is communicated by network with information centre computer and is connect;All ID numbers of distribution device are stored in the Platform Server,
And the distribution network figure of information centre's computer is downloaded on local storage by Platform Server, and is built inside Platform Server
A vertical contingency table, by ID number with include that the designation of drawing of distribution network figure of the ID number is corresponding;Hyperlink is established simultaneously, it will
The designation of drawing of electric network figure is associated with the distribution network figure being downloaded on Platform Server;
The method step are as follows:
After step 1, live sensing detection device detect that related distribution device breaks down, by the identification number of the distribution device with
And the voltage value detected is sent to Platform Server together;And the sensing detection device continues to use with certain frequency to be somebody's turn to do
The voltage value of failure distribution device is simultaneously sent to Platform Server;
Step 2, Platform Server obtain the identification number and voltage value of the distribution device to break down, when in the preset period
When inside persistently obtaining the voltage value, show that failure persistently exists, not report by mistake, Platform Server matches wire stitcher according to the failure at this time
The identification number of part opens corresponding distribution network figure, and is labeled to failure distribution device.
2. a kind of Distribution Network Failure method for rapidly positioning as described in claim 1, it is characterised in that: step 3, operator are in platform
The distribution network figure is checked in the display device of server, so as to circuit where quick disengagement failure distribution device;Or it is flat
Distribution network figure screenshot is sent on the terminal receiving device of relevant person in charge by platform server, consequently facilitating excluding event in time
Barrier.
3. a kind of Distribution Network Failure method for rapidly positioning as described in claim 1, it is characterised in that: Platform Server is by information centre
The distribution network figure of computer converts thereof into CAD formatted file after being downloaded on local storage.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811648301.XA CN109444674A (en) | 2018-12-30 | 2018-12-30 | A kind of Distribution Network Failure method for rapidly positioning |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811648301.XA CN109444674A (en) | 2018-12-30 | 2018-12-30 | A kind of Distribution Network Failure method for rapidly positioning |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109444674A true CN109444674A (en) | 2019-03-08 |
Family
ID=65542359
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811648301.XA Pending CN109444674A (en) | 2018-12-30 | 2018-12-30 | A kind of Distribution Network Failure method for rapidly positioning |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109444674A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102356571A (en) * | 2011-08-22 | 2012-02-15 | 华为技术有限公司 | Fault detection method and apparatus of optical distribution network and opticla network system |
CN102509198A (en) * | 2011-12-26 | 2012-06-20 | 余姚市供电局 | Method and system for monitoring low-voltage power grid equipment |
CN102998577A (en) * | 2011-09-13 | 2013-03-27 | 国际商业机器公司 | System and method for detecting and localizing abnormal conditions and electrical faults in an electrical grid |
CN104539047A (en) * | 2014-12-23 | 2015-04-22 | 国家电网公司 | Intelligent substation fault diagnosing and positioning method based on multi-factor comparison visualization |
CN106408146A (en) * | 2016-01-20 | 2017-02-15 | 国网新疆电力公司阿勒泰供电公司 | Distribution network entity rapid positioning and first-aid repairing method |
CN107167704A (en) * | 2017-05-16 | 2017-09-15 | 国网山东省电力公司 | Fault Diagnosis of Distribution Network system and method based on CIM |
CN108152660A (en) * | 2016-12-05 | 2018-06-12 | 国网湖北省电力公司襄阳供电公司 | The distant combination system of one Remote Sensing 2 of power matching network fault location |
-
2018
- 2018-12-30 CN CN201811648301.XA patent/CN109444674A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102356571A (en) * | 2011-08-22 | 2012-02-15 | 华为技术有限公司 | Fault detection method and apparatus of optical distribution network and opticla network system |
CN102998577A (en) * | 2011-09-13 | 2013-03-27 | 国际商业机器公司 | System and method for detecting and localizing abnormal conditions and electrical faults in an electrical grid |
CN102509198A (en) * | 2011-12-26 | 2012-06-20 | 余姚市供电局 | Method and system for monitoring low-voltage power grid equipment |
CN104539047A (en) * | 2014-12-23 | 2015-04-22 | 国家电网公司 | Intelligent substation fault diagnosing and positioning method based on multi-factor comparison visualization |
CN106408146A (en) * | 2016-01-20 | 2017-02-15 | 国网新疆电力公司阿勒泰供电公司 | Distribution network entity rapid positioning and first-aid repairing method |
CN108152660A (en) * | 2016-12-05 | 2018-06-12 | 国网湖北省电力公司襄阳供电公司 | The distant combination system of one Remote Sensing 2 of power matching network fault location |
CN107167704A (en) * | 2017-05-16 | 2017-09-15 | 国网山东省电力公司 | Fault Diagnosis of Distribution Network system and method based on CIM |
Non-Patent Citations (1)
Title |
---|
范新桥 等: ""图形化输电线路故障定位系统的研制"", 《电力系统保护与控制》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103606910B (en) | The fault self-recovery method in a kind of outlet of the distribution feeder based on Wide-area Measurement Information dead band | |
CN102306953B (en) | Test method for secondary injection of power distribution automatization system | |
CN102780234B (en) | High-voltage electric debugging method for power generation project | |
CN104090208B (en) | Voltage-type distribution network failure method of disposal | |
CN101587157B (en) | Bus differential protection polarity test method | |
CN101718813B (en) | Method for monitoring voltage acquisition circuit of electric power secondary system | |
CN103490514B (en) | Rural power distribution grid electricity leakage protection device monitoring, controlling and fault detecting method | |
CN107167709A (en) | A kind of electric network fault localization method and alignment system | |
CN103543384A (en) | Method for determining bus ground faults | |
CN102280864A (en) | Post-failure live treatment method for protection device of distribution network system and portable protection device | |
KR102034675B1 (en) | An apparatus and method for circuit breaker restoring by power failure detection remotely for battery charging system of electric vehicle | |
CN104898018A (en) | Automatic pull trial detection and control device for single-phase earth fault of power distribution network | |
CN202127283U (en) | Circuit backup power automatic switching protection device | |
CN104332999A (en) | Automatic main grid power supply transferring strategy generation method for regional power grid | |
CN102565614B (en) | Alternating voltage loop test method | |
CN201601483U (en) | 10kV line live troubleshooting bypass device | |
CN103616610A (en) | Simulation method of monitoring signals in power grid fault line | |
CN109444674A (en) | A kind of Distribution Network Failure method for rapidly positioning | |
CN207518284U (en) | A kind of accident disconnection device of small power incorporating into power network | |
CN103558466A (en) | Method for on-line whole group logic calibration of 10kV protecting device | |
CN102944809B (en) | Method for rapidly identifying power grid fault | |
CN207010200U (en) | Prevent the powered shearing device of transformer station's relay protection debugging primary equipment | |
CN206281921U (en) | The positioner of failure in cabinet control loop | |
CN104348153B (en) | Area power grid master-failure automatically turns power supply control and performs method | |
CN104836189B (en) | It is a kind of can Self-resetting and remote reset electric protective device and its method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190308 |