CN109373441A - Heat supply network energy management system and its processing method - Google Patents

Heat supply network energy management system and its processing method Download PDF

Info

Publication number
CN109373441A
CN109373441A CN201811565741.9A CN201811565741A CN109373441A CN 109373441 A CN109373441 A CN 109373441A CN 201811565741 A CN201811565741 A CN 201811565741A CN 109373441 A CN109373441 A CN 109373441A
Authority
CN
China
Prior art keywords
data
temperature
heat
control device
plc control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811565741.9A
Other languages
Chinese (zh)
Inventor
张曙光
王兆彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Prayson Energy Technology (beijing) Ltd By Share Ltd
Original Assignee
Prayson Energy Technology (beijing) Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Prayson Energy Technology (beijing) Ltd By Share Ltd filed Critical Prayson Energy Technology (beijing) Ltd By Share Ltd
Priority to CN201811565741.9A priority Critical patent/CN109373441A/en
Publication of CN109373441A publication Critical patent/CN109373441A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • F24D19/1006Arrangement or mounting of control or safety devices for water heating systems
    • F24D19/1009Arrangement or mounting of control or safety devices for water heating systems for central heating
    • F24D19/1048Counting of energy consumption

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

The present invention provides a kind of heat supply network energy management system and its processing method, comprising: the PLC control device of multiple user side heat exchange stations, Power Plant Side Gateway Station in Heating Network DCS, data collection system, data processing system and data intelligent management system;Each measuring point in heat exchange station where every PLC control device is separately connected the PLC control device, data collection system connects all PLC control device and Power Plant Side Gateway Station in Heating Network DCS, data processing system connects data collection system, is handled according to the received data of data collection system;Data intelligence management system connects data processing system, according to the processing result of data processing system, obtains and optimizes and revises result for optimize and revise the primary net of each heat exchange station and/or the flow of secondary network, water supply and return water temperature.Above system can realize thermodynamic equilibrium, hydraulic equilibrium and the distribution according to need with heat, so that the energy maximally utilizes, and reduce the loss of energy source process.

