CN206377645U - A kind of new superheater hanging apparatus - Google Patents
A kind of new superheater hanging apparatus Download PDFInfo
- Publication number
- CN206377645U CN206377645U CN201621416026.5U CN201621416026U CN206377645U CN 206377645 U CN206377645 U CN 206377645U CN 201621416026 U CN201621416026 U CN 201621416026U CN 206377645 U CN206377645 U CN 206377645U
- Authority
- CN
- China
- Prior art keywords
- superheater
- fixed
- fixed frame
- steel
- hanging apparatus
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Abstract
The utility model is related to a kind of new superheater hanging apparatus.The device that purpose is to provide should be able to offer convenience to the pipe operation of changing in the maintenance and running of superheater, and can reduce the hoisting cost of superheater, while can also improve the stability of superheater section.Technical scheme is:A kind of new superheater hanging apparatus, it is characterised in that:The device includes the fixed frame being horizontally fixed in horizontal flue header and several suspending assemblies being removably hooked on superheater on fixed frame;The fixed frame is the rectangular frame of two channel-section steels and two steel truss compositions;The suspending assembly includes the boatswain chair being fixed by socket with superheater tube and the hook pin for hanging cooperation is fixed and hooked with the boatswain chair with fixed frame.
Description
Technical field
The utility model is related to garbage burning boiler, specially a kind of new superheater hanging apparatus.
Background technology
With developing rapidly for city, domestic waste problem is increasingly serious, how to realize that domestic waste is harmless
Change, minimizing and recycling turn into the worldwide a great problem faced.Wherein garbage burning boiler is used as a kind of garbage disposal
Mode has been widely applied at home.
In bulky refuse burning boiler, superheater is often arranged vertically in boiler flue with snakelike form of tubes.In order to
Pipe deformation is reduced, in coiled pipe elbow by hanging the components such as hoop, suspension rod, superheater is lifted on top plate beam.This lifting
Structure make it that the suspension centre on superheater is densely distributed, and space is narrow, and hoisting cost is higher.Simultaneously because snakelike pipe bend and elbow
Between spacing it is smaller, it is impossible to be designed with suspension centre in each coiled pipe elbow, therefore, the bend part of suspension centre be not installed
Leave pipe relative deformation generation, influence pipe service life.Further, since entering the complexity of stove component of refuse, water capacity
Larger with hot-restriking die, there is the flue gas produced after burning the high temperature corrosion in very strong corrosivity, burning process mainly just to send out
Life is easier pipe explosion accident occur in superheater area, the miscellaneous part that superheater is compared in boiler.Using superheater hanging side
Maintenance and replacing of the formula structure to superheater piping also bring inconvenience.
Utility model content
The purpose of this utility model is to overcome the shortcomings of that above-mentioned background technology new is used for waste incineration pot there is provided a kind of
The superheater hanging apparatus of stove, the device should be able to offer convenience to the pipe operation of changing in the maintenance and running of superheater, and
The hoisting cost of superheater can be reduced, while can also improve the stability of superheater section.
The technical solution adopted in the utility model is as follows:
A kind of new superheater hanging apparatus, it is characterised in that:The device includes being horizontally fixed on horizontal flue header
On fixed frame and several suspending assemblies for being removably hooked on superheater on fixed frame;
The fixed frame is the rectangular frame of two channel-section steels and two steel truss compositions;
The suspending assembly includes the boatswain chair being fixed by socket with superheater tube and fixes and hung with described with fixed frame
Plate hooks the hook pin for hanging cooperation.
Described steel truss include two plate faces vertically arrangement and it is opposite and to steel plate strip, several reinforced slabs are embedded in
Between the two steel plate strips and two ends of each reinforced slab are welded and fixed with two steel plate strips respectively.
The opening of the channel-section steel towards on the outside of fixed frame and opening symmetrical center line parallel to horizontal plane, welded in opening
Connect the fixed floor that several are arranged vertically.
The support being fixedly connected respectively with channel-section steel parallel to steel truss and two ends is there also is provided in the middle part of the fixed frame
Part, the bottom of the support member is fixedly connected by location-plate with horizontal flue header.
The boatswain chair is by sleeve pipe welding equipment on the pipe of superheater;The hook pin is weldingly fixed on fixed frame.
The suspending assembly welding equipment is on the inside of superheater fixed frame.
The support member is I-steel.
The utility model has the advantage that:Superheater is lifted on horizontal flue collection by the utility model using fixed frame
On case.This structure need not set suspension centre in superheater elbow, largely reduce the hoisting cost of superheater.And
Fixed by suspending way, once pipe explosion accident occurs in superheater, it is well-to-do not only to repair and change pipe working space, and changes plumber
Also more conventional hanging form is measured to reduce.Meanwhile, superheater is fixed on horizontal flue by frame structure, overall structure
More stablize, be conducive to improving the service life of superheater section.
Brief description of the drawings
Fig. 1 is the main structure diagram of the utility model use state.
The attached of Fig. 2 the utility model use states regards structural representation.
Fig. 3 is the A portions mplifying structure schematic diagram in Fig. 1.
Fig. 4 is Fig. 3 overlook direction schematic diagram.
Fig. 5 is B in Fig. 2 to structural representation.
Embodiment
With reference to Figure of description, the utility model is described in further detail, but the utility model be not limited to
Lower embodiment.
Novel superheating device hanging apparatus shown in Fig. 1, including fix and (be welded and fixed) in horizontal cigarette by fixing steel plate 4
Fixed frame 3 in road header 2 and removably hooking is connected to several hanging groups on fixed frame by superheater 1
Part;So as to which by suspending way, superheater is lifted in horizontal flue header.
The fixed frame includes two channel-section steel 3-1 being parallel to each other and two steel truss being parallel to each other, and constitutes one
Horizontally disposed rectangular frame (channel-section steel is welded to connect with steel truss joining place).The opening of the channel-section steel is towards on the outside of fixed frame
And the symmetrical center line of opening is parallel to horizontal plane, several floor 3-2 arranged vertically are welded and fixed in opening;The rib
Plate is equably welded in channel-section steel according to certain spacing, thus the contour shape of floor and the groove of channel-section steel match (floor
In the groove of channel-section steel, its outside is concordant with the edge of channel-section steel groove);The spacing of floor is controlled in 300mm or so two-by-two, with
Floor is set to be uniformly distributed in the groove of whole piece channel-section steel.Floor thickness is more than 6mm, preferably 8mm.The bottom of channel-section steel is fixed
Fixing steel plate in horizontal flue header.The model and length of the channel-section steel are according to the width of garbage burning boiler horizontal flue
Determined with the size of superheater.In view of integrally-built stability, preferably channel-section steel model 20a.
In the steel truss, two steel plate strip 3-3 plate face arranges (width is perpendicular to horizontal plane) and two vertically
Plate face is opposite and right, and several reinforced slabs 3-4 is embedded between two steel plate strips, the two ends of each reinforced slab respectively with two steel
Lath is welded and fixed.The plane of the reinforced slab perpendicular to steel plate strip plane, and also according between certain between reinforced slab
Away from being equably welded between two steel plate strips, play support and improve steel truss rigidity and intensity effect.The reinforced slab
The height of height basis steel sheet bar determines that spacing of the width between two blocks of steel plates is determined.The thickness of steel plate strip and reinforced slab
Generally higher than 6mm, preferably 8mm.
Support member 3-5 (support member is preferred to use I-steel) is there also is provided in the middle part of the fixed frame, the support member is put down
Row bears against in steel truss and two ends and is fixed and (is welded to connect) again on channel-section steel;The bottom of the support member passes through location-plate
5 fix and (are welded to connect) with horizontal flue header.
Obviously, the strength and stiffness of fixed frame coordinate decision jointly from channel-section steel, steel truss and I-steel (support member);
Shown in figure:Whole fixed frame is supported by three horizontal flue headers.
Each suspending assembly include the boatswain chair 3-7 being fixed by socket with superheater tube and fixed with fixed frame and with it is described
The hook pin 3-6 that boatswain chair coordinates.
As shown in figure 3, sleeve pipe 3-8 is set on the outer circumference surface of superheater pipe and is welded and fixed with superheater pipeline;
The boatswain chair is bill suspension hook shape directed downwardly, and boatswain chair is welded on sleeve pipe, so as to be connected as a single entity with superheater;The hook pin
In, two steel plates are parallel to each other and (distance is more than the thickness of boatswain chair) spaced apart, and a bearing pin 3-61 is inserted through
Two steel plates and it is fixed on two steel plates.One end of described two steel plates is connected to the inner side of fixed frame by electric welding
(back side of channel-section steel opening);The hook-type position of boatswain chair is inserted between two steel plates and is hooked on bearing pin, that is, realizes hanging
The cooperation of component.
Part in all suspending assemblies, which is corresponded, to be coordinated, and the fixed relationship of superheater and fixed frame is realized jointly,
Again because fixed frame is welded in horizontal flue header so that superheater is fixed in horizontal flue header, so as to realize overheat
The integral hoisting of device.
Preferred embodiment of the present utility model is the foregoing is only, for those skilled in the art, this practicality is new
Type can have various modifications and variations.It is all within spirit of the present utility model and principle, any modification for being made, equally replace
Change, improve, should be included within protection domain of the present utility model.
Claims (7)
1. a kind of new superheater hanging apparatus, it is characterised in that:The device includes being horizontally fixed on horizontal flue header (2)
On fixed frame (3) and several suspending assemblies for being removably hooked on superheater (1) on fixed frame;
The fixed frame is the rectangular frame of two channel-section steels (3-1) and two steel truss compositions;
The suspending assembly includes the boatswain chair (3-7) being fixed by socket with superheater tube and fixes and hung with described with fixed frame
Plate hooks the hook pin (3-6) for hanging cooperation.
2. new superheater hanging apparatus according to claim 1, it is characterised in that:Described steel truss includes two
Plate face vertically arrangement and it is opposite and to steel plate strip (3-3), several reinforced slabs (3-4) are embedded between two steel plate strips and every
The two ends of individual reinforced slab are welded and fixed with two steel plate strips respectively.
3. new superheater hanging apparatus according to claim 2, it is characterised in that:The opening of the channel-section steel is towards admittedly
Determine on the outside of framework and opening symmetrical center line parallel to horizontal plane, be welded and fixed several floors arranged vertically in opening
(3-2)。
4. new superheater hanging apparatus according to claim 3, it is characterised in that:The middle part of the fixed frame is also
The support member (3-5) being fixedly connected respectively with channel-section steel parallel to steel truss and two ends is disposed with, the bottom of the support member, which passes through, determines
Position plate is fixedly connected with horizontal flue header.
5. new superheater hanging apparatus according to claim 4, it is characterised in that:The boatswain chair passes through sleeve pipe (3-
8) welding equipment is on the pipe of superheater;The hook pin is weldingly fixed on fixed frame.
6. new superheater hanging apparatus according to claim 5, it is characterised in that:The suspending assembly welding equipment is in mistake
On the inside of hot device fixed frame.
7. new superheater hanging apparatus according to claim 6, it is characterised in that:The support member is I-steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621416026.5U CN206377645U (en) | 2016-12-22 | 2016-12-22 | A kind of new superheater hanging apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621416026.5U CN206377645U (en) | 2016-12-22 | 2016-12-22 | A kind of new superheater hanging apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206377645U true CN206377645U (en) | 2017-08-04 |
Family
ID=59407525
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621416026.5U Withdrawn - After Issue CN206377645U (en) | 2016-12-22 | 2016-12-22 | A kind of new superheater hanging apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206377645U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106642063A (en) * | 2016-12-22 | 2017-05-10 | 杭州新世纪能源环保工程股份有限公司 | Novel superheater hoisting installation |
CN107720580A (en) * | 2017-10-19 | 2018-02-23 | 福建省第电力建设公司 | A kind of boiler construction water-cooling wall rapid construction hanging apparatus and its method |
-
2016
- 2016-12-22 CN CN201621416026.5U patent/CN206377645U/en not_active Withdrawn - After Issue
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106642063A (en) * | 2016-12-22 | 2017-05-10 | 杭州新世纪能源环保工程股份有限公司 | Novel superheater hoisting installation |
CN107720580A (en) * | 2017-10-19 | 2018-02-23 | 福建省第电力建设公司 | A kind of boiler construction water-cooling wall rapid construction hanging apparatus and its method |
CN107720580B (en) * | 2017-10-19 | 2023-09-01 | 中国电建集团福建工程有限公司 | Quick construction hoisting device and method for boiler construction water-cooled wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206377645U (en) | A kind of new superheater hanging apparatus | |
CN106642063A (en) | Novel superheater hoisting installation | |
WO2016155583A1 (en) | Heating furnace with obliquely arranged coil pipes | |
CN202403247U (en) | Corner-tube waste heat boiler | |
CN207962618U (en) | Water cooling clamp-type anti-rock U-shaped pendant superheater | |
CN216244283U (en) | Sealing structure of incinerator | |
CN205102102U (en) | Coal saving device of boiler | |
CN209801458U (en) | flue gas baffle structure between tube panels of economizer of horizontal garbage waste heat boiler | |
CN105222121A (en) | A kind of boiler economizer | |
CN204629509U (en) | Gas baffle device between economizer tube panel | |
WO2010081274A1 (en) | Connecting means for vertical rigid girder | |
CN206803134U (en) | CFBB superheater support structure | |
CN210118729U (en) | Boiler suspension pipe and horizontal pipe wear-proof device | |
CN201706527U (en) | Combination air preheater | |
CN2901219Y (en) | Novel pre-heater for thermal power generating boiler | |
CN202074560U (en) | Film-type wall boiler | |
CN201242166Y (en) | Thermal brake hydrologic cycle hollow stove bridge | |
CN201740012U (en) | Marine boiler body | |
CN205388305U (en) | Novel low temperature second grade economizer | |
CN218565404U (en) | Low-temperature economizer with bottom capable of automatically cleaning ash | |
CN205208618U (en) | Device is prevented leaking by exhaust -heat boiler furnace roof with high -efficient sealing performance | |
CN215570483U (en) | Novel exhaust-heat boiler for medical waste incineration industry | |
CN105485692A (en) | Flue gas damper device used between coal economizer tube panels | |
CN214322129U (en) | Multi-head electric welding machine for flue | |
CN209819894U (en) | Arc-shaped inner container for water boiler |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20170804 Effective date of abandoning: 20181211 |
|
AV01 | Patent right actively abandoned |