CN109403173A - Prefabricated side walk slab and structure of sidewalk - Google Patents

Prefabricated side walk slab and structure of sidewalk Download PDF

Info

Publication number
CN109403173A
CN109403173A CN201811347901.2A CN201811347901A CN109403173A CN 109403173 A CN109403173 A CN 109403173A CN 201811347901 A CN201811347901 A CN 201811347901A CN 109403173 A CN109403173 A CN 109403173A
Authority
CN
China
Prior art keywords
side walk
walk slab
prefabricated
slab
support plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811347901.2A
Other languages
Chinese (zh)
Inventor
徐珂
惠涛
姚玲玲
张建勋
刘文娟
张福喜
侯林杰
刘志勇
王飞
常灿华
闫建磊
黄明海
康柯楠
袁卫锁
王鹏英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Communications Planning Survey & Design Institute
Zhengzhou Transport Infrastructure Investment Co Ltd
Original Assignee
Zhengzhou Communications Planning Survey & Design Institute
Zhengzhou Transport Infrastructure Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Communications Planning Survey & Design Institute, Zhengzhou Transport Infrastructure Investment Co Ltd filed Critical Zhengzhou Communications Planning Survey & Design Institute
Priority to CN201811347901.2A priority Critical patent/CN109403173A/en
Publication of CN109403173A publication Critical patent/CN109403173A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C15/00Pavings specially adapted for footpaths, sidewalks or cycle tracks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention relates to a kind of prefabricated side walk slab and structure of sidewalk.Prefabricated side walk slab includes the top plate walked for passerby, the support plate being connected to below top plate both lateral sides, and the support plate and top plate of two sides surround longitudinally through U-lag.Prefabricated side walk slab in the present invention is provided with support plate, support plate and top plate surround longitudinally through U-lag, supporting beam need not be poured when site operation again, and cable can be set in U-lag, the workload at the prefabricated scene of capable of being reduced on prefabricated side walk slab of support plate, the construction efficiency at scene is improved, is constructed more convenient.

Description

Prefabricated side walk slab and structure of sidewalk
Technical field
The present invention relates to a kind of prefabricated side walk slab and structure of sidewalk.
Background technique
In recent years, China's few, short time limit of wideling popularize field operation, various consumption and few green of circulation material dosage Color structure, wherein fully-prefabricated assembled structure technology includes design standard, Light-duty Structural, element precast, production plant Change and the construction contents such as assembling, well adapt to current national strategy requirement, fundamentally improve engineering mixed economy and Social benefit and the industrial upgrading for promoting construction industry.
In the work progress of accessory structure of bridge, traditional side walk slab's system such as Authorization Notice No. is A kind of pavement composite structure disclosed in CN105803924B, the Chinese invention patent that authorized announcement date is 2017.09.08, The composite structure includes built-in fitting, gooseneck and precast rc slab, and the prefabricated of mixed passenger and freight railway is arranged in built-in fitting Keep off the tiny fragments of stone, coal, etc. within the walls, the root of gooseneck is fixedly connected with built-in fitting, and the upper surface of the upper surface of gooseneck and prefabricated gear Zha Qiang are the same as flat Face, gooseneck head end top are provided with noise barrier stand column, and precast rc slab is arranged in the upper surface of gooseneck, precast reinforced Concrete slab is divided into vertical branch and transverse branch, and cable trough is formed between vertical branch and noise barrier stand column, transverse branch Upper surface upwardly extends, and the root of transverse branch reserves reinforcing bar outward, which stretches to above prefabricated gear tiny fragments of stone, coal, etc. wall, Casting concrete together when pouring cast-in-place gear tiny fragments of stone, coal, etc. wall above prefabricated gear tiny fragments of stone, coal, etc. wall.The top of vertical branch and setting are in noise barrier stand column On angle steel between be covered with activity powder grinding concrete RPC plate, activity powder grinding concrete RPC plate, that is, side walk slab.The pavement Composite structure uses precast rc slab, but still needs to pour gear Zha Qiang (i.e. supporting beam) to be laid with people above gear tiny fragments of stone, coal, etc. wall Trade plate, and keep off Zha Qiang be it is necessary, gear Zha Qiang also need to surround the cable trough that current supply cable passes through together with side walk slab, by This causes the problems such as site workload is big, construction efficiency is low, sequence of construction is complicated.
Summary of the invention
The purpose of the present invention is to provide a kind of prefabricated side walk slabs, are being laid with to solve existing prefabricated side walk slab When due to needing first cast-in-place supporting beam cause the problem that site workload is big, construction efficiency is low, construction is complicated;Mesh of the invention Also reside in the structure of sidewalk for providing that a kind of site workload is small, construction efficiency is high, easy for construction.
To achieve the above object, the technical solution of prefabricated side walk slab of the invention is:
Prefabricated side walk slab, including the top plate walked for passerby, the support plate being connected to below top plate both lateral sides, two sides Support plate and top plate surround longitudinally through U-lag.
The beneficial effect of prefabricated side walk slab of the invention is: the prefabricated side walk slab in the present invention is provided with support plate, Support plate and top plate surround longitudinally through U-lag, and when site operation need not pour supporting beam again, and can set in U-lag Cable is set, side walk slab is integrally prefabricated side walk slab, i.e. the workload at the prefabricated scene of capable of reducing on top plate of support plate, The construction efficiency at scene is improved, is constructed more convenient.
Further, the support plate bottom is provided with towards the varus portion extended in U-type groove, and varus portion is capable of increasing pre- The area of side walk slab bottom surface processed enhances stability.
Further, the bottom of an at least side support plate is provided with the protrusion outwardly protruded backwards to the varus portion, convex Portion can increase the area of side walk slab bottom surface out, and reinforce the support to top plate.
Further, it is embedded with the guardrail steel plate for installing guardrail on top plate, shield is arranged in when installation on guardrail steel plate Column is simple and convenient.
To achieve the above object, the technical solution of structure of sidewalk of the invention is:
Structure of sidewalk, including side walk slab's paved surface, it is characterised in that: further include being laid on side walk slab's paving along longitudinal direction If at least two prefabricated side walk slabs on face, prefabricated side walk slab includes the top plate walked for passerby, is connected to top plate transverse direction The support plate of down either side, the support plate and top plate of two sides surround longitudinally through U-lag.
The beneficial effect of structure of sidewalk of the invention is: structure of sidewalk uses prefabricated side walk slab in the present invention, Prefabricated side walk slab is provided with support plate, and support plate and top plate surround longitudinally through U-lag, and when site operation need not pour again Supporting beam, and cable can be set in U-lag, the work at the prefabricated scene of capable of being reduced on prefabricated side walk slab of support plate Amount, the construction efficiency at the scene of improving are constructed more convenient.
