CN109409776A - A kind of security risk three dimensional constitution reports and submits method - Google Patents

A kind of security risk three dimensional constitution reports and submits method Download PDF

Info

Publication number
CN109409776A
CN109409776A CN201811362999.9A CN201811362999A CN109409776A CN 109409776 A CN109409776 A CN 109409776A CN 201811362999 A CN201811362999 A CN 201811362999A CN 109409776 A CN109409776 A CN 109409776A
Authority
CN
China
Prior art keywords
risk
security risk
information
typing
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811362999.9A
Other languages
Chinese (zh)
Inventor
青舟
张佩竹
付功云
杨喆
蒋卓鹏
袁文祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Liuyuan Group Co Ltd
Original Assignee
China Railway Liuyuan Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Liuyuan Group Co Ltd filed Critical China Railway Liuyuan Group Co Ltd
Priority to CN201811362999.9A priority Critical patent/CN109409776A/en
Publication of CN109409776A publication Critical patent/CN109409776A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities

Abstract

The present invention discloses a kind of security risk three dimensional constitution and reports and submits method, comprising the following steps: 1 carries out security risk investigation;The 2 safety problem copying platforms that will be found in step 1, typing mode include the typing of the mobile terminal APP and pc client typing;3 judge the position that risk occurs;If 4 steps 3 are judged as ground risk, coordinate data is picked up by GIS image figure layer or modal position data are obtained by risk source model, location coordinate information occurs for selection;If step 3 is judged as underground risk, by tunnel ring-shaped sheet model, tunnel ring-shaped sheet number is selected;Co-ordinate position information or tunnel ring number information in 5 recording steps 4;Security risk information is stored in database by 6;7 carry out two three-dimensional linkage displayings.The present invention visualizes set 2-D data mode by 3 D stereo and reports and submits security risk information, improves safety risk management level, strengthens the management of security risk hidden danger during Engineering Construction Management.

Description

A kind of security risk three dimensional constitution reports and submits method
Technical field
The invention belongs to engineering safety risk management technology fields, especially a kind of safety wind involved in construction management process Dangerous three dimensional constitution reports and submits method.
Background technique
Security risk control mode in existing construction process, mostly uses 2-D data system to be managed, all Risk hidden danger information is shown with written form, and the form of expression is single, gives the correct time in risk hidden danger and location information is described In indefinite situation, rectification personnel can not accurately position risk and position occurs, and reduce rectification efficiency, be unfavorable for engineering and apply Work safety management.
How the prior art is utilized, improves reporting schemes using 3-D technology combination two-dimensional surface data, manage each side Personnel's ocular and clear risk occurs position and rectifies and improves in time, improves safety risk management level, this is the technology of this field Personnel's technical problem urgently to be resolved.
Summary of the invention
The present invention for the technical problems in the prior art, provides a kind of security risk three dimensional constitution and reports and submits method, It can reach and security risk information is reported and submitted by 3 D stereo visualization set 2-D data mode, improve safety risk management water It is flat, the beneficial effect of the management of security risk hidden danger during reinforcement Engineering Construction Management.
In order to solve the above technical problems, the technical solution adopted by the present invention is that: a kind of security risk three dimensional constitution side of reporting and submitting Method, comprising the following steps:
(1) it carries out security risk and checks S100;
(2) the safety problem copying platform S200 that will be found in step (1), typing mode includes the typing of the mobile terminal APP (S201) and pc client typing (S202);
(3) position for judging that risk occurs belongs to ground risk or underground risk S300;
(4) if step (3) is judged as ground risk, coordinate data is picked up by GIS image figure layer S401 or passes through wind Dangerous source model S402 obtains modal position data, and location coordinate information (S400) occurs for selection;If step (3) is judged as ground leeward Danger selects tunnel ring-shaped sheet number S500 then by tunnel ring-shaped sheet model S501;
(5) co-ordinate position information in recording step (4) or tunnel ring number information S600;
(6) security risk information is stored in database S700;
(7) two three-dimensional linkages are carried out and shows S800.
Compared with prior art, the present invention has the beneficial effects that the present invention visualizes set by 3 D stereo 2-D data mode reports and submits security risk information, safety risk management level is improved, during strengthening Engineering Construction Management The management of security risk hidden danger.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention.
Specific embodiment
Technical solution in order to enable those skilled in the art to better understand the present invention, in the following with reference to the drawings and specific embodiments It elaborates to the present invention.
Embodiment of the invention discloses a kind of security risk three dimensional constitutions to report and submit method, as shown in the figure comprising following Step:
(1) it carries out security risk and checks S100;
(2) the safety problem copying platform S200 that will be found in step (1), typing mode includes the typing of the mobile terminal APP (S201) and pc client typing (S202);
(3) position for judging that risk occurs belongs to ground risk or underground risk S300;
(4) if step (3) is judged as ground risk, coordinate data is picked up by GIS image figure layer S401 or passes through wind Dangerous source model S402 obtains modal position data, and location coordinate information (S400) occurs for selection;If step (3) is judged as ground leeward Danger selects tunnel ring-shaped sheet number S500 then by tunnel ring-shaped sheet model S501;
(5) co-ordinate position information in recording step (4) or tunnel ring number information S600;
(6) security risk information is stored in database S700;
(7) two three-dimensional linkages are carried out and shows S800.
In the present embodiment, by taking the risk hidden danger of rail traffic ground as an example, when patrol officer carries out ground security risk investigation, It was found that risk hidden danger situation, inspector carries out event by mobile terminal APP and reports, and typing related data information is simultaneously taken pictures, information Mainly include upper journalist, on call time, details description and the data such as risk hidden danger type, system, which judges automatically risk hidden danger, is It is no to belong to ground risk source.
For without risk source model interaction, mobile APP directly records coordinate position, carries out in security risk preservation Report, after the completion of reporting, whole security risk data are saved to database, and risk coordinate information is rendered into GIS striograph by platform, Two three-dimensional linkage displayings are carried out in conjunction with risk hidden danger 2-D data.
For if you need to the risk hidden danger with model interaction, co-related risks of above giving the correct time source model is all safe after the completion of reporting Risk data is saved to database, and risk source own coordinate information is rendered into GIS striograph and is associated by platform, and in platform Middle combination risk hidden danger 2-D data carries out two three-dimensional linkage displayings.
In the present embodiment, by taking the risk hidden danger of rail traffic ground as an example, when patrol officer carries out ground security risk investigation, It was found that risk hidden danger situation, inspector carries out event by pc client and reports, in platform typing related data information and on Biography is taken pictures, information mainly include upper journalist, on call time, details description and data, the system such as risk hidden danger type are sentenced automatically Whether disconnected risk hidden danger belongs to ground risk source.
For clicking directly on risk position in system GIS striograph, system picks up coordinate without risk source model interaction Information is reported into then row security risk preservation, and after the completion of reporting, whole security risk data are saved to database, and platform will Risk coordinate information is rendered into GIS striograph combination risk hidden danger 2-D data and carries out two three-dimensional linkage displayings.
For above giving the correct time and directly selecting risk source model if you need to the risk hidden danger with model interaction, after the completion of reporting, all Security risk data are saved to database, and risk source model and two-dimentional risk data are associated binding by platform, and carry out two Three-dimensional linkage is shown.
In the present embodiment, by taking the risk hidden danger of rail traffic underground as an example, patrol officer carries out construction of underground tunnel safety wind When the investigation of danger, risk hidden danger situation is found, inspector carries out event by mobile terminal APP or pc client and reports, typing phase Data information is closed simultaneously to take pictures, information mainly include upper journalist, on call time, details description and the data such as risk hidden danger type, System judges automatically whether risk hidden danger belongs to underground risk source.
It gives the correct time on mobile terminal, the associated ring number of hidden danger, after the completion of reporting, whole security risk data is selected by mobile terminal It saves to database, platform combines ring number corresponding ring plate model risk hidden danger 2-D data to carry out two three-dimensional connection in platform It is dynamic to show.
It gives the correct time on pc client, the associated ring of hidden danger is selected by tunnel threedimensional model in platform, after the completion of reporting, all Security risk data are saved to database, and the corresponding ring plate model of ring number is combined risk hidden danger 2-D data by platform in platform Carry out two three-dimensional linkage displayings.
It is described the invention in detail above by embodiment, but the content is only exemplary implementation of the invention Example, should not be considered as limiting the scope of the invention.Protection scope of the present invention is defined by the claims.All utilizations Technical solutions according to the invention or those skilled in the art are under the inspiration of technical solution of the present invention, in reality of the invention In matter and protection scope, designs similar technical solution and reach above-mentioned technical effect, or to made by application range All the changes and improvements etc. should still belong to patent of the invention and cover within protection scope.It should be noted that in order to clear It is stated, part and protection scope of the present invention is omitted in explanation of the invention without being directly significantly associated with but this field skill The statement of component known to art personnel and processing.

Claims (1)

1. a kind of security risk three dimensional constitution reports and submits method, it is characterised in that combine 2-D data side by 3 D stereo visualization Formula reports and submits security risk information, improves safety risk management level, security risk is hidden during strengthening Engineering Construction Management The management of trouble, comprising the following steps:
(1) security risk investigation is carried out;
(2) the safety problem copying platform that will be found in step (1), typing mode includes the typing of the mobile terminal APP and PC client Hold typing;
(3) position for judging that risk occurs belongs to ground risk or underground risk;
(4) if step (3) is judged as ground risk, coordinate data is picked up by GIS image figure layer or passes through risk source model Modal position data are obtained, location coordinate information occurs for selection;If step (3) is judged as underground risk, pass through tunnel ring-shaped sheet Model selects tunnel ring-shaped sheet number;
(5) co-ordinate position information or tunnel ring number information in recording step (4);
(6) security risk information is stored in database;
(7) two three-dimensional linkage displayings are carried out.
CN201811362999.9A 2018-11-15 2018-11-15 A kind of security risk three dimensional constitution reports and submits method Pending CN109409776A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811362999.9A CN109409776A (en) 2018-11-15 2018-11-15 A kind of security risk three dimensional constitution reports and submits method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811362999.9A CN109409776A (en) 2018-11-15 2018-11-15 A kind of security risk three dimensional constitution reports and submits method

Publications (1)

Publication Number Publication Date
CN109409776A true CN109409776A (en) 2019-03-01

Family

ID=65473584

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811362999.9A Pending CN109409776A (en) 2018-11-15 2018-11-15 A kind of security risk three dimensional constitution reports and submits method

Country Status (1)

Country Link
CN (1) CN109409776A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110489888A (en) * 2019-08-23 2019-11-22 中铁第六勘察设计院集团有限公司 Based on the three-dimensional association general technology method of BIM platform two
CN115100362A (en) * 2022-08-23 2022-09-23 航天正通汇智(北京)科技股份有限公司 Space automatic modeling and visualization method based on four-color chart and oblique photography

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103440600A (en) * 2013-09-13 2013-12-11 成都中铁隆工程集团有限公司 BIM (Building Information Modeling) risk monitoring system and method of multilayer 4D (4-Dimensional) model
CN106651663A (en) * 2016-10-10 2017-05-10 天津泰达城市轨道投资发展有限公司 Track traffic construction safety risk display method and system
CN108732979A (en) * 2018-05-15 2018-11-02 浙江大学 A kind of construction safety managing and control system based on BIM technology

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103440600A (en) * 2013-09-13 2013-12-11 成都中铁隆工程集团有限公司 BIM (Building Information Modeling) risk monitoring system and method of multilayer 4D (4-Dimensional) model
CN106651663A (en) * 2016-10-10 2017-05-10 天津泰达城市轨道投资发展有限公司 Track traffic construction safety risk display method and system
CN108732979A (en) * 2018-05-15 2018-11-02 浙江大学 A kind of construction safety managing and control system based on BIM technology

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
许南茜: ""GIS与BIM结合技术在化工园区规划中的应用-以湖北应城经济开发区东城工业园控制性详细规划为例"", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110489888A (en) * 2019-08-23 2019-11-22 中铁第六勘察设计院集团有限公司 Based on the three-dimensional association general technology method of BIM platform two
CN115100362A (en) * 2022-08-23 2022-09-23 航天正通汇智(北京)科技股份有限公司 Space automatic modeling and visualization method based on four-color chart and oblique photography

Similar Documents

Publication Publication Date Title
CN104299286B (en) Public security inspection is registered method and system
CN112525164B (en) Method for detecting deformation of super high-rise building based on unmanned aerial vehicle oblique photography technology
CN106791700B (en) Enterprise critical area personnel path safety monitoring system and method
Yabuki et al. An invisible height evaluation system for building height regulation to preserve good landscapes using augmented reality
CN109409776A (en) A kind of security risk three dimensional constitution reports and submits method
CN107292989A (en) High voltage power transmission cruising inspection system based on 3DGIS technologies
CN105118021A (en) Feature point-based image registering method and system
CN106412526A (en) Police oblique-photography real 3D platform system and interface system thereof
CN108876857A (en) Localization method, system, equipment and the storage medium of automatic driving vehicle
CA3063606A1 (en) Method and apparatus for planning sample points for surveying and mapping, control terminal, and storage medium
CN106323286B (en) A kind of robot coordinate system and the transform method of three-dimensional measurement coordinate system
CN112648976B (en) Live-action image measuring method and device, electronic equipment and storage medium
CN112686877A (en) Binocular camera-based three-dimensional house damage model construction and measurement method and system
CN108957504A (en) The method and system of indoor and outdoor consecutive tracking
CN113627005B (en) Intelligent vision monitoring method
CN110306809A (en) Steel construction curtain wall location and installation method for correcting error based on BIM 3 D laser scanning
CN117392328B (en) Three-dimensional live-action modeling method and system based on unmanned aerial vehicle cluster
CN109859320A (en) A kind of system and method generating three-dimensional visualization image according to pipe network attribute data
CN109325276B (en) BIM model object-based examination processing method
CN115493567B (en) Territorial mapping and drawing method, system and application based on unmanned aerial vehicle technology
CN111245945A (en) Marine oil spilling supervisory systems based on buoy and unmanned aerial vehicle control
CN110163962A (en) A method of based on Smart 3D oblique photograph technology export actual landform contour
CN114971249A (en) Underground engineering risk early warning and interactive analysis method based on mixed reality
CN104964670B (en) It is a kind of to carry out with no paper photogrammetric method using digital device
CN108954016A (en) Fuel gas pipeline leakage disposal system based on augmented reality

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190301