CN109413161A - A kind of guideboard installation progress monitoring system - Google Patents
A kind of guideboard installation progress monitoring system Download PDFInfo
- Publication number
- CN109413161A CN109413161A CN201811157383.8A CN201811157383A CN109413161A CN 109413161 A CN109413161 A CN 109413161A CN 201811157383 A CN201811157383 A CN 201811157383A CN 109413161 A CN109413161 A CN 109413161A
- Authority
- CN
- China
- Prior art keywords
- guideboard
- installation
- loop bar
- outer mold
- mounting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009434 installation Methods 0.000 title claims abstract description 68
- 238000012544 monitoring process Methods 0.000 title claims abstract description 17
- 238000003780 insertion Methods 0.000 claims description 8
- 230000037431 insertion Effects 0.000 claims description 8
- 210000002421 cell wall Anatomy 0.000 claims description 6
- 238000012360 testing method Methods 0.000 claims description 3
- 238000011900 installation process Methods 0.000 abstract description 3
- 230000006872 improvement Effects 0.000 description 11
- 238000010586 diagram Methods 0.000 description 4
- BGPVFRJUHWVFKM-UHFFFAOYSA-N N1=C2C=CC=CC2=[N+]([O-])C1(CC1)CCC21N=C1C=CC=CC1=[N+]2[O-] Chemical compound N1=C2C=CC=CC2=[N+]([O-])C1(CC1)CCC21N=C1C=CC=CC1=[N+]2[O-] BGPVFRJUHWVFKM-UHFFFAOYSA-N 0.000 description 3
- 238000005299 abrasion Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000003447 ipsilateral effect Effects 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/10—Protocols in which an application is distributed across nodes in the network
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01S—RADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
- G01S19/00—Satellite radio beacon positioning systems; Determining position, velocity or attitude using signals transmitted by such systems
- G01S19/01—Satellite radio beacon positioning systems transmitting time-stamped messages, e.g. GPS [Global Positioning System], GLONASS [Global Orbiting Navigation Satellite System] or GALILEO
- G01S19/13—Receivers
- G01S19/14—Receivers specially adapted for specific applications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063114—Status monitoring or status determination for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/02—Protocols based on web technology, e.g. hypertext transfer protocol [HTTP]
- H04L67/025—Protocols based on web technology, e.g. hypertext transfer protocol [HTTP] for remote control or remote monitoring of applications
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Tourism & Hospitality (AREA)
- Computer Networks & Wireless Communication (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Development Economics (AREA)
- Remote Sensing (AREA)
- Marketing (AREA)
- Radar, Positioning & Navigation (AREA)
- General Business, Economics & Management (AREA)
- Educational Administration (AREA)
- Theoretical Computer Science (AREA)
- Signal Processing (AREA)
- Game Theory and Decision Science (AREA)
- Primary Health Care (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Position Fixing By Use Of Radio Waves (AREA)
Abstract
The invention discloses a kind of guideboard installation progress monitoring systems.Advantages of the present invention: when installing guideboard, the location information of guideboard is understood according to the GPS locator on guideboard, when the guideboard of the coordinate position is installed, it turns off the switch, wireless transmitter exports shutdown signal to Cloud Server at this time, the position coordinates of the guideboard installation point are switched into the state of being installed after Cloud Server reception shutdown signal, the installation progress of guideboard can be monitored in real time, and by the position coordinates switching state of mounted guideboard, the installation progress of guideboard in one panel region of more intuitive display, to distribute installation task in real time according to installation progress, improve the installation effectiveness of entire area.Current guideboard carries out in installation process in a panel region, the installation progress of guideboard can not be learnt in real time, so that installation task can not be distributed according to the installation situation of guideboard, it may appear that be partially completed installation, partial region is only installed the case where sub-fraction, and the installation effectiveness of whole region is low.
Description
Technical field
The present invention relates to guideboard field, more particularly to a kind of guideboard installation progress monitoring system.
Background technique
Guideboard for convenience of citizens' activities, leads and shows, debates point direction etc., and the traffic built on road both sides or greenbelt is set
It applies.Since increasingly prosperity, the guideboard of city bus have evolved into the indispensable important component in one, city.
Current guideboard carries out not learning the installation progress of guideboard in real time in installation process in a panel region, different
The efficiency that landform installs guideboard is different, so that installation task can not be distributed according to the installation situation of guideboard, it may appear that be partially completed
The case where installation, sub-fraction is only installed in partial region, the installation effectiveness of whole region is low, the delaying installation completion of works time.
Summary of the invention
In view of the deficiencies of the prior art, the present invention intends to provide a kind of guideboard installation according in region
The guideboard installation progress monitoring system of situation adjustment distribution installation personnel.
To achieve the above object, the present invention provides the following technical scheme that a kind of guideboard installation progress monitoring system, including
Have: guideboard, Cloud Server are provided with GPS locator on the guideboard, and the GPS locator is connect with Cloud Server, described
GPS locator sends position signal to Cloud Server, and the position coordinates of each guideboard installation point are stored on the Cloud Server,
The GPS locator is equipped with switch and wireless transmitter, the switch are connected with wireless transmitter, when guideboard is mounted on road
After board installation point, turns off the switch wireless transmitter and export shutdown signal to Cloud Server, Cloud Server will after receiving shutdown signal
The position coordinates of the guideboard installation point switch to the state of being installed.
As a further improvement of the present invention, the GPS locator is removably arranged on guideboard.
As a further improvement of the present invention, the GPS locator is equipped with mounting ring, and the mounting ring is by GPS positioning
Device is detachably arranged on guideboard.
As a further improvement of the present invention, the mounting ring includes interior band and tyre, the interior band and in addition with
GPS locator is fixedly connected, and the interior band is removably attachable to together after encasing guideboard with tyre, and the interior band is by several
A internal module for being hinged is constituted, and the tyre is made of the outer mold piece that several are hinged, each internal module and
The middle part of outer mold piece and/or edge are provided with the tool of installing and dismounting guideboard, and the tool includes test pencil or several rule
Straight screwdriver, Phillips screwdriver, the nut spanner of lattice.
As a further improvement of the present invention, the tool it is telescopic be stored in internal module and internal module or outer mold piece with
The adjacent side in outer mold piece hinged end.
As a further improvement of the present invention, it is flexible to offer first for the side of several internal modules and outer mold piece
Hole, several tools slide correspondingly to be connected in several first telescopic holes, equal edge in several first telescopic holes
Length direction offers several limiting slots, and the tool is equipped with limited block, when in limited block insertion limiting slot, tool quilt
Limit.
As a further improvement of the present invention, the outer mold piece is equipped with far from GPS locator one end and is used for and internal module
The head of the fixing clamp of connection, the fixing clamp curves inwardly, and the adjacent side in the hinged end of several internal modules is equipped with phase
Mutually symmetrically for the holding holes of the head insertion of fixing clamp.
As a further improvement of the present invention, it is equipped with magnet on the internal module and outer mold piece, the magnet setting exists
The end face of internal module or outer mold piece.
As a further improvement of the present invention, the hinged both ends one end of the internal module is equipped with the first mounting groove, and described the
The cell wall of one mounting groove is equipped with the first hinge hole, and the other end is equipped with the first mounting blocks, and first mounting blocks are equipped with first
Through-hole, the first through hole is interior to be equipped with telescopic first mounting rod, passes through the first mounting rod, first between adjacent internal module
Mounting blocks and the connection of the first mounting groove, the hinged both ends one end of the outer mold piece are equipped with the second mounting groove, second mounting groove
Cell wall be equipped with the second hinge hole, the other end be equipped with the second mounting blocks, second mounting blocks be equipped with the second through-hole, it is described
Be equipped with telescopic second mounting rod in second through-hole, between adjacent outer mold piece by the second mounting rod, the second mounting blocks and
The connection of second mounting groove.
As a further improvement of the present invention, first mounting rod includes the first loop bar, the first spring and two
One mandril, first loop bar is hollow, and first spring is arranged in the first loop bar, and two first mandrils are respectively set
At the both ends of the first loop bar, the inner wall of first loop bar is equipped with the first stop collar, two first mandril insertions first
One end of loop bar is equipped with the first limited block, and one end that two first mandrils stretch out the first loop bar is axially arranged with the first idler wheel, institute
Stating the second mounting rod includes the second loop bar, second spring and two the second mandrils, and second loop bar is hollow, second bullet
Spring is arranged in the second loop bar, and two second mandrils are separately positioned on the both ends of the second loop bar, second loop bar it is interior
Wall is equipped with the second stop collar, and one end that two second mandrils are inserted into the second loop bars is equipped with the second limited block, and two pieces the
One end that two mandrils stretch out the second loop bar is axially arranged with the second idler wheel.
Beneficial effects of the present invention are believed when installing guideboard according to the position that the GPS locator on guideboard understands guideboard
Breath, and when the guideboard of the coordinate position is installed, it turns off the switch, wireless transmitter exports shutdown signal and takes to cloud at this time
It is engaged in device, the position coordinates of the guideboard installation point are switched to the state of being installed, Ke Yishi after receiving shutdown signal by Cloud Server
When monitor the installation progress of guideboard, and by the position coordinates switching state of mounted guideboard, more intuitive display is a piece of
The installation progress of guideboard completes entire area together to distribute installation task in real time according to installation progress in region, full wafer
The installation effectiveness in region is high, is completed earlier.
Detailed description of the invention
Fig. 1 is flow diagram of the invention;
Fig. 2 is overall structure diagram of the invention;
Fig. 3 is the structural scheme of mechanism of the first telescopic hole of the invention, limiting slot and limited block;
The structural schematic diagram that Fig. 4 is connected between internal module of the invention;
The structural schematic diagram that Fig. 5 is connected between outer mold piece of the invention.
Description of symbols: 1, guideboard;2, Cloud Server;11, GPS locator;111, it switchs;112, wireless transmitter;12, pacify
Fill ring;121, interior band;122, in addition;1210, internal module;1220, outer mold piece;120, tool;13, the first telescopic hole;130, it limits
Position slot;1201, limited block;3, fixing clamp;30, holding holes;4, magnet;51, the first mounting groove;511, the first hinge hole;512,
First mounting blocks;5120, first through hole;61, the first mounting rod;52, the second mounting groove;521, the second hinge hole;522, second
Mounting blocks;5220, the second through-hole;62, the second mounting rod;611, the first loop bar;612, the first mandril;613, the first spring;
6111, the first stop collar;6121, the first limited block;71, the first idler wheel;621, the second loop bar;622, the second mandril;623,
Two springs;6211, the second stop collar;6221, the second limited block;72, the second idler wheel.
Specific embodiment
The present invention is described in further detail below in conjunction with embodiment given by attached drawing.
Shown in referring to Fig.1-Fig. 5, a kind of guideboard installation progress monitoring system of the present embodiment includes: guideboard 1, cloud clothes
It is engaged in device 2, is provided with GPS locator 11 on the guideboard 1, the GPS locator 11 is connect with Cloud Server 2, the GPS positioning
Device 11 sends position signal to Cloud Server 2, and the position coordinates of each 1 installation point of guideboard, institute are stored on the Cloud Server 2
It states GPS locator 11 to connect equipped with switch 111 and wireless transmitter 112, the switch 111 and wireless transmitter 112, as general
After guideboard 1 is mounted on 1 installation point of guideboard, turns off the switch 111 wireless transmitters 112 and export shutdown signal to Cloud Server 2, cloud clothes
The position coordinates of 1 installation point of guideboard are switched into the state of being installed after the business reception shutdown signal of device 2.
Through the above technical solutions, understanding the position of guideboard 1 according to the GPS locator 11 on guideboard 1 when installing guideboard 1
Confidence breath, and when the guideboard of the coordinate position 1 is installed, 111 are turned off the switch, the output of wireless transmitter 112 at this time is closed
Signal is closed to Cloud Server 2, Cloud Server 2 receives and the position coordinates of 1 installation point of guideboard are switched to installation after shutdown signal
Completion status can monitor the installation progress of guideboard 1 in real time, and by the position coordinates switching state of mounted guideboard 1, more
Adding the installation progress of guideboard 1 in one panel region of intuitive display makes full wafer to distribute installation task in real time according to installation progress
Region is completed together, and the installation effectiveness of entire area is high, is completed earlier.Current guideboard 1 carries out installation process in a panel region
In, the installation progress of guideboard 1 can not be learnt in real time, and the efficiency of different landform installation guideboards 1 is different, thus can not be according to guideboard
1 installation situation distributes installation task, it may appear that it is partially completed installation, the case where sub-fraction is only installed in partial region, entirely
The installation effectiveness in region is low, the delaying installation completion of works time.
As a kind of improved specific embodiment, the GPS locator 11 is removably arranged on guideboard 1.
Through the above technical solutions, GPS locator 11 is removably arranged on guideboard 1, when guideboard 1 is installed to correspondence
GPS locator 11 can be disassembled, be installed on another guideboard 1 after coordinate, reuse, energy conservation and environmental protection, save at
This.
As a kind of improved specific embodiment, the GPS locator 11 is equipped with mounting ring 12, the mounting ring 12
GPS locator 11 is detachably arranged on guideboard 1.
Through the above technical solutions, GPS positioning is detachably arranged on guideboard 1 using mounting ring 12, installing and dismounting
Convenient, use is more efficient.
As a kind of improved specific embodiment, the mounting ring 12 includes interior band 121 and in addition 122, it is described in
Band 121 and tyre 122 are fixedly connected with GPS locator 11, and the interior band 121 is detachable after encasing guideboard 1 in addition 122
Link together, the internal module 1210 that the interior band 121 is hinged by several is constituted, and the tyre 122 is by several
The outer mold piece 1220 being hinged is constituted, and the middle part and/or edge of each internal module 1210 and outer mold piece 1220 are provided with
The tool 120 of installing and dismounting guideboard 1, the tool 120 include the straight screwdriver of test pencil or several specifications, cross spiral shell
Silk knife, nut spanner.
Through the above technical solutions, remove GPS locator 11 when guideboard 1 is moved to respective coordinates position, using outer
The tool 120 of installing and dismounting guideboard 1 in module 1220 and internal module 1210 installs guideboard 1, the tool 120 on modules
It is different, meet the installation of the guideboard 1 of most types, guideboard 1 is installed using the tool 120 in GPS locator 11,
Without carrying tool 120 when carrying guideboard 1, the carrying of reduction tool 120 reduces the amount of labour of staff when installing, and
Tool 120 avoids the case where tool 120 is fallen all in GPS locator 11, ensures installation progress.
As a kind of improved specific embodiment, the tool 120 is telescopic to be stored in internal module 1210 and internal model
Block 1210 or the side adjacent with 1220 hinged end of outer mold piece of outer mold piece 1220.
Through the above technical solutions, by the setting of tool 120 internal module 1210 and internal module 1210 or outer mold piece 1220 with
The adjacent side in 1220 hinged end of outer mold piece does not influence internal module 1210 and internal module 1210, outer mold piece 1220 and outer mold piece
It is hinged between 1220, make its stable connection, and adjacent 120 mutual dislocation of tool, tool 120 is arranged in internal module 1210
The side adjacent with 1220 hinged end of outer mold piece with internal module 1210 or outer mold piece 1220 will be unwanted when using tool 120
The inside constriction of tool 120, using tool 120 stretch out (or tool 120 to be used will be needed to overhanging out against
Part out), it will not influence the use of tool 120 between adjacent tool 120, adjacent tool 120 will not mutually be supported with guideboard 1
Touching, it may be convenient to be used in various environment, installing and dismounting is more efficient, and the setting of 120 mutual dislocation of tool reduces by work
The quantity for the tool 120 for needing to adjust when tool 120 is shunk, reduces by more than the workload of half, further increases working efficiency.
As a kind of improved specific embodiment, several internal modules 1210 and the side of outer mold piece 1220 are opened up
There is the first telescopic hole 13, several slidings correspondingly of tool 120 are connected in several first telescopic holes 13, several described
Several limiting slots 130 are offered in first telescopic hole 13 along its length, the tool 120 is equipped with limited block 1201,
When limited block 1201 is embedded in limiting slot 130, tool 120 is limited.
Through the above technical solutions, the tool 120 of ipsilateral needs is first rotated, limited block is made when tool 120 is shunk
1201 misplace with limiting slot 130, and stretching tool 120, make it in the first telescopic hole 13, rotate tool later later
120, so that the limited block 1201 on tool 120 is embedded in the limiting slot 130 in limit hole, tool 120 stretches out, and in the tool
Shunk after the completion of 120 uses, it is subsequent using other tool 120 when it is easy to operate.
As a kind of improved specific embodiment, the outer mold piece 1220 is equipped with far from 11 one end of GPS locator and uses
It curves inwardly in the head of the fixing clamp 3 being connect with internal module 1210, the fixing clamp 3, the hinge of several internal modules 1210
Connect the holding holes 30 for holding adjacent side to be equipped with the symmetrical head insertion for fixing clamp 3.
Through the above technical solutions, internal module 1210 sticks on road when GPS locator 11 is mounted on guideboard 1
On board 1, outer mold piece 1220 is sticked on guideboard 1 later, internal module 1210 and outer mold piece 1220 and guideboard 1 offset when sticking
Touching, latter hand pressing internal module 1210 be fixed, another hand finger press fixing clamp 3, open fixing clamp 3, make institute
Outer mold piece 1220 is covered in internal module 1210 by some internal modules 1210 after stretching with outer mold piece 1220, the head of fixing clamp 3
It is inserted into the holding holes 30 of the internal module 1210 of maximum distance, entire GPS locator 11 is fixed on guideboard 1 at this time, and bending is set
In the insertion holding holes 30 that the head of the fixing clamp 3 of meter can be more convenient, fixed efficiency is improved.
As a kind of improved specific embodiment, magnet 4, institute are equipped on the internal module 1210 and outer mold piece 1220
State the end face that internal module 1210 or outer mold piece 1220 is arranged in magnet 4.
Through the above technical solutions, when GPS locator 11 is fixed on guideboard 1, internal module 1210 and outer mold piece 1220
On magnet 4 be adsorbed on guideboard 1, further increase the stability that GPS locator 11 is fixed on guideboard 1, avoid GPS positioning
The case where device 11 slides when being fixed on guideboard 1 improves the accuracy that GPS locator 11 positions coordinate, improves installation
Precision.