Further, the support plate bottom is provided with towards the varus portion extended in the U-type groove, varus portion and people's row The support cooperation of guidance tape paved surface, varus portion are capable of increasing the area of prefabricated side walk slab bottom surface, enhance stability.
Further, structure of sidewalk further include transversely be laid in side walk slab's paved surface at least two described in Prefabricated side walk slab is provided with longitudinal wet joint in transverse direction between two neighboring prefabricated side walk slab, and laterally upper two neighboring The opposite support plate bottom of prefabricated side walk slab is provided with the protrusion outwardly protruded backwards to respective varus portion, longitudinal wet The cross section of seam shape with a narrow upper and lower width, protrusion can reduce the amount of pouring of concrete when pouring, in addition protrusion Also it can reinforce the support to top plate, increase the bonded area between side walk slab's paved surface.
Further, the shield for installing guardrail is embedded on the laterally top plate of upper outermost prefabricated side walk slab It is simple and convenient that guardrail is arranged when installation on guardrail steel plate for column steel plate.
Further, structure of sidewalk further include transversely be laid in side walk slab's paved surface at least two described in Prefabricated side walk slab, is provided with longitudinal wet joint in transverse direction between two neighboring prefabricated side walk slab, in side walk slab's paved surface It is fixed with reinforcing bar between the prefabricated side walk slab in two transverse directions, passes through the reinforcing bar energy in longitudinal wet joint and longitudinal wet joint Enough enhance the structural strength on pavement.
Further, the reinforcing bar longitudinally disposed at least two and L-shaped, a line of each reinforcing bar is each attached to people In the plate paved surface of trade, another a line direction it is consistent, keep structural strength everywhere in pavement uniform towards consistent reinforcing bar.
Detailed description of the invention
Fig. 1 is the schematic diagram of the specific embodiment of structure of sidewalk of the invention;
Fig. 2 is the main view of Fig. 1;
Fig. 3 is the top view of Fig. 1;
Fig. 4 is the left view of Fig. 1;
Fig. 5 is prefabricated side walk slab's schematic diagram in outside in Fig. 1;
Fig. 6 is prefabricated side walk slab's schematic diagram of inside in Fig. 1;
Description of symbols: 1, top plate;2, support plate;21, varus portion;22, protrusion;3, reinforcing bar;4, guardrail steel plate;5, Longitudinal wet joint;61, docking groove;62, docking protrusion;7, adhesive mortar;8, pipeline;9, bridge floor cantilever slab;10, hole for hoist.
Specific embodiment
Embodiments of the present invention are described further with reference to the accompanying drawing.
The specific embodiment of structure of sidewalk of the invention, as shown in Figure 1, due to usually requiring constructing in the prior art Cast in situs is used to support the supporting beam of side walk slab, but pours supporting beam at the scene and will cause that site workload is big, work effect Rate is low, construction is complicated.For overcome the deficiencies in the prior art, the present embodiment provides a kind of site workload is small, construction is simple is applied The high-efficient structure of sidewalk of work.Prefabricated side walk slab in the present embodiment is laid on bridge floor cantilever slab 9, and side walk slab is laid with Face is the upper surface of bridge floor cantilever slab 9.
As shown in Figure 1, the prefabricated sidewalk plate structure in the present embodiment includes side walk slab's paved surface and is laid on people's row The prefabricated side walk slab that two rows in guidance tape paved surface are arranged side by side, prefabricated side walk slab include the top plate walked in top for people 1 and lower section support plate 2, support plate 2 is supported top plate 1 in the two sides of top plate 1.Since support plate 2 and top plate 1 are made as in advance Integrally, it no longer needs to pour supporting beam when site operation, reduces workload, improve site operation efficiency, simplify construction Process.In order to keep top plate 1 more stable, one end that support plate 2 is laid with face contact in lower section with side walk slab is provided with varus portion 21, varus portion 21 is capable of increasing the contact area between prefabricated side walk slab and side walk slab's paved surface, makes prefabricated side walk slab It is more stable.Support plate 2 and top plate 1 positioned at two sides constitute inverted U-type groove, being capable of pipeline installation 8 in U-type groove.This reality Apply the extending direction that the longitudinal direction in example is 2 length of support plate, two rows of prefabricated side walk slabs or so lateral arrangement.
As shown in Figures 2 and 3, longitudinal wet is provided between two prefabricated side walk slabs being arranged laterally side by side in the present embodiment Seam 5 arranges the reinforcing bar 3 of a L-type, the reinforcing bar 3 of L-type in longitudinal wet joint 5 at interval of 200mm to 300mm along the longitudinal direction It is embedded in side walk slab's paved surface in longitudinal wet joint 5 vertically on one side, wet seam 5 is prolonged along longitudinal direction in the horizontal direction on one side It stretches.The prefabricated side walk slab of adjacent in transverse direction two can be made to connect by longitudinal wet joint 5 more stable, it will not be in cross It is moved on direction.
