CN102733390B - Method for removing underground waste anchor cable/anchor rod - Google Patents

Method for removing underground waste anchor cable/anchor rod Download PDF

Info

Publication number
CN102733390B
CN102733390B CN201210195631.4A CN201210195631A CN102733390B CN 102733390 B CN102733390 B CN 102733390B CN 201210195631 A CN201210195631 A CN 201210195631A CN 102733390 B CN102733390 B CN 102733390B
Authority
CN
China
Prior art keywords
anchor cable
anchor
cutting
supporter
support body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210195631.4A
Other languages
Chinese (zh)
Other versions
CN102733390A (en
Inventor
丁仕辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong No 2 Hydropower Engineering Co Ltd
Original Assignee
Guangdong No 2 Hydropower Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong No 2 Hydropower Engineering Co Ltd filed Critical Guangdong No 2 Hydropower Engineering Co Ltd
Priority to CN201210195631.4A priority Critical patent/CN102733390B/en
Publication of CN102733390A publication Critical patent/CN102733390A/en
Application granted granted Critical
Publication of CN102733390B publication Critical patent/CN102733390B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a method for removing an underground waste anchor cable/anchor rod. The method is characterized by comprising the following steps of: a), determining the head drilling starting position of the waste anchor cable/anchor rod; b), cutting the junction surface of the periphery of an anchorage body and rock soil to separate the anchorage body from the rock soil, and synchronously putting a support body in a cut out gap while cutting is performed; c), cutting until the bottom end of the waste anchor cable/anchor rod is cut to ensure the whole section of the anchorage body to be located in the support body, and pulling out to remove the anchorage body from the support body; and d), performing backfill grouting in the support body; ending the grouting when the support body is overflowed and recovering the support body. According to the method for removing the underground waste anchor cable/anchor rod, the support body is synchronously put while the cutting is performed, and thus, the waste anchor cable/anchor rod can be easily removed, and the gap can be filled by the grouting at the later stage, and thus, an earthwork structure cannot be damaged. The method for removing the underground waste anchor cable/anchor rod is simple and easy to implement, does not need wide-range excavation and is safe, convenient, fast and efficient. The method for removing the underground waste anchor cable/anchor rod can be applied to underground engineering construction.

Description

The method for dismounting of anchor cable/anchor pole is discarded in a kind of underground
Technical field
The present invention relates to a kind of construction method of underground construction, particularly a kind ofly remove the method that anchor cable/anchor pole is discarded in underground.
Background technology
Engineering extensively adopt anchor cable or anchor pole provide supporting to foundation ditch, its support principle is: utilize the domatic ground of the lateral stabilization of bracing of foundation pit stake/wall to provide anchored force, connect by anchor cable or anchor pole and bracing of foundation pit stake/joist anchor, implement the supporting to bracing of foundation pit stake or enclosure wall.As for when needing to select anchor cable, when need to select anchor pole, should reality be depended on and determine, but the operating principle of the two be substantially identical.
The construction technology of anchor cable/anchor pole is: pore-creating → anchor cable/anchor pole fabrication and installation → anchor cable/bolthole grouting → anchor cable/anchor pole tensioning fixation → non-anchored section grouting → anchor head preservative treatment.
As can be seen here, after completing above-mentioned construction, just have one section of anchor cable or anchor pole is embedded in underground, this section of anchoring body is very important when work, play the effect of the frictional force providing powerful, but once after pattern foundation pit supporting structure completes, anchoring body is just stayed in soil.
For a long time, using anchor cable/anchor pole usually to have ignored interim anchor cable/anchor pole when carrying out pattern foundation pit supporting structure on the impact of surrounding environment, seldom having and carrying out for interim anchor cable/anchor pole the design and construction that reclaims.Thus, after pattern foundation pit supporting structure completes, a large amount of discarded anchor cable/anchor pole has been embedded in underground, has had a strong impact on the development & construction of successive projects project, has become the underground obstacle of successive projects project construction.If clear up these to discard anchoring body in underground, then need extensive earth excavation, cause the waste of construction cost, therefore must have a kind of efficient, fast, the underground that simple, construction cost is low discards the method for dismounting of anchor cable/anchor pole.
Summary of the invention
Object of the present invention, is to provide a kind of underground to discard the method for dismounting of anchor cable/anchor pole.
The solution that the present invention solves its technical problem is:
A method for dismounting for anchor cable/anchor pole is discarded in underground, it is characterized in that: comprise the following steps:
A), determine that the head of discarded anchor cable/anchor pole executes brill start position;
B), between the periphery and ground bonding surface of anchoring body cut, anchoring body is separated with ground, and while cutting, synchronously follow up supporter in the gap cut out;
C), stop cutting when being cut to the bottom of discarded anchor cable/anchor pole, ensure that whole section of anchoring body is all positioned at supporter, anchoring body is extracted dismounting from supporter;
D), toward backfill grouting in supporter, body to be supported overflows when starching and stops filling with and reclaim supporter.
As the further improvement of technique scheme, in step a), after determining that the head of discarded anchor cable/anchor pole executes brill start position, lay drilling machine construction platform; In step b), described in be cut into anchoring body be axle center annular cutting; In step b) ~ step d), described supporter is basket.
As the further improvement of technique scheme, in step c), be adopt jack or other drafting tools that anchoring body is extracted dismounting from core barrel or sleeve pipe.
The invention has the beneficial effects as follows: the present invention cuts the ground at anchoring body place among a small circle, and the supporter that synchronously follows up in cutting while, like this when pulling out discarded anchor cable/anchor pole, the earthwork is not easily caved in, and the slip casting in later stage has been filled up owing to having removed the hole that discarded anchor cable/anchor pole is formed again, ensure that earthwork structure can not be destroyed.The present invention is simple, without the need to excavating, reaches engineering effort that is safe, convenient, efficient, cost saving on a large scale.The present invention can be applicable in underground engineering construction.
Accompanying drawing explanation
In order to be illustrated more clearly in the technical scheme in the embodiment of the present invention, below the accompanying drawing used required in describing embodiment is briefly described.Obviously, described accompanying drawing is a part of embodiment of the present invention, instead of whole embodiment, and those skilled in the art, under the prerequisite not paying creative work, can also obtain other design schemes and accompanying drawing according to these accompanying drawings.
Fig. 1 is enforcement principle schematic of the present invention, which show the cross section state of discarded anchor cable/anchor pole place soil layer.
Detailed description of the invention
Clear, complete description is carried out, to understand object of the present invention, characteristic sum effect fully below with reference to embodiment and the accompanying drawing technique effect to design of the present invention, concrete structure and generation.Obviously; described embodiment is a part of embodiment of the present invention, instead of whole embodiment, based on embodiments of the invention; other embodiments that those skilled in the art obtains under the prerequisite not paying creative work, all belong to the scope of protection of the invention.In addition, all connection/annexations mentioned in literary composition, not singly refer to that component directly connects, and refer to and according to concrete performance, can connect auxiliary by adding or reducing, and form more excellent draw bail.
With reference to Fig. 1, the method for dismounting of anchor cable/anchor pole is discarded in a kind of underground, it is characterized in that: comprise the following steps:
A), determine that the head of discarded anchor cable/anchor pole executes brill start position, i.e. head 1 as shown in Figure 1;
B), between the periphery and ground bonding surface of anchoring body 2 cut, anchoring body 2 is separated with ground, and while cutting, synchronous follow-up supporter 3 in the gap cut out;
C), stop cutting when being cut to the bottom 6 of discarded anchor cable/anchor pole, ensure that whole section of anchoring body 2 is all positioned at supporter 3, anchoring body 2 is extracted dismounting from supporter 3;
D), toward backfill grouting in supporter 3, body 3 to be supported overflows when starching and stops filling with and reclaim supporter 3.
Be further used as preferred embodiment, in step a), after determining that the head 1 of discarded anchor cable/anchor pole executes brill start position, lay drilling machine construction platform; In step b), described in be cut into anchoring body 2 be that the annular in axle center is cut; In step b) ~ step d), described supporter 3 is core barrel or sleeve pipe.Particularly, be adopt the core barrel of band annular bit 4 or sleeve pipe to be inserted in head 1 to execute brill, such drill bit advances, while core barrel or sleeve pipe are progressively brought in cutting gaps.After cutting completes, just the bonding surface 5 of anchor cable/anchor pole and ground can be kept apart, relieve the frictional force between anchoring body 2 and stratum, thus can successfully discarded anchor cable/anchor pole be extracted.
Being further used as preferred embodiment, in step c), is adopt jack or other drafting tools that anchoring body 2 is extracted dismounting from core barrel or sleeve pipe.
More than that better embodiment of the present invention is illustrated, but the invention is not limited to described embodiment, those of ordinary skill in the art also can make all equivalent modifications or replacement under the prerequisite without prejudice to spirit of the present invention, and these equivalent modification or replacement are all included in the application's claim limited range.

Claims (1)

1. a method for dismounting for anchor cable/anchor pole is discarded in underground, it is characterized in that: comprise the following steps:
A), determine that the head of discarded anchor cable/anchor pole executes brill start position, after determining that the head of discarded anchor cable/anchor pole executes brill start position, lay drilling machine construction platform;
B), cut between the periphery and ground bonding surface of anchoring body, anchoring body is separated with ground, and while cutting, synchronously follow up supporter in the gap cut out, described be cut into anchoring body be axle center annular cutting, described supporter is core barrel or sleeve pipe;
C), stop cutting when being cut to the bottom of discarded anchor cable/anchor pole, ensure that whole section of anchoring body is all positioned at supporter, adopt jack or other drafting tools that anchoring body is extracted dismounting from core barrel or sleeve pipe;
D), toward backfill grouting in supporter, body to be supported overflows when starching and stops filling with and reclaim supporter.
CN201210195631.4A 2012-06-14 2012-06-14 Method for removing underground waste anchor cable/anchor rod Expired - Fee Related CN102733390B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210195631.4A CN102733390B (en) 2012-06-14 2012-06-14 Method for removing underground waste anchor cable/anchor rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210195631.4A CN102733390B (en) 2012-06-14 2012-06-14 Method for removing underground waste anchor cable/anchor rod

Publications (2)

Publication Number Publication Date
CN102733390A CN102733390A (en) 2012-10-17
CN102733390B true CN102733390B (en) 2014-12-24

Family

ID=46989647

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210195631.4A Expired - Fee Related CN102733390B (en) 2012-06-14 2012-06-14 Method for removing underground waste anchor cable/anchor rod

Country Status (1)

Country Link
CN (1) CN102733390B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103953358B (en) * 2014-04-21 2016-05-18 江苏鼎达建筑新技术有限公司 Underground obstacle is removed construction method
CN105840219B (en) * 2016-04-08 2018-06-19 郑州市第一建筑工程集团有限公司 Two-way excitation resonance type anchor cable plucking device
CN107859520A (en) * 2017-11-02 2018-03-30 中建交通建设集团有限公司 A kind of slurry shield passes through the driving method in anchor cable area over long distances
CN111537258B (en) * 2020-05-22 2022-07-15 中国水利水电第十六工程局有限公司 Dam concrete prestress anchor cable blasting demolition sampling method
CN112412508A (en) * 2020-11-25 2021-02-26 晋城蓝焰煤业股份有限公司 Method for fixing ground anchor construction and hard object extraction of coal seam broken bottom plate
CN112483145A (en) * 2020-12-16 2021-03-12 河南理工大学 High-pressure water jet anchor-releasing and anchor-releasing equipment and anchor-releasing method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0819676B2 (en) * 1993-03-04 1996-02-28 房夫 坂野 Method for removing underground structures and obstacles within the adjacent line of 1.000 mm from the boundary
CN201496086U (en) * 2009-09-09 2010-06-02 中国矿业大学 A kind of sleeve type retrievable anchor rod
CN201560777U (en) * 2009-11-04 2010-08-25 沂源县鲁村煤矿有限公司 Anchor rod recovery machine
CN101838988A (en) * 2010-05-10 2010-09-22 昆明捷程桩工有限责任公司 Comprehensive construction method for extracting anchor cable
CN102392444A (en) * 2011-10-26 2012-03-28 中冶集团武汉勘察研究院有限公司 Easily-recycled anchor rod device and recycling method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0819676B2 (en) * 1993-03-04 1996-02-28 房夫 坂野 Method for removing underground structures and obstacles within the adjacent line of 1.000 mm from the boundary
CN201496086U (en) * 2009-09-09 2010-06-02 中国矿业大学 A kind of sleeve type retrievable anchor rod
CN201560777U (en) * 2009-11-04 2010-08-25 沂源县鲁村煤矿有限公司 Anchor rod recovery machine
CN101838988A (en) * 2010-05-10 2010-09-22 昆明捷程桩工有限责任公司 Comprehensive construction method for extracting anchor cable
CN102392444A (en) * 2011-10-26 2012-03-28 中冶集团武汉勘察研究院有限公司 Easily-recycled anchor rod device and recycling method

Also Published As

Publication number Publication date
CN102733390A (en) 2012-10-17

Similar Documents

Publication Publication Date Title
CN102733390B (en) Method for removing underground waste anchor cable/anchor rod
CN102312429B (en) Rapid separation and integral hoisting method for pile head of cast-in-place concrete pile
CN102155234B (en) Excavation construction method for unsymmetrical small-space tunnel
CN110093928A (en) A kind of foundation pit supporting construction and earth excavation construction method
CN110409461A (en) A kind of base pit stand construction based on assembled large-diameter tubular pile
CN103669369B (en) The supporting and protection structure of foundation ditch and supporting method
CN104405403A (en) Construction method capable of controlling deformation of surrounding rock of underground excavated large-span subway station
CN102758458B (en) Underground continuous wall repairing method
CN105041322A (en) Method and system for reinforcing hole for push bench to go in and out
CN104234062A (en) Landslide control method of ionic type rare earth in-situ mineral leaching stope
CN106437798A (en) Pretreatment method for anchor cable group penetrating through shield driving fracture surface
CN106121659B (en) The narrow-bore tunnel excavation method of major urban arterial highway upper-soft lower-hard ground is worn under one kind
CN108612100A (en) A method of anchor cable is handled using churning driven
CN104196014A (en) Combined rock-embedded anchor cable slide-resistant pile where round steel is implanted and construction method thereof
EA031926B1 (en) Method for forming a pillar part and reinforcing adjacently constructed parallel tunnels with reinforcing rods
CN104775433A (en) Pile extracting construction method
CN106088115A (en) The method increasing Stability of Soil of High Side Slopes
CN105484751A (en) Method for preventing large-section rectangular pipe-jacking tunnel from generating soil loading phenomenon
CN108661652B (en) Reinforcing device and method for shield starting and receiving ends in mine tunnel
CN107091092A (en) The approximate full face tunneling structure of mountain highway tunnel neutrality country rock and method
CN108397202B (en) Freeze the leading excavation method of base tunnel in multi-step under advance support
CN204186394U (en) Full section of tunnel pre-reinforcement structure
CN203924072U (en) The retaining wall supporting and protection structure of the super dark hand excavated pile of a kind of super large
CN105840203A (en) Large section loess tunnel pre-cutting method construction method
CN104963332A (en) Construction method for pipe-following drilling micro pile of slewing drilling machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141224

CF01 Termination of patent right due to non-payment of annual fee