CN206377645U - A kind of new superheater hanging apparatus - Google Patents

A kind of new superheater hanging apparatus Download PDF

Info

Publication number
CN206377645U
CN206377645U CN201621416026.5U CN201621416026U CN206377645U CN 206377645 U CN206377645 U CN 206377645U CN 201621416026 U CN201621416026 U CN 201621416026U CN 206377645 U CN206377645 U CN 206377645U
Authority
CN
China
Prior art keywords
superheater
fixed
fixed frame
steel
hanging apparatus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201621416026.5U
Other languages
Chinese (zh)
Inventor
罗誉娅
简应富
余军华
徐广夺
吴春芳
姜天天
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINSHIJI ENERGY ENVIRONMENTAL PROTECTION ENGINEERING Co Ltd HANGZHOU
Original Assignee
XINSHIJI ENERGY ENVIRONMENTAL PROTECTION ENGINEERING Co Ltd HANGZHOU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINSHIJI ENERGY ENVIRONMENTAL PROTECTION ENGINEERING Co Ltd HANGZHOU filed Critical XINSHIJI ENERGY ENVIRONMENTAL PROTECTION ENGINEERING Co Ltd HANGZHOU
Priority to CN201621416026.5U priority Critical patent/CN206377645U/en
Application granted granted Critical
Publication of CN206377645U publication Critical patent/CN206377645U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to a kind of new superheater hanging apparatus.The device that purpose is to provide should be able to offer convenience to the pipe operation of changing in the maintenance and running of superheater, and can reduce the hoisting cost of superheater, while can also improve the stability of superheater section.Technical scheme is:A kind of new superheater hanging apparatus, it is characterised in that:The device includes the fixed frame being horizontally fixed in horizontal flue header and several suspending assemblies being removably hooked on superheater on fixed frame;The fixed frame is the rectangular frame of two channel-section steels and two steel truss compositions;The suspending assembly includes the boatswain chair being fixed by socket with superheater tube and the hook pin for hanging cooperation is fixed and hooked with the boatswain chair with fixed frame.

Description

A kind of new superheater hanging apparatus
Technical field
The utility model is related to garbage burning boiler, specially a kind of new superheater hanging apparatus.
Background technology
With developing rapidly for city, domestic waste problem is increasingly serious, how to realize that domestic waste is harmless Change, minimizing and recycling turn into the worldwide a great problem faced.Wherein garbage burning boiler is used as a kind of garbage disposal Mode has been widely applied at home.
In bulky refuse burning boiler, superheater is often arranged vertically in boiler flue with snakelike form of tubes.In order to Pipe deformation is reduced, in coiled pipe elbow by hanging the components such as hoop, suspension rod, superheater is lifted on top plate beam.This lifting Structure make it that the suspension centre on superheater is densely distributed, and space is narrow, and hoisting cost is higher.Simultaneously because snakelike pipe bend and elbow Between spacing it is smaller, it is impossible to be designed with suspension centre in each coiled pipe elbow, therefore, the bend part of suspension centre be not installed Leave pipe relative deformation generation, influence pipe service life.Further, since entering the complexity of stove component of refuse, water capacity Larger with hot-restriking die, there is the flue gas produced after burning the high temperature corrosion in very strong corrosivity, burning process mainly just to send out Life is easier pipe explosion accident occur in superheater area, the miscellaneous part that superheater is compared in boiler.Using superheater hanging side Maintenance and replacing of the formula structure to superheater piping also bring inconvenience.
Utility model content
The purpose of this utility model is to overcome the shortcomings of that above-mentioned background technology new is used for waste incineration pot there is provided a kind of The superheater hanging apparatus of stove, the device should be able to offer convenience to the pipe operation of changing in the maintenance and running of superheater, and The hoisting cost of superheater can be reduced, while can also improve the stability of superheater section.
The technical solution adopted in the utility model is as follows:
A kind of new superheater hanging apparatus, it is characterised in that:The device includes being horizontally fixed on horizontal flue header On fixed frame and several suspending assemblies for being removably hooked on superheater on fixed frame;
The fixed frame is the rectangular frame of two channel-section steels and two steel truss compositions;
The suspending assembly includes the boatswain chair being fixed by socket with superheater tube and fixes and hung with described with fixed frame Plate hooks the hook pin for hanging cooperation.
Described steel truss include two plate faces vertically arrangement and it is opposite and to steel plate strip, several reinforced slabs are embedded in Between the two steel plate strips and two ends of each reinforced slab are welded and fixed with two steel plate strips respectively.
The opening of the channel-section steel towards on the outside of fixed frame and opening symmetrical center line parallel to horizontal plane, welded in opening Connect the fixed floor that several are arranged vertically.
The support being fixedly connected respectively with channel-section steel parallel to steel truss and two ends is there also is provided in the middle part of the fixed frame Part, the bottom of the support member is fixedly connected by location-plate with horizontal flue header.
The boatswain chair is by sleeve pipe welding equipment on the pipe of superheater;The hook pin is weldingly fixed on fixed frame.
The suspending assembly welding equipment is on the inside of superheater fixed frame.
The support member is I-steel.
The utility model has the advantage that:Superheater is lifted on horizontal flue collection by the utility model using fixed frame On case.This structure need not set suspension centre in superheater elbow, largely reduce the hoisting cost of superheater.And Fixed by suspending way, once pipe explosion accident occurs in superheater, it is well-to-do not only to repair and change pipe working space, and changes plumber Also more conventional hanging form is measured to reduce.Meanwhile, superheater is fixed on horizontal flue by frame structure, overall structure More stablize, be conducive to improving the service life of superheater section.
Brief description of the drawings
Fig. 1 is the main structure diagram of the utility model use state.
The attached of Fig. 2 the utility model use states regards structural representation.
Fig. 3 is the A portions mplifying structure schematic diagram in Fig. 1.
Fig. 4 is Fig. 3 overlook direction schematic diagram.
Fig. 5 is B in Fig. 2 to structural representation.
Embodiment
With reference to Figure of description, the utility model is described in further detail, but the utility model be not limited to Lower embodiment.
Novel superheating device hanging apparatus shown in Fig. 1, including fix and (be welded and fixed) in horizontal cigarette by fixing steel plate 4 Fixed frame 3 in road header 2 and removably hooking is connected to several hanging groups on fixed frame by superheater 1 Part;So as to which by suspending way, superheater is lifted in horizontal flue header.
The fixed frame includes two channel-section steel 3-1 being parallel to each other and two steel truss being parallel to each other, and constitutes one Horizontally disposed rectangular frame (channel-section steel is welded to connect with steel truss joining place).The opening of the channel-section steel is towards on the outside of fixed frame And the symmetrical center line of opening is parallel to horizontal plane, several floor 3-2 arranged vertically are welded and fixed in opening;The rib Plate is equably welded in channel-section steel according to certain spacing, thus the contour shape of floor and the groove of channel-section steel match (floor In the groove of channel-section steel, its outside is concordant with the edge of channel-section steel groove);The spacing of floor is controlled in 300mm or so two-by-two, with Floor is set to be uniformly distributed in the groove of whole piece channel-section steel.Floor thickness is more than 6mm, preferably 8mm.The bottom of channel-section steel is fixed Fixing steel plate in horizontal flue header.The model and length of the channel-section steel are according to the width of garbage burning boiler horizontal flue Determined with the size of superheater.In view of integrally-built stability, preferably channel-section steel model 20a.
In the steel truss, two steel plate strip 3-3 plate face arranges (width is perpendicular to horizontal plane) and two vertically Plate face is opposite and right, and several reinforced slabs 3-4 is embedded between two steel plate strips, the two ends of each reinforced slab respectively with two steel Lath is welded and fixed.The plane of the reinforced slab perpendicular to steel plate strip plane, and also according between certain between reinforced slab Away from being equably welded between two steel plate strips, play support and improve steel truss rigidity and intensity effect.The reinforced slab The height of height basis steel sheet bar determines that spacing of the width between two blocks of steel plates is determined.The thickness of steel plate strip and reinforced slab Generally higher than 6mm, preferably 8mm.
Support member 3-5 (support member is preferred to use I-steel) is there also is provided in the middle part of the fixed frame, the support member is put down Row bears against in steel truss and two ends and is fixed and (is welded to connect) again on channel-section steel;The bottom of the support member passes through location-plate 5 fix and (are welded to connect) with horizontal flue header.
Obviously, the strength and stiffness of fixed frame coordinate decision jointly from channel-section steel, steel truss and I-steel (support member); Shown in figure:Whole fixed frame is supported by three horizontal flue headers.
Each suspending assembly include the boatswain chair 3-7 being fixed by socket with superheater tube and fixed with fixed frame and with it is described The hook pin 3-6 that boatswain chair coordinates.
As shown in figure 3, sleeve pipe 3-8 is set on the outer circumference surface of superheater pipe and is welded and fixed with superheater pipeline; The boatswain chair is bill suspension hook shape directed downwardly, and boatswain chair is welded on sleeve pipe, so as to be connected as a single entity with superheater;The hook pin In, two steel plates are parallel to each other and (distance is more than the thickness of boatswain chair) spaced apart, and a bearing pin 3-61 is inserted through Two steel plates and it is fixed on two steel plates.One end of described two steel plates is connected to the inner side of fixed frame by electric welding (back side of channel-section steel opening);The hook-type position of boatswain chair is inserted between two steel plates and is hooked on bearing pin, that is, realizes hanging The cooperation of component.
Part in all suspending assemblies, which is corresponded, to be coordinated, and the fixed relationship of superheater and fixed frame is realized jointly, Again because fixed frame is welded in horizontal flue header so that superheater is fixed in horizontal flue header, so as to realize overheat The integral hoisting of device.
Preferred embodiment of the present utility model is the foregoing is only, for those skilled in the art, this practicality is new Type can have various modifications and variations.It is all within spirit of the present utility model and principle, any modification for being made, equally replace Change, improve, should be included within protection domain of the present utility model.

Claims (7)

1. a kind of new superheater hanging apparatus, it is characterised in that:The device includes being horizontally fixed on horizontal flue header (2) On fixed frame (3) and several suspending assemblies for being removably hooked on superheater (1) on fixed frame;
The fixed frame is the rectangular frame of two channel-section steels (3-1) and two steel truss compositions;
The suspending assembly includes the boatswain chair (3-7) being fixed by socket with superheater tube and fixes and hung with described with fixed frame Plate hooks the hook pin (3-6) for hanging cooperation.
2. new superheater hanging apparatus according to claim 1, it is characterised in that:Described steel truss includes two Plate face vertically arrangement and it is opposite and to steel plate strip (3-3), several reinforced slabs (3-4) are embedded between two steel plate strips and every The two ends of individual reinforced slab are welded and fixed with two steel plate strips respectively.
3. new superheater hanging apparatus according to claim 2, it is characterised in that:The opening of the channel-section steel is towards admittedly Determine on the outside of framework and opening symmetrical center line parallel to horizontal plane, be welded and fixed several floors arranged vertically in opening (3-2)。
4. new superheater hanging apparatus according to claim 3, it is characterised in that:The middle part of the fixed frame is also The support member (3-5) being fixedly connected respectively with channel-section steel parallel to steel truss and two ends is disposed with, the bottom of the support member, which passes through, determines Position plate is fixedly connected with horizontal flue header.
5. new superheater hanging apparatus according to claim 4, it is characterised in that:The boatswain chair passes through sleeve pipe (3- 8) welding equipment is on the pipe of superheater;The hook pin is weldingly fixed on fixed frame.
6. new superheater hanging apparatus according to claim 5, it is characterised in that:The suspending assembly welding equipment is in mistake On the inside of hot device fixed frame.
7. new superheater hanging apparatus according to claim 6, it is characterised in that:The support member is I-steel.
CN201621416026.5U 2016-12-22 2016-12-22 A kind of new superheater hanging apparatus Withdrawn - After Issue CN206377645U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621416026.5U CN206377645U (en) 2016-12-22 2016-12-22 A kind of new superheater hanging apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621416026.5U CN206377645U (en) 2016-12-22 2016-12-22 A kind of new superheater hanging apparatus

Publications (1)

Publication Number Publication Date
CN206377645U true CN206377645U (en) 2017-08-04

Family

ID=59407525

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621416026.5U Withdrawn - After Issue CN206377645U (en) 2016-12-22 2016-12-22 A kind of new superheater hanging apparatus

Country Status (1)

Country Link
CN (1) CN206377645U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106642063A (en) * 2016-12-22 2017-05-10 杭州新世纪能源环保工程股份有限公司 Novel superheater hoisting installation
CN107720580A (en) * 2017-10-19 2018-02-23 福建省第电力建设公司 A kind of boiler construction water-cooling wall rapid construction hanging apparatus and its method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106642063A (en) * 2016-12-22 2017-05-10 杭州新世纪能源环保工程股份有限公司 Novel superheater hoisting installation
CN107720580A (en) * 2017-10-19 2018-02-23 福建省第电力建设公司 A kind of boiler construction water-cooling wall rapid construction hanging apparatus and its method
CN107720580B (en) * 2017-10-19 2023-09-01 中国电建集团福建工程有限公司 Quick construction hoisting device and method for boiler construction water-cooled wall

Similar Documents

Publication Publication Date Title
CN206377645U (en) A kind of new superheater hanging apparatus
CN106642063A (en) Novel superheater hoisting installation
WO2016155583A1 (en) Heating furnace with obliquely arranged coil pipes
CN202403247U (en) Corner-tube waste heat boiler
CN207962618U (en) Water cooling clamp-type anti-rock U-shaped pendant superheater
CN216244283U (en) Sealing structure of incinerator
CN205102102U (en) Coal saving device of boiler
CN209801458U (en) flue gas baffle structure between tube panels of economizer of horizontal garbage waste heat boiler
CN105222121A (en) A kind of boiler economizer
CN204629509U (en) Gas baffle device between economizer tube panel
WO2010081274A1 (en) Connecting means for vertical rigid girder
CN206803134U (en) CFBB superheater support structure
CN210118729U (en) Boiler suspension pipe and horizontal pipe wear-proof device
CN201706527U (en) Combination air preheater
CN2901219Y (en) Novel pre-heater for thermal power generating boiler
CN202074560U (en) Film-type wall boiler
CN201242166Y (en) Thermal brake hydrologic cycle hollow stove bridge
CN201740012U (en) Marine boiler body
CN205388305U (en) Novel low temperature second grade economizer
CN218565404U (en) Low-temperature economizer with bottom capable of automatically cleaning ash
CN205208618U (en) Device is prevented leaking by exhaust -heat boiler furnace roof with high -efficient sealing performance
CN215570483U (en) Novel exhaust-heat boiler for medical waste incineration industry
CN105485692A (en) Flue gas damper device used between coal economizer tube panels
CN214322129U (en) Multi-head electric welding machine for flue
CN209819894U (en) Arc-shaped inner container for water boiler

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20170804

Effective date of abandoning: 20181211

AV01 Patent right actively abandoned