As shown in Fig. 2, prefabricated side walk slabs that the difference in the present embodiment is arranged or so are adjacent, in the prefabricated side walk slab in left side Right side support plate 2 on and the Left-side support plate 2 of the prefabricated side walk slab in right side on be provided with backwards to respective varus portion 21 Protrusion 22, two protrusions 22 are oppositely arranged, and 22 section of protrusion is right-angled trapezium shape, and upper bottom is opposite, and bottom is supported or opposed, It is laid with face contact with side walk slab with waist at right angle is gone to the bottom, two protrusions 22 make the shape with a narrow upper and lower width of longitudinal wet joint 5 Shape.The concrete amount that longitudinal wet joint 5 uses is filled when 22 one side of protrusion can reduce site operation;Another aspect energy The contact area of support plate 2 and side walk slab's paved surface, reinforces the support to top plate 1 where enough enhancings.In other embodiments, Support plate setting it is thicker in the case where, protrusion can also be no longer set.
As shown in figure 4, prefabricated side walk slab is provided with docking protrusion 62 at top plate 1 and with other prefabricated side walk slabs' Docking protrusion 62 cooperation docking grooves 61, longitudinally arranged two neighboring prefabricated side walk slab by docking groove 61 with dock it is convex 62 are played to be docked.In construction, docking protrusion 62 is Nian Jie by epoxy resin mortar with docking groove 61, and joint connection in site is convenient and reliable.
As shown in Figure 5 and Figure 6, support plate is increased with the prior art by prefabricated side walk slab in this present embodiment is opposite 2, therefore constant weight is increased, it is also set on top plate 1 for the ease of the prefabricated side walk slab in construction and installation, the present embodiment The hole for hoist 10 of diameter 30mm to 50mm is equipped with for on-site hoisting, there are four hole for hoist 10 is set altogether, top plate 1 is separately positioned on and leans on Nearly four corners.
As shown in figure 5, it is additionally provided with guardrail steel plate 4 in the top surface of prefabricated side walk slab on the outermost side in the present embodiment, Convenient for the installation of sidewalk guardrail, two blocks of guardrail steel plates 4 are provided on every piece of prefabricated side walk slab as needed in the present embodiment.
When construction, the corresponding position first under each prefabricated side walk slab is laid with adhesive mortar 7, longitudinally successively spreads along bridge If prefabricated side walk slab;When installation, loop wheel machine is connected by the hole for hoist 10 on prefabricated side walk slab, after lifting to corresponding position, Hole for hoist 10 is blocked using mortar.Later, the docking protrusion 62 and docking groove between two longitudinally adjacent prefabricated side walk slabs 61 are bonded using epoxy resin mortar, finally use C40 concreting longitudinal wet joint 5 again.Prefabricated pavement in the present embodiment Plate is all made of High Strength Concrete Structures, every piece of prefabricated side walk slab according to thickness in 40mm to 60mm, width along the longitudinal direction For 1000mm to 2500mm, length in transverse direction is 1500mm to 2500mm, and plate is interior without regular reinforcement 3, and it is pre- to reduce factory The complicated processes that reinforcing bar 3 is bound in system, improve the quality of pre-manufactured product.
The present invention uses fully-prefabricated assembled high-strength concrete structure of sidewalk, can be light in batch production standard production, structure Typeization is prefabricated, full prefabricated construction etc., well adapts to current national strategy requirement.Fundamentally improve the mixed economy of engineering With social benefit and promote the industrial upgrading of construction industry.Prefabricated side walk slab can bulk it is prefabricated, every piece of area is big, and factory is pre- Appearance processed is guaranteed, and overall effect is good, and prefabricated components Forming Quality is good, while reducing the maintenance cost in later period, in China Urban construction promotional value with higher.
Support plate in the present embodiment is connected to the end of top plate, and in other embodiments, support plate can also be not provided with In end, it is arranged at position relatively close to the inner portion.In other embodiments, when bridge floor is relatively narrow, a row can also be only set Wider prefabricated side walk slab constitutes pavement;Opposite, it also can be set when bridge floor is wider, in transverse direction multiple prefabricated Side walk slab, such as the prefabricated side walk slab of three rows is set and constitutes pavement, prefabricated people's row is located in the middle in transverse direction at this time Protrusion is provided on guidance tape plate supported on both sides.In other embodiments, when a row is only arranged in pavement in a lateral direction When prefabricated side walk slab, it can according to need setting multiple support plates and top plate preferably supported, i.e., outermost two Support plate is set again in the U-type groove that a support plate and top plate surround.In other embodiments, can also by support plate be arranged compared with Valgus can be no longer arranged in thickness at this time.Pavement in the present embodiment is laid on bridge floor, in other embodiments, can also To be laid on highway, on street or in park.
The specific embodiment of side walk slab of the invention, the tool of side walk slab and above-mentioned structure of sidewalk in the present embodiment Sidewalk plate structure in body embodiment is identical, repeats no more.

