CN109426683A - Project Management System based on BIM network technology - Google Patents

Project Management System based on BIM network technology Download PDF

Info

Publication number
CN109426683A
CN109426683A CN201710749076.8A CN201710749076A CN109426683A CN 109426683 A CN109426683 A CN 109426683A CN 201710749076 A CN201710749076 A CN 201710749076A CN 109426683 A CN109426683 A CN 109426683A
Authority
CN
China
Prior art keywords
host
management
modeling
network technology
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710749076.8A
Other languages
Chinese (zh)
Inventor
姚金满
周芝平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhongnan Construction Group Co Ltd
Original Assignee
Zhejiang Zhongnan Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Zhongnan Construction Group Co Ltd filed Critical Zhejiang Zhongnan Construction Group Co Ltd
Priority to CN201710749076.8A priority Critical patent/CN109426683A/en
Publication of CN109426683A publication Critical patent/CN109426683A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063116Schedule adjustment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Geometry (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Quality & Reliability (AREA)
  • Computer Hardware Design (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Architecture (AREA)
  • Health & Medical Sciences (AREA)
  • Civil Engineering (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides the Project Management System based on BIM network technology.The Project Management System based on BIM network technology includes modeling platform, table top, data management host, modeling host, data management display screen, modeling display screen, material shelf, main station, locker, Intranet manager, database, electronic box, reserve battery, switch, outer net manager, data collection host, personal management module, handling of goods and materials module, construction process management module and qualification management of blueprint module.Project Management System provided by the invention based on BIM network technology effectively raises the speed of service of data-handling efficiency and host, and modeled segments configuration improves the safety of Buildings Modeling information in an intranet environment;Modularization management can be carried out to each construction content, improve the efficiency of management, and each information can be aggregated into the database, realize information sharing.

Description

Project Management System based on BIM network technology
Technical field
The present invention relates to technical field of building construction, more particularly to the Project Management System based on BIM network technology.
Background technique
Construction is a highly complex dynamic process, working procedure and duration, cost, resource, between place all There is complicated dynamic connections, and have comparable uncertain and randomness.Therefore construction projects manage not But it needs to consider the uniqueness of building design itself, and to consider the constraint conditions such as duration, cost, resource and place.Into Seek a dynamic balance between degree, cost and the big level of control of quality three, is through the complex management of entire work progress Activity has and contains much information, and information change is fast, is related to the feature of factor complexity, therefore information technology is led in construction project management The potential using value in domain is huge, and BIM is also known as Building Information Model, and BIM design process is divided into resource, behavior, delivers three bases This dimension, provides the specific method and practice content of the implementation standard of design companies, and BIM is not simply to carry out digital information It is integrated, but the application of digital information, and can be used for designing, build, the digitizing solution of management, this method supports building The integrated management environment of engineering can make architectural engineering significantly improve efficiency throughout its entire process, largely reduce risk.
Current construction management is not scientific and normal enough, the information of each administrative department can not realize it is shared so that The working efficiency of management organization is lower, and background information modeling can not obtain required data in time, influences modeling process, and The safety of information management is inadequate.
Therefore, it is necessary to which providing the new Project Management System based on BIM network technology solves above-mentioned technical problem.
Summary of the invention
The technical problem to be solved by the present invention is to provide high safety, the efficiency of management is high, modeling speed is fast based on BIM network The Project Management System of technology.
In order to solve the above technical problems, it includes: to build that the present invention, which provides the Project Management System based on BIM network technology, Die station;Table top, the table top are installed on the top of the modeling platform;Data management host, the data management host are fixed on The bottom of the table top;Data management display screen, the data management display screen are electrically connected the data management host;Modeling The side of host, the modeling host is equipped with data management host;Display screen is modeled, described in modeling display screen electric connection Model host;Intranet manager, the Intranet manager and the modeling host, the data management host are electrically connected;Number According to library, the database is connected to the Intranet manager;Switch, the switch are electrically connected the database;Electronic box, it is described Electronic box is electrically connected the switch;Outer net manager is connected with each other between the outer net manager and the database;Data are adopted Collect host, is connected with each other between the data collection host and the outer net manager;Personal management module, the personal management Module is bidirectionally connected to the data collection host;Handling of goods and materials module, the handling of goods and materials module are bidirectionally connected to the number According to acquisition host;Construction process management module, the construction process management module are bidirectionally connected to the data collection host;Money Matter management of blueprint module, the qualification management of blueprint module are bidirectionally connected to the data collection host.
Preferably, main station is fixed at the top of the table top.
Preferably, material shelf is fixed at the top of the table top, and the material shelf is fixed on the one of the main station Side.
Preferably, the bottom of the modeling platform is equipped with locker.
Preferably, the electronic box is electrically connected reserve battery, and the reserve battery is electrically connected the switch.
Preferably, it is bi-directionally connected between the database and the Intranet manager, the outer net manager.
Preferably, the data management display screen, the adjacent top for being fixed on the table top of the modeling display screen.
Preferably, the data management host, the modeling host are bi-directionally connected the Intranet manager.
Preferably, the modeling host is the modeling host based on BIM network technology.
Preferably, the Intranet manager and the outer net manager are arranged independently of each other.
Compared with the relevant technologies, the Project Management System provided by the invention based on BIM network technology has such as It is lower the utility model has the advantages that
The present invention provides the Project Management System based on BIM network technology, and modeling efficiency is high, is led by the way that the modeling is arranged Machine and the data management host can operate separately data information and modeling information, effectively raise data-handling efficiency With the speed of service of host, and modeled segments configuration in an intranet environment, can effectively avoid outside invading, raising is built Build the safety of modeling information;Mould is managed configured with the personal management module, the handling of goods and materials module, the construction process Block and the qualification management of blueprint module can carry out modularization management to each construction content, improve the efficiency of management, and Each information can be aggregated into the database, realized information sharing, improved the working efficiency of each administrative department and build Imitate rate;It can guarantee that modeling region will not power off when power is off, guarantee that modeling data will not be lost.
Detailed description of the invention
Fig. 1 is the structure of the preferred embodiment of the Project Management System provided by the invention based on BIM network technology Schematic diagram;
Fig. 2 is Database Systems connection schematic diagram shown in FIG. 1.
Figure label: 1, modeling platform, 2, table top, 3, data management host, 4, modeling host, 5, data management display screen, 6, modeling display screen, 7, material shelf, 8, main station, 9, locker, 10, Intranet manager, 11, database, 12, electronic box, 13, Reserve battery, 14, switch, 15, outer net manager, 16, data collection host, 17, personal management module, 18, handling of goods and materials mould Block, 19, construction process management module, 20, qualification management of blueprint module.
Specific embodiment
The invention will be further described with embodiment with reference to the accompanying drawing.
Please refer to Fig. 1 and Fig. 2, wherein Fig. 1 is the architectural engineering provided by the invention based on BIM network technology The structural schematic diagram of the preferred embodiment of management system;Fig. 2 is Database Systems connection schematic diagram shown in FIG. 1.Based on BIM net The Project Management System of network technology includes: modeling platform 1;Table top 2, the table top 2 are installed on the top of the modeling platform 1; Data management host 3, the data management host 3 are fixed on the bottom of the table top 2, and the data management host 3 can be convenient for Modeling personnel have access to information at any time, are modeled;Data management display screen 5, the data management display screen 5 are electrically connected described Data management host 3;Host 4 is modeled, the side of the modeling host 4 is equipped with data management host 3, data handling procedure and builds Mold process is respectively equipped with individual host, effectively raises data processing speed and modeling speed;Display screen 6 is modeled, it is described Modeling display screen 6 is electrically connected the modeling host 4;Intranet manager 10, the Intranet manager 10 and the modeling host 5, the data management host 3 is electrically connected;Database 11, the database 11 is connected to the Intranet manager 10, described Database 11 is to store each data;Switch 14, the switch electrically 14 connect the database 11;Electronic box 12, the electricity Case 12 is electrically connected the switch 14;Outer net manager 15 mutually interconnects between the outer net manager 15 and the database 11 It connects;Data collection host 16 is connected with each other between the data collection host 16 and the outer net manager 15, and the data are adopted Collection host 16 can acquire construction information, architecture information and be pocessed upload;Personal management module 17, the personal management module 17 are bidirectionally connected to the data collection host 16, and the record of personal management module 17 has construction personnel's personal information and applies Worker person's routine work situation;Handling of goods and materials module 18, the handling of goods and materials module 18 are bidirectionally connected to the data acquisition master Machine 16 can carry out comprehensive record management to construction material;Construction process management module 19, the construction process management module 19 It is bidirectionally connected to the data collection host 16, construction process can comprehensively be recorded, be managed;Qualification management of blueprint module 20, the qualification management of blueprint module 20 is bidirectionally connected to the data collection host 16, can to the certificate of construction, qualification and Various drawings are recorded, are uploaded.
Wherein, the top of the table top 2 is fixed with main station 8, can model personnel and contact with construction personnel, solve to ask Topic.
Wherein, the top of the table top 2 is fixed with material shelf 7, and the material shelf 7 is fixed on the main station 8 Staff's material stored is convenient in side.
The bottom of the modeling platform 1 is equipped with locker 9, stores article convenient for staff.
Wherein, the electronic box 12 is electrically connected reserve battery 13, and the reserve battery 13 is electrically connected the switch 14, It can guarantee that modeling region will not power off when power is off, guarantee that modeling data will not be lost.
It is bi-directionally connected between the database 11 and the Intranet manager 10, the outer net manager 15, realizes number According to upload and shared, improve working, the efficiency of management of each department.
The data management display screen 5, the adjacent top for being fixed on the table top 2 of the modeling display screen 6 are convenient for work Personnel operate separately.
In order to improve the safety of modeling data, the data management host 3, the modeling host 4 are bi-directionally connected institute State Intranet manager 10.
The modeling host 4 is the modeling host 4 based on BIM network technology, can effectively improve modeling efficiency.
The Intranet manager 10 and the outer net manager 15 are arranged independently of each other, guarantee that internal modeling data will not It leaks.
In day-to-day operation, the data collection host 16 can acquire construction information, architecture information, the personal management mould Block 17 can record construction personnel's personal information and construction personnel's routine work situation, the handling of goods and materials module 18 can be to constructions Goods and materials carry out comprehensive record management, the construction process management module 19 can carry out comprehensive record management to construction process, The qualification management of blueprint module 20 can record the certificate of construction, qualification and various drawings, and each data are at Reason is uploaded to the data collection host 16, and the data collection host 16 uploads data by the outer net manager 15 To the database 11, the Intranet manager 10 can carry out closing encryption to modeled network, so that Intranet is safer, modeling Personnel can download required data from the database 11 by the data management host 3 and handle, and pass through the modeling Host 4 using ibm networking technology carry out data modeling, each administrative department can from the 11 download management data of database, Realize information sharing.
Embodiment one:
Applied in pile foundation construction,
Step 1: exploration and design side, construction party and management side are used as BIM system application participant, are operated by Web browser Integrated project management system;
Step 2: the typing of exploration and design side and the instrument detection data for uploading stake holes;Construction party upload in real time pile foundation construction progress, The data such as practice of construction verticality, aperture and sediment thickness and construction quality, safety records;Management Fang Ze is to these numbers of constructing According to being audited, supervised and uploaded quality inspection table;
Step 3: owner passes through each functional department's client operation BIM of project intranet server as system application main body side Software, the information that comprehensive each participant uploads carry out project progress, resource, quality, cost and the management of the 4D in place dynamic, control And the visual Simulation of work progress.
The system can be run under any network condition, it might even be possible to it is defeated to carry out data under 4G network by tablet computer Enter and browse, work efficiency is high, and visualized operation is conducive to manage.
Embodiment two:
The system be applied to determine piling machine position when, construction party upload this practice of construction verticality, aperture, at The information such as slag thickness, concrete amount, which can be transferred through clicking its pattern query, to be arrived, to the construction speed of pile base, quality management with Control brings great convenience.
Embodiment one and embodiment two show that the Construction Project Management system based on BIM realizes the multi-party based on BIM It cooperates, improves the construction management level of IT application and working efficiency, achieve positive effect.System has fully demonstrated BIM and has existed Application value in Construction Project Management is BIM, and the deep application in engineering construction provides new technical method and software System.
Compared with the relevant technologies, the Project Management System provided by the invention based on BIM network technology has such as It is lower the utility model has the advantages that
The present invention provides the Project Management System based on BIM network technology, and modeling efficiency is high, is led by the way that the modeling is arranged Machine 4 and the data management host 3 can operate separately data information and modeling information, effectively raise data processing effect The speed of service of rate and host, and modeled segments configuration can effectively avoid outside invading in an intranet environment, improve The safety of Buildings Modeling information;Configured with the personal management module 17, the handling of goods and materials module 18, the construction process Management module 19 and the qualification management of blueprint module 20 can carry out modularization management to each construction content, improve pipe Efficiency is managed, and each information can be aggregated into the database 11, realizes information sharing, improve the work of each administrative department Make efficiency and modeling efficiency;It can guarantee that modeling region will not power off when power is off, guarantee that modeling data will not be lost.
The above description is only an embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills Art field, is included within the scope of the present invention.

Claims (10)

1. the Project Management System based on BIM network technology characterized by comprising
Model platform;
Table top, the table top are installed on the top of the modeling platform;
Data management host, the data management host are fixed on the bottom of the table top;
Data management display screen, the data management display screen are electrically connected the data management host;
Host is modeled, the side of the modeling host is equipped with data management host;
Display screen is modeled, the modeling display screen is electrically connected the modeling host;
Intranet manager, the Intranet manager and the modeling host, the data management host are electrically connected;
Database, the database are connected to the Intranet manager;
Switch, the switch are electrically connected the database;
Electronic box, the electronic box are electrically connected the switch;
Outer net manager is connected with each other between the outer net manager and the database;
Data collection host is connected with each other between the data collection host and the outer net manager;
Personal management module, the personal management module are bidirectionally connected to the data collection host;
Handling of goods and materials module, the handling of goods and materials module are bidirectionally connected to the data collection host;
Construction process management module, the construction process management module are bidirectionally connected to the data collection host;
Qualification management of blueprint module, the qualification management of blueprint module are bidirectionally connected to the data collection host.
2. the Project Management System according to claim 1 based on BIM network technology, which is characterized in that described Main station is fixed at the top of face.
3. the Project Management System according to claim 1 based on BIM network technology, which is characterized in that described Material shelf is fixed at the top of face, and the material shelf is fixed on the side of the main station.
4. the Project Management System according to claim 1 based on BIM network technology, which is characterized in that described to build The bottom of die station is equipped with locker.
5. the Project Management System according to claim 1 based on BIM network technology, which is characterized in that the electricity Case is electrically connected reserve battery, and the reserve battery is electrically connected the switch.
6. the Project Management System according to claim 1 based on BIM network technology, which is characterized in that the number It is bi-directionally connected according between library and the Intranet manager, the outer net manager.
7. the Project Management System according to claim 1 based on BIM network technology, which is characterized in that the number According to management display screen, the adjacent top for being fixed on the table top of the modeling display screen.
8. the Project Management System according to claim 1 based on BIM network technology, which is characterized in that the number The Intranet manager is bi-directionally connected according to managing main frame, the modeling host.
9. the Project Management System according to claim 1 based on BIM network technology, which is characterized in that described to build Mould host is the modeling host based on BIM network technology.
10. the Project Management System according to claim 1 based on BIM network technology, which is characterized in that in described Net manager and the outer net manager are arranged independently of each other.
CN201710749076.8A 2017-08-28 2017-08-28 Project Management System based on BIM network technology Pending CN109426683A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710749076.8A CN109426683A (en) 2017-08-28 2017-08-28 Project Management System based on BIM network technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710749076.8A CN109426683A (en) 2017-08-28 2017-08-28 Project Management System based on BIM network technology

Publications (1)

Publication Number Publication Date
CN109426683A true CN109426683A (en) 2019-03-05

Family

ID=65502355

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710749076.8A Pending CN109426683A (en) 2017-08-28 2017-08-28 Project Management System based on BIM network technology

Country Status (1)

Country Link
CN (1) CN109426683A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853657A (en) * 2019-03-15 2019-06-07 湖北工业大学 A kind of artificial digging pile automatic clinker-removing device and application method based on BIM technology
CN111161098A (en) * 2019-12-02 2020-05-15 中铁建设集团有限公司 Pile foundation construction machine account management system and method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106920049A (en) * 2017-03-28 2017-07-04 内蒙古科技大学 A kind of Project Management System platform based on BIM network technologies

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106920049A (en) * 2017-03-28 2017-07-04 内蒙古科技大学 A kind of Project Management System platform based on BIM network technologies

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
何亚伯: "《土木工程监理》", 30 September 2015, 武汉大学出版社 *
余芳强等: "一种面向施工企业的建筑工程构件库分类管理系统", 《建筑施工》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853657A (en) * 2019-03-15 2019-06-07 湖北工业大学 A kind of artificial digging pile automatic clinker-removing device and application method based on BIM technology
CN111161098A (en) * 2019-12-02 2020-05-15 中铁建设集团有限公司 Pile foundation construction machine account management system and method

Similar Documents

Publication Publication Date Title
Vilutiene et al. Building information modeling (BIM) for structural engineering: A bibliometric analysis of the literature
Lu et al. Moving from building information models to digital twins for operation and maintenance
CN107483253A (en) A kind of data center machine room operation management system based on three-dimensional VR
CN109447480A (en) A kind of road and bridge engineering equipment safety monitoring system and method based on BIM+GIS modeling
CN105652830A (en) Bridge monitoring system based on BIM
CN110059150A (en) Hydraulic engineering Digital Archives System based on BIM+GIS
CN103136101A (en) Software automated testing unified operation platform
CN106022617A (en) Inspection control system based on marketing multi-system data center
CN106652261A (en) Safe bookshelf and self-service borrowing and returning method thereof
CN107451737A (en) A kind of big data O2O check of drawings cloud platform management systems examined for engineering construction figure
CN107835107A (en) A kind of metering display systems based on power network metering topological sum WebGis
CN110266533A (en) Big data platform management system
CN104809933A (en) Unscripted emergency drill system, method and equipment for power grid
Jiang Intelligent building construction management based on BIM digital twin
Al Marzouqi et al. Building ADNOC's Pillars for Process Standardization and Best Practices through an Integrated Reservoir Management Framework
CN109426683A (en) Project Management System based on BIM network technology
Cai et al. Optimization of human resource file information decision support system based on cloud computing
Li et al. Research and design of mineral resource management system based on big data and GIS technology
CN205353660U (en) Intelligence cloud cabinet management and control information system
Kubota et al. Data model–centered four-dimensional information management system for road maintenance
CN111860895A (en) BIM-based bridge auxiliary facility operation maintenance management system
Amirebrahimi et al. An integrated web-based 3D modeling and visualization platform to support sustainable cities
Geddes The large hadron collider and grid computing
CN106850322A (en) Resource apparatus management system based on six-layer model
CN116245270A (en) Intelligent school system and intelligent school system application method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190305