CN109441363A - Flexible push structure, propeller assembly, rock drilling equipment and flexible propulsion method - Google Patents
Flexible push structure, propeller assembly, rock drilling equipment and flexible propulsion method Download PDFInfo
- Publication number
- CN109441363A CN109441363A CN201910011556.3A CN201910011556A CN109441363A CN 109441363 A CN109441363 A CN 109441363A CN 201910011556 A CN201910011556 A CN 201910011556A CN 109441363 A CN109441363 A CN 109441363A
- Authority
- CN
- China
- Prior art keywords
- leading truck
- flexible
- bracket
- rock drill
- propeller assembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 239000011435 rock Substances 0.000 title claims abstract description 106
- 238000005553 drilling Methods 0.000 title claims abstract description 38
- 238000000034 method Methods 0.000 title claims abstract description 34
- 230000007246 mechanism Effects 0.000 claims abstract description 22
- 230000008450 motivation Effects 0.000 claims 1
- 230000008092 positive effect Effects 0.000 abstract description 2
- 230000008569 process Effects 0.000 description 23
- 230000008093 supporting effect Effects 0.000 description 22
- 229910000831 Steel Inorganic materials 0.000 description 7
- 239000010959 steel Substances 0.000 description 7
- 238000010586 diagram Methods 0.000 description 5
- 230000000007 visual effect Effects 0.000 description 5
- 230000001960 triggered effect Effects 0.000 description 4
- 230000009471 action Effects 0.000 description 3
- 238000010276 construction Methods 0.000 description 3
- 230000001737 promoting effect Effects 0.000 description 3
- 230000009172 bursting Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000004880 explosion Methods 0.000 description 2
- 240000007594 Oryza sativa Species 0.000 description 1
- 235000007164 Oryza sativa Nutrition 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000001976 improved effect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 235000009566 rice Nutrition 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B15/00—Supports for the drilling machine, e.g. derricks or masts
- E21B15/003—Supports for the drilling machine, e.g. derricks or masts adapted to be moved on their substructure, e.g. with skidding means; adapted to drill a plurality of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B15/00—Supports for the drilling machine, e.g. derricks or masts
- E21B15/04—Supports for the drilling machine, e.g. derricks or masts specially adapted for directional drilling, e.g. slant hole rigs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
Abstract
The present invention relates to a kind of flexible push structure, propeller assembly, rock drilling equipment and flexible propulsion methods, belong to rock drilling equipment technical field.Technical solution is: including bracket (100), the first leading truck (200), the second leading truck (400) and the driving mechanism being connected between the first leading truck (200) and the second leading truck (400), for driving the second leading truck (400) to move with respect to the first leading truck (200), the first leading truck (200) slides axially along bracket (100) driving mechanism with the second leading truck (400).The positive effect of the present invention is: extending the clearance issues for increasing drilling depth and dexterously having evaded the generation that is layering, show no sign of reducing the whole positioning accuracy of propeller assembly, observation when significantly reducing the operation and operation of the whole height of propeller assembly, more conducively operator compared with other flexible propellers simultaneously to bore position.
Description
Technical field
The present invention relates to a kind of flexible push structure, propeller assembly, rock drilling equipment and flexible propulsion methods, belong to rock drilling
Equipment technical field.
Background technique
Drill jumbo is also referred to as drilling jumbo, is a kind of rock drilling equipment that tunnels and underground engineering uses drill bursting construction.Chisel
Rock bench vehicle usually also needs to shoulder the drill process of the bolthole for roadway support after completing blasthole drill process.?
In drill bursting construction operation, usually require to improve single-shot drilling depth rice number to improve drivage efficiency.Therefore in the feelings of conditions permit
Under condition, it is often desirable that improve the drilling depth of rock drill on drill jumbo.In the prior art, propeller is provided on drill jumbo
Assembly, wherein propeller assembly includes leading truck and the rock drill moved back and forth on leading truck.Since the length of leading truck is solid
It is fixed, if being intended to improve the drilling depth of rock drill, the shift motion of rock drill can only be increased.But it uses in the related technology
In the set-up mode for improving rock drill shift motion, there is higher position errors, so that the positioning accuracy of rock drill
It substantially reduces.
Summary of the invention
It is an object of the present invention to provide a kind of flexible push structure, propeller assembly, rock drilling equipment and flexible propulsion method, two
Layer slideway shares the same sliding positioning datum point, effectively eliminates the clearance issues for the generation that is layering, greatly improves
The whole positioning accuracy of rock drill, while also significantly reducing the whole height of propeller assembly, more conducively operator
Observation when operation and operation to bore position solves the above problem present in background technique.
The technical scheme is that
A kind of flexible push structure, is used for rock drilling equipment, including bracket, the first leading truck, the second leading truck and is connected to first
Driving mechanism between leading truck and the second leading truck, wherein driving mechanism is for driving the second leading truck to lead relative to first
It is moved to frame, the first leading truck slides axially along bracket with the second leading truck, and the first leading truck and the second leading truck are with support
Frame positioning is slided.
The bracket has hollow movable passageway, and the first leading truck is threaded through in movable passageway.
Second leading truck includes spaced upper layer sliding rail and lower layer's sliding rail in above-below direction, the upper layer sliding rail
Extend along the moving direction of rock drill with lower layer sliding rail, second leading truck is sliding by the upper surface of lower layer's sliding rail and bracket
Dynamic connection.
The front end of first leading truck is provided with fixing seat, and the driving mechanism includes propelling cylinder, the propulsion oil
The cylinder barrel of cylinder is connect with the second leading truck, and piston rod is connect with fixing seat;Alternatively, the cylinder barrel of the propelling cylinder and fixing seat connect
It connects, piston rod is connect with the second leading truck.
Offer pilot hole in the fixing seat, the drill steel of the rock drill can self- steering hole be pierced by.
The invention also includes compensating cylinder, the compensating cylinder is connected between bracket and the first leading truck, for driving
The first leading truck opposing brackets are mobile.
A kind of propeller assembly, including rock drill and aforementioned flexible push structure, rock drill are movably arranged at second
On leading truck, rock drill is slided along the upper layer sliding rail of the second leading truck.
The invention also includes the preceding switch to travel forward in place for detecting the second leading truck, the preceding switch and rock drill
Driving assembly control connection.
The invention also includes the rear switch for moving rearwards to position for detecting rock drill, switched and propelling cylinder control after described
System connection.
A kind of rock drilling equipment, including rock drilling equipment ontology and aforementioned flexible propeller assembly, the flexible propeller assembly
It is installed on rock drilling equipment ontology.
A kind of flexible propulsion method is connected between the first leading truck, the second leading truck by driving mechanism, and driving mechanism is used
In driving the second leading truck to move relative to the first leading truck, the first leading truck slides axially along bracket with the second leading truck,
First leading truck and the second leading truck are using bracket as sliding positioning datum point.
The positive effect of the present invention is: structure is simple, method is novel, and the first leading truck is independently pacified with the second leading truck
On bracket, the same sliding positioning datum point is shared, that is, extends and increases drilling depth, and dexterously evaded layer stackup
The clearance issues for adding generation show no sign of the whole positioning accuracy for reducing rock drill, while having compared with other flexible propellers
The observation when operation and operation of the whole height, more conducively operator for reducing propeller assembly to effect to bore position.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the flexible propeller assembly provided in an embodiment of the present invention under the first visual angle;
Fig. 2 is structural schematic diagram of the flexible propeller assembly provided in an embodiment of the present invention under the second visual angle;
Fig. 3 is partial structural diagram of the flexible propeller assembly provided in an embodiment of the present invention under the first visual angle;
Fig. 4 is another partial structural diagram of the flexible propeller assembly provided in an embodiment of the present invention under the first visual angle;
Fig. 5 is another partial structural diagram of the flexible propeller assembly provided in an embodiment of the present invention under the first visual angle.
In figure: 100- bracket;The first leading truck of 200-;300- propelling cylinder;The second leading truck of 400-;500- rock drill drives
Dynamic component;600- rock drill;700- drill steel;900- compensating cylinder;110- sliding block;120- supporting block;210- fixing seat;211- is led
Xiang Kong;The upper layer 410- sliding rail;420- lower layer sliding rail;510- feed cylinder;520- front wheel supporting plate;530- rear wheel supporting plate;
540- euphroe;810- preceding switch;It is switched after 820-.
Specific embodiment
Below in conjunction with drawings and examples, the present invention is further illustrated.
As shown in Figure 1-Figure 3, a kind of flexible push structure is present embodiments provided, rock drilling equipment, including bracket are used for
100, the first leading truck 200, the second leading truck 400 and the driving being connected between the first leading truck 200 and the second leading truck 400
Mechanism, wherein driving mechanism is for driving the second leading truck 400 to move relative to the first leading truck 200, the first leading truck 200
It slides axially along bracket 100 with the second leading truck 400, the first leading truck 200 and the second leading truck 400 are fixed with bracket 100
It is slided position.
The bracket has hollow movable passageway, and the first leading truck is threaded through in movable passageway.
A kind of propeller assembly, including rock drill and aforementioned flexible push structure, rock drill 600 are movably arranged at
On two leading trucks 400, rock drill 600 is slided along the upper layer sliding rail of the second leading truck 400.
A kind of rock drilling equipment, including rock drilling equipment ontology and aforementioned flexible propeller assembly, the flexible propeller assembly
It is installed on rock drilling equipment ontology.
A kind of flexible propulsion method is connected between the first leading truck 200, the second leading truck 400 by driving mechanism, driving
Mechanism is for driving the second leading truck 400 to move relative to the first leading truck 200, the first leading truck 200 and the second leading truck 400
It slides axially along bracket 100, the first leading truck 200 and the second leading truck 400 are using bracket 400 as sliding positioning datum
Point.
The groundwork process of the flexible push structure are as follows: when flexible propeller assembly work, utilize flexible push structure
Flexible realization rock drill 600 propulsion and move back pricker, wherein during initial alignment, the first leading truck 200 is in bracket 100
Upper movement, to drive the front and back feeding synchronous with rock drill 600 of the second leading truck 400, during being somebody's turn to do, bracket 100 is kept fixed shape
State, so that the first leading truck 200 is moved forward and backward using bracket 100 as running fix datum mark, meanwhile, in the rigidity of driving mechanism
Under connection function, the second leading truck 400 is also moved on bracket 100 using bracket 100 as running fix datum mark;It is being advanced over
Cheng Zhong, the first leading truck 200 move in place, and the driving mechanism movement between the first leading truck 200 and the second leading truck 400 is driven
Dynamic second leading truck 400 moves on bracket 100, realizes its position change with respect to the first leading truck 200, also, rock drill
600 move forward on the second leading truck 400, complete to promote operation;During moving back pricker, rock drill 600 is in the second leading truck
It is moved backward on 400, the second leading truck 400 moves backward on bracket 100, and the first leading truck 200 moves back on bracket 100
Dynamic, pricker operation is moved back in completion.
In the flexible push structure, by the way that the running fix datum mark of two layers of mobile guide frame is disposed as bracket 100,
So that the gap error between the first leading truck 200 and bracket 100 will not be transferred to rock drill 600 by the second leading truck 400
Place has effectively evaded because accumulating the larger problem of gap error caused by being layering between leading truck, so that this is flexible
Push structure realize drilling depth extend while, be also equipped with higher positioning accuracy, thus rock drilling equipment pivoted arm around
During the rotation of its centre of gyration is to find surrounding explosion hole location, simplifies and operator is needed to move repeatedly along quick-fried plane is bored
700 center of drill steel also improves location efficiency while improving positioning accuracy, to guarantee to determine the process of explosion hole location
Operational reliability.
It should be noted that arrow direction of the Fig. 1 into Fig. 3 indicates the direction of motion of rock drill 600 in the present embodiment,
Wherein, a indicates the forward propulsion operation process of rock drill 600, b indicate rock drill 600 backward move back pricker operation process, that is,
It says, the direction of a refers to that the front end of flexible propeller assembly, the direction of b refer to the rear end of flexible propeller assembly, also,
It is front end towards one end of a, towards b's in first leading truck 200, the second leading truck 400 and rock drilling bottom plate hereinafter
One end is rear end.
Please continue to refer to Fig. 1 to Fig. 3, in the present embodiment, bracket 100 can have hollow movable passageway, wherein first
Leading truck 200 is threaded through in movable passageway.
Such setting enables the first leading truck 200 to be installed and moved using the inner space of bracket 100,
Reduce the first leading truck 200 to the occupancy of 100 surrounding space of bracket, to reduce the whole of the flexible push structure of the present embodiment
Body height and overall width not only increase the integration degree of the flexible push structure, moreover, this by the first leading truck
200, through the form being arranged in bracket 100, increase the contact area between the first leading truck 200 and bracket 100, are protecting
While demonstrate,proving connection reliability between the two, the stationarity in 200 moving process of the first leading truck is also improved.
Please continue to refer to Fig. 1 to Fig. 3, and Fig. 4 is combined, in the present embodiment, movable passageway is by the cuboid inside bracket 100
Type chamber is formed, and the first leading truck 200 matches setting with the type chamber.Such setting, so that 200 opposing brackets of the first leading truck
It during 100 is mobile, can be oriented to naturally using the type chamber inside bracket 100, structure is simple, not only saves
Components purchase and assembly cost, also improve assembly efficiency.
It should be noted that in the present embodiment, the type chamber being used to form inside the bracket 100 of movable passageway, cross section
It can be rectangular structure type shown in figure, but be not limited solely to this, other shapes form can also be used, such as:
Square or hexagon etc., meanwhile, the first leading truck 200 matches setting with type chamber, as long as passing through this type of bracket 100
Cavity configuration form can be realized the sliding inside it of the first leading truck 200 and realize the guiding to its sliding process.
Preferably, the first leading truck 200 is slidably connected with bracket 100.Specifically, the side of the first leading truck 200 is light
Face, the side wall of bracket 100 are provided with the multiple supporting blocks 120 extended to inside movable passageway, wherein multiple 120 edges of supporting block
The length direction interval of bracket 100 is arranged.
When the first leading truck 200 moves in movable passageway, supporting block 120 is contacted with the side of the first leading truck 200
And the two is slidably matched, to realize being slidably connected between the first leading truck 200 and bracket 100.Also, in the flexible propulsion
It before device assembly carries out operation, can also be adjusted by the length for protruding into movable passageway to supporting block 120, to reach reduction the
The purpose of gap error, such setting between one leading truck 200 and supporting block 120, significantly reduce the first leading truck 200
With the slippage errors between bracket 100, to ensure that the kinematic accuracy of the first leading truck 200.
Please continue to refer to Fig. 1 to Fig. 3, in the present embodiment, the second leading truck 400 may include interval setting in above-below direction
Upper layer sliding rail 410 and lower layer's sliding rail 420, specifically, upper layer sliding rail 410 and the moving along rock drill 600 of lower layer's sliding rail 420
Direction extends, wherein the second leading truck 400 is connect by lower layer's sliding rail 420 with the upper surface slide of bracket 100.That is,
The top of the first leading truck 200, upper cunning of second leading truck 400 as the flexible push structure is arranged in second leading truck 400
Frame, lower slider of first leading truck 200 as the flexible push structure.
Please continue to refer to Fig. 1 to Fig. 4, in the present embodiment, it is fixedly installed on bracket 100 and matches with 420 sliding of lower layer sliding rail
The sliding block 110 of conjunction.
Preferably, the quantity of sliding block 110 is two, and two sliding blocks 110 are arranged at intervals at support along the length direction of bracket 100
Frame 100.Such setting, so that the second leading truck 400, in sliding process, spaced two sliding blocks 110 are led to second
It is formed to frame 400 and stablizes support, to ensure that the stationarity in 400 sliding process of the second leading truck.
It should be noted that the first leading truck 200 can be the above-mentioned knot for being slideably positioned in bracket 100 in the present embodiment
Configuration formula, but it is not only limited to this, it can also roll and connect with bracket 100;Similarly, the second leading truck 400 can also roll
It is set to bracket 100, as long as can be realized movement of first leading truck 200 on bracket 100 by this set form
And second movement of the leading truck 400 on bracket 100.
Please continue to refer to Fig. 4, in the present embodiment, the front end of the first leading truck 200 is provided with fixing seat 210, also, drives
Mechanism may include propelling cylinder 300, and specifically, propelling cylinder 300 is connected between fixing seat 210 and the second leading truck 400,
For driving opposite first leading truck 200 of the second leading truck 400 to move.Wherein, the cylinder barrel of propelling cylinder 300 is connected to second and leads
To on frame 400, the piston rod of propelling cylinder 300 is connected in fixing seat 210.
The flexible push structure is in promoting operation process, and the piston rod of propelling cylinder 300 is retracted with respect to cylinder barrel, first
Under the premise of leading truck 200 is fixed, so that the second leading truck 400 follows the cylinder barrel of propelling cylinder 300 to feed forward, realize
Promote operation;In moving back pricker operation process, the piston rod of propelling cylinder 300 is then stretched out with respect to cylinder barrel, so that the second leading truck 400
It is moved along the direction opposite with above-mentioned direction of feed, pricker operation is moved back in realization.
It should be noted that the cylinder barrel and the second leading truck 400 that can be above-mentioned propelling cylinder 300 connect in the present embodiment
Connect and setting form that piston rod is connect with fixing seat 210, but be not limited solely to this, can also using other setting forms,
Such as: connecting the cylinder barrel of propelling cylinder 300 with fixing seat 210 and piston rod is connect with the second leading truck 400, utilize piston rod phase
To the expanding-contracting action of cylinder barrel, advance and the rollback of the second leading truck 400 are realized.Certainly, driving mechanism can also be electric pushrod
Deng the form of other power driving mechanisms, as long as therefore it can be realized second by this set form of propelling cylinder 300
Relative to the movement of the first leading truck 200, the present embodiment is not defined its specific setting form leading truck 400.
Please continue to refer to Fig. 1 and Fig. 2, in the present embodiment, pilot hole 211 can be opened up in fixing seat 210, specifically, chisel
The 700 self- steering hole 211 of drill steel of rock machine 600 is pierced by.
When rock drill 600 pushes ahead operation, as rock drill 600 is moved forward with respect to the second leading truck 400, drill steel
700 always in pilot hole 211 and along the axial movement of pilot hole 211, guide it by pilot hole 211;Similarly,
When rock drill 600 draws back pricker operation, pilot hole 211 guides the movement of retracting of drill steel 700.
Please continue to refer to Fig. 2 and Fig. 4, in the present embodiment, which can also include compensating cylinder 900, tool
Body, compensating cylinder 900 is connected between bracket 100 and the first leading truck 200, for driving the opposite support of the first leading truck 200
Frame 100 is mobile.
The flexible push structure can use compensating cylinder 900 and the first leading truck 200 driven to exist before carrying out bore operation
It is moved back and forth in bracket 100, to realize the positioning of 400 front end of the second leading truck.
Specifically, the cylinder barrel of compensating cylinder 900 is connected on bracket 100, after piston rod is connected to the first leading truck 200
End.It is, of course, also possible to be that the cylinder barrel of compensating cylinder 900 is connected to the rear end of the first leading truck 200, and piston rod is connected to bracket
It is opposite to can be realized the first leading truck 200 as long as passing through this set form of compensating cylinder 900 for structure type on 100
The movement of bracket 100.
In addition, please continue to refer to Fig. 1 to Fig. 3, and Fig. 5 is combined, the present embodiment additionally provides a kind of flexible propeller assembly,
The flexible propeller assembly includes rock drill 600, the rock drill driving assembly 500 for driving rock drill 600 mobile and above-mentioned
Flexible push structure, wherein under the driving effect of rock drill driving assembly 500, rock drill 600 can be along the second leading truck
400 upper layer sliding rail 410 slides.
Specifically, rock drill driving assembly 500 may include front wheel supporting plate 520, rear wheel supporting plate 530, preceding wirerope
(not shown), rear wirerope (not shown) and feed cylinder 510, wherein along the direction of motion of rock drill 600,
Front wheel supporting plate 520 and rear wheel supporting plate 530 are spaced and are slideably positioned in upper layer sliding rail 410, meanwhile, 520 He of front wheel supporting plate
Rear wheel supporting plate 530 is fixedly connected with the cylinder barrel of feed cylinder 510, and the piston rod of feed cylinder 510 and the second leading truck
400 connections.Also, it is provided with front wheel on front wheel supporting plate 520, rear wheel, rock drill are provided on rear wheel supporting plate 530
600 are fixed on rear wheel supporting plate 530 by rock drilling bottom plate.Specifically, the front end of the first end of preceding wirerope and rock drilling bottom plate connects
It connects, second end is connect with the second leading truck 400, and the rope section of preceding wirerope is wound around on front wheel, wire rope pulley before being formed
Group;Correspondingly, the first end of rear wirerope is connect with the rear end of rock drilling bottom plate, and second end is connect with the second leading truck 400, and after
The rope section of wirerope is wound around on rear wheel, wire rope pulley group after formation.
In the rock drill driving assembly 500, preceding wire rope pulley group and rear wire rope pulley group form travel multiplier mechanisms.
When rock drill 600 moves forward, the piston rod of feed cylinder 510 is retracted with respect to its cylinder barrel, front wheel supporting plate 520 and rear wheel
The forward slip on upper layer sliding rail 410 of supporting plate 530, when the piston rod of feed cylinder 510 retracts one times of stroke with respect to its cylinder barrel,
Rock drill 600 moves forward two times of strokes;Correspondingly, when rock drill 600 moves backward, the piston rod phase of feed cylinder 510
Its cylinder barrel is stretched out, front wheel supporting plate 520 and rear wheel supporting plate 530 slide backward on upper layer sliding rail 410, in feed cylinder
When 510 piston rod stretches out one times of stroke with respect to its cylinder barrel, rock drill 600 moves backward two times of strokes.
The rock drill driving assembly 500 of this oil cylinder-wirerope realizes the forward efficient feeding of rock drill 600, significantly
It improves the propulsion of rock drill 600 and moves back pricker efficiency.It should be noted that in the present embodiment, rock drill driving assembly 500 can be with
It is above-mentioned oil cylinder-construction of wire rope form, but is not limited solely to this, other structures form can also be used, such as: motor-
Lead screw or oil motor-chain etc. can be realized rock drill as long as passing through this structure type of rock drill driving assembly 500
600 reciprocating movement on upper layer sliding rail 410.
Please continue to refer to Fig. 1 and Fig. 5, in the present embodiment, which can also include euphroe 540,
Specifically, euphroe 540 is fixed on the second leading truck 400, wherein the of the second end of preceding wirerope and rear wirerope
Two ends are connect with euphroe 540.
The rock drill driving assembly 500 after use after a period of time, can use euphroe 540 to preceding wirerope and
The tensioning degree of wirerope is adjusted afterwards, to guarantee the tensioning state of preceding wirerope and rear wirerope.
Please continue to refer to Fig. 1 to Fig. 3, in the present embodiment, which can also include for detecting second
Leading truck 400 travels forward preceding switch 810 in place, and specifically, preceding switch 810 and the control of rock drill driving assembly 500 connect.
The rock drill 600 is in promoting operation process, when propelling cylinder 300 drives the second leading truck 400 to move forward to
Position after, preceding switch 810 is triggered, and by second leading truck 400 movement in place signal be sent to feed cylinder 510, control into
It is acted to oil cylinder 510;Under the driving of feed cylinder 510, rock drill 600 is fed forward, is realized and is promoted operation.
The setting of preceding switch 810 realizes the second leading truck 400 with rock drill 600 and is promoting the linkage in operation process
Movement ensure that the automatic forward feed of rock drill 600 after the movement in place of the second leading truck 400, to improve the present embodiment
Flexible propeller assembly promotes the high efficiency and fluency of operation process.
Preferably, in the present embodiment, the front end of the second leading truck 400 is arranged in preceding switch 810.
Please continue to refer to Fig. 1 to Fig. 3, in the present embodiment, which can also include for detecting rock drilling
Machine 600 moves rearwards to the rear switch 820 of position, and specifically, rear switch 820 is connected with the control of propelling cylinder 300.
The rock drill 600 is in moving back pricker operation process, after feed cylinder 510 drives rock drill 600 to move rearwards to position,
Switch 820 is triggered afterwards, and by the rock drill 600 movement, signal is sent to propelling cylinder 300 in place, controls propelling cylinder 300
Movement;Under the driving of propelling cylinder 300, the second leading truck 400 retracts backward, and pricker operation is moved back in realization.
The setting of switch 820 afterwards realizes the second leading truck 400 with rock drill 600 and is moving back the linkage in pricker operation process
Movement, the automatic of second leading truck 400 retracts backward after ensure that the movement in place of rock drill 600, to improve the present embodiment
Flexible propeller assembly moves back the high efficiency and fluency of pricker operation process.
Preferably, in the present embodiment, the rear end of the second leading truck 400 is arranged in rear switch 820.
It should be noted that preceding switch 810 and rear switch 820 can be the shapes such as pilot operated valve device or solenoid valve in the present embodiment
Formula, also, preceding switch 810 and rear switch 820 can be the triggering form of contact shown in figure, can also be non-contact triggering
Form, as long as can realize the second leading truck 400 respectively by this set form of preceding switch 810 and rear switch 820
Linkage action in operation process and the second leading truck 400 is being promoted to move back pricker operation with rock drill 600 with rock drill 600
Linkage action in the process.
In the present embodiment, the first earrings can also be fixedly installed on bracket, can also be fixedly installed on the first leading truck
Two earrings.Such setting realizes the installation of 510 oil feed line of propelling cylinder 300, compensating cylinder 900 and feed cylinder,
The situation for causing interference to each moving component due to pipeline is at random is avoided to a certain extent, be ensure that the present embodiment is flexible and is promoted
The functional reliability of device assembly.
The groundwork process of the flexible propeller assembly are as follows: firstly, the jib lubbing mechanism using rock drilling equipment stretches this
Propeller assembly is placed in operating position;Then, the first leading truck 200 is driven back and forth to move on bracket 100 using compensating cylinder 900
It is dynamic, and positioned using the fixing seat 210 of the first leading truck 200.
It promotes in operation process, the rod chamber oil inlet of propelling cylinder 300, so that the piston rod of propelling cylinder 300 is with respect to it
Cylinder barrel retracts, so that the second leading truck 400 be driven to travel forward;When the preceding switch 810 and fixing seat on the second leading truck 400
When 210 contact, preceding switch 810 is triggered, and control signal is exported to feed cylinder 510, controls feed cylinder 510 and acts,
To realize the driving to rock drill 600;During rock drill 600 is fed forward along upper layer sliding rail 410, drill steel 700 begins
The guiding movement in pilot hole 211 eventually, when rock drill 600 is fed to forward the front end of the second leading truck 400, propulsion terminates.
It moves back in pricker operation process, the rod chamber oil inlet of feed cylinder 510, so that the piston rod of feed cylinder 510 is with respect to it
Cylinder barrel retracts, so that rock drill 600 be driven to move backward along upper layer sliding rail 410;When rear wheel supporting plate 530 and the second leading truck
When the rear switch 820 of 400 rear ends contacts, rear switch 820 is triggered, and control signal is exported to propelling cylinder 300, makes to promote
The rodless cavity oil inlet of oil cylinder 300, so that its piston rod is stretched out with respect to cylinder barrel, so that the second leading truck 400 opposite first be driven to lead
It is moved backward to frame 200, moving back pricker terminates.
In addition, the present embodiment additionally provides a kind of rock drilling equipment, specifically, the rock drilling equipment include rock drilling equipment ontology and
Above-mentioned flexible propeller assembly, wherein flexible propeller assembly is installed on rock drilling equipment ontology.
By the way that above-mentioned flexible propeller assembly is arranged in rock drilling equipment, correspondingly, which has above-mentioned flexible
The institute of propeller assembly is advantageous, and this is no longer going to repeat them.
Claims (10)
1. a kind of flexible push structure, it is characterised in that: including bracket (100), the first leading truck (200), the second leading truck
(400) it is used for the driving mechanism that is connected between the first leading truck (200) and the second leading truck (400), the driving mechanism
The second leading truck (400) are driven to move with respect to the first leading truck (200), the first leading truck (200) and the second leading truck (400) are equal
It slides axially along bracket (100), the first leading truck (200) is slided with the second leading truck (400) with bracket (100) positioning
It is dynamic.
2. flexible push structure according to claim 1, it is characterised in that: the bracket (100) has hollow movement
Channel, the first leading truck (200) are threaded through in movable passageway.
3. flexible push structure according to claim 2, it is characterised in that: second leading truck (400) includes upper
The spaced upper layer sliding rail (410) in lower direction and lower layer's sliding rail (420), the upper layer sliding rail (410) and lower layer's sliding rail (420)
Extend along the moving direction of rock drill (600), second leading truck (400) passes through lower layer's sliding rail (420) and bracket (100)
Upper surface slide connection.
4. flexible push structure according to claim 1 to 3, it is characterised in that: first leading truck
(200) front end is provided with fixing seat (210), and the driving mechanism includes propelling cylinder (300), the propelling cylinder (300)
Cylinder barrel connect with the second leading truck (400), piston rod is connect with fixing seat (210);Alternatively, the propelling cylinder (300)
Cylinder barrel is connect with fixing seat (210), and piston rod is connect with the second leading truck (400).
5. flexible push structure according to claim 1 to 3, it is characterised in that: further include compensating cylinder
(900), the compensating cylinder (900) is connected between bracket (100) and the first leading truck (200), for driving the first guiding
Frame (200) opposing brackets (100) are mobile.
6. a kind of flexible propeller assembly, it is characterised in that: limited including rock drill (600) and claim 1-5 any one
Fixed flexible push structure, rock drill (600) are movably arranged on the second leading truck (400).
7. flexible propeller assembly according to claim 6, it is characterised in that: further include rock drill driving assembly (500),
The preceding switch (810) to travel forward in place for detecting the second leading truck (400), the preceding switch (810) and rock drill drive
Component (500) control connection.
8. flexible propeller assembly according to claim 7, it is characterised in that: further include for detecting rock drill (600)
The rear switch (820) of position is moved rearwards to, (820) and propelling cylinder (300) control is switched after described and is connected.
9. a kind of rock drilling equipment, it is characterised in that: including stretching described in rock drilling equipment ontology and claim 6-8 any one
Propeller assembly, flexible propeller assembly are installed on rock drilling equipment ontology.
10. a kind of flexible propulsion method, it is characterised in that: the first leading truck (200), the second leading truck pass through drive between (400)
The connection of motivation structure, driving mechanism is for driving the second leading truck (400) to move relative to the first leading truck (200), the first guiding
Frame (200) slides axially along bracket (100) with the second leading truck (400), the first leading truck (200) and the second leading truck
(400) using bracket (400) as sliding positioning datum point.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910011556.3A CN109441363A (en) | 2019-01-07 | 2019-01-07 | Flexible push structure, propeller assembly, rock drilling equipment and flexible propulsion method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910011556.3A CN109441363A (en) | 2019-01-07 | 2019-01-07 | Flexible push structure, propeller assembly, rock drilling equipment and flexible propulsion method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109441363A true CN109441363A (en) | 2019-03-08 |
Family
ID=65540188
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910011556.3A Withdrawn CN109441363A (en) | 2019-01-07 | 2019-01-07 | Flexible push structure, propeller assembly, rock drilling equipment and flexible propulsion method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109441363A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109958394A (en) * | 2019-03-18 | 2019-07-02 | 山西天巨重工机械有限公司 | A kind of airborne drilling machine of rock drilling |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU1758200A (en) * | 2000-02-18 | 2000-05-04 | Cram Australia Pty Ltd | A roof bolt installation apparatus and feed frame |
WO2004074626A1 (en) * | 2003-02-21 | 2004-09-02 | Sandvik Tamrock Oy | Telescopic feed beam for rock drill and method of measuring rock drill travel |
US20070227752A1 (en) * | 2004-05-31 | 2007-10-04 | Janne Voimanen | Telescopic Feed Beam for Rock Drill |
CN202508087U (en) * | 2012-03-21 | 2012-10-31 | 湘煤立达矿山装备股份有限公司 | Slide rail type propeller with route multiplying mechanism |
CN205154011U (en) * | 2015-09-25 | 2016-04-13 | 中国铁建重工集团有限公司 | A advancing device and drill jumbo for rock drill |
CN108691513A (en) * | 2018-07-09 | 2018-10-23 | 北京威力清矿山控制技术有限公司 | A kind of Operating Pressure well head plays down tube and fortune pipe automation operating system and its device |
CN209277826U (en) * | 2019-01-07 | 2019-08-20 | 秦皇岛迪峰凿岩设备有限公司 | Flexible push structure, propeller assembly and rock drilling equipment |
-
2019
- 2019-01-07 CN CN201910011556.3A patent/CN109441363A/en not_active Withdrawn
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU1758200A (en) * | 2000-02-18 | 2000-05-04 | Cram Australia Pty Ltd | A roof bolt installation apparatus and feed frame |
WO2004074626A1 (en) * | 2003-02-21 | 2004-09-02 | Sandvik Tamrock Oy | Telescopic feed beam for rock drill and method of measuring rock drill travel |
US20070227752A1 (en) * | 2004-05-31 | 2007-10-04 | Janne Voimanen | Telescopic Feed Beam for Rock Drill |
CN202508087U (en) * | 2012-03-21 | 2012-10-31 | 湘煤立达矿山装备股份有限公司 | Slide rail type propeller with route multiplying mechanism |
CN205154011U (en) * | 2015-09-25 | 2016-04-13 | 中国铁建重工集团有限公司 | A advancing device and drill jumbo for rock drill |
CN108691513A (en) * | 2018-07-09 | 2018-10-23 | 北京威力清矿山控制技术有限公司 | A kind of Operating Pressure well head plays down tube and fortune pipe automation operating system and its device |
CN209277826U (en) * | 2019-01-07 | 2019-08-20 | 秦皇岛迪峰凿岩设备有限公司 | Flexible push structure, propeller assembly and rock drilling equipment |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109958394A (en) * | 2019-03-18 | 2019-07-02 | 山西天巨重工机械有限公司 | A kind of airborne drilling machine of rock drilling |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108979688B (en) | Full-automatic anchor rod trolley | |
CN102390759B (en) | Tube discharging device with coiled tubing reel | |
CN102434111A (en) | Hydraulically-driven two-stage-feed dovetail-groove-guide symmetrically-arranged anchor rod drilling machine | |
CN106563948B (en) | A kind of separate type riveted joint for the horizontal automatic drill riveter of aircraft target ship | |
CN209277826U (en) | Flexible push structure, propeller assembly and rock drilling equipment | |
CN109441363A (en) | Flexible push structure, propeller assembly, rock drilling equipment and flexible propulsion method | |
CN111890335B (en) | Five-degree-of-freedom synchronous telescopic two-stage manipulator | |
CN200975211Y (en) | Telescopic thruster for digging drill carriage | |
CN107905738A (en) | A kind of rock drilling device realized two-stage and promoted | |
CN111322084A (en) | Slip table moving mechanism and undercut platform truck | |
CN202463971U (en) | Multi-position automobile body dragging machine | |
CN102644397A (en) | Hydraulic column type elevating system for two-floor elevating traversing stereo garage | |
CN202926255U (en) | Novel transfer trolley for power catwalk machine | |
CN103334767A (en) | Synchronous mechanical telescopic boom | |
CN103406743B (en) | Automatic opening mechanism for automobile engine tile cover | |
CN106392678B (en) | It is a kind of can the mobile dual stage combination in series slide unit of double-speed | |
CN205151654U (en) | Emergency braking's panel automatic lifting device | |
CN104385453A (en) | Multifunctional block separator of aerated concrete | |
CN209522511U (en) | A kind of load hoofing part mechanism | |
CN213144503U (en) | Drill and anchor integrated push beam | |
CN206241655U (en) | It is a kind of can double-speed movement dual stage combination in series slide unit | |
CN112857731A (en) | Positioning and tensioning device between wind tunnel sections | |
CN208747065U (en) | A kind of pallet head sideward machine | |
CN101104506A (en) | Drilling machine module straight and curve passage mobile method and mobile device | |
CN207739945U (en) | A kind of rock drilling device realized two-stage and promoted |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190308 |
|
WW01 | Invention patent application withdrawn after publication |