CN109426683A - Project Management System based on BIM network technology - Google Patents
Project Management System based on BIM network technology Download PDFInfo
- Publication number
- CN109426683A CN109426683A CN201710749076.8A CN201710749076A CN109426683A CN 109426683 A CN109426683 A CN 109426683A CN 201710749076 A CN201710749076 A CN 201710749076A CN 109426683 A CN109426683 A CN 109426683A
- Authority
- CN
- China
- Prior art keywords
- host
- management
- modeling
- network technology
- data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005516 engineering process Methods 0.000 title claims abstract description 33
- 238000007726 management method Methods 0.000 claims abstract description 83
- 238000010276 construction Methods 0.000 claims abstract description 40
- 238000013523 data management Methods 0.000 claims abstract description 33
- 238000000034 method Methods 0.000 claims abstract description 23
- 239000000463 material Substances 0.000 claims abstract description 21
- 238000013480 data collection Methods 0.000 claims abstract description 20
- 230000008569 process Effects 0.000 claims abstract description 17
- 238000012797 qualification Methods 0.000 claims abstract description 12
- 230000005611 electricity Effects 0.000 claims description 2
- 238000013461 design Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 4
- 238000009430 construction management Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 238000009435 building construction Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 238000012938 design process Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 230000006855 networking Effects 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 230000008092 positive effect Effects 0.000 description 1
- 239000013049 sediment Substances 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 239000002893 slag Substances 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063116—Schedule adjustment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0633—Workflow analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Economics (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- Geometry (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Quality & Reliability (AREA)
- Computer Hardware Design (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Architecture (AREA)
- Health & Medical Sciences (AREA)
- Civil Engineering (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention provides the Project Management System based on BIM network technology.The Project Management System based on BIM network technology includes modeling platform, table top, data management host, modeling host, data management display screen, modeling display screen, material shelf, main station, locker, Intranet manager, database, electronic box, reserve battery, switch, outer net manager, data collection host, personal management module, handling of goods and materials module, construction process management module and qualification management of blueprint module.Project Management System provided by the invention based on BIM network technology effectively raises the speed of service of data-handling efficiency and host, and modeled segments configuration improves the safety of Buildings Modeling information in an intranet environment;Modularization management can be carried out to each construction content, improve the efficiency of management, and each information can be aggregated into the database, realize information sharing.
Description
Technical field
The present invention relates to technical field of building construction, more particularly to the Project Management System based on BIM network technology.
Background technique
Construction is a highly complex dynamic process, working procedure and duration, cost, resource, between place all
There is complicated dynamic connections, and have comparable uncertain and randomness.Therefore construction projects manage not
But it needs to consider the uniqueness of building design itself, and to consider the constraint conditions such as duration, cost, resource and place.Into
Seek a dynamic balance between degree, cost and the big level of control of quality three, is through the complex management of entire work progress
Activity has and contains much information, and information change is fast, is related to the feature of factor complexity, therefore information technology is led in construction project management
The potential using value in domain is huge, and BIM is also known as Building Information Model, and BIM design process is divided into resource, behavior, delivers three bases
This dimension, provides the specific method and practice content of the implementation standard of design companies, and BIM is not simply to carry out digital information
It is integrated, but the application of digital information, and can be used for designing, build, the digitizing solution of management, this method supports building
The integrated management environment of engineering can make architectural engineering significantly improve efficiency throughout its entire process, largely reduce risk.
Current construction management is not scientific and normal enough, the information of each administrative department can not realize it is shared so that
The working efficiency of management organization is lower, and background information modeling can not obtain required data in time, influences modeling process, and
The safety of information management is inadequate.
Therefore, it is necessary to which providing the new Project Management System based on BIM network technology solves above-mentioned technical problem.
Summary of the invention
The technical problem to be solved by the present invention is to provide high safety, the efficiency of management is high, modeling speed is fast based on BIM network
The Project Management System of technology.
In order to solve the above technical problems, it includes: to build that the present invention, which provides the Project Management System based on BIM network technology,
Die station;Table top, the table top are installed on the top of the modeling platform;Data management host, the data management host are fixed on
The bottom of the table top;Data management display screen, the data management display screen are electrically connected the data management host;Modeling
The side of host, the modeling host is equipped with data management host;Display screen is modeled, described in modeling display screen electric connection
Model host;Intranet manager, the Intranet manager and the modeling host, the data management host are electrically connected;Number
According to library, the database is connected to the Intranet manager;Switch, the switch are electrically connected the database;Electronic box, it is described
Electronic box is electrically connected the switch;Outer net manager is connected with each other between the outer net manager and the database;Data are adopted
Collect host, is connected with each other between the data collection host and the outer net manager;Personal management module, the personal management
Module is bidirectionally connected to the data collection host;Handling of goods and materials module, the handling of goods and materials module are bidirectionally connected to the number
According to acquisition host;Construction process management module, the construction process management module are bidirectionally connected to the data collection host;Money
Matter management of blueprint module, the qualification management of blueprint module are bidirectionally connected to the data collection host.
Preferably, main station is fixed at the top of the table top.
Preferably, material shelf is fixed at the top of the table top, and the material shelf is fixed on the one of the main station
Side.
Preferably, the bottom of the modeling platform is equipped with locker.
Preferably, the electronic box is electrically connected reserve battery, and the reserve battery is electrically connected the switch.
Preferably, it is bi-directionally connected between the database and the Intranet manager, the outer net manager.
Preferably, the data management display screen, the adjacent top for being fixed on the table top of the modeling display screen.
Preferably, the data management host, the modeling host are bi-directionally connected the Intranet manager.
Preferably, the modeling host is the modeling host based on BIM network technology.
Preferably, the Intranet manager and the outer net manager are arranged independently of each other.
Compared with the relevant technologies, the Project Management System provided by the invention based on BIM network technology has such as
It is lower the utility model has the advantages that
The present invention provides the Project Management System based on BIM network technology, and modeling efficiency is high, is led by the way that the modeling is arranged
Machine and the data management host can operate separately data information and modeling information, effectively raise data-handling efficiency
With the speed of service of host, and modeled segments configuration in an intranet environment, can effectively avoid outside invading, raising is built
Build the safety of modeling information;Mould is managed configured with the personal management module, the handling of goods and materials module, the construction process
Block and the qualification management of blueprint module can carry out modularization management to each construction content, improve the efficiency of management, and
Each information can be aggregated into the database, realized information sharing, improved the working efficiency of each administrative department and build
Imitate rate;It can guarantee that modeling region will not power off when power is off, guarantee that modeling data will not be lost.
Detailed description of the invention
Fig. 1 is the structure of the preferred embodiment of the Project Management System provided by the invention based on BIM network technology
Schematic diagram;
Fig. 2 is Database Systems connection schematic diagram shown in FIG. 1.
Figure label: 1, modeling platform, 2, table top, 3, data management host, 4, modeling host, 5, data management display screen,
6, modeling display screen, 7, material shelf, 8, main station, 9, locker, 10, Intranet manager, 11, database, 12, electronic box, 13,
Reserve battery, 14, switch, 15, outer net manager, 16, data collection host, 17, personal management module, 18, handling of goods and materials mould
Block, 19, construction process management module, 20, qualification management of blueprint module.
Specific embodiment
The invention will be further described with embodiment with reference to the accompanying drawing.
Please refer to Fig. 1 and Fig. 2, wherein Fig. 1 is the architectural engineering provided by the invention based on BIM network technology
The structural schematic diagram of the preferred embodiment of management system;Fig. 2 is Database Systems connection schematic diagram shown in FIG. 1.Based on BIM net
The Project Management System of network technology includes: modeling platform 1;Table top 2, the table top 2 are installed on the top of the modeling platform 1;
Data management host 3, the data management host 3 are fixed on the bottom of the table top 2, and the data management host 3 can be convenient for
Modeling personnel have access to information at any time, are modeled;Data management display screen 5, the data management display screen 5 are electrically connected described
Data management host 3;Host 4 is modeled, the side of the modeling host 4 is equipped with data management host 3, data handling procedure and builds
Mold process is respectively equipped with individual host, effectively raises data processing speed and modeling speed;Display screen 6 is modeled, it is described
Modeling display screen 6 is electrically connected the modeling host 4;Intranet manager 10, the Intranet manager 10 and the modeling host
5, the data management host 3 is electrically connected;Database 11, the database 11 is connected to the Intranet manager 10, described
Database 11 is to store each data;Switch 14, the switch electrically 14 connect the database 11;Electronic box 12, the electricity
Case 12 is electrically connected the switch 14;Outer net manager 15 mutually interconnects between the outer net manager 15 and the database 11
It connects;Data collection host 16 is connected with each other between the data collection host 16 and the outer net manager 15, and the data are adopted
Collection host 16 can acquire construction information, architecture information and be pocessed upload;Personal management module 17, the personal management module
17 are bidirectionally connected to the data collection host 16, and the record of personal management module 17 has construction personnel's personal information and applies
Worker person's routine work situation;Handling of goods and materials module 18, the handling of goods and materials module 18 are bidirectionally connected to the data acquisition master
Machine 16 can carry out comprehensive record management to construction material;Construction process management module 19, the construction process management module 19
It is bidirectionally connected to the data collection host 16, construction process can comprehensively be recorded, be managed;Qualification management of blueprint module
20, the qualification management of blueprint module 20 is bidirectionally connected to the data collection host 16, can to the certificate of construction, qualification and
Various drawings are recorded, are uploaded.
Wherein, the top of the table top 2 is fixed with main station 8, can model personnel and contact with construction personnel, solve to ask
Topic.
Wherein, the top of the table top 2 is fixed with material shelf 7, and the material shelf 7 is fixed on the main station 8
Staff's material stored is convenient in side.
The bottom of the modeling platform 1 is equipped with locker 9, stores article convenient for staff.
Wherein, the electronic box 12 is electrically connected reserve battery 13, and the reserve battery 13 is electrically connected the switch 14,
It can guarantee that modeling region will not power off when power is off, guarantee that modeling data will not be lost.
It is bi-directionally connected between the database 11 and the Intranet manager 10, the outer net manager 15, realizes number
According to upload and shared, improve working, the efficiency of management of each department.
The data management display screen 5, the adjacent top for being fixed on the table top 2 of the modeling display screen 6 are convenient for work
Personnel operate separately.
In order to improve the safety of modeling data, the data management host 3, the modeling host 4 are bi-directionally connected institute
State Intranet manager 10.
The modeling host 4 is the modeling host 4 based on BIM network technology, can effectively improve modeling efficiency.
The Intranet manager 10 and the outer net manager 15 are arranged independently of each other, guarantee that internal modeling data will not
It leaks.
In day-to-day operation, the data collection host 16 can acquire construction information, architecture information, the personal management mould
Block 17 can record construction personnel's personal information and construction personnel's routine work situation, the handling of goods and materials module 18 can be to constructions
Goods and materials carry out comprehensive record management, the construction process management module 19 can carry out comprehensive record management to construction process,
The qualification management of blueprint module 20 can record the certificate of construction, qualification and various drawings, and each data are at
Reason is uploaded to the data collection host 16, and the data collection host 16 uploads data by the outer net manager 15
To the database 11, the Intranet manager 10 can carry out closing encryption to modeled network, so that Intranet is safer, modeling
Personnel can download required data from the database 11 by the data management host 3 and handle, and pass through the modeling
Host 4 using ibm networking technology carry out data modeling, each administrative department can from the 11 download management data of database,
Realize information sharing.
Embodiment one:
Applied in pile foundation construction,
Step 1: exploration and design side, construction party and management side are used as BIM system application participant, are operated by Web browser
Integrated project management system;
Step 2: the typing of exploration and design side and the instrument detection data for uploading stake holes;Construction party upload in real time pile foundation construction progress,
The data such as practice of construction verticality, aperture and sediment thickness and construction quality, safety records;Management Fang Ze is to these numbers of constructing
According to being audited, supervised and uploaded quality inspection table;
Step 3: owner passes through each functional department's client operation BIM of project intranet server as system application main body side
Software, the information that comprehensive each participant uploads carry out project progress, resource, quality, cost and the management of the 4D in place dynamic, control
And the visual Simulation of work progress.
The system can be run under any network condition, it might even be possible to it is defeated to carry out data under 4G network by tablet computer
Enter and browse, work efficiency is high, and visualized operation is conducive to manage.
Embodiment two:
The system be applied to determine piling machine position when, construction party upload this practice of construction verticality, aperture, at
The information such as slag thickness, concrete amount, which can be transferred through clicking its pattern query, to be arrived, to the construction speed of pile base, quality management with
Control brings great convenience.
Embodiment one and embodiment two show that the Construction Project Management system based on BIM realizes the multi-party based on BIM
It cooperates, improves the construction management level of IT application and working efficiency, achieve positive effect.System has fully demonstrated BIM and has existed
Application value in Construction Project Management is BIM, and the deep application in engineering construction provides new technical method and software
System.
Compared with the relevant technologies, the Project Management System provided by the invention based on BIM network technology has such as
It is lower the utility model has the advantages that
The present invention provides the Project Management System based on BIM network technology, and modeling efficiency is high, is led by the way that the modeling is arranged
Machine 4 and the data management host 3 can operate separately data information and modeling information, effectively raise data processing effect
The speed of service of rate and host, and modeled segments configuration can effectively avoid outside invading in an intranet environment, improve
The safety of Buildings Modeling information;Configured with the personal management module 17, the handling of goods and materials module 18, the construction process
Management module 19 and the qualification management of blueprint module 20 can carry out modularization management to each construction content, improve pipe
Efficiency is managed, and each information can be aggregated into the database 11, realizes information sharing, improve the work of each administrative department
Make efficiency and modeling efficiency;It can guarantee that modeling region will not power off when power is off, guarantee that modeling data will not be lost.
The above description is only an embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair
Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills
Art field, is included within the scope of the present invention.
Claims (10)
1. the Project Management System based on BIM network technology characterized by comprising
Model platform;
Table top, the table top are installed on the top of the modeling platform;
Data management host, the data management host are fixed on the bottom of the table top;
Data management display screen, the data management display screen are electrically connected the data management host;
Host is modeled, the side of the modeling host is equipped with data management host;
Display screen is modeled, the modeling display screen is electrically connected the modeling host;
Intranet manager, the Intranet manager and the modeling host, the data management host are electrically connected;
Database, the database are connected to the Intranet manager;
Switch, the switch are electrically connected the database;
Electronic box, the electronic box are electrically connected the switch;
Outer net manager is connected with each other between the outer net manager and the database;
Data collection host is connected with each other between the data collection host and the outer net manager;
Personal management module, the personal management module are bidirectionally connected to the data collection host;
Handling of goods and materials module, the handling of goods and materials module are bidirectionally connected to the data collection host;
Construction process management module, the construction process management module are bidirectionally connected to the data collection host;
Qualification management of blueprint module, the qualification management of blueprint module are bidirectionally connected to the data collection host.
2. the Project Management System according to claim 1 based on BIM network technology, which is characterized in that described
Main station is fixed at the top of face.
3. the Project Management System according to claim 1 based on BIM network technology, which is characterized in that described
Material shelf is fixed at the top of face, and the material shelf is fixed on the side of the main station.
4. the Project Management System according to claim 1 based on BIM network technology, which is characterized in that described to build
The bottom of die station is equipped with locker.
5. the Project Management System according to claim 1 based on BIM network technology, which is characterized in that the electricity
Case is electrically connected reserve battery, and the reserve battery is electrically connected the switch.
6. the Project Management System according to claim 1 based on BIM network technology, which is characterized in that the number
It is bi-directionally connected according between library and the Intranet manager, the outer net manager.
7. the Project Management System according to claim 1 based on BIM network technology, which is characterized in that the number
According to management display screen, the adjacent top for being fixed on the table top of the modeling display screen.
8. the Project Management System according to claim 1 based on BIM network technology, which is characterized in that the number
The Intranet manager is bi-directionally connected according to managing main frame, the modeling host.
9. the Project Management System according to claim 1 based on BIM network technology, which is characterized in that described to build
Mould host is the modeling host based on BIM network technology.
10. the Project Management System according to claim 1 based on BIM network technology, which is characterized in that in described
Net manager and the outer net manager are arranged independently of each other.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710749076.8A CN109426683A (en) | 2017-08-28 | 2017-08-28 | Project Management System based on BIM network technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710749076.8A CN109426683A (en) | 2017-08-28 | 2017-08-28 | Project Management System based on BIM network technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109426683A true CN109426683A (en) | 2019-03-05 |
Family
ID=65502355
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710749076.8A Pending CN109426683A (en) | 2017-08-28 | 2017-08-28 | Project Management System based on BIM network technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109426683A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109853657A (en) * | 2019-03-15 | 2019-06-07 | 湖北工业大学 | A kind of artificial digging pile automatic clinker-removing device and application method based on BIM technology |
CN111161098A (en) * | 2019-12-02 | 2020-05-15 | 中铁建设集团有限公司 | Pile foundation construction machine account management system and method |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106920049A (en) * | 2017-03-28 | 2017-07-04 | 内蒙古科技大学 | A kind of Project Management System platform based on BIM network technologies |
-
2017
- 2017-08-28 CN CN201710749076.8A patent/CN109426683A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106920049A (en) * | 2017-03-28 | 2017-07-04 | 内蒙古科技大学 | A kind of Project Management System platform based on BIM network technologies |
Non-Patent Citations (2)
Title |
---|
何亚伯: "《土木工程监理》", 30 September 2015, 武汉大学出版社 * |
余芳强等: "一种面向施工企业的建筑工程构件库分类管理系统", 《建筑施工》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109853657A (en) * | 2019-03-15 | 2019-06-07 | 湖北工业大学 | A kind of artificial digging pile automatic clinker-removing device and application method based on BIM technology |
CN111161098A (en) * | 2019-12-02 | 2020-05-15 | 中铁建设集团有限公司 | Pile foundation construction machine account management system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Vilutiene et al. | Building information modeling (BIM) for structural engineering: A bibliometric analysis of the literature | |
Lu et al. | Moving from building information models to digital twins for operation and maintenance | |
CN107483253A (en) | A kind of data center machine room operation management system based on three-dimensional VR | |
CN109447480A (en) | A kind of road and bridge engineering equipment safety monitoring system and method based on BIM+GIS modeling | |
CN105652830A (en) | Bridge monitoring system based on BIM | |
CN110059150A (en) | Hydraulic engineering Digital Archives System based on BIM+GIS | |
CN103136101A (en) | Software automated testing unified operation platform | |
CN106022617A (en) | Inspection control system based on marketing multi-system data center | |
CN106652261A (en) | Safe bookshelf and self-service borrowing and returning method thereof | |
CN107451737A (en) | A kind of big data O2O check of drawings cloud platform management systems examined for engineering construction figure | |
CN107835107A (en) | A kind of metering display systems based on power network metering topological sum WebGis | |
CN110266533A (en) | Big data platform management system | |
CN104809933A (en) | Unscripted emergency drill system, method and equipment for power grid | |
Jiang | Intelligent building construction management based on BIM digital twin | |
Al Marzouqi et al. | Building ADNOC's Pillars for Process Standardization and Best Practices through an Integrated Reservoir Management Framework | |
CN109426683A (en) | Project Management System based on BIM network technology | |
Cai et al. | Optimization of human resource file information decision support system based on cloud computing | |
Li et al. | Research and design of mineral resource management system based on big data and GIS technology | |
CN205353660U (en) | Intelligence cloud cabinet management and control information system | |
Kubota et al. | Data model–centered four-dimensional information management system for road maintenance | |
CN111860895A (en) | BIM-based bridge auxiliary facility operation maintenance management system | |
Amirebrahimi et al. | An integrated web-based 3D modeling and visualization platform to support sustainable cities | |
Geddes | The large hadron collider and grid computing | |
CN106850322A (en) | Resource apparatus management system based on six-layer model | |
CN116245270A (en) | Intelligent school system and intelligent school system application method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190305 |