CN103490514B - Rural power distribution grid electricity leakage protection device monitoring, controlling and fault detecting method - Google Patents

Rural power distribution grid electricity leakage protection device monitoring, controlling and fault detecting method Download PDF

Info

Publication number
CN103490514B
CN103490514B CN201310426261.5A CN201310426261A CN103490514B CN 103490514 B CN103490514 B CN 103490514B CN 201310426261 A CN201310426261 A CN 201310426261A CN 103490514 B CN103490514 B CN 103490514B
Authority
CN
China
Prior art keywords
protection device
leakage protection
master station
trip
leakage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310426261.5A
Other languages
Chinese (zh)
Other versions
CN103490514A (en
Inventor
邓国平
贺伟明
贺铁光
张志辉
陈剑刚
张敏
朱佐平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiangtan Power Supply Co of State Grid Hunan Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Xiangtan Power Supply Co of State Grid Hunan Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiangtan Power Supply Co of State Grid Hunan Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Xiangtan Power Supply Co of State Grid Hunan Electric Power Co Ltd
Priority to CN201310426261.5A priority Critical patent/CN103490514B/en
Publication of CN103490514A publication Critical patent/CN103490514A/en
Application granted granted Critical
Publication of CN103490514B publication Critical patent/CN103490514B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

本发明公开了一种农村配电网漏电保护装置监测和控制及故障巡检的方法,它通过智能终端自动采集各配电台区变压器二次侧的相电流,然后根据是否有跳闸操作记录、是否在规定时间内完成跳闸、跳闸时的相电流大小来判定跳闸类型,并通过控制主站发送跳闸指令到漏电保护装置来检测漏电保护装置是否能正常动作,并且控制主站根据保护启动记录及保护动作结果,来分析当前漏电保护器装置运行情况。本发明能够对各配电台区的漏电保护装置进行远程监控;能够远程控制各配电台区的漏电保护装置动作;能够区分漏电保护装置的动作原因;能够对漏电保护装置进行故障巡检。The invention discloses a method for monitoring and controlling the leakage protection device of a rural distribution network and fault inspection. It automatically collects the phase current of the secondary side of the transformer in each distribution station area through an intelligent terminal, and then according to whether there is a trip operation record, Whether the tripping is completed within the specified time, the phase current at the time of tripping determines the type of tripping, and the master station sends a trip command to the leakage protection device to detect whether the leakage protection device can operate normally, and the control master station is based on the protection start record and The result of the protection action is used to analyze the current operation status of the leakage protector device. The invention can remotely monitor the leakage protection device of each distribution station area; can remotely control the action of the leakage protection device of each distribution station area; can distinguish the action cause of the leakage protection device; and can perform fault inspection on the leakage protection device.

Description

农村配电网漏电保护装置监测和控制及故障巡检的方法Method of Monitoring and Controlling and Fault Inspection of Rural Distribution Network Leakage Protection Device

技术领域technical field

本发明涉及一种农村配电网漏电保护装置监测和控制及故障巡检的方法。The invention relates to a method for monitoring and controlling a leakage protection device of a rural power distribution network and for fault inspection.

背景技术Background technique

我国农村电网通过多年的改造和建设,漏电保护装置(一般由漏电保护器加上交流接触器组成)已广泛普及,成为保障农村客户用电安全的重要防线,但在实际运行管理中对漏电保护装置还处于人工维护的落后状态,无法及时了解漏电保护装置的运行状态,在漏电保护装置跳闸后不能及时发现和处理,并且需台区员到现场恢复通电,无法有效保障供电可靠性,并且人工管理模式无法准确掌握漏电保护装置是否完好、是否正常工作。After many years of transformation and construction in my country's rural power grids, leakage protection devices (generally composed of leakage protectors and AC contactors) have been widely popularized and become an important line of defense to ensure the safety of rural customers' electricity use. The device is still in the backward state of manual maintenance, and it is impossible to know the operating status of the leakage protection device in time. After the leakage protection device trips, it cannot be found and dealt with in time, and the station staff must go to the site to restore the power, which cannot effectively guarantee the reliability of the power supply. The management mode cannot accurately grasp whether the leakage protection device is in good condition and whether it is working normally.

发明内容Contents of the invention

本发明所要解决的技术问题是,提供一种农村配电网漏电保护装置监测和控制及故障巡检的方法,采用该方法能够对各配电台区的漏电保护装置进行远程监控,以及时了解漏电保护装置的运行状态;能够远程控制各配电台区的漏电保护装置动作,以及时恢复供电;能够区分漏电保护装置的动作原因,以方便操作人员进行相应的处理;能够对漏电保护装置进行故障巡检,以及时发现漏电保护装置的故障。The technical problem to be solved by the present invention is to provide a method for monitoring and controlling the leakage protection device of the rural distribution network and fault inspection. By using this method, the leakage protection device of each distribution station area can be remotely monitored, so as to know in time The operating status of the leakage protection device; it can remotely control the action of the leakage protection device in each distribution station area, so as to restore the power supply in time; it can distinguish the reason for the action of the leakage protection device, so that the operator can handle it accordingly; it can control the leakage protection device Fault inspection, in order to find the fault of leakage protection device in time.

为解决上述技术问题,本发明提供的农村配电网漏电保护装置监测和控制及故障巡检的方法,它包括以下步骤:In order to solve the above-mentioned technical problems, the method for monitoring and controlling the leakage protection device of the rural distribution network provided by the present invention and fault inspection, it includes the following steps:

(1)、通过一智能终端控制回路将配电台区的各个出线回路上的漏电保护装置的电源线相连接,将配电台区的各个出线回路上的漏电保护装置的位置信号接点接入相应的智能终端的信号回路,将各个智能终端与一控制主站通过GPRS/CDMA无线连接,通过控制主站远程控制各配电台区的各个出线回路上的漏电保护装置进行跳闸、合闸、解锁合闸操作,通过控制主站实时监测各配电台区的各个出线回路上的漏电保护装置的状态;(1) Connect the power lines of the leakage protection devices on each outlet circuit of the distribution station area through an intelligent terminal control circuit, and connect the position signal contacts of the leakage protection devices on each outlet circuit of the distribution station area The signal circuit of the corresponding intelligent terminal connects each intelligent terminal with a control master station through GPRS/CDMA wireless connection, and remotely controls the leakage protection device on each outlet circuit of each distribution station area through the control master station to trip, close, Unlocking and closing operation, real-time monitoring of the status of leakage protection devices on each outlet circuit of each distribution station area by controlling the master station;

(2)、通过智能终端自动采集各配电台区变压器二次侧的相电流Ia、Ib、Ic并上报至控制主站;(2) Automatically collect the phase currents I a , I b , and I c of the secondary side transformers in each distribution station through the intelligent terminal and report them to the control master station;

(3)、当控制主站监测到有漏电保护装置跳闸时,控制主站查询有无相应的跳闸操作记录,若有,则判定为远程操作跳闸,若没有,则判定为现场跳闸;(3) When the control master station detects that the leakage protection device trips, the control master station inquires whether there is a corresponding trip operation record, if there is, it is judged as a remote operation trip, if not, it is judged as an on-site trip;

(4)、通过控制主站设定漏电保护装置状态检测持续时间t并下发至各个智能终端,现场跳闸时,智能终端检测相应的漏电保护装置是否在时间t内跳闸-合闸-跳闸,若是,则判定漏电保护装置为正常跳闸,若不是,则判定漏电保护装置为异常跳闸;(4) Set the leakage protection device status detection duration t through the control master station and send it to each smart terminal. When the site trips, the smart terminal detects whether the corresponding leakage protection device trips-closes-trips within the time t, If so, it is judged that the leakage protection device is a normal trip, if not, it is judged that the leakage protection device is an abnormal trip;

(5)通过控制主站设定过负荷电流I,现场跳闸时,如果相应的智能终端检测到相应的配电台区变压器二次侧任意一相电流超过I,则判定为过负荷跳闸;(5) Set the overload current I by controlling the master station, and when the site trips, if the corresponding intelligent terminal detects that the current of any phase on the secondary side of the transformer in the corresponding distribution station exceeds I, it will be judged as an overload trip;

(6)、通过控制主站选择配电台区变压器出线回路上的漏电保护装置进行人工远程试验跳闸,当控制主站下发试跳指令后,智能终端检测相应出线回路上的漏电保护装置是否已经跳闸,若是,则智能终端发送试跳成功的信息到控制主站,若不是,则智能终端发送告警信息到控制主站;(6) Select the leakage protection device on the outlet circuit of the transformer in the distribution station area by the control master station to perform manual remote test tripping. After the control master station issues a test trip command, the intelligent terminal detects whether the leakage protection device on the corresponding outlet circuit is It has been tripped, if so, the intelligent terminal sends a message that the trial jump is successful to the control master station, if not, the intelligent terminal sends an alarm message to the control master station;

(7)、通过控制主站设置试跳任务,指定试跳时间和试跳回路,自动在指定时间对指定的配电台区变压器的各个出线回路上的漏电保护装置依次发送跳闸指令,然后通过智能终端检测相应的漏电保护装置是否完成跳闸操作,若是,则智能终端发送漏电保护装置正常的信息到控制主站,并控制漏电保护装置合闸,如不是,则智能终端发送漏电保护装置故障的信息到控制主站。(7) Set the test trip task by controlling the master station, specify the trial trip time and the trial trip circuit, and automatically send trip instructions to the leakage protection devices on each outlet circuit of the transformer in the designated distribution station at the specified time, and then pass The smart terminal detects whether the corresponding leakage protection device has completed the tripping operation. If so, the smart terminal sends the information that the leakage protection device is normal to the control master station, and controls the leakage protection device to close. information to the control master.

(8)、通过控制主站进行漏电保护装置运行状态智能判断,控制主站根据保护启动记录及保护动作结果,来分析当前漏电保护器装置运行情况,当保护启动后,如果漏电保护器跳闸变位正确,则显示漏电保护器正常,当保护启动后,如果漏电保护器跳闸失败,则显示漏电保护器异常。(8) Intelligently judge the operating status of the leakage protection device through the control master station. The control master station analyzes the current operation status of the leakage protector device according to the protection start record and protection action results. After the protection starts, if the leakage protector trips and changes If the bit is correct, it indicates that the leakage protector is normal. When the protection starts, if the leakage protector fails to trip, it indicates that the leakage protector is abnormal.

作为改进,当控制主站接收到漏电保护装置故障的信息时,控制主站通过定制的短信内容,发送短信告知管理人员。As an improvement, when the control master station receives the information of the leakage protection device failure, the control master station will send a short message to inform the management personnel through the customized content of the short message.

采用以上方法后,本发明与现有技术相比,具有以下的优点:After adopting the above method, the present invention has the following advantages compared with the prior art:

本发明接线简单,适用范围广,而且通过控制主站可以实时监测各配电台区的漏电保护装置的运行状态,一旦发现有漏电保护装置跳闸,可以及时发现并处理;通过控制主站可下发指令到相应的智能终端,再由智能终端控制相应的漏电保护装置动作,使得控制主站可以远程控制漏电保护装置执行跳闸、合闸、解锁合闸等动作,在发现有漏电保护装置跳闸时,可以远程控制漏电保护装置合闸,以及时恢复供电;可以区分漏电保护装置的远程操作跳闸、现场跳闸、正常跳闸、异常跳闸、过负荷跳闸,使得操作人员可以根据不同的动作原因进行相应的处理;通过控制主站可以对各配电台区的漏电保护装置进行巡检,也就是说对各配电台区中的各个出线回路上的漏电保护装置依次发送跳闸指令,然后通过智能终端检测相应的漏电保护装置是否完成跳闸操作,以及时发现漏电保护装置的故障,可以及时排除故障。The invention has simple wiring and wide application range, and can monitor the operating status of the leakage protection devices in each distribution station area in real time by controlling the master station. Once a leakage protection device is found to trip, it can be found and processed in time; Send instructions to the corresponding intelligent terminal, and then the intelligent terminal controls the action of the corresponding leakage protection device, so that the control master station can remotely control the leakage protection device to perform actions such as tripping, closing, unlocking and closing, etc. When a leakage protection device is found to trip It can remotely control the closing of the leakage protection device to restore the power supply in time; it can distinguish the remote operation trip, field trip, normal trip, abnormal trip, and overload trip of the leakage protection device, so that the operator can perform corresponding actions according to different action reasons. Processing; through the control of the master station, the leakage protection device of each distribution station area can be inspected, that is to say, the leakage protection device on each outlet circuit in each distribution station area is sent in turn. The trip command is then detected by the intelligent terminal. Whether the corresponding leakage protection device has completed the tripping operation, and the fault of the leakage protection device can be found in time, and the fault can be eliminated in time.

另外,在控制主站接收到漏电保护装置故障的信息时,控制主站可以发送定制短信告知管理人员,以使管理人员可以及时得知漏电保护装置的故障信息,及时到达现场对漏电保护装置进行故障排除。In addition, when the control master station receives the fault information of the leakage protection device, the control master station can send a customized text message to inform the management personnel, so that the management personnel can know the fault information of the leakage protection device in time, and arrive at the scene in time to repair the leakage protection device. troubleshooting.

具体实施方式Detailed ways

下面结合具体实施方式对本发明作进一步详细地说明。The present invention will be described in further detail below in combination with specific embodiments.

本发明提供了一种农村配电网漏电保护装置监测和控制及故障巡检的方法,它包括以下步骤:The invention provides a method for monitoring and controlling the leakage protection device of a rural distribution network and fault inspection, which includes the following steps:

(1)、将一智能终端的控制回路与配电台区的各个出线回路上的漏电保护装置的电源线相连接,将配电台区的各个出线回路上的漏电保护装置的位置信号接点接入相应的智能终端的信号回路,位置信号接点也就是漏电保护器上的用于输出信号的辅助接点,通过位置信号接点可以将漏电保护装置是否完成跳闸动作的信息反馈至相应的智能终端,将各个智能终端与一控制主站GPRS/CDMA无线连接,通过控制主站远程控制各配电台区的各个出线回路上的漏电保护装置进行跳闸、合闸、解锁合闸操作,通过控制主站实时监测各配电台区的各个出线回路上的漏电保护装置的状态;(1) Connect the control circuit of an intelligent terminal with the power line of the leakage protection device on each outlet circuit of the distribution station area, and connect the position signal contacts of the leakage protection device on each outlet circuit of the distribution station area The position signal contact is also the auxiliary contact on the leakage protector for output signals. Through the position signal contact, the information of whether the leakage protection device has completed the tripping action can be fed back to the corresponding smart terminal. Each intelligent terminal is connected with a control master station GPRS/CDMA wirelessly, through the control master station, the leakage protection device on each outlet circuit of each distribution station area is remotely controlled to perform tripping, closing, unlocking and closing operations, and through the control master station in real time Monitor the status of leakage protection devices on each outlet circuit of each distribution station area;

(2)、通过智能终端自动采集各配电台区变压器二次侧的相电流Ia、Ib、Ic并上报至控制主站;(2) Automatically collect the phase currents I a , I b , and I c of the secondary side transformers in each distribution station through the intelligent terminal and report them to the control master station;

(3)、当控制主站监测到有漏电保护装置跳闸时,控制主站查询有在控制主站上无相应的跳闸操作记录,若有,则判定为远程操作跳闸,若没有,则判定为现场跳闸;(3) When the control master station detects that there is a leakage protection device tripping, the control master station inquires whether there is a corresponding tripping operation record on the control master station. If there is, it will be judged as a remote operation trip. If not, it will be judged as a On-site tripping;

(4)、通过控制主站设定漏电保护装置状态检测持续时间t并下发至各个智能终端,现场跳闸时,智能终端检测相应的漏电保护装置是否在时间t内跳闸-合闸-跳闸,若是,则判定漏电保护装置为正常跳闸,若不是,则判定漏电保护装置为异常跳闸,(4) Set the leakage protection device status detection duration t through the control master station and send it to each smart terminal. When the site trips, the smart terminal detects whether the corresponding leakage protection device trips-closes-trips within the time t, If yes, it is judged that the leakage protection device is a normal trip, if not, it is judged that the leakage protection device is an abnormal trip,

(5)通过控制主站设定过负荷电流I,现场跳闸时,如果相应的智能终端检测到相应的配电台区变压器二次侧任意一相电流超过I,则判定为过负荷跳闸;(5) Set the overload current I by controlling the master station, and when the site trips, if the corresponding intelligent terminal detects that the current of any phase on the secondary side of the transformer in the corresponding distribution station exceeds I, it will be judged as an overload trip;

(6)、通过控制主站选择配电台区变压器出线回路上的漏电保护装置进行人工远程试验跳闸,当控制主站下发试跳指令后,智能终端检测相应出线回路上的漏电保护装置是否已经跳闸,也就是说智能终端检测相应出线回路上的漏电保护装置的位置信号接点是否有完成合闸的信息反馈至智能终端,若是,则智能终端发送试跳成功的信息到控制主站,若不是,则智能终端发送告警信息到控制主站;(6) Select the leakage protection device on the outlet circuit of the transformer in the distribution station area by the control master station to perform manual remote test tripping. After the control master station issues a test trip command, the intelligent terminal detects whether the leakage protection device on the corresponding outlet circuit is It has tripped, that is to say, the smart terminal detects whether the position signal contact of the leakage protection device on the corresponding outlet circuit has completed the closing information and feeds back to the smart terminal. If not, the intelligent terminal sends an alarm message to the control master station;

(7)、通过控制主站设置试跳任务,指定试跳时间和试跳回路,自动在指定时间(零点左右,用户闲时)对指定的配电台区变压器的各个出线回路上的漏电保护装置依次发送跳闸指令,然后通过智能终端检测相应的漏电保护装置是否完成跳闸操作,若是,则智能终端发送漏电保护装置正常的信息到控制主站,并控制漏电保护装置合闸,如不是,则智能终端发送漏电保护装置故障的信息到控制主站。以此判断现场漏电保护器的接线是否正常,不正常则汇总给管理人员。(7) Set the test jump task by controlling the master station, specify the test jump time and the test jump circuit, and automatically protect the leakage protection on each outlet circuit of the transformer in the designated distribution station at the specified time (around zero, when the user is idle) The device sends tripping instructions in sequence, and then detects whether the corresponding leakage protection device has completed the tripping operation through the intelligent terminal. The intelligent terminal sends the fault information of the leakage protection device to the control master station. Use this to judge whether the wiring of the leakage protector on site is normal, and if it is abnormal, it will be summarized and reported to the management personnel.

(8)、通过控制主站进行漏电保护器运行状态智能判断,采取主站系统根据因保护启动记录及保护动作结果(即漏电保护器变位)的两种数据,来分析当前漏电保护器装置运行情况。当保护启动后,如果漏电保护器跳闸变位正确,则显示漏电保护器正常;当保护启动后,如果漏电保护器跳闸失败,则显示漏电保护器异常。(8) Intelligently judge the operating status of the leakage protector by controlling the master station, and use the master station system to analyze the current leakage protector device based on the two data of the start record of the protection and the result of the protection action (that is, the displacement of the leakage protector) operating conditions. When the protection starts, if the leakage protector trips and shifts correctly, it will display that the leakage protector is normal; when the protection starts, if the leakage protector fails to trip, it will display that the leakage protector is abnormal.

当控制主站接收到漏电保护装置故障的信息时,控制主站发送可定制内容短信告知管理人员。When the control master station receives the information about the failure of the leakage protection device, the control master station will send a short message with customizable content to inform the management personnel.

以上仅就本发明应用较佳的实例做出了说明,但不能理解为是对权利要求的限制,本发明的结构可以有其他变化,不局限于上述结构。总之,凡在本发明的独立权利要求的保护范围内所作的各种变化均在本发明的保护范围内。The above is only a description of the preferred examples of the application of the present invention, but it should not be construed as a limitation on the claims. The structure of the present invention can have other changes and is not limited to the above structure. In a word, all the various changes made within the protection scope of the independent claims of the present invention are within the protection scope of the present invention.

Claims (2)

1.一种农村配电网漏电保护装置监测和控制及故障巡检的方法,其特征在于,它包括以下步骤:1. A method for monitoring and controlling and fault inspection of a rural power distribution network leakage protection device, is characterized in that it comprises the following steps: (1)、通过一智能终端控制回路将配电台区的各个出线回路上的漏电保护装置的电源线相连接,将配电台区的各个出线回路上的漏电保护装置的位置信号接点接入相应的智能终端的信号回路,将各个智能终端与一控制主站通过GPRS/CDMA无线连接,通过控制主站远程控制各配电台区的各个出线回路上的漏电保护装置进行跳闸、合闸、解锁合闸操作,通过控制主站实时监测各配电台区的各个出线回路上的漏电保护装置的状态;(1) Connect the power lines of the leakage protection devices on each outlet circuit of the distribution station area through an intelligent terminal control circuit, and connect the position signal contacts of the leakage protection devices on each outlet circuit of the distribution station area The signal circuit of the corresponding intelligent terminal connects each intelligent terminal with a control master station through GPRS/CDMA wireless connection, and remotely controls the leakage protection device on each outlet circuit of each distribution station area through the control master station to trip, close, Unlocking and closing operation, real-time monitoring of the status of leakage protection devices on each outlet circuit of each distribution station area by controlling the master station; (2)、通过智能终端自动采集各配电台区变压器二次侧的相电流Ia、Ib、Ic并上报至控制主站;(2) Automatically collect the phase currents I a , I b , and I c of the secondary side transformers in each distribution station through the intelligent terminal and report them to the control master station; (3)、当控制主站监测到有漏电保护装置跳闸时,控制主站查询有无相应的跳闸操作记录,若有,则判定为远程操作跳闸,若没有,则判定为现场跳闸;(3) When the control master station detects that the leakage protection device trips, the control master station inquires whether there is a corresponding trip operation record, if there is, it is judged as a remote operation trip, if not, it is judged as an on-site trip; (4)、通过控制主站设定漏电保护装置状态检测持续时间t并下发至各个智能终端,现场跳闸时,智能终端检测相应的漏电保护装置是否在时间t内跳闸-合闸-跳闸,若是,则判定漏电保护装置为正常跳闸,若不是,则判定漏电保护装置为异常跳闸;(4) Set the leakage protection device status detection duration t by controlling the master station and send it to each smart terminal. When the site trips, the smart terminal detects whether the corresponding leakage protection device trips-closes-trips within the time t, If so, it is judged that the leakage protection device is a normal trip, if not, it is judged that the leakage protection device is an abnormal trip; (5)通过控制主站设定过负荷电流I,现场跳闸时,如果相应的智能终端检测到相应的配电台区变压器二次侧任意一相电流超过I,则判定为过负荷跳闸;(5) By controlling the master station to set the overload current I, when the site trips, if the corresponding intelligent terminal detects that any phase current on the secondary side of the transformer in the corresponding distribution station exceeds I, then it is determined to be an overload trip; (6)、通过控制主站选择配电台区变压器出线回路上的漏电保护装置进行人工远程试验跳闸,当控制主站下发试跳指令后,智能终端检测相应出线回路上的漏电保护装置是否已经跳闸,若是,则智能终端发送试跳成功的信息到控制主站,若不是,则智能终端发送告警信息到控制主站;(6) Select the leakage protection device on the outlet circuit of the transformer in the distribution station area by the control master station to perform manual remote test tripping. After the control master station issues a test jump command, the intelligent terminal detects whether the leakage protection device on the corresponding outlet circuit is It has been tripped, if so, the intelligent terminal sends a message that the trial jump is successful to the control master station, if not, the intelligent terminal sends an alarm message to the control master station; (7)、通过控制主站设置试跳任务,指定试跳时间和试跳回路,自动在指定时间对指定的配电台区变压器的各个出线回路上的漏电保护装置依次发送跳闸指令,然后通过智能终端检测相应的漏电保护装置是否完成跳闸操作,若是,则智能终端发送漏电保护装置正常的信息到控制主站,并控制漏电保护装置合闸,如不是,则智能终端发送漏电保护装置故障的信息到控制主站;(7) Set the test trip task by controlling the master station, specify the trial trip time and the trial trip circuit, and automatically send trip instructions to the leakage protection devices on each outlet circuit of the transformer in the designated distribution station at the specified time, and then pass The smart terminal detects whether the corresponding leakage protection device has completed the tripping operation. If so, the smart terminal sends the information that the leakage protection device is normal to the control master station, and controls the leakage protection device to close. Information to the control master station; (8)、通过控制主站进行漏电保护装置运行状态智能判断,控制主站根据保护启动记录及保护动作结果,来分析当前漏电保护器装置运行情况,当保护启动后,如果漏电保护器跳闸变位正确,则显示漏电保护器正常,当保护启动后,如果漏电保护器跳闸失败,则显示漏电保护器异常。(8) Through the intelligent judgment of the operating status of the leakage protection device through the control master station, the control master station analyzes the current operation status of the leakage protector device according to the protection start record and protection action results. After the protection is started, if the leakage protector trips and changes If the bit is correct, it indicates that the leakage protector is normal. When the protection starts, if the leakage protector fails to trip, it indicates that the leakage protector is abnormal. 2.根据权利要求1所述的农村配电网漏电保护装置监测和控制及故障巡检的方法,其特征在于:当控制主站接收到漏电保护装置故障的信息时,控制主站通过定制的短信内容,发送短信告知管理人员。2. The method for monitoring and controlling the leakage protection device of rural power distribution network according to claim 1 and the method for fault inspection, characterized in that: when the control master station receives the information of the leakage protection device failure, the control master station passes the customized SMS content, send a text message to inform the management personnel.
CN201310426261.5A 2013-09-18 2013-09-18 Rural power distribution grid electricity leakage protection device monitoring, controlling and fault detecting method Active CN103490514B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310426261.5A CN103490514B (en) 2013-09-18 2013-09-18 Rural power distribution grid electricity leakage protection device monitoring, controlling and fault detecting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310426261.5A CN103490514B (en) 2013-09-18 2013-09-18 Rural power distribution grid electricity leakage protection device monitoring, controlling and fault detecting method

Publications (2)

Publication Number Publication Date
CN103490514A CN103490514A (en) 2014-01-01
CN103490514B true CN103490514B (en) 2015-02-04

Family

ID=49830539

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310426261.5A Active CN103490514B (en) 2013-09-18 2013-09-18 Rural power distribution grid electricity leakage protection device monitoring, controlling and fault detecting method

Country Status (1)

Country Link
CN (1) CN103490514B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105990820A (en) * 2015-03-18 2016-10-05 南华大学 Short-circuit fault tripping method for improving power supply reliability of rural power grid
CN105226618A (en) * 2015-09-23 2016-01-06 国网山东桓台县供电公司 Earth leakage protective device and leakage switch centralized control method
CN107976603A (en) * 2017-11-21 2018-05-01 国网山东省电力公司淄博供电公司 Portable concentrated gas meter box earth detector
CN109031023A (en) * 2018-08-16 2018-12-18 杭州华春科技有限公司 A kind of current leakage detection system with tripping catch function
CN108879967B (en) * 2018-09-19 2024-10-01 广东电网有限责任公司 Distribution transformer area outgoing line branch line switch tripping alarm system
CN112421782A (en) * 2020-11-20 2021-02-26 云南电网有限责任公司临沧供电局 Leakage protection switch on-line monitoring device
CN113030715B (en) * 2021-03-02 2024-03-26 国网浙江省电力有限公司湖州供电公司 Residual current operated circuit breaker performance detection device and fault judgment method
CN114389369B (en) * 2022-03-23 2022-07-05 广东承能电力安装有限公司 Intelligent monitoring system and method for electric room load
CN116760191A (en) * 2023-08-15 2023-09-15 国网山西省电力公司晋中供电公司 Power load debugging method and device

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101090425B1 (en) * 2009-09-28 2011-12-07 한국전력공사 Distribution Protection Cooperation System and Operation Method
CN102510128A (en) * 2011-10-27 2012-06-20 王成楷 Intelligent electric leakage remote monitoring protector of low-voltage power grid
CN203086238U (en) * 2012-11-23 2013-07-24 中国西电电气股份有限公司 Intelligent high-voltage switch control signal conversion equipment
CN203086241U (en) * 2012-12-09 2013-07-24 国家电网公司 Electric leakage protection test monitoring system

Also Published As

Publication number Publication date
CN103490514A (en) 2014-01-01

Similar Documents

Publication Publication Date Title
CN103490514B (en) Rural power distribution grid electricity leakage protection device monitoring, controlling and fault detecting method
CN106501631B (en) High voltage DC breaker lightning arrester connected in parallel leakage current monitoring device and method
CN106124935A (en) Middle and low voltage network Fault Locating Method
CN102299563B (en) Digital-analog (DA) protection method for intelligent distribution network
CN103606909A (en) Protecting system and method for power distribution network circuit
CN204349579U (en) A kind of distribution line automatic switching system
CN114460888A (en) A smart energy management system
CN107508264A (en) A kind of site route protection does not have a power failure drive method
CN102624090B (en) Based on the intelligent high-pressure panel switches of electronic mutual inductor
CN104332999B (en) Area power grid major network turns power supply strategy-generating method automatically
CN102636705B (en) A remote leakage protector fault and AC contactor blockage or fault judgment device and its analysis method
CN108828344A (en) One kind is for substation line protective device pressing plate detection alarm method and device
CN105186471A (en) Power distribution network line fault detection device and method
CN103675520A (en) Remote analysis method for determining leakage protector faults and AC contactor obstruction or faults
CN106680708A (en) Electrical life test monitoring protector for low-voltage alternating-current circuit breaker and application thereof
CN202333747U (en) Electric leakage protection device of guard ground system
CN105071249A (en) Intelligent low voltage power distribution box
CN110473747B (en) Circuit breaker and circuit breaker operation identification method
CN204925230U (en) Single -phase residual capacity signal trigger ware
CN204885910U (en) An intelligent low-voltage distribution box
CN103854711B (en) A kind of method of analytical reactions heap shutdown breaker opening times performance
CN102121960A (en) Intelligent fault judging device for self-closed through line of railway distribution network
CN106841743B (en) Method and device for detecting and controlling secondary side of transformer
CN106159909A (en) The protection of controller switching equipment intelligent switch-on controls device
CN205791495U (en) The protection of controller switching equipment intelligent switch-on controls device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant