CN207739945U - A kind of rock drilling device realized two-stage and promoted - Google Patents
A kind of rock drilling device realized two-stage and promoted Download PDFInfo
- Publication number
- CN207739945U CN207739945U CN201721809276.XU CN201721809276U CN207739945U CN 207739945 U CN207739945 U CN 207739945U CN 201721809276 U CN201721809276 U CN 201721809276U CN 207739945 U CN207739945 U CN 207739945U
- Authority
- CN
- China
- Prior art keywords
- guide plate
- forward beam
- connect
- rack
- cylinder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of rock drilling devices realized two-stage and promoted, including rock drill(1), upper guide plate(2), drilling rod (3), propelling cylinder (4), forward beam (5), compensating cylinder (6), lower guide plate (7), the rock drill connects the tail end of the drilling rod, the rock drill connects composition first movement pair by the top of upper guide plate and forward beam, one end of the propelling cylinder is connect with forward beam, and the other end is connect by wire rope pulley mechanism with rock drill;The lower part of the forward beam connect the second prismatic pair of composition by lower guide plate with rack, and one end of compensating cylinder is connect with rack, and the other end is connect with forward beam.The puncheon centralizing device for buttressing drilling rod front end is arranged in the front end of the rack(11).The front end of the rack is provided with positional cylinder(9), the extensible member front end of positional cylinder is provided with the locating rod for supporting working face(10).The utility model forward beam size under identical impulse stroke is only the half of conventional apparatus, thus can meet in operation in narrow space.
Description
Technical field
The utility model is related to engineering machinery, and in particular to a kind of rock drilling device realized two-stage and promoted.
Background technology
It is needed in water power tunnel, subway engineering, railway tunnel, vcehicular tunnel, underground power house, military ground engineering construction
Preliminary bracing is carried out, needs to carry out drilling operation by rock drill in Bracing Process(Such as lock foot anchoring stock hole, advanced tubule
Hole).Due to above-mentioned operating environment narrow space, drilling operation is manually presently mainly carried out by pusher leg drill.
As shown in Figure 1, the drilling rod stroke of rock drilling device provisioned in heavy construction equipment is all pushed away by rock drill is opposite at present
It moves and generates into beam, thus the length dimension of forward beam is very big, is put to good use not open in narrow working environment, it is difficult to it is competent at above-mentioned work
Make.
Utility model content
Technical problem to be solved in the utility model can be met narrow in view of the shortcomings of the prior art, offer is a kind of
The engineering machinery rock drilling device of job space.
In order to solve the above technical problems, the technical solution adopted in the utility model is:A kind of rock drilling realized two-stage and promoted
Device, including rock drill, upper guide plate, propelling cylinder, forward beam, compensating cylinder, lower guide plate, wherein
The rock drill connects composition first movement pair by the top of upper guide plate and forward beam, the propelling cylinder
One end is connect with forward beam, and the other end is connect by wire rope pulley mechanism with rock drill;
The lower part of the forward beam connect with rack by lower guide plate composition the second prismatic pair, one end of compensating cylinder with
Rack connects, and the other end is connect with forward beam.
The utility model is using cumulative principle, and the displacement using rock drill with respect to forward beam is as a hemistich of rock drilling device
Journey, other half stroke of the forward beam with respect to the displacement of rack as rock drilling device.Rock drilling device entire in this way is in identical work
In the case of stroke the length dimension of forward beam by be conventional apparatus half, rock drilling device can be met in operation in narrow space
It needs.
To improve the job stability of the utility model rock drilling device drilling rod, the front end setting of the rack is bored for buttressing
The puncheon centralizing device of bar front end.When rock drill at work, the puncheon centralizing device in rock drill distal end will buttress drilling rod, prevent drilling rod from shaking,
Improve borehole stability.
To improve the job stability of the utility model rock drilling device, the front end of the rack is provided with positional cylinder, fixed
The extensible member front end of position oil cylinder is provided with the locating rod for supporting working face.After rock drilling device determines punch position,
Locating rod is acted by positional cylinder stretches out, until on its top to working face.Rock drilling device can be effectively reduced in this way in work
Shaking during work improves borehole stability.
The upper and lower guide plate is preferably the guide plate that cross section is V-type, the company of the forward beam and upper and lower guide plate
End is connect to be set as and the matched convex body of V-type guide plate.In this way, the connection of the utility model forward beam and rock drill, rack
It is more reliable, it is advantageous steady mobile.
Description of the drawings
Fig. 1 is the structural schematic diagram of Traditional project machinery rock drilling device.
Fig. 2 is the installation diagram of the utility model engineering machinery one example of rock drilling device.
Fig. 3 is that the rock drill of the utility model engineering machinery rock drilling device moves the assembly of half stroke relative to forward beam
Figure.
Fig. 4 is assembly of the forward beam with respect to machine frame movement half stroke of the utility model engineering machinery rock drilling device
Figure.
Fig. 5 is the locating rod action schematic diagram of the utility model engineering machinery rock drilling device.
Fig. 6 is the cross-sectional structure schematic diagram of the utility model forward beam and upper and lower guide plate.
Specific implementation mode
An application example of the utility model on tunnel rock drilling arching trolley is given below.
As shown in Fig. 2-Fig. 6, a kind of one embodiment of rock drilling device for realizing that two-stage promotes of the utility model includes rock drill
1, upper guide plate 2, drilling rod 3, propelling cylinder 4, forward beam 5, compensating cylinder 6, lower guide plate 7, rack 8, positional cylinder 9, positioning
Bar 10, puncheon centralizing device 11, wherein upper guide plate 2, lower guide plate 7 are preferably the guide plate that cross section is V-type.
Rock drill 1 is connect by upper guide plate 2 with forward beam 5, and first movement pair is formed.One end of propelling cylinder 4 with push away
It is connected into beam 5, the other end of propelling cylinder 4 is connect by wire rope pulley mechanism with rock drill 1.When propelling cylinder 4 works
Rock drill 1 will be acted on by wire rope pulley mechanism, realizes relative motion of the rock drill 1 with respect to forward beam 5, to realize this
The half stroke of utility model rock drilling device.
Forward beam 5 is connect by lower guide plate 7 with rack 8, and the second prismatic pair is formed.6 one end of compensating cylinder connects with rack 8
It connects, other end is connect with forward beam 5.Forward beam 5 will be pushed to be moved with respect to rack 8 when compensating cylinder 6 works, to realize this
Another half trip of utility model rock drilling device.
Puncheon centralizing device 11 is arranged in the front end of rack 8, for buttressing 3 front end of drilling rod.3 tail end of drilling rod is connect with rock drill 1.
8 front end of rack is provided with positional cylinder 9.The front end of positional cylinder 9 is provided with locating rod 10, and positional cylinder 9 stretches out
When locating rod 10 will be driven toward extension, until its top is on working face.
Claims (4)
1. a kind of rock drilling device realized two-stage and promoted, including rock drill(1), upper guide plate(2), propelling cylinder (4), forward beam
(5), compensating cylinder (6), lower guide plate (7), which is characterized in that
The rock drill connects composition first movement pair, one end of the propelling cylinder by the top of upper guide plate and forward beam
It is connect with forward beam, the other end is connect by wire rope pulley mechanism with rock drill;
The lower part of the forward beam connect the second prismatic pair of composition, one end of compensating cylinder and rack by lower guide plate with rack
Connection, the other end are connect with forward beam.
2. a kind of rock drilling device realized two-stage and promoted according to claim 1, which is characterized in that the front end of the rack
Puncheon centralizing device for buttressing drilling rod front end is set(11).
3. a kind of rock drilling device realized two-stage and promoted according to claim 1, which is characterized in that the front end of the rack
It is provided with positional cylinder(9), the extensible member front end of positional cylinder is provided with the locating rod for supporting working face(10).
4. a kind of rock drilling device realized two-stage and promoted according to claim 1, which is characterized in that the upper and lower guiding
Plate is preferably the guide plate that cross section is V-type, and the connecting pin of the forward beam and upper and lower guide plate is set as and V-type guide plate
Matched convex body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721809276.XU CN207739945U (en) | 2017-12-22 | 2017-12-22 | A kind of rock drilling device realized two-stage and promoted |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721809276.XU CN207739945U (en) | 2017-12-22 | 2017-12-22 | A kind of rock drilling device realized two-stage and promoted |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207739945U true CN207739945U (en) | 2018-08-17 |
Family
ID=63119118
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721809276.XU Active CN207739945U (en) | 2017-12-22 | 2017-12-22 | A kind of rock drilling device realized two-stage and promoted |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207739945U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107905738A (en) * | 2017-12-22 | 2018-04-13 | 长沙科达智能装备股份有限公司 | A kind of rock drilling device realized two-stage and promoted |
-
2017
- 2017-12-22 CN CN201721809276.XU patent/CN207739945U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107905738A (en) * | 2017-12-22 | 2018-04-13 | 长沙科达智能装备股份有限公司 | A kind of rock drilling device realized two-stage and promoted |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10233755B2 (en) | Drilling and bursting heading machine | |
CN107905738A (en) | A kind of rock drilling device realized two-stage and promoted | |
CN201714392U (en) | Rock drilling device | |
CN100538008C (en) | Digging-drilling integrated digging-drilling machine | |
CN103485714A (en) | Drilling mechanism and drill loader | |
CN102691506A (en) | Spherical support girder turning mechanism for open-type hard-rock boring machines | |
CN205805429U (en) | Driving drill carriage concertina type forward beam | |
CN104929517A (en) | Full-hydraulic drill type pressure relieving equipment with double drill bits and pressure relieving method | |
CN205135430U (en) | Drill jumbo translation drill boom that stretches out and draws back | |
CN103174382B (en) | Multifunctional hydraulic anchor rod drill carriage | |
CN207739945U (en) | A kind of rock drilling device realized two-stage and promoted | |
CN200975211Y (en) | Telescopic thruster for digging drill carriage | |
CN205135410U (en) | Balladeur train telescopic drill jumbo propeller | |
CN104948109A (en) | Suspension type omni-directional anchor rod drill carriage | |
CN102230378B (en) | Digging and drilling integrated machine | |
CN204312072U (en) | A kind of working beam gatherer, motion arm and tunneling chassis | |
CN203808829U (en) | Suspension type omnibearing anchor rod drilling carriage | |
CN202745755U (en) | Combination extension rod type water supply device | |
CN106121704B (en) | A kind of mining excavation working face walking prop, traveling method and development machine | |
CN106320996B (en) | Drilling rod double embrace for piling machine presses system | |
CN201794531U (en) | Lifting device for power head of drilling machine | |
CN204238947U (en) | A kind of telescopic boring rock body | |
CN201763239U (en) | Pillar drilling machine | |
CN214273496U (en) | Cantilever type double-arm hydraulic anchor rod drill carriage | |
CN219910663U (en) | Rail type pneumatic rock drill, universal rock drilling manipulator and tunnel rock drilling carriage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |