CN109403223A - A kind of bridge pile foundation method for repairing and constructing - Google Patents

A kind of bridge pile foundation method for repairing and constructing Download PDF

Info

Publication number
CN109403223A
CN109403223A CN201811534318.2A CN201811534318A CN109403223A CN 109403223 A CN109403223 A CN 109403223A CN 201811534318 A CN201811534318 A CN 201811534318A CN 109403223 A CN109403223 A CN 109403223A
Authority
CN
China
Prior art keywords
pile foundation
concrete
repairing
repaired
constructing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811534318.2A
Other languages
Chinese (zh)
Inventor
夏连营
逄金磊
张瑞松
刘传虎
惠睿谦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201811534318.2A priority Critical patent/CN109403223A/en
Publication of CN109403223A publication Critical patent/CN109403223A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D37/00Repair of damaged foundations or foundation structures

Abstract

The invention discloses a kind of bridge pile foundation method for repairing and constructing, comprising: installs building enclosure in pile foundation periphery to be repaired;From the top surface of pile foundation to be repaired to concrete core is drilled through inside it, until defective locations;By drilling through the hole of the concrete core concrete perfusion into pile foundation.This method no longer uses traditional impact drill repair mode, by boring, class equipment is directly vertical inwardly to be drilled through from pile foundation top surface, after reaching up to defective locations, into the hole drilled out, concrete perfusion is completed to repair again, the supporting that building enclosure is needed is installed in construction around pile foundation before starting and sealing guarantees the effect of pouring construction, which removes core by boring, position is damaged from the external pile foundation that directly reaches, it is convenient and efficient, it ensure that the effect of reparation by way of being perfused again, which either cost or construction efficiency are all much better than form of construction work commonly used in the prior art, it is difficult to efficiently solve bridge pile foundation defect repair, the technical problem of time-consuming consumption higher cost etc..

Description

A kind of bridge pile foundation method for repairing and constructing
Technical field
The present invention relates to technical field of building construction, more specifically to a kind of bridge pile foundation method for repairing and constructing.
Background technique
It is larger to the control difficulty of quality that bridge pile foundation engineering belongs to underground concealed engineering, especially in Muddy Bottoms geological conditions And when pile foundation construction in the engineering-environments such as river shoal, river, pile foundation often goes wrong.
Impact drill processing pile foundation damaged location is usually used in common pile foundation repair mode, using this method duration compared with Length generally requires 1-2 months, costly, either pile foundation traditional from the point of view of shortening the construction period or reducing construction cost Repair mode all existing defects.
In conclusion how to efficiently solve, bridge pile foundation defect repair is difficult, and the technology of time-consuming consumption higher cost etc. is asked Topic, is current those skilled in the art's urgent problem.
Summary of the invention
In view of this, the purpose of the present invention is to provide a kind of bridge pile foundation method for repairing and constructing, the bridge pile foundation reparation Construction method can efficiently solve bridge pile foundation defect repair difficulty, the technical problem of time-consuming consumption higher cost etc..
In order to achieve the above object, the invention provides the following technical scheme:
A kind of bridge pile foundation method for repairing and constructing, comprising:
Building enclosure is installed in pile foundation periphery to be repaired;
From the top surface of pile foundation to be repaired to concrete core is drilled through inside it, until defective locations;
By drilling through the hole of the concrete core concrete perfusion into pile foundation.
Preferably, in above-mentioned bridge pile foundation method for repairing and constructing, the top surface from pile foundation to be repaired is to drilling through inside it In concrete core, drills through concrete core and bored using the water mill of diameter 100mm.
Preferably, in above-mentioned bridge pile foundation method for repairing and constructing, the top surface from pile foundation to be repaired is to drilling through inside it In concrete core, depth 1m is drilled through every time, and concrete remaining in hole is taken out, continue to drill down to later.
Preferably, in above-mentioned bridge pile foundation method for repairing and constructing, the top surface from pile foundation to be repaired is to drilling through inside it Concrete core, until further including that will manually cut cleaning in defective locations after defective locations.
Preferably, in above-mentioned bridge pile foundation method for repairing and constructing, the hole by drilling through concrete core is into pile foundation Concrete perfusion, wherein concrete perfusion uses the concrete of label identical as foundation pile.
Preferably, in above-mentioned bridge pile foundation method for repairing and constructing, the bridge pile foundation method for repairing and constructing further includes, in advance Using ultrasound examination pile foundation damage situations.
Bridge pile foundation method for repairing and constructing provided by the invention, comprising: install building enclosure in pile foundation periphery to be repaired;From The top surface of pile foundation to be repaired is to concrete core is drilled through inside it, until defective locations;By drilling through the hole of concrete core to stake Concrete perfusion in base.This bridge pile foundation method for repairing and constructing provided by the invention no longer uses traditional impact drill reparation side Formula is inwardly drilled through by the way that brill class equipment is directly vertical from pile foundation top surface, after reaching up to defective locations, into the hole drilled out Again concrete perfusion is completed to repair, and the supporting that building enclosure is needed is installed in construction around pile foundation before starting and sealing is protected The effect of pouring construction is demonstrate,proved, which removes core by boring, and damages position from the external pile foundation that directly reaches, and it is convenient and efficient, pass through Again the mode being perfused ensure that the effect of reparation, which either cost or construction efficiency are all much better than in the prior art Common form of construction work efficiently solves bridge pile foundation defect repair difficulty, the technical problem of time-consuming consumption higher cost etc..
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is the flow diagram of bridge pile foundation method for repairing and constructing provided in an embodiment of the present invention;
Fig. 2 is the usage scenario schematic diagram of bridge pile foundation method for repairing and constructing provided in an embodiment of the present invention.
Appended drawing reference is as follows in figure:
Pile foundation 1, concrete core 2, defective locations 3.
Specific embodiment
The embodiment of the invention discloses a kind of bridge pile foundation method for repairing and constructing, tired to solve bridge pile foundation defect repair Difficulty, the technical problem of time-consuming consumption higher cost etc..
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Fig. 1, Fig. 2 are please referred to, Fig. 1 is that the process of bridge pile foundation method for repairing and constructing provided in an embodiment of the present invention is illustrated Figure, Fig. 2 are the usage scenario schematic diagram of bridge pile foundation method for repairing and constructing provided in an embodiment of the present invention.
Bridge pile foundation method for repairing and constructing provided by the invention, comprising:
S01: building enclosure is installed in 1 periphery of pile foundation to be repaired;
S02: from the top surface of pile foundation 1 to be repaired to concrete core 2 is drilled through inside it, until defective locations 3;
S03: by drilling through the hole of concrete core 2 concrete perfusion into pile foundation 1.
This bridge pile foundation method for repairing and constructing provided by the invention no longer uses traditional impact drill repair mode, passes through Brill class equipment is directly vertical inwardly to be drilled through from 1 top surface of pile foundation, after reaching up to defective locations 3, again into the hole drilled out Concrete perfusion is completed to repair, and the supporting that building enclosure is needed is installed in construction around pile foundation 1 before starting and sealing guarantees The effect of pouring construction, which remove core by boring, and damage position from the external pile foundation 1 that directly reaches, convenient and efficient, pass through weight The mode being newly perfused ensure that the effect of reparation, which either cost or construction efficiency are all much better than in the prior art often Form of construction work efficiently solves bridge pile foundation defect repair difficulty, the technical problem of time-consuming consumption higher cost etc..
To advanced optimize above-mentioned technical proposal, on the basis of the above embodiments preferably, above-mentioned bridge pile foundation reparation In construction method, the top surface from pile foundation 1 to be repaired drills through concrete core using straight to drilling through in concrete core 2 inside it The water mill of diameter 100mm bores.
In technical solution provided in this embodiment, drilling tool used by specifically limiting is bored as water mill, a diameter of 100mm, The drilling tool be suitble to the present embodiment in the work progress for drilling through concrete core, can be faster more reliable drill through out core.
To advanced optimize above-mentioned technical proposal, on the basis of the above embodiments preferably, above-mentioned bridge pile foundation reparation In construction method, the top surface from pile foundation 1 to be repaired drills through depth 1m to drilling through in concrete core inside it every time, and will Remaining concrete takes out in hole, continues to drill down to later.
Technical solution provided in this embodiment has advanced optimized the concrete operations mode for drilling through construction, i.e., between it is intermittent Construction drills through out the concrete core 2 that length is 1m or so every time, and carries out drilling through next time after the cleaning, which is suitble to The work characteristics of selected drilling tool, and it is able to maintain efficient construction.
To advanced optimize above-mentioned technical proposal, on the basis of the above embodiments preferably, above-mentioned bridge pile foundation reparation In construction method, the top surface from pile foundation 1 to be repaired is to concrete core 2 is drilled through inside it, until also wrapping after defective locations 3 Including manually will cut cleaning in defective locations 3.By the cleaning in advance to defective locations, filling concrete is further ensured Pouring quality guarantees that the pile foundation after repairing is stronger.
To advanced optimize above-mentioned technical proposal, on the basis of the above embodiments preferably, above-mentioned bridge pile foundation reparation In construction method, the concrete perfusion into pile foundation 1 of the hole by drilling through concrete core, wherein concrete perfusion use with The concrete of the identical label of foundation pile.It is irrigated reparation by using with the whole concrete with model of pile foundation 1, after guaranteeing perfusion Concrete can have better cementability between original concrete.
To advanced optimize above-mentioned technical proposal, on the basis of the above embodiments preferably, above-mentioned bridge pile foundation reparation In construction method, the bridge pile foundation method for repairing and constructing further includes using 1 damage situations of ultrasound examination pile foundation in advance.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other The difference of embodiment, the same or similar parts in each embodiment may refer to each other.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.

Claims (6)

1. a kind of bridge pile foundation method for repairing and constructing characterized by comprising
Building enclosure is installed in pile foundation periphery to be repaired;
From the top surface of pile foundation to be repaired to concrete core is drilled through inside it, until defective locations;
By drilling through the hole of the concrete core concrete perfusion into pile foundation.
2. bridge pile foundation method for repairing and constructing according to claim 1, which is characterized in that the top from pile foundation to be repaired Towards being drilled through in concrete core inside it, drills through concrete core and bored using the water mill of diameter 100mm.
3. bridge pile foundation method for repairing and constructing according to claim 2, which is characterized in that the top from pile foundation to be repaired Towards drilling through in concrete core inside it, drill through depth 1m every time, and concrete remaining in hole taken out, continue later to Under drill through.
4. bridge pile foundation method for repairing and constructing according to claim 3, which is characterized in that the top from pile foundation to be repaired Towards concrete core is drilled through inside it, until further including that will manually cut cleaning in defective locations after defective locations.
5. bridge pile foundation method for repairing and constructing according to claim 4, which is characterized in that described by drilling through concrete core Hole into pile foundation concrete perfusion, wherein concrete perfusion use label identical as foundation pile concrete.
6. bridge pile foundation method for repairing and constructing according to claim 5, which is characterized in that the bridge pile foundation repairing construction Method further includes using ultrasound examination pile foundation damage situations in advance.
CN201811534318.2A 2018-12-14 2018-12-14 A kind of bridge pile foundation method for repairing and constructing Pending CN109403223A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811534318.2A CN109403223A (en) 2018-12-14 2018-12-14 A kind of bridge pile foundation method for repairing and constructing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811534318.2A CN109403223A (en) 2018-12-14 2018-12-14 A kind of bridge pile foundation method for repairing and constructing

Publications (1)

Publication Number Publication Date
CN109403223A true CN109403223A (en) 2019-03-01

Family

ID=65459316

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811534318.2A Pending CN109403223A (en) 2018-12-14 2018-12-14 A kind of bridge pile foundation method for repairing and constructing

Country Status (1)

Country Link
CN (1) CN109403223A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112482372A (en) * 2020-12-02 2021-03-12 保利长大工程有限公司 Defect repairing method for cast-in-place pile

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08326018A (en) * 1995-05-31 1996-12-10 Mitsubishi Heavy Ind Ltd Method of pier preparation construction by method of all casing construction
CN101413265A (en) * 2008-10-07 2009-04-22 天津二十冶建设有限公司 Defect reinforcing and processing construction method of drill filling pile
CN103541359A (en) * 2013-09-18 2014-01-29 浙江省岩土基础公司 Method for repairing and treating quality defect of cast-in-place pile
CN105507314A (en) * 2015-12-16 2016-04-20 王良源 Improved bridge cast-in-place pile foundation repair method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08326018A (en) * 1995-05-31 1996-12-10 Mitsubishi Heavy Ind Ltd Method of pier preparation construction by method of all casing construction
CN101413265A (en) * 2008-10-07 2009-04-22 天津二十冶建设有限公司 Defect reinforcing and processing construction method of drill filling pile
CN103541359A (en) * 2013-09-18 2014-01-29 浙江省岩土基础公司 Method for repairing and treating quality defect of cast-in-place pile
CN105507314A (en) * 2015-12-16 2016-04-20 王良源 Improved bridge cast-in-place pile foundation repair method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
卿三惠等: "《土木工程施工工艺 桥梁工程 第2版》", 31 October 2013 *
王中文、陈儒发: "钻孔灌注桩超深度缺陷压注混凝土处理技术与应用", 《岩土工程学报》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112482372A (en) * 2020-12-02 2021-03-12 保利长大工程有限公司 Defect repairing method for cast-in-place pile

Similar Documents

Publication Publication Date Title
CN102147033B (en) Non-excavation directional traversing construction method for thermal power pipeline
CN101672187B (en) Anti-seepage water treatment method
CN113090068B (en) Vacuum pouring process for rush-repairing deep-buried building top concrete structure under limited conditions
CN208748662U (en) Foundation pit front-supporting type slip casting steel pipe support structure
WO2020239080A1 (en) Method for minimally invasive repair and rapid replacement of underground drainage pipes
CN109403223A (en) A kind of bridge pile foundation method for repairing and constructing
CN102733390B (en) Method for removing underground waste anchor cable/anchor rod
CN204002832U (en) A kind of shield tunnel portal structure
CN106930722A (en) The permanent shut-in well method of the natural gas well
CN104563126A (en) Rotary drill drilling cast-in-place pile construction method
CN104234443B (en) A kind of corbel type reinforcement means of steel reinforced concrete member and newly-increased beam
CN206052744U (en) A kind of highway bridge construction cofferdam device
CN209384231U (en) Combined type ruggedized construction based on building pile foundation
CN207878472U (en) Solid matter step type rotary digging pile supporting system
CN109322621B (en) Broken layer pipe fixing and grouting method
CN101725147A (en) Construction process of first-inserting last-jetting type steel churning pile enclosing structure under low net space
CN104790895A (en) Cable transmission drillable type water source well leaking stoppage method
CN104763332A (en) Percussive-rotary drilling method and system for horizontal directional drilling crossing
CN112228084B (en) Shield tunnel portal expanding reconstruction construction method
CN204326977U (en) Probing churning retaining wall drilling tool
CN204139644U (en) A kind of newly-increased beam of SRC member
CN107143335A (en) The guide hole construction method of ultra-deep shaft
CN111206941B (en) Tunnel lining thickness deficiency processing method
CN205296216U (en) Interim operation platform of underground factory building rock anchor crane girder
CN207228105U (en) A kind of deep hole blasting steel reinforcement cage

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190301