CN109442374A - Gas baffle structure between a kind of horizontal rubbish Economizer of Heat Recovery Boiler tube panel - Google Patents

Gas baffle structure between a kind of horizontal rubbish Economizer of Heat Recovery Boiler tube panel Download PDF

Info

Publication number
CN109442374A
CN109442374A CN201811373815.9A CN201811373815A CN109442374A CN 109442374 A CN109442374 A CN 109442374A CN 201811373815 A CN201811373815 A CN 201811373815A CN 109442374 A CN109442374 A CN 109442374A
Authority
CN
China
Prior art keywords
tube panel
economizer
baffle
heat recovery
recovery boiler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811373815.9A
Other languages
Chinese (zh)
Inventor
韩瑞锋
李志扬
王志超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Huaguang Boiler Co Ltd
Original Assignee
Wuxi Huaguang Boiler Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Huaguang Boiler Co Ltd filed Critical Wuxi Huaguang Boiler Co Ltd
Priority to CN201811373815.9A priority Critical patent/CN109442374A/en
Publication of CN109442374A publication Critical patent/CN109442374A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22DPREHEATING, OR ACCUMULATING PREHEATED, FEED-WATER FOR STEAM GENERATION; FEED-WATER SUPPLY FOR STEAM GENERATION; CONTROLLING WATER LEVEL FOR STEAM GENERATION; AUXILIARY DEVICES FOR PROMOTING WATER CIRCULATION WITHIN STEAM BOILERS
    • F22D1/00Feed-water heaters, i.e. economisers or like preheaters
    • F22D1/02Feed-water heaters, i.e. economisers or like preheaters with water tubes arranged in the boiler furnace, fire tubes, or flue ways
    • F22D1/04Feed-water heaters, i.e. economisers or like preheaters with water tubes arranged in the boiler furnace, fire tubes, or flue ways the tubes having plain outer surfaces, e.g. in vertical arrangement
    • F22D1/06Feed-water heaters, i.e. economisers or like preheaters with water tubes arranged in the boiler furnace, fire tubes, or flue ways the tubes having plain outer surfaces, e.g. in vertical arrangement in horizontal arrangement
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F9/00Casings; Header boxes; Auxiliary supports for elements; Auxiliary members within casings
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F9/00Casings; Header boxes; Auxiliary supports for elements; Auxiliary members within casings
    • F28F9/007Auxiliary supports for elements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F2275/00Fastening; Joining
    • F28F2275/20Fastening; Joining with threaded elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Incineration Of Waste (AREA)

Abstract

The present invention relates to horizontal rubbish waste heat boiler technical fields, gas baffle structure between specially a kind of horizontal rubbish Economizer of Heat Recovery Boiler tube panel, its abrasion that can effectively reduce economizer tube, improve the reliability and safety of boiler operatiopn, it includes left tube panel and right tube panel, it is characterized in that, the gap location of the left tube panel and the right tube panel is equipped with baffle mechanism, the baffle mechanism includes strip baffle, the strip baffle is installed on the left tube panel or the right tube panel by U bolt, the supporting block for being used to support the U bolt is installed on the left tube panel or the right tube panel, partition is provided between the strip baffle and the left tube panel or the right tube panel.

Description

Gas baffle structure between a kind of horizontal rubbish Economizer of Heat Recovery Boiler tube panel
Technical field
The present invention relates to horizontal rubbish waste heat boiler technical field, specially a kind of horizontal rubbish Economizer of Heat Recovery Boiler pipe Gas baffle structure between screen.
Background technique
It is burned in bedroom waste heat boiler back-end ductwork in fire grate garbage, is generally disposed with superheater, reheater, economizer, It is structurally characterized in that convection heating surface tube bank is vertically hung in horizontal flue, restrains by upper and lower two concentrate tubes and vertical tube group At being arranged by rows in back-end ductwork along boiler width direction.Wherein economizer region is compared to other heating surface areas Domain, tube bank arrangement is intensive, and flue gas flow rate is higher, and unreasonable, smoke corridor easy to form is arranged in tube bank.But since structure limits System, causes two groups of tube panel gaps of economizer or so excessive, a large amount of flue gases can circulate by this gap, walk to form flue gas Corridor.The flue gas flow rate in usual smoke corridor region is 3 ~ 4 times bigger than normal flow again, therefore the economizer tube in the position is ground Damage is much more serious than normal wear, there is very big security risk.
Summary of the invention
In order to solve it is existing because smoke corridor there are due to cause economizer tube serious wear, there is very big security risk The problem of, the present invention provides gas baffle structures between a kind of horizontal rubbish Economizer of Heat Recovery Boiler tube panel, can effectively subtract The abrasion of few economizer tube, improves the reliability and safety of boiler operatiopn.
Its technical solution is such that gas baffle structure between a kind of horizontal rubbish Economizer of Heat Recovery Boiler tube panel, packet Include left tube panel and right tube panel, which is characterized in that the gap location of the left tube panel and the right tube panel is equipped with baffle mechanism, described Baffle mechanism includes strip baffle, and the strip baffle is installed on the left tube panel or the right tube panel by U bolt, described The supporting block for being used to support the U bolt, the strip baffle and the left pipe are installed on left tube panel or the right tube panel Partition is provided between screen or the right tube panel.
It is further characterized by the strip baffle is constituted by welding at least two blocks of steel plates on angle steel;
The U bolt both ends are separately connected the angle steel and the steel plate and are fixed by nut;
The strip baffle is installed on the left tube panel or the right tube panel by two U bolts;
The supporting block is the round steel for being welded in the left tube panel or the right tube panel;
The partition is welded in the strip baffle.
After adopting the structure of the invention, original biggish gap is separated by two free air spaces by strip baffle, subtracted The abrasion for having lacked economizer tube is realized by partition and U bolt and is fixed, improves the reliability and safety of boiler operatiopn.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention;
Fig. 2 is structural schematic diagram at I in Fig. 1;
Fig. 3 be in Fig. 2 A to baffle arrangement structural schematic diagram;
Fig. 4 is structural schematic diagram at II in Fig. 2;
Fig. 5 be in Fig. 4 B to baffle mechanism structural schematic diagram.
Specific embodiment
See Fig. 1, Fig. 2, Fig. 3, Fig. 4, shown in Fig. 5, gas baffle knot between a kind of horizontal rubbish Economizer of Heat Recovery Boiler tube panel Structure comprising the gap location of Zuo Guanping 1 and right tube panel 2, Zuo Guanping 1 and right tube panel 2 is equipped with baffle mechanism, and baffle mechanism includes Strip baffle 3, strip baffle 3 are installed on right tube panel 2 by two U bolts 4, are equipped on right tube panel 2 and are used to support U-shaped spiral shell The supporting block 5 of bolt 4, is provided with partition 6 between strip baffle 2 and right tube panel 2, for convenience, partition 6 is directly fixed on strip gear Plate 3.Specifically, strip baffle 3 is constituted by welding two pieces of steel plate 3-2 on angle steel 3-1,4 both ends of U bolt are separately connected angle steel 3- 1 and steel plate 3-2 is simultaneously fixed by nut 7, and structure is simple, and materials are convenient, and installing and dismounting also facilitates;Supporting block 5 is to be welded in the right side The round steel of tube panel 2 effectively prevent strip baffle 3 to glide, and does not need the large area welding on tube panel, can avoid damage to pipe Son.

Claims (6)

1. gas baffle structure between a kind of horizontal rubbish Economizer of Heat Recovery Boiler tube panel comprising left tube panel and right tube panel, it is special Sign is that the gap location of the left tube panel and the right tube panel is equipped with baffle mechanism, and the baffle mechanism includes strip baffle, The strip baffle is installed on the left tube panel or the right tube panel by U bolt, on the left tube panel or the right tube panel The supporting block for being used to support the U bolt is installed, is set between the strip baffle and the left tube panel or the right tube panel It is equipped with partition.
2. gas baffle structure between a kind of horizontal rubbish Economizer of Heat Recovery Boiler tube panel according to claim 1, feature It is, the strip baffle is constituted by welding at least two blocks of steel plates on angle steel.
3. gas baffle structure between a kind of horizontal rubbish Economizer of Heat Recovery Boiler tube panel according to claim 1, feature It is, the U bolt both ends are separately connected the angle steel and the steel plate and are fixed by nut.
4. gas baffle structure between a kind of horizontal rubbish Economizer of Heat Recovery Boiler tube panel according to claim 1, feature It is, the strip baffle is installed on the left tube panel or the right tube panel by two U bolts.
5. gas baffle structure between a kind of horizontal rubbish Economizer of Heat Recovery Boiler tube panel according to claim 1, feature It is, the supporting block is the round steel for being welded in the left tube panel or the right tube panel.
6. gas baffle structure between a kind of horizontal rubbish Economizer of Heat Recovery Boiler tube panel according to claim 1, feature It is, the partition is welded in the strip baffle.
CN201811373815.9A 2018-11-19 2018-11-19 Gas baffle structure between a kind of horizontal rubbish Economizer of Heat Recovery Boiler tube panel Pending CN109442374A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811373815.9A CN109442374A (en) 2018-11-19 2018-11-19 Gas baffle structure between a kind of horizontal rubbish Economizer of Heat Recovery Boiler tube panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811373815.9A CN109442374A (en) 2018-11-19 2018-11-19 Gas baffle structure between a kind of horizontal rubbish Economizer of Heat Recovery Boiler tube panel

Publications (1)

Publication Number Publication Date
CN109442374A true CN109442374A (en) 2019-03-08

Family

ID=65553891

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811373815.9A Pending CN109442374A (en) 2018-11-19 2018-11-19 Gas baffle structure between a kind of horizontal rubbish Economizer of Heat Recovery Boiler tube panel

Country Status (1)

Country Link
CN (1) CN109442374A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204629509U (en) * 2015-03-12 2015-09-09 无锡华光锅炉股份有限公司 Gas baffle device between economizer tube panel
CN105485692A (en) * 2015-03-12 2016-04-13 无锡华光锅炉股份有限公司 Flue gas damper device used between coal economizer tube panels
CN209801458U (en) * 2018-11-19 2019-12-17 无锡华光锅炉股份有限公司 flue gas baffle structure between tube panels of economizer of horizontal garbage waste heat boiler

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204629509U (en) * 2015-03-12 2015-09-09 无锡华光锅炉股份有限公司 Gas baffle device between economizer tube panel
CN105485692A (en) * 2015-03-12 2016-04-13 无锡华光锅炉股份有限公司 Flue gas damper device used between coal economizer tube panels
CN209801458U (en) * 2018-11-19 2019-12-17 无锡华光锅炉股份有限公司 flue gas baffle structure between tube panels of economizer of horizontal garbage waste heat boiler

Similar Documents

Publication Publication Date Title
ES2214941B2 (en) COLLECTING ELEMENTS OF CFB IMPACT TYPE PARTICLES, UNITED TO REFRIGERATED SUPPORTS.
CN203940411U (en) A kind of arrangement of convection superheater
CN102042600B (en) Circulating fluidized bed refuse incineration boiler
TW201638526A (en) Exhaust duct and boiler
CN201526976U (en) Refuse-fired boiler for circulating fluidized bed
JP6076511B2 (en) Fluidized bed boiler including support structure for particle separator
CN109442374A (en) Gas baffle structure between a kind of horizontal rubbish Economizer of Heat Recovery Boiler tube panel
CN209801458U (en) flue gas baffle structure between tube panels of economizer of horizontal garbage waste heat boiler
CN106642063B (en) A kind of novel superheater hanging apparatus
US20070175413A1 (en) Suspended steam boiler
CN109084323B (en) Dust deposit baffle device is prevented to big bellows
US2114619A (en) Apparatus for burning bagasse and like fuels
CN206377645U (en) A kind of new superheater hanging apparatus
CN206787349U (en) A kind of spiral finned tube heat-exchanger rig utilized for Large Copacity fume afterheat
CN208859643U (en) Big bellows accumulatingdust baffle plate device
CN211011326U (en) Horizontal over heater installation device
CN103742900B (en) A kind of Anti-abrasion water wall tube panel
US3971345A (en) Coal fired package boiler
CN105485692B (en) Gas baffle device between a kind of economizer tube panel
CN207539927U (en) A kind of coal saving tube shoe
CN110873333A (en) Natural circulation vertical waste liquid incineration boiler
CN210921430U (en) Coal economizer structure of salt-containing waste liquid incineration boiler
CN217584501U (en) Smoke-isolating device in boiler flue
CN219510771U (en) Anti-wear structure for horizontal heating surface tube panel hanging tube of pulverized coal boiler
RU2570954C1 (en) Water heating boiler with rectangular cross-section

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination