CN105485692B - Gas baffle device between a kind of economizer tube panel - Google Patents

Gas baffle device between a kind of economizer tube panel Download PDF

Info

Publication number
CN105485692B
CN105485692B CN201510107768.3A CN201510107768A CN105485692B CN 105485692 B CN105485692 B CN 105485692B CN 201510107768 A CN201510107768 A CN 201510107768A CN 105485692 B CN105485692 B CN 105485692B
Authority
CN
China
Prior art keywords
economizer
angle steel
tube panel
pipe
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510107768.3A
Other languages
Chinese (zh)
Other versions
CN105485692A (en
Inventor
任孝明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Huaguang Environment and Energy Group Co Ltd
Original Assignee
Wuxi Huaguang Boiler Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Huaguang Boiler Co Ltd filed Critical Wuxi Huaguang Boiler Co Ltd
Priority to CN201510107768.3A priority Critical patent/CN105485692B/en
Publication of CN105485692A publication Critical patent/CN105485692A/en
Application granted granted Critical
Publication of CN105485692B publication Critical patent/CN105485692B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Chimneys And Flues (AREA)

Abstract

The present invention relates to bulky refuse burning boiler, specially in garbage burning boiler, gas baffle device between a kind of economizer tube panel, its is simple in construction, pipe will not be caused to damage, can easily solve the problems, such as to form smoke corridor and tube wear between economizer tube panel, it includes economizer tube panel, characterized in that, angle steel is arranged on the outside of economizer pipe by U bolt.

Description

Gas baffle device between a kind of economizer tube panel
Technical field
The present invention relates to bulky refuse burning boiler, specially in garbage burning boiler, flue gas between a kind of economizer tube panel Retaining device.
Background technology
In bulky refuse burning boiler, gap is larger between economizer tube panel and tube panel, when flue gas passes through, easily forms cigarette Make corridor leave with rage, reduce the heat-transfer effect of overall heating surface, and abrasion is also easy to produce to pipe.Take in the past and be directly welded at pipe with band steel Sub- side, because pipe vertical direction is longer, this measure is taken easily to produce injury to pipe during fielding welding, such as Welded stress, pipe deformation, weld defect etc., welding job amount are also relatively large.
The content of the invention
In order to solve the above problems, the invention provides gas baffle device between a kind of economizer tube panel, its is simple in construction, Pipe will not be caused to damage, can easily solve the problems, such as to form smoke corridor and tube wear between economizer tube panel.
Its technical scheme is such:Gas baffle device between a kind of economizer tube panel, it includes economizer tube panel, and it is special Sign is that angle steel is arranged on the outside of economizer pipe by U bolt.
It is further characterized by, and the angle steel sidepiece is provided with steel plate, and the steel plate on the angle steel with being provided with cooperation Mounting hole, the U bolt is fixedly connected with the angle steel through the mounting hole by nut;
Composition backing on the angle steel, the economizer pipe are arranged between the backing plate and the U bolt;
The angle steel sidepiece is evenly arranged with multiple steel plates from top to bottom, and Rod Bracing is welded with the economizer pipe Plate, the U bolt lower end are supported on the Rod Bracing plate.
After structure of the present invention, angle steel is installed on the outside of economizer pipe by U bolt, is avoided and is directly welded in The defects of on the outside of economizer pipe, pipe will not be caused to damage, angle steel stops that flue gas can easily solve economizer tube panel Between form smoke corridor and tube wear problem.
Brief description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 be in Fig. 1 A to angle steel schematic diagram;
Fig. 3 is Fig. 1 overlooking the structure diagrams;
Fig. 4 is enlarged diagram at I in Fig. 3.
Embodiment
Seeing Fig. 1, Fig. 2, Fig. 3, shown in Fig. 4, gas baffle device between a kind of economizer tube panel, it includes economizer tube panel 1, Angle steel 2 is arranged at the outside of economizer pipe 4 by U bolt 3.
The welding of the sidepiece of angle steel 2 is provided with steel plate 5, and steel plate 5 and the mounting hole that cooperation is provided with angle steel 2, U bolt 3 pass through Mounting hole is fixedly connected with angle steel 2 by nut 6;Composition backing 7 on angle steel 2, economizer pipe 4 are arranged in backing plate 7 and U bolt Between 3, economizer pipe 4 does not contact directly with angle steel 2, protects economizer pipe.
The sidepiece of angle steel 2 is evenly arranged with three steel plates 5 from top to bottom, and Rod Bracing plate 8 is welded with economizer pipe 4, The lower end of U bolt 3 of bottom is supported on Rod Bracing plate 8, is prevented angle steel 2 from sliding downwards, is further protected economizer tube Son 4.

Claims (2)

1. gas baffle device between a kind of economizer tube panel, it includes economizer tube panel, it is characterised in that angle steel passes through U-shaped spiral shell Bolt is arranged on the outside of economizer pipe;The angle steel sidepiece is provided with steel plate, and the steel plate on the angle steel with being provided with cooperation Mounting hole, the U bolt are fixedly connected with the angle steel through the mounting hole by nut;Composition backing on the angle steel, The economizer pipe is arranged between the backing plate and the U bolt.
2. gas baffle device between a kind of economizer tube panel according to claim 1, it is characterised in that the angle steel sidepiece Multiple steel plates are evenly arranged with from top to bottom, and Rod Bracing plate, U bolt lower end branch are welded with the economizer pipe Support on the Rod Bracing plate.
CN201510107768.3A 2015-03-12 2015-03-12 Gas baffle device between a kind of economizer tube panel Active CN105485692B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510107768.3A CN105485692B (en) 2015-03-12 2015-03-12 Gas baffle device between a kind of economizer tube panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510107768.3A CN105485692B (en) 2015-03-12 2015-03-12 Gas baffle device between a kind of economizer tube panel

Publications (2)

Publication Number Publication Date
CN105485692A CN105485692A (en) 2016-04-13
CN105485692B true CN105485692B (en) 2017-11-21

Family

ID=55672848

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510107768.3A Active CN105485692B (en) 2015-03-12 2015-03-12 Gas baffle device between a kind of economizer tube panel

Country Status (1)

Country Link
CN (1) CN105485692B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109442374A (en) * 2018-11-19 2019-03-08 无锡华光锅炉股份有限公司 Gas baffle structure between a kind of horizontal rubbish Economizer of Heat Recovery Boiler tube panel

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0056834A2 (en) * 1981-01-22 1982-08-04 Elpag Ag Chur Method of manufacturing a module comprising a tubular heating element
DE20004051U1 (en) * 2000-03-03 2000-09-14 WVT Breiding GmbH, 58239 Schwerte Wear protection for boiler tubes
CN201724201U (en) * 2010-08-18 2011-01-26 上海锅炉厂有限公司 Flue gas baffle plate for fin-shaped tube panels
CN202182455U (en) * 2011-08-18 2012-04-04 江苏力沃新能源科技股份有限公司 Support frame inside steam drum device
CN103307619A (en) * 2013-06-03 2013-09-18 长沙锅炉厂有限责任公司 Flue gas baffle device inside horizontal waste heat boiler
CN204629509U (en) * 2015-03-12 2015-09-09 无锡华光锅炉股份有限公司 Gas baffle device between economizer tube panel

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0056834A2 (en) * 1981-01-22 1982-08-04 Elpag Ag Chur Method of manufacturing a module comprising a tubular heating element
DE20004051U1 (en) * 2000-03-03 2000-09-14 WVT Breiding GmbH, 58239 Schwerte Wear protection for boiler tubes
CN201724201U (en) * 2010-08-18 2011-01-26 上海锅炉厂有限公司 Flue gas baffle plate for fin-shaped tube panels
CN202182455U (en) * 2011-08-18 2012-04-04 江苏力沃新能源科技股份有限公司 Support frame inside steam drum device
CN103307619A (en) * 2013-06-03 2013-09-18 长沙锅炉厂有限责任公司 Flue gas baffle device inside horizontal waste heat boiler
CN204629509U (en) * 2015-03-12 2015-09-09 无锡华光锅炉股份有限公司 Gas baffle device between economizer tube panel

Also Published As

Publication number Publication date
CN105485692A (en) 2016-04-13

Similar Documents

Publication Publication Date Title
CN105485692B (en) Gas baffle device between a kind of economizer tube panel
CN204629509U (en) Gas baffle device between economizer tube panel
US20140227073A1 (en) Catalyst loading and unloading device and methods therefor
CN209801458U (en) flue gas baffle structure between tube panels of economizer of horizontal garbage waste heat boiler
CN205102164U (en) Water -cooling wall
CN202973121U (en) Ground torch furnace body with high-intensity ceramic fiber modules
CN208427822U (en) Flux transport equipment for horizontal pipeline narrow gap automatic submerged-arc welding machine
CN203307387U (en) Billet locating baffle plate device on in-furnace roller table
CN103786021B (en) The assembling device of radiant tube and using method
CN203330611U (en) Adjustable pipeline assembly welding bracket
CN202324676U (en) Pipe joint device and guardrail
CN205111021U (en) Welding of belted steel fishplate bar is with fixed structure of copper packing board
CN103738589B (en) A kind of Hollow heat insulation tray
CN204747792U (en) Coil pipe automatic weld workstation
CN206425307U (en) A kind of overall Self-loading-unloading washing steel pipes platform
CN206207393U (en) Boiler feed water collection box structure
CN205461403U (en) Oil tank oil mist fan exhaust recovery device
CN105689400A (en) Furnace area roller bed fireproof plate device
CN205568602U (en) Sacrificial rites stove
CN203783164U (en) Glass separation wall dislocation prevention gap gluing regulator
CN202692422U (en) Novel coal saving device of coal-fired boiler
CN203804510U (en) Assembling and dissembling device for winding drum of steel coiling machine of rolling mill
CN104907355B (en) A kind of uncoiling blanking material supporting rack
CN217685086U (en) Boiler connecting flue maintenance channel
CN106705018A (en) Boiler water header structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 214028 No. 3 Chengnan Road, new Wu District, Jiangsu, Wuxi

Patentee after: Wuxi Huaguang Environmental Protection Energy Group Co., Ltd

Address before: 214028 No. 3 Chengnan Road, New District, Jiangsu, Wuxi

Patentee before: WUXI HUAGUANG BOILER Co.,Ltd.

CP03 Change of name, title or address