Claims (10)

1. prefabricated side walk slab, it is characterised in that: including the top plate walked for passerby, the branch being connected to below top plate both lateral sides Fagging, the support plate and top plate of two sides surround longitudinally through U-lag.
2. prefabricated side walk slab according to claim 1, it is characterised in that: the support plate bottom is provided with towards U-shaped The varus portion extended in slot.
3. prefabricated side walk slab according to claim 2, it is characterised in that: the bottom of an at least side support plate is provided with back The protrusion outwardly protruded to the varus portion.
4. prefabricated side walk slab according to claim 1 or 2 or 3, it is characterised in that: be embedded on top plate for installing shield The guardrail steel plate on column.
5. structure of sidewalk, including side walk slab's paved surface, it is characterised in that: further include being laid on side walk slab's laying along longitudinal direction At least two prefabricated side walk slabs on face, prefabricated side walk slab include the top plate walked for passerby, are connected to top plate lateral two The support plate of side-lower, the support plate and top plate of two sides surround longitudinally through U-lag.
6. structure of sidewalk according to claim 5, it is characterised in that: the support plate bottom is provided with towards the U The varus portion extended in type groove, varus portion and the support cooperation of side walk slab's paved surface.
7. structure of sidewalk according to claim 6, including side walk slab's paved surface, it is characterised in that: structure of sidewalk Including be transversely laid in side walk slab's paved surface at least two described in prefabricated side walk slab, it is two neighboring pre- in transverse direction Longitudinal wet joint is provided between side walk slab processed, and the laterally opposite support plate bottom of upper two neighboring prefabricated side walk slab It is provided with the protrusion outwardly protruded backwards to respective varus portion, the cross section of longitudinal wet joint shape with a narrow upper and lower width.
8. according to structure of sidewalk described in claim 5 or 6 or 7, it is characterised in that: be located at laterally upper outermost prefabricated people The guardrail steel plate for installing guardrail is embedded on the top plate of trade plate.
9. structure of sidewalk according to claim 5 or 6, it is characterised in that: structure of sidewalk includes transversely being laid on In side walk slab's paved surface at least two described in prefabricated side walk slab, set between two neighboring prefabricated side walk slab in transverse direction It is equipped with longitudinal wet joint, is fixed with reinforcing bar between the prefabricated side walk slab in two transverse directions in side walk slab's paved surface.
10. structure of sidewalk according to claim 9, it is characterised in that: the reinforcing bar longitudinally disposed at least two and L-shaped, a line of each reinforcing bar is each attached in side walk slab's paved surface, the direction of another a line is consistent.
CN201811347901.2A 2018-11-13 2018-11-13 Prefabricated side walk slab and structure of sidewalk Pending CN109403173A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811347901.2A CN109403173A (en) 2018-11-13 2018-11-13 Prefabricated side walk slab and structure of sidewalk

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811347901.2A CN109403173A (en) 2018-11-13 2018-11-13 Prefabricated side walk slab and structure of sidewalk

Publications (1)

Publication Number Publication Date
CN109403173A true CN109403173A (en) 2019-03-01

Family

ID=65473171

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811347901.2A Pending CN109403173A (en) 2018-11-13 2018-11-13 Prefabricated side walk slab and structure of sidewalk

Country Status (1)

Country Link
CN (1) CN109403173A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158456A (en) * 2019-06-18 2019-08-23 中冶华天工程技术有限公司 A kind of light-duty base systems and its construction method on bridge floor pavement

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001288706A (en) * 2000-04-06 2001-10-19 Nippon Chuzo Kk Expansion apparatus for sidewalk of bridge
CN201883372U (en) * 2010-11-11 2011-06-29 北京惠诚基业工程技术有限责任公司 Integral sidewalk pedestrian plate
CN102587267A (en) * 2012-04-06 2012-07-18 浙江大学 Tension-fabricated bridge with prestressed hollow-plate-girders and middle transverse partitions and construction method of tension-fabricated bridge with prestressed hollow-plate-girder and middle transverse partitions
CN102844498A (en) * 2010-04-19 2012-12-26 国际机械金属公司 Construction sidewalk for bridge
CN103255720A (en) * 2013-05-28 2013-08-21 桂林理工大学 Method for assembled integral type reinforced concrete slab bridge
CN206308570U (en) * 2016-12-02 2017-07-07 成都建工工业化建筑有限公司 The Prefabricated road installed for city pedestrian guardrail is mated formation plate
CN210031380U (en) * 2018-11-13 2020-02-07 郑州交通建设投资有限公司 Prefabricated sidewalk plate and sidewalk structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001288706A (en) * 2000-04-06 2001-10-19 Nippon Chuzo Kk Expansion apparatus for sidewalk of bridge
CN102844498A (en) * 2010-04-19 2012-12-26 国际机械金属公司 Construction sidewalk for bridge
CN201883372U (en) * 2010-11-11 2011-06-29 北京惠诚基业工程技术有限责任公司 Integral sidewalk pedestrian plate
CN102587267A (en) * 2012-04-06 2012-07-18 浙江大学 Tension-fabricated bridge with prestressed hollow-plate-girders and middle transverse partitions and construction method of tension-fabricated bridge with prestressed hollow-plate-girder and middle transverse partitions
CN103255720A (en) * 2013-05-28 2013-08-21 桂林理工大学 Method for assembled integral type reinforced concrete slab bridge
CN206308570U (en) * 2016-12-02 2017-07-07 成都建工工业化建筑有限公司 The Prefabricated road installed for city pedestrian guardrail is mated formation plate
CN210031380U (en) * 2018-11-13 2020-02-07 郑州交通建设投资有限公司 Prefabricated sidewalk plate and sidewalk structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158456A (en) * 2019-06-18 2019-08-23 中冶华天工程技术有限公司 A kind of light-duty base systems and its construction method on bridge floor pavement

Similar Documents

Publication Publication Date Title
CN102808465B (en) Assembly connecting structure and assembly connecting method of assembled concrete frame and shear wall combination
CN104929034A (en) Small modularized steel-concrete rapid-construction box girder bridge and construction method thereof
CN104088221B (en) A kind of T-shaped plate girder precast segment unit based on steel truss and combined bridge deck
CN108342973A (en) Whole H profile steel-concrete composite beam bridge and construction method across prefabricated installation
KR101245828B1 (en) Construction method of continuously reinforced concrete pavements using reinforcement inducing/fixing equipment
CN102535502B (en) Method for preventing settling and cracking of terrace with large area by utilizing combined prestressing concrete beams at region with soft soil layer
CN110042770A (en) A method of using the original bridge of external prestressing steel Shu Tuokuan in length and breadth
CN106894325A (en) A kind of deck transverse slope adjusts structure and laying method
CN106087711A (en) Antinode work beam-steel concrete top board-external prestressing combines T-shaped simply supported beam
CN107740588A (en) A kind of hoisting transportation method of narrow and small location construction material in city
CN105821764B (en) Non-fragment orbit rigidity adjuster
CN109403173A (en) Prefabricated side walk slab and structure of sidewalk
CN201933395U (en) Beam-arch combined bridge of bridge deck system without middle beams
CN220504158U (en) Mixed frame structure connected by primary connectors
CN113338155A (en) Roadbed for controlling differential settlement of transition section of highway bridge and construction method
CN206722214U (en) Precast beam and the continuous superposed floor of prefabricated PC
CN210031380U (en) Prefabricated sidewalk plate and sidewalk structure
CN105696453B (en) A kind of steel-concrete combination beam
CN216237943U (en) Rural highway cement concrete pavement assembled structure of small traffic
CN205474785U (en) Steel - ultra high performance concrete combination continuous bridge structure
CN105887922B (en) A kind of method that inwall construction is carried out using truss support device
CN210975382U (en) Prefabricated plate rail structure for urban rail transit overhead line
CN210049373U (en) Assembly type I-steel composite floor slab mounting structure
CN209260532U (en) Assembled steel web plate composite box joist steel web and precast slab connecting structure
CN105735084A (en) Road side stone construction method and structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination