CN109377055A - A kind of method and device of business paper adjustment - Google Patents

A kind of method and device of business paper adjustment Download PDF

Info

Publication number
CN109377055A
CN109377055A CN201811253206.XA CN201811253206A CN109377055A CN 109377055 A CN109377055 A CN 109377055A CN 201811253206 A CN201811253206 A CN 201811253206A CN 109377055 A CN109377055 A CN 109377055A
Authority
CN
China
Prior art keywords
feeds intake
material inventory
list
information
difference
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811253206.XA
Other languages
Chinese (zh)
Inventor
吴悠
尹俊波
袁辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kingdee Software China Co Ltd
Original Assignee
Kingdee Software China Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kingdee Software China Co Ltd filed Critical Kingdee Software China Co Ltd
Priority to CN201811253206.XA priority Critical patent/CN109377055A/en
Publication of CN109377055A publication Critical patent/CN109377055A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • G06Q10/0875Itemisation or classification of parts, supplies or services, e.g. bill of materials

Abstract

The embodiment of the present application discloses a kind of method and device of business paper adjustment, for after bill-of-material structure changes, adjust single information that feeds intake, obtain the comparison of bill-of-material structure variation front and back supply/demand, document is adjusted, the automation of business paper modification is realized, covering is comprehensive, to reduce the time used in business reorganization, the efficiency of processing business is improved.The method of the embodiment of the present application includes: the first material inventory and modified second material inventory obtained before modification;The first material inventory and the second material inventory are calculated, the different information that feeds intake is obtained;According to the different information that feeds intake, determine that corresponding first feeds intake list;It according to the different information that feeds intake, adjusts this and first feeds intake list, obtain this and second feed intake list;Compare this first feed intake list and this second feed intake list, generate demand difference information, which is used to indicate the processing of the corresponding second material inventory.

Description

A kind of method and device of business paper adjustment
Technical field
This application involves systems design areas, and in particular to a kind of method and device of business paper adjustment.
Background technique
Production plan is the important component of enterprise operation plan, and planner is needed to make pool peace to production task Row specifically drafts the plan of the kind, quantity, quality and progress of production product.
General process is in present Enterprise Resources Plan (enterprise resource planning, ERP) system Document (sales order or product prediction etc.) calculates material demand plan (material requirement according to demand Planning, MRP) after, it obtains material and needs production, the quantity of buying and time, reach enterprise's material requirement and supply whole Body balance.In production process occur technique or product structure change, such as to bill of materials (bill of material, BOM) increase or delete material, the operation such as modification material unit dose is ordered if any the production task list in system and the buying on way It is single, it needs manual setting quantity and recalculates MRP.
Artificial calculating is fully relied on, needs to modify all feed intake single entry and the quantity for referring to correlative inventory BOM, It only modifies single BOM, considers that the whole equilibrium of supply and demand must also calculate a MRP, in the case where more than the BOM, calculating a MRP can Several hours can be needed, the efficiency of business progress is affected.
Summary of the invention
The embodiment of the present application provides a kind of method and device of business paper adjustment, in bill of materials BOM structure After variation, single information that feeds intake is adjusted, the comparison of supply/demand before and after BOM structure change is obtained, document is adjusted, is reduced Time used in business reorganization improves the efficiency of processing business.
In order to achieve the above objectives, the embodiment of the present application provides the following technical solutions:
The application first aspect provides a kind of method of business paper adjustment, and this method can be applied among ERP system, should The device that the method for business paper adjustment is related in the process of implementation corresponds to corresponding functional entity in ERP system.The party Method may include: the first material inventory BOM and modified 2nd BOM obtained before modification;To the first BOM and this second BOM is calculated, and the different information that feeds intake is obtained;According to the different information that feeds intake, determine that corresponding first feeds intake list;According to the throwing Expect different information, adjust this and first feed intake list, obtains this and second feed intake list;Compare this first feed intake list and this second feed intake list, Demand difference information is generated, which is used to indicate the processing of corresponding second BOM.
Optionally, first material inventory BOM and modification in some application embodiments of the application, before acquisition modification The 2nd BOM afterwards may include: the first material inventory BOM and modified second before obtaining modification in storage difference table BOM includes the more new information of bill of materials in the storage difference table.
Optionally, in some application embodiments of the application, the comparison this first feed intake list and this second feed intake list, it is raw It may include: to obtain this first to feed intake list and second difference for feeding intake the quantity of identical material in list at demand difference information;Root According to the difference of the quantity, demand difference information is generated.
Optionally, in some application embodiments of the application, this method can also include: to increase to the first BOM Add, modify or delete material information, obtains the 2nd BOM.
Optionally, in some application embodiments of the application, the first BOM is carried out adding, modifying or deleting object Expect information, obtain the 2nd BOM, may include: the operation for responding user, generates modification instruction;It is instructed according to the modification, to this First BOM carries out adding, modifying or deleting material information, obtains the 2nd BOM.
The application second aspect provides a kind of device of business paper adjustment, and the device of business paper adjustment, which has, to be realized The function of the method for any one possible implementation of above-mentioned first aspect or first aspect.The function can pass through hardware reality It is existing, corresponding software realization can also be executed by hardware.The hardware or software include one or more opposite with above-mentioned function The module answered.
The third aspect, the embodiment of the present application provide a kind of adjustment device, the adjustment device may include terminal device or The entities such as chip, described device include: input/output (I/O) interface, processor and memory;The memory is for storing Instruction;The processor is used to execute the described instruction in the memory, so that the adjustment device executes such as aforementioned first Method described in any one of aspect.
Fourth aspect, the embodiment of the present application provides a kind of computer readable storage medium, including instruction, when it is in computer When upper operation, so that computer executes the method as described in aforementioned first aspect and any optional implementation.
The computer storage medium include: USB flash disk, mobile hard disk, read-only memory (read-only memory, ROM), with Machine accesses various Jie that can store program code such as memory (random access memory, RAM), magnetic or disk Matter.
5th aspect, this application provides a kind of chip system, which includes processor, for supporting adjustment dress It sets and realizes function involved in above-mentioned aspect, for example, sending or handling data and/or information involved in the above method. In a kind of possible design, the chip system further includes memory, the memory, necessary for saving adjustment device Program instruction and data.The chip system is also possible to apply and executes corresponding function in adjustment device either adjustment device The System on Chip/SoC of energy.
6th aspect, the embodiment of the present application provide a kind of computer program product, when run on a computer, so that Computer executes the method as described in aforementioned first aspect and any optional implementation.
As can be seen from the above technical solutions, the embodiment of the present application has the effect that
First material inventory BOM and modified second of the embodiment of the present application after BOM structure change, before obtaining modification BOM;First BOM and the 2nd BOM are calculated, the different information that feeds intake is obtained;According to the different information that feeds intake, determining pair First answered feeds intake list;It according to the different information that feeds intake, adjusts this and first feeds intake list, obtain this and second feed intake list;Compare this One feed intake list and this second feed intake list, generate demand difference information, which is used to indicate corresponding second BOM's Processing.Compared to calculating document manually one by one, the embodiment of the present application realizes the automation of business paper modification, and covering is comprehensive, To reduce the time used in business reorganization, the efficiency of processing business is improved.
Detailed description of the invention
Fig. 1 is the logic relation picture during material requirement plan in the prior art;
Fig. 2 is a kind of schematic diagram of the method for business paper adjustment provided by the embodiments of the present application;
Fig. 3 is a kind of programmed logic flow chart of the embodiment of the present application;
Fig. 4 is a kind of application scenarios schematic diagram in the embodiment of the present application;
Fig. 5 is a kind of structural schematic diagram of the device of business paper adjustment in the embodiment of the present application;
Fig. 6 is a kind of structural schematic diagram for adjusting device in the embodiment of the present application.
Specific embodiment
With reference to the accompanying drawing, the application embodiment of the application is described, it is clear that described application embodiment is only It is the application embodiment of the application a part, rather than whole application embodiments.Those of ordinary skill in the art it is found that with The development of technology and the appearance of new scene, technical solution provided by the embodiments of the present application are same suitable for similar technical problem With.
The embodiment of the present application provides a kind of method and device of business paper adjustment, in bill of materials BOM structure After variation, single information that feeds intake is adjusted, the comparison of supply/demand before and after BOM structure change is obtained, document is adjusted, is realized The automation of business paper modification, covering comprehensively, to reduce the time used in business reorganization, improve the effect of processing business Rate.
Production plan is the important component of enterprise operation plan, and planner is needed to make pool peace to production task Row specifically drafts the plan of the kind, quantity, quality and progress of production product.General process is according to need in existing ERP system Ask document (sales order or product prediction etc.) calculate material demand plan (material requirement planning, MRP it after), obtains material and needs production, the quantity of buying and time, reach enterprise's material requirement and supply whole machine balancing.MRP Refer to according to the subordinate and quantitative relation of each level article of product structure, be plan object with each article, using the period of completing as when Between benchmark back scheduling, distinguish each article by time in advance length and assign plans the sequencing of time, be a kind of industry manufacture Plan management of materials and quipment mode in enterprise.
As shown in Figure 1, being the logic relation picture during material requirement plan in the prior art, specifically, producing Technique or product structure change occur in journey, for example increases material BOM or delete material, the behaviour such as modification material unit dose Make, if any the production task list in system and the purchase order on way, needs manual setting quantity and recalculate MRP.
Although it should be noted that show 3 lists that feed intake in Fig. 1, it is to be understood that, material composition, the object for feeding intake single Expect that quantity and document quantity should all be determined according to actual scene, specifically herein without limitation.
Prior art is cumbersome, fully relies on artificial calculating, needs modification to refer to all of related BOM and feeds intake Single entry and quantity;And time-consuming, only modifies single BOM, considers that the whole equilibrium of supply and demand must also calculate a MRP, client In the case that material and BOM are more, several hours may be needed by calculating a MRP, affect the efficiency of business progress.
The method that the embodiment of the present application proposes is to solve the problems, such as this, for ease of understanding, below in the embodiment of the present application Detailed process be described, as shown in Fig. 2, being a kind of signal of the method for business paper adjustment provided by the embodiments of the present application Figure, including but not limited to following steps:
201, first material inventory BOM and modified 2nd BOM before modification are obtained;
In the embodiment of the present application, first material inventory and second material inventory are to describe product structure in data format File is the master document of product structure data file and ERP that computer can identify.BOM makes system identification product knot Structure, and the tie of connection and communication enterprise's items business.
In the embodiment of the present application, the modification of first material inventory can be and delete relevant material variety, it can also be with Be increase the quantity of a certain material, such as: first material inventory includes tri- kinds of materials of A, B, C, now increases the quantity of A material 10, C material is deleted, the material collection after change is combined into second material inventory, and concrete condition is determined according to actual scene, it is specific this Place is without limitation.
It should be noted that the modification operation in the embodiment of the present application may be in response to the input of user, journey may also respond to The calculating of sequence adjusts, and concrete condition is determined according to actual scene, specifically herein without limitation.
202, the first BOM and the 2nd BOM are calculated, obtains the different information that feeds intake;
In the embodiment of the present application, calculating the first BOM and the 2nd BOM to be quantitative difference, Such as: the first BOM provides that A material quantity is 10, and the first BOM provides that A material quantity is 30, then the different information that feeds intake is newly-increased A Material (30-10=20);The calculating may be that difference in type divides, such as: the first BOM provide A material quantity be 10, B material quantity is 10, and the 2nd BOM regulation A material quantity is 30, B material quantity is 10 and C material quantity is 5, then feed intake difference Different information is newly-increased A material (30-10=20), increases C material 5 newly;Concrete condition is determined according to actual scene, is not done herein specifically It limits.
It should be noted that the different information that feeds intake can occur to feed intake in scene in generation, it is also possible to demand buying field Jing Zhong, concrete condition is determining according to actual scene, specifically herein without limitation.
203, feed intake different information according to, determines that corresponding first feeds intake list;
In the embodiment of the present application, first, which feeds intake, singly can be material used when putting into a collection of production, and BOM is the list that feeds intake Set, such as: 10 tons of demand A material (A material needs a, b raw material) in BOM, existing b raw material is sufficient, then needs to extract comprising a First feeds intake list, query-relevant data.
It should be noted that BOM and feeding intake and singly can be the relationship of product and raw material, it is also possible to purchase total amount and product The relationship of unit price, concrete condition is determining according to actual scene, specifically herein without limitation.
204, feed intake different information according to, and adjustment described first feeds intake list, obtains described second and feeds intake list;
In the embodiment of the present application, adjustment described first, which feeds intake, singly can be the addition of type, such as: the different information that feeds intake rule Surely newly-increased D product and E product (D product demand d, e raw material;E product demand e, f raw material), it singly includes d, e raw material that first, which feeds intake, Do not have since the f raw material first of E product demand feeds intake singly, then second feeds intake list as d, e, f raw material.
It should be noted that the different information that feeds intake can occur to feed intake in scene in generation, it is also possible to demand buying field Jing Zhong, concrete condition is determining according to actual scene, specifically herein without limitation.
205, comparison described first feeds intake, and single and described second feeds intake list, generates demand difference information;
In the embodiment of the present application, demand difference information can be quantitative difference, or the difference of type, example Such as: first feed intake it is single comprising d raw material quantity be 10, e raw material quantity is 5, second to feed intake single comprising d raw material quantity be 15, e raw material Quantity is 5, f raw material quantity is 5, then it is (15-10=5) that demand difference information, which is d raw material quantity, and f raw material quantity is 5, specifically Situation is determining according to actual scene, specifically herein without limitation.
Due to adjusting single information that feeds intake after bill of materials BOM structure change, supply and demand feelings before and after BOM structure change are obtained The comparison of condition, and then document is adjusted, the automation of business paper modification is realized, covering is comprehensive, to reduce industry The business adjustment time used, improve the efficiency of processing business.
In a kind of specific operation scenario, the embodiment of the present application can be the software program in terminal device, such as Fig. 3 institute Show, is a kind of programmed logic flow chart of the embodiment of the present application.
The method that the embodiment of the present application proposes is to solve the problems, such as this, for ease of understanding, below in the embodiment of the present application Detailed process be described.
Start, obtains the modification signal of BOM;The corresponding information of modification signal of BOM is stored in the difference table of database In, it is called in order to check;The list that feeds intake for referring to BOM is searched, is determined at this time, refers to feeding intake for BOM if it does not exist Single, then EP (end of program) refers to the list that feeds intake of BOM if it exists, then single information that will feed intake is pushed to change platform;Change platform root The difference of production and buying is calculated according to the difference that feeds intake, then a key changes business paper quantity, EP (end of program).
In the embodiment of the present application, the logic of program embody well BOM modification process, through feeding intake single association with And the calculating of production and buying difference, business paper quantity can be changed with a key, i.e. click demand document, provide the change of supply and demand document Quantitative comparison before and after changing double-clicks and directly adjusts document quantity, realizes the automation of business paper modification, and covering is comprehensive, from And reduce the time used in business reorganization, improve the efficiency of processing business.
It adjusts, can also ring it should be noted that the program of above-mentioned application embodiment can be calculated in response to terminal device It should be adjusted in the input data of user, as shown in figure 4, being a kind of application scenarios schematic diagram in the embodiment of the present application, illustrate use The process of the input data adjustment at family.
The embodiment of the present application can be applied in the device of business paper adjustment according to the above method, and to business paper tune Whole device carries out the division of functional module, for example, each functional module of each function division can be corresponded to, it can also be by two Or more than two functions are integrated in a processing module.Above-mentioned integrated module both can take the form of hardware realization, It can also be realized in the form of software function module.It should be noted that being to show to the division of module in the embodiment of the present application Meaning property, only a kind of logical function partition, there may be another division manner in actual implementation.
For example, in the case where to use the integrated each functional unit of model split, as shown in figure 5, being that the application is implemented A kind of structural schematic diagram of the device of business paper adjustment in example.
If Fig. 5 shows, the device 500 of business paper adjustment provided by the embodiments of the present application includes acquiring unit 501, calculates list Member 502, determination unit 503, adjustment unit 504 and generation unit 505.
Acquiring unit 501, for obtaining first material inventory BOM and modified 2nd BOM before modifying;
Computing unit 502 obtains the different information that feeds intake for calculating the first BOM and the 2nd BOM;
Determination unit 503, for according to the different information that feeds intake, determining that corresponding first feeds intake list;
Adjustment unit 504 first feeds intake list for according to the different information that feeds intake, adjusting this, obtains this and second feeds intake list;
Generation unit 505, for compare this first feed intake list and this second feed intake list, generate demand difference information, this is needed Different information is asked to be used to indicate the processing of corresponding second BOM.
Optionally, acquiring unit 501, specifically for the first material inventory BOM before obtaining modification in storage difference table It include the more new information of bill of materials in the storage difference table with modified 2nd BOM.
Optionally, generation unit 505, specifically for obtain this first feed intake list and this second feed intake identical material in list The difference of quantity;The generation unit 505 is specifically used for the difference according to the quantity, generates demand difference information.
Optionally, acquiring unit 501 are also used to carry out adding, modifying or deleting material information to the first BOM, obtain To the 2nd BOM.
Optionally, acquiring unit 501 generate modification instruction specifically for responding the operation of user;The acquiring unit 501, Specifically for according to the modification instruct, the first BOM is carried out adding, modifying or deleting material information, obtain this second BOM。
Wherein, all related contents for each step that above method embodiment is related to can quote corresponding function unit Function description, details are not described herein.
In the present embodiment, the device 500 of business paper adjustment can be using the integrated each functional module of model split Form present.Here " module " can refer to application-specific integrated circuit (application-specific Integrated circuit, ASIC), circuit executes the processor and memory of one or more softwares or firmware program, collection At logic circuit and/or other device of above-mentioned function can be provided.In a simple embodiment, the technology of this field Personnel are contemplated that the device 500 of business paper adjustment can use form shown in fig. 6.
As shown in fig. 6, being a kind of structural schematic diagram for adjusting device in the embodiment of the present application, adjustment device 600 includes: defeated Enter/export (I/O) interface 601, processor 602, memory 603.Specifically, the processor 602 in Fig. 6 can be deposited by calling The computer executed instructions stored in reservoir 603, so that adjustment device 600 executes the realization business sheet in above method embodiment According to the method for adjustment.
Specifically, the acquiring unit 501, computing unit 502, determination unit 503, adjustment unit 504 and generation in Fig. 5 are single Function/realization process of member 505 can call the computer stored in memory 603 execution to refer to by the processor 602 in Fig. 6 It enables to realize.Alternatively, the acquiring unit 501, computing unit 502, determination unit 503, adjustment unit 504 and generation in Fig. 5 are single Function/realization process of member 505 can be realized by input/output (I/O) interface 601 in Fig. 6.
Since adjustment device 600 provided by the embodiments of the present application can be used for executing the method for business paper adjustment, Can be obtained technical effect can refer to above method embodiment, and details are not described herein.
Optionally, the embodiment of the present application provides a kind of chip system, which includes processor, adjusts for supporting The method that engagement positions realize above-mentioned business paper adjustment.In a kind of possible design, which further includes memory.It should Memory, for saving the necessary program instruction of adjustment device and data.The chip system can be made of chip, can also be with Comprising chip and other discrete devices, the embodiment of the present application is not especially limited this.
In the above-described embodiments, can come wholly or partly by software, hardware, firmware or any combination thereof real It is existing.When implemented in software, it can entirely or partly realize in the form of a computer program product.
The computer program product includes one or more computer instructions.Load and execute on computers the meter When calculation machine program instruction, entirely or partly generate according to process or function described in the embodiment of the present application.The computer can To be general purpose computer, special purpose computer, computer network or other programmable devices.The computer instruction can be deposited Storage in a computer-readable storage medium, or from a computer readable storage medium to another computer readable storage medium Transmission, for example, the computer instruction can pass through wired (example from a web-site, computer, server or data center Such as coaxial cable, optical fiber, Digital Subscriber Line (DSL)) or wireless (such as infrared, wireless, microwave) mode to another website Website, computer, server or data center are transmitted.The computer readable storage medium can be computer and can deposit Any usable medium of storage either includes that the data storages such as one or more usable mediums integrated server, data center are set It is standby.The usable medium can be magnetic medium, (for example, floppy disk, hard disk, tape), optical medium (for example, DVD) or partly lead Body medium (such as solid state hard disk solid state disk (SSD)) etc..
The description and claims of this application and term " first " in above-mentioned attached drawing, " second " etc. are for distinguishing Similar object, without being used to describe a particular order or precedence order.It should be understood that the data used in this way are in appropriate feelings It can be interchanged under condition, so that the embodiments described herein can be real with the sequence other than the content for illustrating or describing herein It applies.In addition, term " includes " and " having " and their any deformation, it is intended that cover it is non-exclusive include, for example, packet The process, method, system, product or equipment for having contained series of steps or module those of be not necessarily limited to be clearly listed step or Module, but may include other steps being not clearly listed or intrinsic for these process, methods, product or equipment or Module.Occur in this application to step carry out name perhaps number be not meant to must according to name or number Indicated time/logic sequencing executes the step in method flow, and named or number process step can be with Execution order is changed according to the technical purpose to be realized, as long as identical or similar technical effect can be reached.This Shen Please appeared in module division, be a kind of division in logic, can have other division side when realizing in practical application Formula, such as multiple modules can be combined into or are integrated in another system, or some features can be ignored or not executed, separately Outside, shown or discussion mutual coupling, direct-coupling or communication connection can be through some interfaces, module Between indirect coupling or communication connection can be electrical or other similar form, be not construed as limiting in the application.Also, make It can be the separation that may not be physically for the module or submodule of separate part description, can be and may not be physics Module, or can be distributed in multiple circuit modules, some or all of modules can be selected according to the actual needs To realize the purpose of application scheme.
Those of ordinary skill in the art will appreciate that all or part of the steps in the various methods of above-described embodiment is can It is completed with instructing relevant hardware by program, which can be stored in a computer readable storage medium, storage Medium may include: ROM, RAM, disk or CD etc..
The method, apparatus and system of a kind of adjustment of business paper provided by the embodiment of the present application have been carried out in detail above Thin to introduce, specific examples are used herein to illustrate the principle and implementation manner of the present application, and above embodiments are said It is bright to be merely used to help understand the present processes and its core concept;At the same time, for those skilled in the art, foundation The thought of the application, there will be changes in the specific implementation manner and application range, in conclusion the content of the present specification is not It is interpreted as the limitation to the application.

Claims (10)

1. a kind of method of business paper adjustment characterized by comprising
First material inventory and modified second material inventory before obtaining modification;
The first material inventory and the second material inventory are calculated, the different information that feeds intake is obtained;
According to the different information that feeds intake, determine that corresponding first feeds intake list;
According to the different information that feeds intake, adjustment described first feeds intake list, obtains described second and feeds intake list;
It compares described first and feeds intake that single and described second feeds intake list, generate demand difference information, the demand difference information is used for Indicate the processing of the corresponding second material inventory.
2. the method according to claim 1, wherein after the first material inventory obtained before modifying and modification Second material inventory, comprising:
First material inventory and modified second material inventory before obtaining modification in storage difference table, the storage difference It include the more new information of bill of materials in table.
3. the method according to claim 1, wherein the comparison described first feeds intake and single feeds intake with described second It is single, generate demand difference information, comprising:
Obtain described first feed intake it is single and described second feed intake the quantity of identical material in list difference;
According to the difference of the quantity, demand difference information is generated.
4. method according to claim 1 or 3, which is characterized in that the method also includes:
The first material inventory is carried out adding, modifying or deleting material information, obtains the second material inventory.
5. according to the method described in claim 4, it is characterized in that, the first material inventory is increased, modify or Material information is deleted, the second material inventory is obtained, comprising:
The operation of user is responded, modification instruction is generated;
It is instructed according to the modification, the first material inventory is carried out adding, modifying or deleting material information, obtained described Second material inventory.
6. a kind of device of business paper adjustment characterized by comprising
Acquiring unit, for obtaining first material inventory and modified second material inventory before modifying;
Computing unit obtains the difference letter that feeds intake for calculating the first material inventory and the second material inventory Breath;
Determination unit determines that corresponding first feeds intake list for the different information that feeds intake according to;
Adjustment unit, for the different information that feeds intake according to, adjustment described first feeds intake list, obtains described second and feeds intake list;
Generation unit feeds intake that single and described second feeds intake list for comparing described first, generates demand difference information, the demand Different information is used to indicate the processing of the corresponding second material inventory.
7. device according to claim 6, which is characterized in that
The acquiring unit, specifically for the first material inventory and modified second before obtaining modification in storage difference table Bill of materials, the more new information stored in difference table including bill of materials.
8. device according to claim 6, which is characterized in that
The generation unit, specifically for obtain described first feed intake it is single and described second feed intake identical material in list quantity it Difference;
The generation unit is specifically used for the difference according to the quantity, generates demand difference information.
9. a kind of adjustment device, which is characterized in that the adjustment device includes: input/output (I/O) interface, processor and deposits Reservoir is stored with program instruction in the memory;
The processor executes method a method as claimed in any one of claims 1 to 5 for executing the program instruction stored in memory.
10. a kind of computer readable storage medium, including instruction, which is characterized in that when described instruction is transported on a computing device When row, so that the computer equipment executes method according to any one of claims 1 to 5.
CN201811253206.XA 2018-10-25 2018-10-25 A kind of method and device of business paper adjustment Pending CN109377055A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811253206.XA CN109377055A (en) 2018-10-25 2018-10-25 A kind of method and device of business paper adjustment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811253206.XA CN109377055A (en) 2018-10-25 2018-10-25 A kind of method and device of business paper adjustment

Publications (1)

Publication Number Publication Date
CN109377055A true CN109377055A (en) 2019-02-22

Family

ID=65401510

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811253206.XA Pending CN109377055A (en) 2018-10-25 2018-10-25 A kind of method and device of business paper adjustment

Country Status (1)

Country Link
CN (1) CN109377055A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110321512A (en) * 2019-06-03 2019-10-11 平安科技(深圳)有限公司 Product dissemination method, device, computer equipment and storage medium
CN111080148A (en) * 2019-12-20 2020-04-28 Oppo(重庆)智能科技有限公司 Net value calculation method and device of ERP system, electronic equipment and storage medium
CN111401814A (en) * 2020-03-25 2020-07-10 Oppo(重庆)智能科技有限公司 Data processing method and device, electronic equipment and computer readable medium
CN112464317A (en) * 2020-11-23 2021-03-09 金蝶云科技有限公司 Drawing modification method, product management system and computer storage medium
CN112862399A (en) * 2021-02-06 2021-05-28 深圳市智莱科技股份有限公司 Method, device and equipment for changing material list table and storage medium
CN113177382A (en) * 2021-04-28 2021-07-27 百富计算机技术(深圳)有限公司 Product and circuit board design method and device thereof, computing equipment and storage medium
CN113610492A (en) * 2021-07-22 2021-11-05 江苏金小满信息科技有限公司 Engineering material counter-flow process management system
CN114358799A (en) * 2021-12-24 2022-04-15 苏州浪潮智能科技有限公司 Hardware information management method and device, electronic equipment and storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102354316A (en) * 2011-09-22 2012-02-15 用友软件股份有限公司 Data updating device and data updating method
CN104281902A (en) * 2013-07-05 2015-01-14 航天信息软件技术有限公司 Material requirement suggestion making method
CN107465757A (en) * 2017-08-24 2017-12-12 金蝶软件(中国)有限公司 The processing method and related service system of a kind of document

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102354316A (en) * 2011-09-22 2012-02-15 用友软件股份有限公司 Data updating device and data updating method
CN104281902A (en) * 2013-07-05 2015-01-14 航天信息软件技术有限公司 Material requirement suggestion making method
CN107465757A (en) * 2017-08-24 2017-12-12 金蝶软件(中国)有限公司 The processing method and related service system of a kind of document

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110321512A (en) * 2019-06-03 2019-10-11 平安科技(深圳)有限公司 Product dissemination method, device, computer equipment and storage medium
CN111080148A (en) * 2019-12-20 2020-04-28 Oppo(重庆)智能科技有限公司 Net value calculation method and device of ERP system, electronic equipment and storage medium
CN111401814A (en) * 2020-03-25 2020-07-10 Oppo(重庆)智能科技有限公司 Data processing method and device, electronic equipment and computer readable medium
CN111401814B (en) * 2020-03-25 2024-01-12 Oppo(重庆)智能科技有限公司 Data processing method, device, electronic equipment and computer readable medium
CN112464317A (en) * 2020-11-23 2021-03-09 金蝶云科技有限公司 Drawing modification method, product management system and computer storage medium
CN112862399A (en) * 2021-02-06 2021-05-28 深圳市智莱科技股份有限公司 Method, device and equipment for changing material list table and storage medium
CN113177382A (en) * 2021-04-28 2021-07-27 百富计算机技术(深圳)有限公司 Product and circuit board design method and device thereof, computing equipment and storage medium
CN113177382B (en) * 2021-04-28 2024-01-26 百富计算机技术(深圳)有限公司 Product, circuit board design method and device thereof, computing equipment and storage medium
CN113610492A (en) * 2021-07-22 2021-11-05 江苏金小满信息科技有限公司 Engineering material counter-flow process management system
CN114358799A (en) * 2021-12-24 2022-04-15 苏州浪潮智能科技有限公司 Hardware information management method and device, electronic equipment and storage medium
CN114358799B (en) * 2021-12-24 2024-01-19 苏州浪潮智能科技有限公司 Hardware information management method and device, electronic equipment and storage medium

Similar Documents

Publication Publication Date Title
CN109377055A (en) A kind of method and device of business paper adjustment
US11847103B2 (en) Data migration using customizable database consolidation rules
US20200104377A1 (en) Rules Based Scheduling and Migration of Databases Using Complexity and Weight
EP3025456B1 (en) Service provider network migration
US20200104375A1 (en) Data Migration Using Source Classification and Mapping
EP3772687B1 (en) System and methods for optimal allocation of multi-tenant platform infrastructure resources
US11915175B2 (en) System and method for allocating manufactured products to sellers using profitable order promising
US9892467B2 (en) System and method for implementing charge centric billing
CN110276571A (en) Cargo dispatching method and device and computer readable storage medium
US20110167034A1 (en) System and method for metric based allocation of costs
CN104813285A (en) Binding of application and infrastructure blueprints
CN107274231A (en) Data predication method and device
WO2022237667A1 (en) Method and apparatus for determining order fulfillment warehouse
US11087255B2 (en) System and methods for fulfilling an order by determining an optimal set of sources and resources
US20170236082A1 (en) System and methods for real time display of supply chain and data processing of related tasks and events
US11816613B2 (en) System and method for adaptive and dynamic pricing of self-storage storage units
KR101868993B1 (en) System, method and computer program for work management to manufacture printed circuit board
CN107844936A (en) Variation, device, terminal and the computer-readable recording medium of BOM
US20150032506A1 (en) Demand forecast segmentation apparatus and method, apparatus and method for adjusting demand forecast and recording medium recording program thereof
US10963963B2 (en) Rule based hierarchical configuration
US20170236221A1 (en) System and methods for visualization of supply chain and data processing of related tasks and events
CN111985862A (en) Method and apparatus for locating inventory items
CN107943542A (en) A kind of configuration information management method, device, computer-readable recording medium and storage control
CN106779439A (en) A kind of task distribution method and device
CN109636262A (en) A kind of order processing method, apparatus, system, computer equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190222