Description

Heat supply network energy management system and its processing method
Technical field
The present invention relates to energy management technology, especially a kind of heat supply network energy management system and its processing method.
Background technique
With the development of the city and urbanization rate improves, urban population increases, the rapid expansion of city heat supply area and scale Greatly, heat supply control lag is serious, and energy supply system energy consumption is high, and the control difficulty of heating system increases, manages not in place, pipe network There are the imbalance of waterpower and thermal drying, water circulating pump is in the small temperature difference operating status of big flow, can not utilize existing data pair The real-time optimization of heating system combustion adjustment and parameter, heat is uneven, and energy consumption is serious, and heating effect is difficult to ensure, is unfavorable for The energy-saving run of heating system is unable to reach effective control in real time and energy conservation;User side heat exchange station service life factor simultaneously, Equipment performance is caused to reduce.The significant wastage for causing the energy influences the quality of heat user.It is not suitable with the development of energy-saving and emission-reduction.
Existing Prevention in Control System of Heating Net only adjusts water and temperature by heat source side, by adjusting the heat exchange of user side user side Temperature control door of standing adjusts waterpower and thermodynamic equilibrium.
The management of existing Prevention in Control System of Heating Net is not in place, and pipe network is there are the imbalance of waterpower and thermal drying, at water circulating pump It, can not be using existing data to the real-time optimization of heating system combustion adjustment and parameter, heat in the small temperature difference operating status of big flow Amount is uneven, and energy consumption is serious, and heating effect is difficult to ensure, is unfavorable for the energy-saving run of heating system, is unable to reach effective reality When control and energy conservation.
Summary of the invention
For the problems of the prior art, the present invention provides a kind of heat supply network energy management system and its processing method, to Guarantee thermodynamic equilibrium, hydraulic equilibrium, distribution according to need heat, realizes and intelligent control is carried out to the heating demand of heat supply network.
In a first aspect, the present invention provides a kind of heat supply network energy management system, comprising:
The PLC control device of multiple user side heat exchange stations, Power Plant Side Gateway Station in Heating Network DCS, data collection system, data processing System and data intelligent management system;
Each environment temperature measuring point in heat exchange station where wherein, every PLC control device is separately connected PLC control device, Heat user temperature point, a net side temperature and pressure-measuring-point, and/or secondary net side temperature and pressure-measuring-point, every PLC control Device is used to receive the measurement data of each measuring point of connection;
The data collection system connects all PLC control device and Power Plant Side Gateway Station in Heating Network DCS, each for receiving The measurement data of measurement data and Power Plant Side Gateway Station in Heating Network the DCS input for the affiliated heat exchange station that a PLC control device obtains;
The data processing system connects the data collection system, and according to the received all data of data collection system It is handled, obtains processing result;
The data intelligence management system connects the data processing system, and the processing according to the data processing system As a result, obtaining for optimizing and revising the primary net of each heat exchange station and/or flow, water supply and/or the return water temperature of secondary network Optimize and revise result;
The data intelligence management system connects each PLC control device, optimizes and revises knot to the transmission of PLC control device Fruit, the PLC control device according to optimize and revise primary net and/or secondary network where result adjustment in heat exchange station flow, Water supply and return water temperature.
Optionally, the data collection system and each PLC control device are carried out based on modbus+RTU communications protocol Data transmission;
The data intelligence management system and each PLC control device are based on modbus+RTU communications protocol and carry out data Transmission;
The PLC control device has DTU transmission unit;
The data intelligence management system has DTU transmission unit.
Optionally, the PLC control device is located in heat exchange station control room belonging to the PLC control device;
It is first that the data collection system, data processing system and the data intelligence management system are respectively positioned on Power Plant Side heat supply network It stands in control room.
Optionally, the measurement data of the Power Plant Side Gateway Station in Heating Network DCS input includes:
Temperature, the pressure of Power Plant Side heat exchangers for district heating of the heat exchangers for district heating of the temperature point detection of Power Plant Side heat exchangers for district heating The pressure value of the heat exchangers for district heating of power measuring point detection, the heat pump measurement frequency of primary net water circulating pump measuring point measurement, heat supply network return water On trunk pipeline first flowmeter measurement flow, and/or, the real-time heating demand information of Power Plant Side;
Wherein, the real-time heating demand information of the Power Plant Side is according to temperature, the pressure in the measurement data of Power Plant Side The information that value and flow rate calculation obtain.
Optionally, the measurement data of each heat exchange station of each PLC control device input includes:
The temperature data of the temperature data of the temperature point of heat user, primary net return water temperature measuring point, primary net is for water temperature Spend the temperature data of measuring point, the pressure data of primary net pressure of return water measuring point, the pressure data of primary net pressure of supply water measuring point, two The temperature data of secondary net return water temperature measuring point, the temperature data of secondary network supply water temperature measuring point, secondary network pressure of return water measuring point Heat pump frequency measurement data, the user side of pressure data, the pressure data of secondary network pressure of supply water measuring point, secondary network water circulating pump The temperature data of heat exchange temperature measuring point and the pressure data of pressure-measuring-point;
Environment temperature according to the environment temperature measuring point detection being mounted on outside user side regenerator volume.
Optionally, each PLC control device includes warning device;
There are at least one exceeded data in the measurement data for determining received each measuring point for the PLC control device When, alarm signal is issued by the warning device;
Alternatively, PLC control device receives heat exchange where the PLC control device that the data intelligence management system determines When the warning message stood, alarm signal is issued by the warning device.
Second aspect, the embodiment of the present invention also provide a kind of place based on heat supply network energy management system described in first aspect Reason method, comprising:
The data processing system is calculated according to the received all measurement data of data collection system, obtains primary net Predict the prediction heating demand curve of heating demand curve and secondary network, and
The data processing system is according to all measurement data, the facility information once netted and secondary network that pre-enter Facility information, obtain the thermal loss information of thermal loss information and secondary network once netted;
It is supply water temperature that the data processing system is once netted according to the prediction heating demand curve acquisition once netted, primary Net water supply flow, and the supply water temperature of the prediction heating demand curve acquisition secondary network according to secondary network;
The data intelligence management system is according to the prediction heat supply for predicting heating demand curve, secondary network once netted The real-time heating demand information of load curve and the received Power Plant Side of data collection system is compared, and is obtained for optimizing Adjust the primary net of each heat exchange station and/or the flow of secondary network, water supply and return water temperature optimizes and revises result.
Optionally, the result of optimizing and revising includes:
Secondary network supply water temperature adjusted, primary net water supply flow adjusted, and/or, it is adjusted primary to net back Coolant-temperature gage.
Optionally, the facility information once netted includes:
Elevation, buried depth, pipe material, pipeline wall thickness, the pipe heat-transfer coefficient, heat preservation material, insulation thickness once netted, And/or the coefficient of heat conduction of heat preservation material.
The invention has the benefit that
Firstly, passing through the temperature that acquires primary net, secondary network, heat exchange station and heat user, pressure, flow, water circulating pump The data such as frequency are analyzed, comparison is handled, and are classified to a large amount of data, carry out temperature-compensating in conjunction with weather condition data And correction, the thermic load data of heat user are targetedly obtained after analysis, can accurately be fitted the unit time for obtaining heat user With heating curve, the abnormal alarm of energy consumption is provided, abnormal energy consumption is effectively managed, is dispatched according to monitoring center, adjustment one Secondary heat supply network flow and return water temperature guarantee thermodynamic equilibrium, hydraulic equilibrium, by the distribution according to need with heat, to realize to heat supply network Heating demand carries out intelligent control, accomplishes that the energy maximally utilizes, reduces the loss of the energy.Hot press exhaust steam residual heat is introduced simultaneously Recovery system is recycled, the energy utilization rate of power plant is improved.
Heat supply network and heat exchange station, outdoor temperature and room temperature are monitored automatically secondly, can also realize.
Detailed description of the invention
Fig. 1 is the schematic diagram for the heat supply network energy management system that one embodiment of the invention provides;
Fig. 2 is the distribution schematic diagram of each measuring point for the PLC control device connection that one embodiment of the invention provides.
Appended drawing reference:
Heat supply network return water trunk pipeline C1;
Heat supply network water supply trunk pipeline C2;
Steam power plant heating steam bleeding system D1;
Hot press exhaust steam residual heat recovery system D2;
Steam power plant steam exhaust exhauster system D3;
Data collection system 1, data processing system 2, data intelligence management system 3;
Heat user side ring border temperature point 11,12, heat supply network side temperature of heat user temperature point and pressure-measuring-point 13, two Secondary heat supply network side temperature and pressure-measuring-point 14, secondary network water circulating pump 15, temperature control door 16, user side heat exchange temperature and pressure-measuring-point 17, the frequency measuring point 22 of user side heat exchange station 18, flowmeter 19, Power Plant Side temperature and pressure-measuring-point 21, primary net water circulating pump.
Specific embodiment
In order to preferably explain the present invention, in order to understand, with reference to the accompanying drawing, by specific embodiment, to this hair It is bright to be described in detail.
Embodiment 1
As shown in Figure 1, the present embodiment provides a kind of heat supply network energy management systems, comprising:
The PLC control device of multiple user side heat exchange stations, Power Plant Side Gateway Station in Heating Network DCS, data collection system 1, at data Reason system 2 and data intelligent management system 3;
Each environment temperature measuring point in heat exchange station where wherein, every PLC control device is separately connected PLC control device, Heat user temperature point, a net side temperature and pressure-measuring-point, and/or secondary net side temperature and pressure-measuring-point, every PLC control Device is used to receive the measurement data of each measuring point of connection;
The data collection system 1 connects all PLC control device and Power Plant Side Gateway Station in Heating Network DCS, every for receiving The measurement data of measurement data and Power Plant Side Gateway Station in Heating Network the DCS input for the affiliated heat exchange station that one PLC control device obtains;
The data processing system 2 connects the data collection system, and according to the received all numbers of data collection system According to being handled, processing result is obtained;
The data intelligence management system 3 connects the data processing system, and the place according to the data processing system Reason is as a result, obtain for optimizing and revising the primary net of each heat exchange station and/or the flow of secondary network, water supply and/or return water temperature Degree optimizes and revises result;
The data intelligence management system 3 connects each PLC control device, optimizes and revises to the transmission of PLC control device As a result, the PLC control device according to optimize and revise result control respective temperature control door realize primary net in exchange heat stations and/ Or the adjusting of the flow of secondary network, water supply and return water temperature.
In the present embodiment, data collection system 1 and each PLC control device are carried out based on modbus+RTU communications protocol Data transmission;
The data intelligence management system 3 is based on modbus+RTU communications protocol with each PLC control device and is counted According to transmission.
It should be understood that Modbus agreement is applied to a kind of all-purpose language on electronic controller.Configuring each control When device processed, all devices based on Modbus agreement must all select identical transmission mode and serial ports parameter.
PLC control device in the present embodiment can have DTU transmission unit;The data intelligence management system can have DTU (Data Transfer unit) transmission unit.
In the present embodiment, DTU (Data Transfer unit) transmission unit is used exclusively for converting serial data Serial data is converted to for IP data or by IP data.
In practical applications, above-mentioned arbitrary PLC control device is respectively positioned on heat exchange station control room belonging to PLC control device It is interior;Data collection system 1, data processing system and the data intelligence management system are respectively positioned on Power Plant Side Gateway Station in Heating Network control room It is interior.
In the present embodiment, the measurement data of Power Plant Side Gateway Station in Heating Network DCS input can include:
Temperature, the pressure of Power Plant Side heat exchangers for district heating of the heat exchangers for district heating of the temperature point detection of Power Plant Side heat exchangers for district heating The pressure value of the heat exchangers for district heating of power measuring point detection, the heat pump measurement frequency of primary net water circulating pump measuring point measurement, heat supply network return water On trunk pipeline first flowmeter measurement flow, and/or, the real-time heating demand information of Power Plant Side;
Wherein, the real-time heating demand information of the Power Plant Side is according to temperature, the pressure in the measurement data of Power Plant Side The information that value and flow rate calculation obtain.For example, the measurement data of Power Plant Side is inputted in preparatory software for calculation, power plant is exported The real-time heating demand information of side.
Further, the measurement data of each heat exchange station of each PLC control device input includes: the temperature of heat user Spend the temperature data of measuring point, the temperature data of primary net return water temperature measuring point, the temperature data of primary net supply water temperature measuring point, one The pressure data of secondary net pressure of return water measuring point, the pressure data of primary net pressure of supply water measuring point, secondary network return water temperature measuring point Temperature data, the temperature data of secondary network supply water temperature measuring point, the pressure data of secondary network pressure of return water measuring point, secondary network supply water The pressure data of pressure-measuring-point, the heat pump frequency measurement data of the pump discharge pressure measuring point of secondary network water circulating pump, temperature control door are surveyed Measurement data, the temperature data of user side heat exchange temperature measuring point and the pressure data of pressure-measuring-point of point;As shown in Figure 1.
In addition, the measurement data of each heat exchange station of above-mentioned PLC control device input further include: foundation is mounted on user The environment temperature of environment temperature measuring point detection outside the regenerator volume of side.
Optionally, in a particular application, above-mentioned PLC control device can also also obtain secondary net side moisturizing in heat exchange station Each data of case, for example, the data of transmitter, the data of refill flow meter, the data of small pump converter plant, moisturizing adjusting door Data etc..
If heat exchange station uses the water supply tank of secondary net side, the tune of self-regulating water tank liquid level and small pump may be implemented Section, realization is increasingly automated, without human intervention.
In addition, in practical applications, each PLC control device may include warning device, in PLC control device in determination There are when at least one exceeded data in the measurement data of received each measuring point, alarm signal is issued by the warning device Number;
Alternatively, PLC control device receives heat exchange where the PLC control device that the data intelligence management system determines When the warning message stood, alarm signal is issued by the warning device.
In the present embodiment, outdoor temperature sensor, user indoor temperature sensor are connected to data collection system, and data are adopted The signal of collecting system output is connected to data processing system, calculates influence of the outdoor temperature change to heat supply, and pass through data intelligence Energy management system is predicted and is compensated to primary net and secondary network supply water temperature.
For example, confession of the data collection system for a heat supply network for each PLC control device of real-time reception transmission Coolant-temperature gage, return water temperature, water supply flow, circling water flow rate, pressure of supply water and pressure of return water, each secondary heat supply network of user side heat exchange station The real-time thermic load data such as supply water temperature, return water temperature, water supply flow, circling water flow rate, pressure of supply water and pressure of return water.
Data processing system can intend the real-time thermic load data of data collection system input and the weather condition data Close the prediction thermic load curve for obtaining the heat user;Data intelligence management system is according to the prediction thermic load curve to described The real-time heating demand of heat supply network carries out intelligent control.It specifically, can be negative according to the predicted real-time heat supply of heating demand curve acquisition The predicted value of lotus;After the predicted value of the real-time heating demand is compared with currently practical heating demand, automatic tracing and Adjust the practical heating demand of heat supply network.
In addition, data processing system is also used to predict that heating demand is compared with practical heating demand, according to described Heat transfer coefficient, water, caliber, pressure of supply water and the temperature computation of the heating network of heat supply network obtain thermal losses (such as pipe network Dispersed heat), the correction heating demand of heat supply network is obtained after the prediction heating demand is added with a pipe network thermal losses;
It will be appreciated that in the present embodiment, in above-mentioned heat supply network energy management system data intelligence management system can The water supply flow that a heat supply network is adjusted according to the prediction heating demand perhaps adjusts the return water temperature an of heat supply network or adjusts Rectification flow and temperature;It calculates and obtains after primary net return water temperature is added up lower than the heating demand of the heat user secondary network of predicted value The supply water temperature of secondary network optimization, and supply water temperature is optimized according to the secondary network and calculates the flow value adjustment heat supply network obtained A heat supply network water supply flow or return water temperature.Further, according to the secondary heat supply network supply and return water temperature of the reality and prediction Secondary heat supply network supply and return water temperature calculation processing second heat network optimization supply and return water temperature, and the temperature adjustment after being optimized according to secondary network The water supply flow or return water temperature once netted.
In the present embodiment, while guaranteeing heat supply network water, operating condition is optimized and revised, adjusts the return water temperature an of heat supply network Degree.The advantageous utilization rate for improving exhaust steam residual heat.
Embodiment 2
The present embodiment provides a kind of processing method of 1 heat supply network energy management system based on the above embodiment, method includes Following steps:
Step S1, data processing system is calculated according to the received all measurement data of data collection system, obtains one The prediction heating demand curve of prediction the heating demand curve and secondary network of secondary net, and
Step S2, data processing system is according to all measurement data, the facility information once netted and two pre-entered The facility information of secondary net obtains the thermal loss information of the thermal loss information and secondary network once netted.
For example, the facility information once netted includes: the elevation once netted, buried depth, pipe material, pipeline wall thickness, pipe Road heat transfer coefficient, heat preservation material, insulation thickness, and/or the coefficient of heat conduction of heat preservation material.
Supply water temperature that step S3, data processing system is once netted according to the prediction heating demand curve acquisition once netted, Primary net water supply flow, and the supply water temperature of the prediction heating demand curve acquisition secondary network according to secondary network;
Step S4, data intelligence management system is according to the prediction for predicting heating demand curve, secondary network once netted The real-time heating demand information of heating demand curve and the received Power Plant Side of data collection system is compared, and acquisition is used for That optimizes and revises the primary net of each heat exchange station and/or the flow of secondary network, water supply and return water temperature optimizes and revises result.
Result is optimized and revised in the present embodiment can include: secondary network supply water temperature adjusted, primary net adjusted Water supply flow, and/or, primary net return water temperature adjusted.
In the present embodiment, by the temperature, pressure, flow, the circulation that acquire primary net, secondary network, heat exchange station and heat user The data such as the frequency of water pump are analyzed, comparison is handled, and are classified to a large amount of data, carry out temperature in conjunction with weather condition data Degree compensation and correction targetedly obtain the thermic load data of heat user, can accurately be fitted the list for obtaining heat user after analysis Position time heating curve, provides the abnormal alarm of energy consumption, is effectively managed abnormal energy consumption, dispatched according to monitoring center, A heat supply network flow and return water temperature are adjusted, guarantees thermodynamic equilibrium, hydraulic equilibrium, by the distribution according to need with heat, thus realization pair The heating demand of heat supply network carries out intelligent control, accomplishes that the energy maximally utilizes, reduces the loss of the energy.It is weary to introduce hot press simultaneously Vapour waste heat recycles recovery system, improves the energy utilization rate of power plant.
It can also be realized in the present embodiment and heat supply network and heat exchange station, outdoor temperature and room temperature are monitored automatically.
Embodiment 3
As shown in Fig. 2, each measuring point that the PLC control device of the user side heat exchange station 18 of the present embodiment includes includes: ring Border temperature point 11,12, heat supply network side temperature of heat user temperature point and pressure-measuring-point 13 (temperature that supplies water such as primary net and The temperature and pressure-measuring-point of pressure-measuring-point, primary net return water), (such as secondary network supplies water for second heat net side temperature and pressure-measuring-point 14 Temperature and pressure-measuring-point, the temperature of secondary network return water and pressure-measuring-point), secondary network water circulating pump 15, user side heat exchanger temperature Degree and pressure-measuring-point 17.
The measuring point of heating plant side data (i.e. steam power plant's Gateway Station in Heating Network) can include: Power Plant Side temperature and pressure-measuring-point 21 are (such as Temperature and pressure-measuring-point, the temperature and pressure-measuring-point of return water trunk pipeline of water supply trunk pipeline), the frequency of primary net water circulating pump Rate measuring point 22, flowmeter 19.
Power Plant Side Gateway Station in Heating Network control room in the present embodiment is provided with data collection system 1, data processing system 2, number According to intelligent management system 3.
One PLC control device is set in each each secondary heat exchange station control room, which can wired or nothing Each measuring point where line mode connects it in heat exchange station for receiving the data of each measuring point in affiliated heat exchange station, and will be adopted The data of collection can be input to wirelessly in data collection system 1.
It illustrates, each heat exchange station controls indoor PLC control device and is also connected with secondary net side circulating pump change Frequency device, to acquire the frequency values of the circulating pump frequency converter.
Environment temperature measuring point 11 is installed outside user side regenerator volume, and environment temperature measuring point 11 connects PLC control device, ring The data of border temperature point can be compensated and be corrected to secondary heat supply network supply water temperature in subsequent calculation processing;I.e. at data The corresponding environment temperature of required thermic load is pre-entered according to environment temperature amendment in the subsequent calculation processing of reason system 2.
In a particular application, the PLC control device of any heat exchange station is also connected with heat exchange station second heat net side water supply tank, example Such as, water supply tank transmitter, refill flow meter, small pump converter plant, each data that moisturizing adjusts door send PLC control dress It sets.
Data processing system 2 is fitted according to the data provided with data collection system, calculates prediction heating demand Curve, the prediction heating demand curve such as once netted, the prediction heating demand curve of secondary network.Above-mentioned fitting, which can illustrate, to be come It says, such as 5 DEG C of environment temperature, 40W/ ㎡ is met according to local environment design, it is assumed that 200 ㎡ of area of heat-supply service can go out institute with theoretical calculation Thermic load needed for needing primary net and secondary network.
Data processing system 2 inputs the elevation of once heat supply network, buried depth, and pipe material, pipeline wall thickness and heat transfer coefficient are protected Warm material, thickness and the coefficient of heat conduction calculate the thermal loss for obtaining pipe network by data processing system;
The real-time heating demand of prediction that data processing system 2 is supplied to data intelligence management system includes secondary heat supply network load And pipe network thermal loss;
Data processing system 2 calculates the most unfavorable processing condition point in a heat supply network and (such as meets user's distalmost end according to a heat supply network Thermal load demands), water supply flow and temperature to heat supply network optimize and (can such as reserve surplus capacity, guarantee primary net and two Secondary net flow, temperature);That is, being supplied to and being changed by data intelligence management system after being handled by data processing system 2 The information of the PLC control device of heat stations, to increase thermal load demands information.
Data processing system 2 calculates secondary network supply water temperature according to prediction heating demand;
Heat supply of the prediction heating demand curve that data intelligence management system 3 is provided according to data processing system 2 to heat supply network Load carries out intelligent control, and control signal is connected to each user side heat exchange station PLC control device.Intelligent control at this can illustrate Illustrate: such as 5 DEG C of environment temperature, 40W/ ㎡ being met according to local environment design, it is assumed that 200 ㎡ of area of heat-supply service can be gone out with theoretical calculation Thermic load needed for required primary net and secondary network, when heating network operation, (primary net is for water temperature for thermic load offer heat according to expectation Degree and flow).
Data intelligence management system 3 is used to obtain the prediction heating demand curve that data processing system 2 obtains and current reality Border heating demand adjusts heating demand after comparing calibration.In the present embodiment, prediction load is the thermic load according to calculating, real When/practical heating demand is according to heat user room temperature measuring point load adjusted.For example, according to secondary heat supply network supply water temperature Optimization, adjusts a heat supply network water supply flow and return water temperature, so that a heat supply network return water temperature reaches 40 ± 5 DEG C.
In a particular application, what data intelligence management system 3 obtained, which optimizes and revises result, to be controlled by PLC control device Temperature control door 16 realizes that the PLC control device in the present embodiment can be connect with a heat supply network side temperature control door.
In Fig. 1, each user side heat exchange station PLC control device can be to environment temperature measuring point, heat user temperature point, primary Heat supply network side temperature and pressure-measuring-point, second heat net side temperature and pressure-measuring-point, secondary network water circulating pump, the heat exchange of temperature control door user side Device temperature and pressure-measuring-point data, which are acquired, reaches data acquisition system by modbus communication module and wireless DTU transmission unit System 1, Power Plant Side heter temperature and pressure-measuring-point, primary net water circulating pump lead to data collection system 1 by hardwire.Or Measurement data is wirelessly input to data collection system 1. by person, each measuring point of Power Plant Side
1 data connection of data collection system to data processing system 2, data processing system 2 is connected to data intelligence management System 3, data intelligence management system 3 is by controlling primary net and secondary network system, to realize negative to heat supply network heat supply The intelligent control of lotus.
In the present embodiment, heat supply network and heat exchange station, outdoor temperature and room temperature are monitored automatically, it is primary by acquiring The data such as temperature, pressure, the frequency of flow, water circulating pump of net, secondary network, heat exchange station and heat user are analyzed, at comparison Reason, classifies to a large amount of data, carries out temperature-compensating and correction in conjunction with weather condition data, targetedly takes after analysis The thermic load data for obtaining heat user can accurately be fitted the unit time heating curve for obtaining heat user, be dispatched according to monitoring center, It adjusts a heat supply network flow and return water temperature, guarantees thermodynamic equilibrium, hydraulic equilibrium, with the distribution according to need of heat, to realize to heat The heating demand of net carries out intelligent control, accomplishes that the energy maximally utilizes, reduces the loss of energy source process.Heat is introduced simultaneously Press exhaust steam residual heat recovery system, improves the energy utilization rate of power plant.
Heat supply network energy management system refers to by heat source, a pipe network, each heat exchange station, secondary pipe network and area under one's jurisdiction terminal heat The integrated management of the entire heat supply production process of user.Realize from heat source production to heat exchange station, to building, to user terminal heat supply The target of " adjustable, controllable, measurable, can teletransmission " of amount and the mount of using heat.Dynamic prediction, the heat of heat supply running parameter can be achieved Scheduling, equilibrium analysis, operation trend analysis and energy consumption analysis etc., while by generating various analytical statements, chart, form heat supply System energy consumption statistics, quality-monitoring and appraisement system." heat supply " is monitored with " with heat ", analyses heat supply network data scientifically, always Heat supply rule is tied, traffic control scheme is formulated, reduces energy loss, realizes energy digitlization control.Wisdom heat supply network automation and Digital solution, heat exchange station standardize unattended automatic control, heating power water conservancy balance, heat exchange station automatic control and heating network monitoring system System;Unattended automatic control and remote real-time monitoring;Establish heat supply informationization synthesis energy saving management platform;Reduce heating network operation unit Heat consumption.
Based on the above embodiments 1 to embodiment 3, the heat supply in the present embodiment can partially utilize steam power plant's steam exhaust exhaust system The waste heat of system recycles, for example, the primary net return water of heat supply network return water trunk pipeline C1 passes through hot press exhaust steam residual heat recovery system It is heated, and again passes by steam power plant's heating steam bleeding system and heated, obtained primary in heat supply network water supply trunk pipeline C2 Net supplies water, and temperature is 100 DEG C.
The hot press exhaust steam residual heat recovery system D2 of the present embodiment can be recycled more than the steam exhaust of steam power plant's steam exhaust exhauster system D3 Heat, for example, the hot press exhaust steam residual heat recovery system D2 includes: high back pressure gas trap;Use in the high back pressure gas trap In the steam exhaust that the heat source for heating primary net return water is Steam Turbine in steam power plant's steam exhaust exhauster system D3;Wherein, it is pre- to drop to first If after temperature primary net return water below passes through high back pressure gas trap, the temperature of the primary net return water rises to the second default temperature Degree;Second preset temperature is greater than the first preset temperature.
In addition, hot press exhaust steam residual heat recovery system D2 further includes hot press;Hot press utilizes steam turbine in thermal power plant group Heating steam extraction is as power steam, using the steam exhaust of steam turbine in thermal power plant group as low-temperature heat source, to the primary of the second preset temperature Net return water is heated, so that primary net return water reaches third preset temperature;The third preset temperature is greater than the second default temperature Degree.First preset temperature is 40 DEG C, and the second preset temperature is 58 DEG C, and third preset temperature is 85 DEG C.
Primary net return water after cooling passes through Power Plant Side exhaust steam residual heat recovery system D2 by heat supply network return water trunk pipeline C1 Middle high back pressure condenser, the high back pressure condenser heat primary net return water using recycling Steam Turbine exhaust steam residual heat, make The temperature for obtaining primary net return water is increased to 58 DEG C;
It is increased to 58 DEG C of primary net return water and is then passed through in Power Plant Side exhaust steam residual heat recovery system D2 hot press to above-mentioned 58 DEG C of primary net return water continues to heat, so that primary net return water temperature reaches 85 DEG C;
85 DEG C of primary net return water enters vapor-water heat exchanger in heating steam bleeding system D1 and is heated, so that primary net return water Temperature reach 100 DEG C, supply water as primary net and exported by heat supply network water supply trunk pipeline C2 to cell heat exchange station.The present embodiment In steam power plant steam exhaust exhauster system D3 include Steam Turbine (not marked in figure).
Above-mentioned each embodiment can be cross-referenced, and the present embodiment is not defined each embodiment.
Finally, it should be noted that above-described embodiments are merely to illustrate the technical scheme, rather than to it Limitation;Although the present invention is described in detail referring to the foregoing embodiments, those skilled in the art should understand that: It can still modify to technical solution documented by previous embodiment, or to part of or all technical features into Row equivalent replacement;And these modifications or substitutions, it does not separate the essence of the corresponding technical solution various embodiments of the present invention technical side The range of case.

Claims (9)

1. a kind of heat supply network energy management system characterized by comprising
The PLC control device of multiple user side heat exchange stations, Power Plant Side Gateway Station in Heating Network DCS, data collection system, data processing system With data intelligent management system;
Wherein, each environment temperature measuring point, heat are used in heat exchange station where every PLC control device is separately connected the PLC control device Family temperature point, a net side temperature and pressure-measuring-point, and/or secondary net side temperature and pressure-measuring-point, every PLC control device For receiving the measurement data of each measuring point of connection;
The data collection system connects all PLC control device and Power Plant Side Gateway Station in Heating Network DCS, for receiving each The measurement data of measurement data and Power Plant Side Gateway Station in Heating Network the DCS input for the affiliated heat exchange station that PLC control device obtains;
The data processing system connects the data collection system, and is carried out according to the received all data of data collection system Processing, obtains processing result;
The data intelligence management system connects the data processing system, and the processing knot according to the data processing system Fruit obtains for optimizing and revising the primary net of each heat exchange station and/or the flow of secondary network, water supply and/or return water temperature Optimize and revise result;
The data intelligence management system connects each PLC control device, to PLC control device transmission optimize and revise as a result, The PLC control device is according to optimizing and revising the flow of primary net and/or secondary network where result adjustment in heat exchange station, supply water And return water temperature.
2. system according to claim 1, it is characterised in that:
The data collection system is based on modbus+RTU communications protocol with each PLC control device and carries out data transmission;
The data intelligence management system and each PLC control device are based on modbus+RTU communications protocol and carry out data biography It is defeated;
The PLC control device has DTU transmission unit;
The data intelligence management system has DTU transmission unit.
3. system according to claim 1 or 2, which is characterized in that
The PLC control device is located in heat exchange station control room belonging to the PLC control device;
The data collection system, data processing system and the data intelligence management system are respectively positioned on Power Plant Side Gateway Station in Heating Network control System is indoor.
4. system according to claim 1, it is characterised in that:
The measurement data of Power Plant Side Gateway Station in Heating Network DCS input includes:
Temperature, the pressure of Power Plant Side heat exchangers for district heating of the heat exchangers for district heating of the temperature point detection of Power Plant Side heat exchangers for district heating are surveyed The pressure value of the heat exchangers for district heating of point detection, the heat pump measurement frequency of primary net water circulating pump measuring point measurement, heat supply network return water trunk On pipeline first flowmeter measurement flow, and/or, the real-time heating demand information of Power Plant Side.
5. system according to claim 1, which is characterized in that the affiliated heat exchange station that each PLC control device obtains Measurement data includes:
The temperature data of the temperature data of the temperature point of heat user, primary net return water temperature measuring point, primary net supply water temperature are surveyed The temperature data of point, the pressure data of primary net pressure of return water measuring point, primary net pressure of supply water measuring point pressure data, secondary network The temperature data of return water temperature measuring point, the pressure of the temperature data of secondary network supply water temperature measuring point, secondary network pressure of return water measuring point Data, the pressure data of secondary network pressure of supply water measuring point, the heat pump frequency measurement data of secondary network water circulating pump, user side heat exchange The temperature data of device temperature point and the pressure data of pressure-measuring-point;
Environment temperature according to the environment temperature measuring point detection being mounted on outside user side regenerator volume.
6. system according to claim 1, which is characterized in that each PLC control device includes warning device;
The PLC control device, there are when at least one exceeded data, leads in the measurement data for determining received each measuring point It crosses the warning device and issues alarm signal;
Alternatively, PLC control device receives PLC control device place heat exchange station that the data intelligence management system determines When warning message, alarm signal is issued by the warning device.
7. a kind of processing method based on any heat supply network energy management system of claim 1 to 6, which is characterized in that packet It includes:
The data processing system is calculated according to the received all measurement data of data collection system, obtains primary net prediction The prediction heating demand curve of heating demand curve and secondary network, and
The data processing system is set according to all measurement data, the facility information once netted pre-entered and secondary network Standby information, obtains the thermal loss information of the thermal loss information and secondary network once netted;
Supply water temperature that the data processing system is once netted according to the prediction heating demand curve acquisition once netted, primary net supply Water flow, and the supply water temperature of the prediction heating demand curve acquisition secondary network according to secondary network;
The data intelligence management system is according to the prediction heating demand curve once netted, the prediction heating demand of secondary network The real-time heating demand information of curve and the received Power Plant Side of data collection system is compared, and is obtained for optimizing and revising The flow of the primary net of each heat exchange station and/or secondary network, water supply and return water temperature optimize and revise result.
8. the method according to the description of claim 7 is characterized in that the result of optimizing and revising includes:
Secondary network supply water temperature adjusted, primary net water supply flow adjusted, and/or, primary net return water temperature adjusted Degree.
9. the method according to the description of claim 7 is characterized in that the facility information once netted includes:
Elevation, buried depth, pipe material, pipeline wall thickness, the pipe heat-transfer coefficient, heat preservation material, insulation thickness once netted, and/or Keep the temperature the coefficient of heat conduction of material.
CN201811565741.9A 2018-12-20 2018-12-20 Heat supply network energy management system and its processing method Withdrawn CN109373441A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811565741.9A CN109373441A (en) 2018-12-20 2018-12-20 Heat supply network energy management system and its processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811565741.9A CN109373441A (en) 2018-12-20 2018-12-20 Heat supply network energy management system and its processing method

Publications (1)

Publication Number Publication Date
CN109373441A true CN109373441A (en) 2019-02-22

Family

ID=65371300

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811565741.9A Withdrawn CN109373441A (en) 2018-12-20 2018-12-20 Heat supply network energy management system and its processing method

Country Status (1)

Country Link
CN (1) CN109373441A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110056941A (en) * 2019-04-18 2019-07-26 天津海天方圆节能技术有限公司 A kind of gas furnace heating project intelligent management control method
CN110220234A (en) * 2019-03-11 2019-09-10 华电电力科学研究院有限公司 A kind of heating system and its working method optimized based on heat supply network circulating water flow and the temperature difference
CN110953648A (en) * 2019-12-16 2020-04-03 北京华通兴远供热节能技术有限公司 Heat supply balance system and heat supply method
CN111787123A (en) * 2020-07-27 2020-10-16 四川神琥科技有限公司 Intelligent heat supply network operation and maintenance management system
CN113218109A (en) * 2021-04-15 2021-08-06 北京华远意通热力科技股份有限公司 Intelligent regulation and control device and method for deep waste heat recovery
CN113623721A (en) * 2021-08-10 2021-11-09 长春市云谷节能科技有限公司 Supply and return water digital data processing system and method based on analog-to-digital conversion control
CN114688606A (en) * 2022-02-16 2022-07-01 华能(浙江)能源开发有限公司玉环分公司 Remote central heating control system
CN114791122A (en) * 2022-04-14 2022-07-26 西安热工研究院有限公司 User-type intelligent heating system based on DCS control and control method
WO2022233101A1 (en) * 2021-05-06 2022-11-10 上海优华系统集成技术股份有限公司 Intelligent optimization control device for low-temperature thermal system

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003023288A1 (en) * 2001-09-11 2003-03-20 Danfoss A/S Central heating installation
GB0323370D0 (en) * 2003-10-06 2003-11-05 Ec Power As Heat transfer system
DE102010052104A1 (en) * 2010-11-20 2012-05-24 Hydrometer Gmbh Heat meter for use in district heating plant for built in domestic supply line for determining consumed heat quantity, has temperature sensor switched on so that temperature in return line of primary circuit is involved in evaluation
CN103335359A (en) * 2013-07-09 2013-10-02 浙江大学昆山创新中心 Intelligent heat exchange station
CN203718926U (en) * 2013-12-31 2014-07-16 华电电力科学研究院 Remote heat supply control system with plant network coordinate regulation
CN104482593A (en) * 2014-12-25 2015-04-01 沈阳仪表科学研究院有限公司 Intelligent control method of water/water heat exchange station
CN204345794U (en) * 2014-11-18 2015-05-20 天津市金马热力有限公司 Heating network monitoring system
CN104764084A (en) * 2015-04-02 2015-07-08 北京京能未来燃气热电有限公司 Intelligent heating network control method and system
CN204786737U (en) * 2015-04-10 2015-11-18 中国华电工程(集团)有限公司 Energy -conserving operation control system in heat supply network initial station
CN106123105A (en) * 2016-07-05 2016-11-16 国网天津市电力公司 A kind of system controlling heat supply network heat energy distribution
CN107491020A (en) * 2017-08-13 2017-12-19 中清源环保节能有限公司 A kind of central heating intelligence managing and control system
CN107726442A (en) * 2017-10-18 2018-02-23 烟台华蓝新瑞节能科技有限公司 A kind of heat supply network balance regulation method
CN207610275U (en) * 2017-11-27 2018-07-13 华电能源股份有限公司佳木斯热电厂 A kind of heat supply company intelligent monitor system

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003023288A1 (en) * 2001-09-11 2003-03-20 Danfoss A/S Central heating installation
GB0323370D0 (en) * 2003-10-06 2003-11-05 Ec Power As Heat transfer system
DE102010052104A1 (en) * 2010-11-20 2012-05-24 Hydrometer Gmbh Heat meter for use in district heating plant for built in domestic supply line for determining consumed heat quantity, has temperature sensor switched on so that temperature in return line of primary circuit is involved in evaluation
CN103335359A (en) * 2013-07-09 2013-10-02 浙江大学昆山创新中心 Intelligent heat exchange station
CN203718926U (en) * 2013-12-31 2014-07-16 华电电力科学研究院 Remote heat supply control system with plant network coordinate regulation
CN204345794U (en) * 2014-11-18 2015-05-20 天津市金马热力有限公司 Heating network monitoring system
CN104482593A (en) * 2014-12-25 2015-04-01 沈阳仪表科学研究院有限公司 Intelligent control method of water/water heat exchange station
CN104764084A (en) * 2015-04-02 2015-07-08 北京京能未来燃气热电有限公司 Intelligent heating network control method and system
CN204786737U (en) * 2015-04-10 2015-11-18 中国华电工程(集团)有限公司 Energy -conserving operation control system in heat supply network initial station
CN106123105A (en) * 2016-07-05 2016-11-16 国网天津市电力公司 A kind of system controlling heat supply network heat energy distribution
CN107491020A (en) * 2017-08-13 2017-12-19 中清源环保节能有限公司 A kind of central heating intelligence managing and control system
CN107726442A (en) * 2017-10-18 2018-02-23 烟台华蓝新瑞节能科技有限公司 A kind of heat supply network balance regulation method
CN207610275U (en) * 2017-11-27 2018-07-13 华电能源股份有限公司佳木斯热电厂 A kind of heat supply company intelligent monitor system

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110220234A (en) * 2019-03-11 2019-09-10 华电电力科学研究院有限公司 A kind of heating system and its working method optimized based on heat supply network circulating water flow and the temperature difference
CN110056941A (en) * 2019-04-18 2019-07-26 天津海天方圆节能技术有限公司 A kind of gas furnace heating project intelligent management control method
CN110953648A (en) * 2019-12-16 2020-04-03 北京华通兴远供热节能技术有限公司 Heat supply balance system and heat supply method
CN110953648B (en) * 2019-12-16 2020-10-30 北京华通兴远供热节能技术有限公司 Heat supply balance system and heat supply method
CN111787123A (en) * 2020-07-27 2020-10-16 四川神琥科技有限公司 Intelligent heat supply network operation and maintenance management system
CN113218109A (en) * 2021-04-15 2021-08-06 北京华远意通热力科技股份有限公司 Intelligent regulation and control device and method for deep waste heat recovery
CN113218109B (en) * 2021-04-15 2021-12-14 北京华远意通热力科技股份有限公司 Intelligent regulation and control device and method for deep waste heat recovery
WO2022233101A1 (en) * 2021-05-06 2022-11-10 上海优华系统集成技术股份有限公司 Intelligent optimization control device for low-temperature thermal system
CN113623721A (en) * 2021-08-10 2021-11-09 长春市云谷节能科技有限公司 Supply and return water digital data processing system and method based on analog-to-digital conversion control
CN114688606A (en) * 2022-02-16 2022-07-01 华能(浙江)能源开发有限公司玉环分公司 Remote central heating control system
CN114688606B (en) * 2022-02-16 2024-04-19 华能(浙江)能源开发有限公司玉环分公司 Remote central heating control system
CN114791122A (en) * 2022-04-14 2022-07-26 西安热工研究院有限公司 User-type intelligent heating system based on DCS control and control method

Similar Documents

Publication Publication Date Title
CN109373441A (en) Heat supply network energy management system and its processing method
CN109708258B (en) Refrigeration house temperature feedforward-fuzzy control system and control method based on load dynamic change
CN110288164B (en) Predictive control method for building air-conditioning refrigeration station system
CN102865623B (en) Centralized heating public building heat supply energy-saving control method
CN207716541U (en) The heating energy-saving monitoring system of timesharing subregion
CN215724029U (en) Central air conditioning adaptive control system
CN201255459Y (en) Weather compensator
CN107726442A (en) A kind of heat supply network balance regulation method
CN109917646B (en) System and method for optimizing operation of regional cooling and heating equipment
CN101968250A (en) Energy-saving optimized control system and method for refrigerator room
CN103363585A (en) Regulating method of center heating system in urban area
CN102777974A (en) Automatic adjustment control system for centralized heating
CN103471171A (en) Centralized heating quality adjustment intelligent control system and method
CN108644887A (en) Secondary side heat supply Automatic Balance Regulation method based on room temperature and its intelligent energy consumption monitoring system
CN112361450A (en) Heat exchange station feedback prediction regulation and control method based on indoor temperature
CN102508466A (en) System for metering and charging construction heat and carrying out energy-saving monitoring by Internet of Things
CN104791902A (en) Intelligent control system for EMC pipe network
CN209246249U (en) Heat supply network energy management system
CN113847644B (en) Secondary net valve opening control method and system
CN114134955B (en) Ad hoc network and pressure management system and water pressure management method of self-powered water supply network
CN102620347B (en) Control method for heating circulation pump compensated by using solar radiation
CN113390126B (en) Heating station online dynamic regulation and control device and method based on room temperature feedback
CN113701234A (en) Intelligent control method, device and system for heat supply secondary network
RU2269063C2 (en) Heating plant system, heating plant system local unit, control unit for local unit and method of operation of heating plant system
CN206905104U (en) The central heating system of active dynamic regulation is carried out according to resident family's demand

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190222