As a kind of improved specific embodiment, the hinged both ends one end of the internal module 1210 is equipped with the first mounting groove
51, the cell wall of first mounting groove 51 is equipped with the first hinge hole 511, and the other end is equipped with the first mounting blocks 512, and described first
Mounting blocks 512 are equipped with first through hole 5120, and telescopic first mounting rod 61 is equipped in the first through hole 5120, adjacent
Pass through the first mounting rod 61, the first mounting blocks 512 and the connection of the first mounting groove 51, the outer mold piece 1220 between internal module 1210
Hinged both ends one end is equipped with the second mounting groove 52, and the cell wall of second mounting groove 52 is equipped with the second hinge hole 521, another
End is equipped with the second mounting blocks 522, and second mounting blocks 522 are equipped with the second through-hole 5220, set in second through-hole 5220
There is telescopic second mounting rod 62, passes through the second mounting rod 62, the second mounting blocks 522 and the between adjacent outer mold piece 1220
The connection of two mounting grooves 52.
Through the above technical solutions, first the first mounting rod 61 is inserted into one when two neighboring internal module 1210 is installed
In the first through hole 5120 of first mounting blocks 512 of module 1210, one end of the first mounting rod 61 is inserted into another later
In first hinge hole 511 of module 1210, the first mounting rod 61 is pressed later, and the first mounting rod 61 is compressed, and pushes one at this time
A internal module 1210 makes the first mounting blocks 512 in the internal module 1210 be embedded in the first mounting groove of another internal module 1210
In 51, when first mounting blocks 512 are completely embedded into the first mounting groove 51 of another internal module 1210, the first mounting rod 61
The other end and another first hinge hole 511 it is opposite, the other end insertion of the elongation of the first mounting rod 61, the first mounting rod 61 is another
In one the first hinge hole 511, when two neighboring internal module 1210 rotates, the first mounting rod 61 turns in first through hole 5120
It is dynamic;When two neighboring outer mold piece 1220 is installed, the second mounting rod 62 is first inserted into the second mounting blocks 522 of an outer mold piece 1220
The second through-hole 5220 in, one end of the second mounting rod 62 is inserted into the second hinge hole 521 of another outer mold piece 1220 later
It is interior, the second mounting rod 62 is pressed later, and the second mounting rod 62 is compressed, and is pushed an outer mold piece 1220 at this time, is made the outer mold piece
The second mounting blocks 522 on 1220 are embedded in the second mounting groove 52 of another outer mold piece 1220, when second mounting blocks 522 are complete
When be embedded in the second mounting groove 52 of another outer mold piece 1220 entirely, the other end of the second mounting rod 62 and another is second hinged
Hole 521 is opposite, and the elongation of the second mounting rod 62, the other end of the second mounting rod 62 is embedded in another second hinge hole 521, adjacent
When two outer mold pieces 1220 rotate, the second mounting rod 62 rotates in the second through-hole 5220.
As a kind of improved specific embodiment, first mounting rod 61 includes the first loop bar 611, the first spring
613 and two the first mandrils 612, first loop bar 611 is hollow, and first spring 613 is arranged in the first loop bar 611,
Two first mandrils 612 are separately positioned on the both ends of the first loop bar 611, and the inner wall of first loop bar 611 is equipped with the
One stop collar 6111, one end that two first mandrils 612 are inserted into the first loop bars 611 are equipped with the first limited block 6121, and two
One end that the first mandril of root 612 stretches out the first loop bar 611 is axially arranged with the first idler wheel 71, and second mounting rod 62 includes the
Two loop bars 621, second spring 623 and two the second mandrils 622, second loop bar 621 is hollow, and the second spring 623 is set
It sets in the second loop bar 621, two second mandrils 622 are separately positioned on the both ends of the second loop bar 621, second loop bar
621 inner wall is equipped with the second stop collar 6211, and one end that two second mandrils 622 are inserted into the second loop bar 621 is equipped with
Second limited block 6221, one end that two second mandrils 622 stretch out the second loop bar 621 are axially arranged with the second idler wheel 72.
Through the above technical solutions, when two neighboring internal module 1210 is installed, first by first mandril 612 and first of one end
Idler wheel 71 is inserted into the first hinge hole 511, presses the first mandril of the other end 612 later, and the first spring 613 is compressed at this time, it
The first mounting blocks 512 of an internal module 1210 are inserted into afterwards in the first mounting groove 51 of another internal module 1210, the first peace
Dress block 512 is when being completely embedded into the first mounting groove 51, the first mandril 612 of the other end and the first idler wheel 71 and another the first hinge
It is mutually opposite to connect hole 511, the first spring 613 resets at this time, drives the first mandril 612 of the other end and the first idler wheel 71 to be embedded in another
In a first hinge hole 511, and it is hinged when the first idler wheel 71 and inconsistent, adjacent two internal modules of the first hinge hole 511
It when 1210 rotation, is rotated between the first idler wheel 71 and the first mandril 612, reduces abrasion, prolong the service life.Two neighboring external mold
When block 1220 is installed, first second mandril 622 of one end and the second idler wheel 72 are inserted into the second hinge hole 521, pressing is another later
The second mandril of one end 622, second spring 623 is compressed at this time, is later inserted into the second mounting blocks 522 of an outer mold piece 1220
In second mounting groove 52 of another outer mold piece 1220, when the second mounting blocks 522 are completely embedded into the second mounting groove 52, the other end
The second mandril 622 and the second idler wheel 72 it is mutually opposite with another second hinge hole 521, at this time second spring 623 reset, drive
Second mandril 622 of the other end and the second idler wheel 72 are embedded in another second hinge hole 521, and it is hinged when the second idler wheel 72
It is inconsistent with the second hinge hole 521, when two adjacent outer mold pieces 1220 rotate, between the second idler wheel 72 and the second mandril 622
Rotation reduces abrasion, prolongs the service life, the first stop collar 6111 and the first limited block 6121 are inconsistent, avoid the first mandril
612 skid off the first loop bar 611, and the second stop collar 6211 and the second limited block 6221 are inconsistent, and the second mandril 622 is avoided to skid off
Two loop bars 621.
The above is only a preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-mentioned implementation
Example, all technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for the art
Those of ordinary skill for, several improvements and modifications without departing from the principles of the present invention, these improvements and modifications
It should be regarded as protection scope of the present invention.
Claims (10)
1. a kind of guideboard installation progress monitoring system, includes: guideboard (1), Cloud Server (2), it is characterised in that: the guideboard
(1) it is provided on GPS locator (11), the GPS locator (11) connect with Cloud Server (2), the GPS locator (11)
Position signal is sent to Cloud Server (2), the position coordinates of each guideboard (1) installation point are stored on the Cloud Server (2),
The GPS locator (11) is equipped with switch (111) and wireless transmitter (112), switch (111) and the wireless transmitter
(112) it connects, after guideboard (1) is mounted on guideboard (1) installation point, turns off the switch (111) wireless transmitter (112) output and close
Signal is closed to Cloud Server (2), Cloud Server (2) switches the position coordinates of guideboard (1) installation point after receiving shutdown signal
At being installed state.
2. guideboard installation progress monitoring system according to claim 1, it is characterised in that: the GPS locator (11) can
The setting of disassembly is on guideboard (1).
3. guideboard installation progress monitoring system according to claim 2, it is characterised in that: on the GPS locator (11)
Equipped with mounting ring (12), GPS locator (11) is detachably arranged on guideboard (1) by the mounting ring (12).
4. guideboard installation progress monitoring system according to claim 3, it is characterised in that: the mounting ring (12) includes
Interior band (121) and tyre (122), the interior band (121) and tyre (122) are fixedly connected with GPS locator (11), described interior
Band (121) and tyre (122) are removably attachable to together after encasing guideboard (1), and the interior band (121) is mutual by several
Hinged internal module (1210) is constituted, and the outer mold piece (1220) that the tyre (122) is hinged by several is constituted, Ge Gesuo
The middle part and/or edge for stating internal module (1210) and outer mold piece (1220) are provided with the tool (120) of installing and dismounting guideboard (1),
The tool (120) includes the straight screwdriver, Phillips screwdriver, nut spanner of test pencil or several specifications.
5. guideboard installation progress monitoring system according to claim 4, it is characterised in that: the tool (120) is scalable
Be stored in internal module (1210) side adjacent with outer mold piece (1220) hinged end with internal module (1210) or outer mold piece (1220)
Side.
6. guideboard installation progress monitoring system according to claim 5, it is characterised in that: several internal modules (1210)
It is offered the first telescopic hole (13) with the side of outer mold piece (1220), sliding connects several tools (120) correspondingly
It connects in several first telescopic holes (13), offers several limits along its length in several first telescopic holes (13)
Slot (130), the tool (120) are equipped with limited block (1201), when limited block (1201) insertion limiting slot (130) is interior, work
Tool (120) is limited.
7. guideboard installation progress monitoring system according to claim 6, it is characterised in that: the outer mold piece (1220) is separate
GPS locator (11) one end is equipped with the fixing clamp (3) for connecting with internal module (1210), the head of the fixing clamp (3)
It curves inwardly, the adjacent side in the hinged end of several internal modules (1210) is equipped with the symmetrical head for fixing clamp (3)
The holding holes (30) of portion's insertion.
8. guideboard installation progress monitoring system according to claim 7, it is characterised in that: the internal module (1210) and outer
It is equipped in module (1220) magnet (4), the magnet (4) is arranged in internal module (1210) or the end face of outer mold piece (1220).
9. guideboard installation progress monitoring system according to claim 8, it is characterised in that: the internal module (1210) is hinged
Both ends one end be equipped with the first mounting groove (51), the cell wall of first mounting groove (51) is equipped with the first hinge hole (511), separately
One end is equipped with the first mounting blocks (512), and first mounting blocks (512) are equipped with first through hole (5120), the first through hole
(5120) telescopic first mounting rod (61) is equipped in, between adjacent internal module (1210) by the first mounting rod (61),
First mounting blocks (512) and the first mounting groove (51) connection, the hinged both ends one end of the outer mold piece (1220) are equipped with the second peace
The cell wall of tankage (52), second mounting groove (52) is equipped with the second hinge hole (521), and the other end is equipped with the second mounting blocks
(522), second mounting blocks (522) are equipped with the second through-hole (5220), are equipped in second through-hole (5220) scalable
The second mounting rod (62), pass through the second mounting rod (62), the second mounting blocks (522) and the between adjacent outer mold piece (1220)
Two mounting grooves (52) connection.
10. guideboard installation progress monitoring system according to claim 9, it is characterised in that: first mounting rod (61)
It include the first loop bar (611), the first spring (613) and two the first mandrils (612), first loop bar (611) is hollow, institute
The first spring (613) setting is stated in the first loop bar (611), two first mandrils (612) are separately positioned on the first loop bar
(611) inner wall at both ends, first loop bar (611) is equipped with the first stop collar (6111), two first mandrils
(612) one end for being inserted into the first loop bar (611) is equipped with the first limited block (6121), and two first mandrils (612) stretch out first
One end of loop bar (611) is axially arranged with the first idler wheel (71), and second mounting rod (62) includes the second loop bar (621),
Two springs (623) and two the second mandrils (622), second loop bar (621) is hollow, and second spring (623) setting exists
In second loop bar (621), two second mandrils (622) are separately positioned on the both ends of the second loop bar (621), and described second set
The inner wall of bar (621) is equipped with the second stop collar (6211), and two second mandrils (622) are inserted into the second loop bar (621)
One end is equipped with the second limited block (6221), and one end that two second mandrils (622) stretch out the second loop bar (621) is axially arranged with the
Second wheel (72).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811157383.8A CN109413161B (en) | 2018-09-30 | 2018-09-30 | Guideboard installation progress monitoring system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811157383.8A CN109413161B (en) | 2018-09-30 | 2018-09-30 | Guideboard installation progress monitoring system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109413161A true CN109413161A (en) | 2019-03-01 |
CN109413161B CN109413161B (en) | 2021-07-27 |
Family
ID=65466656
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811157383.8A Active CN109413161B (en) | 2018-09-30 | 2018-09-30 | Guideboard installation progress monitoring system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109413161B (en) |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040215377A1 (en) * | 2003-04-22 | 2004-10-28 | Jung-Rak Yun | Automated self-control traveling system for expressways and method for controlling the same |
CN101446383A (en) * | 2008-12-25 | 2009-06-03 | 广州万安建设监理有限公司 | System and method for supervising gas engineering project |
CN102214135A (en) * | 2010-04-02 | 2011-10-12 | 和硕联合科技股份有限公司 | Method and device for monitoring software installation process and software installation system applied by same |
US20110298603A1 (en) * | 2006-03-06 | 2011-12-08 | King Timothy I | Intersection Collision Warning System |
CN205140430U (en) * | 2015-11-19 | 2016-04-06 | 陈俊岐 | City place name direction identification means and city place name direction tag system |
EP3101639A1 (en) * | 2014-01-31 | 2016-12-07 | JVC Kenwood Corporation | Electronic device, control method for electronic device, and control program for electronic device |
CN205943333U (en) * | 2016-08-22 | 2017-02-08 | 国网浙江省电力公司杭州供电公司 | Transmission line shaft tower identification means |
CN205979462U (en) * | 2016-08-17 | 2017-02-22 | 上海邮电设计咨询研究院有限公司 | Wisdom street lamp |
CN106448453A (en) * | 2016-11-10 | 2017-02-22 | 海南庆禾钢结构设计咨询有限公司 | Guideboard capable of achieving turning pressure relief |
CN107917377A (en) * | 2017-10-16 | 2018-04-17 | 成都德顺泓沥科技有限公司 | It is a kind of that there is the solar street light of light sensation |
CN108122511A (en) * | 2017-11-28 | 2018-06-05 | 安徽云媒信息科技有限公司 | A kind of rotation advertisement frame |
CN108470049A (en) * | 2018-03-09 | 2018-08-31 | 国网上海市电力公司 | A kind of construction project management system based on instrument board |
CN108594730A (en) * | 2018-07-11 | 2018-09-28 | 华中科技大学 | A kind of engineering construction Schedule monitoring system and method based on Internet of Things |
CN108596423A (en) * | 2018-03-02 | 2018-09-28 | 重庆机电装备技术研究院有限公司 | A kind of trackways engineering construction progress msg management method based on BIM |
-
2018
- 2018-09-30 CN CN201811157383.8A patent/CN109413161B/en active Active
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040215377A1 (en) * | 2003-04-22 | 2004-10-28 | Jung-Rak Yun | Automated self-control traveling system for expressways and method for controlling the same |
US20110298603A1 (en) * | 2006-03-06 | 2011-12-08 | King Timothy I | Intersection Collision Warning System |
CN101446383A (en) * | 2008-12-25 | 2009-06-03 | 广州万安建设监理有限公司 | System and method for supervising gas engineering project |
CN102214135A (en) * | 2010-04-02 | 2011-10-12 | 和硕联合科技股份有限公司 | Method and device for monitoring software installation process and software installation system applied by same |
EP3101639A1 (en) * | 2014-01-31 | 2016-12-07 | JVC Kenwood Corporation | Electronic device, control method for electronic device, and control program for electronic device |
CN205140430U (en) * | 2015-11-19 | 2016-04-06 | 陈俊岐 | City place name direction identification means and city place name direction tag system |
CN205979462U (en) * | 2016-08-17 | 2017-02-22 | 上海邮电设计咨询研究院有限公司 | Wisdom street lamp |
CN205943333U (en) * | 2016-08-22 | 2017-02-08 | 国网浙江省电力公司杭州供电公司 | Transmission line shaft tower identification means |
CN106448453A (en) * | 2016-11-10 | 2017-02-22 | 海南庆禾钢结构设计咨询有限公司 | Guideboard capable of achieving turning pressure relief |
CN107917377A (en) * | 2017-10-16 | 2018-04-17 | 成都德顺泓沥科技有限公司 | It is a kind of that there is the solar street light of light sensation |
CN108122511A (en) * | 2017-11-28 | 2018-06-05 | 安徽云媒信息科技有限公司 | A kind of rotation advertisement frame |
CN108596423A (en) * | 2018-03-02 | 2018-09-28 | 重庆机电装备技术研究院有限公司 | A kind of trackways engineering construction progress msg management method based on BIM |
CN108470049A (en) * | 2018-03-09 | 2018-08-31 | 国网上海市电力公司 | A kind of construction project management system based on instrument board |
CN108594730A (en) * | 2018-07-11 | 2018-09-28 | 华中科技大学 | A kind of engineering construction Schedule monitoring system and method based on Internet of Things |
Also Published As
Publication number | Publication date |
---|---|
CN109413161B (en) | 2021-07-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109413161A (en) | A kind of guideboard installation progress monitoring system | |
CN204104238U (en) | A kind of handle hidden for electronic cabinet structure | |
CN205009116U (en) | A spanner for pressurized strut lock nut | |
CN203210242U (en) | Dual-purpose wrench for inner and outer hexagons | |
CN211805902U (en) | Mechanical arm sleeve | |
CN204183471U (en) | Turn the prolongation operation tool of nut | |
CN104128286A (en) | Distribution line pole number spraying structure | |
CN208759561U (en) | It is a kind of can be with the synchronous banding pattern rectangular coordinate system manipulator of external tail portion adjusting elasticity | |
CN203995091U (en) | A kind of for rainbow printing every device for ink | |
CN203839777U (en) | Combining tool for tightly combining switch cabinet | |
CN221135779U (en) | Portable maintenance tool for central air conditioner | |
CN207747837U (en) | A kind of vehicular unmanned plane counter equipment of quick despatch | |
CN207104766U (en) | A kind of multifunction magnetic bottle opener | |
CN205342942U (en) | Convenient to use's bottle opener | |
CN201325022Y (en) | Anti-slip slotted point screwdriver | |
CN2815618Y (en) | Rotary screw-driver | |
CN204175745U (en) | A kind of case fixed mechanism | |
CN207926634U (en) | A kind of novel interchanger | |
CN216490242U (en) | Intelligent digital controller for mine rectifier cabinet | |
CN202684796U (en) | Novel sleeve connecting rod spanner | |
CN203885609U (en) | Screwdriver for orthopedics | |
CN210955182U (en) | Portable wireless sorting indicating device | |
CN202480454U (en) | Corrugated wheel module fixing device of blowing positive-pressure corrugated machine | |
CN209014447U (en) | Changeable weight and will not damage measure product counterweight | |
CN203343992U (en) | Nut assembly-and-disassembly device with long insulating arm |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |