CN109372602A - A kind of biomass incinerator and coal unit steam coupled system and method - Google Patents

A kind of biomass incinerator and coal unit steam coupled system and method Download PDF

Info

Publication number
CN109372602A
CN109372602A CN201811043765.8A CN201811043765A CN109372602A CN 109372602 A CN109372602 A CN 109372602A CN 201811043765 A CN201811043765 A CN 201811043765A CN 109372602 A CN109372602 A CN 109372602A
Authority
CN
China
Prior art keywords
steam
waste heat
heat boiler
vapor
extraction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811043765.8A
Other languages
Chinese (zh)
Other versions
CN109372602B (en
Inventor
王健
黄晨
方鹏
沈丛奇
吕晓东
郑敏捷
魏辉
武广富
杨召青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI ELECTRIC POWER CO Ltd
China Power Engineering Consulting Group East China Electric Power Design Institute Co Ltd
Shanghai Minghua Electric Power Technology and Engineering Co Ltd
Original Assignee
SHANGHAI ELECTRIC POWER CO Ltd
China Power Engineering Consulting Group East China Electric Power Design Institute Co Ltd
Shanghai Minghua Electric Power Technology and Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI ELECTRIC POWER CO Ltd, China Power Engineering Consulting Group East China Electric Power Design Institute Co Ltd, Shanghai Minghua Electric Power Technology and Engineering Co Ltd filed Critical SHANGHAI ELECTRIC POWER CO Ltd
Priority to CN201811043765.8A priority Critical patent/CN109372602B/en
Publication of CN109372602A publication Critical patent/CN109372602A/en
Application granted granted Critical
Publication of CN109372602B publication Critical patent/CN109372602B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K11/00Plants characterised by the engines being structurally combined with boilers or condensers
    • F01K11/02Plants characterised by the engines being structurally combined with boilers or condensers the engines being turbines
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D15/00Adaptations of machines or engines for special use; Combinations of engines with devices driven thereby
    • F01D15/10Adaptations for driving, or combinations with, electric generators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K13/00General layout or general methods of operation of complete plants
    • F01K13/02Controlling, e.g. stopping or starting
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K17/00Using steam or condensate extracted or exhausted from steam engine plant
    • F01K17/02Using steam or condensate extracted or exhausted from steam engine plant for heating purposes, e.g. industrial, domestic

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

The present invention relates to the system and method that a kind of biomass incinerator is coupled with coal unit steam, multiple bypass lines are added on the steam (vapor) outlet pipeline of existing waste heat boiler, respectively enter the different sections and high pressure cylinder blow-off line of level-one extraction line by different bypass lines according to the big minor adjustment steam of waste heat boiler generation quantity of steam.When quantity of steam is smaller, steam enters the level-one extraction line after extraction check valve, instead of No. 1 original high-pressure heater steam extraction;When quantity of steam increases, when No. 1 high-pressure heater steam extraction cannot dissolve steam completely, extra steam enters the level-one extraction line before extraction check valve by filling valve, and returns to coal unit steam turbine high pressure cylinder and carry out acting power generation;When quantity of steam continues growing, substitutes No. 1 high-pressure heater steam extraction and enter coal unit steam turbine high pressure cylinder mode of both doing work and combine when can not dissolve steam completely, extra steam is coupled through temperature-decreased pressure reducer with the steam discharge in high pressure cylinder blow-off line.

Description

A kind of biomass incinerator and coal unit steam coupled system and method
Technical field
The invention belongs to field of thermal power, more specifically to a kind of biomass incinerator and coal unit steam coupling The system and method for conjunction.
Background technique
As social population increases, industry and agricultural development, house refuse, industry and agricultural waste are also growing day by day.Mesh Before, the method for garbage disposal mainly has landfill, compost, burning etc. a variety of, but is the mankind by garbage harmless, recycling treatment The target of garbage disposal.Burning is one of the important means of rubbish processing to be harmless, is had compared with Other Waste processing mode Short processing time, decrement are significant, innoxious more thoroughly and the advantages that recyclable rubbish waste gas of incineration, obtain extensively in countries in the world General application.
China is as a large agricultural country, other than the house refuse for being mainly derived from city, also from rural area Agricultural crop straw, such as corn stover, soybean stalk etc..These agricultural wastes of compost treatment not only take up an area greatly, and when needing Between it is long, therefore, burning be handle these rubbish best way.But field burns and not only causes environmental pollution, and burns The heat of generation is directly wasted.Biomass incinerator and coal unit coupled electricity-generation can crack the burning of stalk field, sludge rubbish The governance problems such as rubbish besieged city are a kind of effective means for improving Biomass Energy Utilization efficiency, reducing disposal of pollutants.
Waste incinerator is disposed with the waste heat boiler of superheater using burning heat for the purpose of handling rubbish in furnace, The generating efficiency of waste-heat oven is very low, 18%~25%, far below the generating efficiency of efficient fuel coal unit about 45%.Meanwhile rubbish There are equipment investment height, heating surface high temperature corrosion, tail portion low-temperature corrosion, dioxin flue gas emission index errors etc. to lack for rubbish incinerator It falls into, and the flue gas purification systems such as individual desulphurization and denitration, dedusting need to be equipped with, equipment cost and operation and maintenance cost are high.Cause This, it is effective one of means for solving waste incinerator drawbacks described above that waste incinerator is combined with coal-burning boiler.
For example, Chinese Patent Application No. CN108266718A discloses a kind of waste incinerator low-lying level working medium and coal-fired pot The high level of furnace coupling utilizes system, the another way water supply of the outlet water conduits and high-pressure heater of the waste incinerator of the system Pipeline converges to be connected with the tail portion economizer of coal-burning boiler afterwards, realizes the hot water that waste incinerator generates being introduced into coal-fired pot The economizer of furnace is to improve the temperature that economizer entrance is intake (referring to Fig. 1).
In another example Chinese Patent Application No. CN 107559058A discloses a kind of waste incinerator middle pressure steam and coal burning machine The Thermal-mechanical Coupling electricity generation system of group, including rubbish furnace body, feed pump, low-pressure heater, oxygen-eliminating device, high-pressure heater, water supply Pipeline, coal unit, main steam line, reheater piping, ultra-high pressure cylinder, high pressure cylinder, condenser, level-one bleed steam pipework and second level Bleed steam pipework, high-pressure heater include level-one high-pressure heater and second level high-pressure heater interconnected, the ultra-high pressure cylinder High pressure cylinder is connected, feed pump connects oxygen-eliminating device by piping connection low-pressure heater, low-pressure heater by the road, and oxygen-eliminating device is through pipe Road connects high-pressure heater, and high-pressure heater connects coal unit through supply line, and coal unit connects main steam line, main steaming Steam pipe road connects ultra-high pressure cylinder, and ultra-high pressure cylinder connects three-level high-pressure heater through level-one bleed steam pipework, and ultra-high pressure cylinder is taken out through second level Vapor pipeline connects second level high-pressure heater, and coal unit connects high pressure cylinder by reheater piping, and high pressure cylinder connects condenser, institute The steam (vapor) outlet for stating rubbish furnace body is connected (referring to fig. 2) through pipeline with level-one bleed steam pipework.The Thermal-mechanical Coupling electricity generation system will The steam that refuse furnace burning generates is coupled into steam turbine therrmodynamic system, but the steam is used only for reducing steam turbine steam extraction, improves combustion The feed temperature of coal burning boiler.It, cannot be complete only by steam turbine steam extraction when the steam that the waste heat boiler burnt away the refuse generates is excessive It totally disappeared when receiving the steam, the utilization rate that this is bound to cause the steam of waste heat boiler generation is not high, causes the thermal energy of steam unrestrained in vain Take.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of biomass incinerators with what coal unit steam coupled is System and method, the method for operation of the size cases Automatic Optimal regulating system of the quantity of steam according to caused by waste heat boiler, So that the energy for the steam that waste heat boiler generates is fully used, realize that energy utilization maximizes.
In order to achieve the above objectives, technical scheme is as follows:
Biomass incinerator and coal unit steam coupled system of the invention includes: waste heat boiler, coal unit steam turbine High pressure cylinder, the level-one extraction line being connected with coal unit steam turbine high pressure cylinder, wherein the level-one extraction line is provided with steam extraction Non-return valve, the waste heat boiler by waste heat boiler steam (vapor) outlet main pipeline and waste heat boiler steam (vapor) outlet first branch pipeline with Level-one extraction line after extraction check valve is connected, wherein one end of the waste heat boiler steam (vapor) outlet first branch pipeline and institute It states waste heat boiler steam (vapor) outlet main pipeline to be connected, the other end is connected with the level-one extraction line after extraction check valve, in this way, waste heat The steam that boiler generates passes sequentially through the waste heat boiler steam (vapor) outlet main pipeline and the waste heat boiler steam (vapor) outlet first Road pipeline is coupled into the level-one extraction line after the extraction check valve with steam extraction therein.
The waste heat boiler also passes through waste heat boiler steam (vapor) outlet main pipeline, waste heat boiler steam (vapor) outlet first branch pipeline It is connected with bypass duct with the level-one extraction line before extraction check valve, wherein one end of the bypass duct and the waste heat pot Furnace steam (vapor) outlet first branch pipeline is connected, and the other end is connected with the level-one extraction line before extraction check valve, in this way, waste heat pot The steam that furnace generates passes sequentially through the waste heat boiler steam (vapor) outlet main pipeline, the waste heat boiler steam (vapor) outlet first branch pipe Road and the bypass duct enter the level-one extraction line before the extraction check valve, high subsequently into the coal unit steam turbine Cylinder pressure carries out acting power generation.
The waste heat boiler also passes through waste heat boiler steam (vapor) outlet main pipeline and waste heat boiler steam (vapor) outlet second branch pipe Road is connected with high pressure cylinder blow-off line, wherein the high pressure cylinder blow-off line is connected with the coal unit steam turbine high pressure cylinder, institute The one end for stating waste heat boiler steam (vapor) outlet second branch pipeline is connected with the waste heat boiler steam (vapor) outlet main pipeline, the other end with The high pressure cylinder blow-off line is connected, in this way, the steam that waste heat boiler generates passes sequentially through the waste heat boiler steam (vapor) outlet master Pipeline and the waste heat boiler steam (vapor) outlet second branch pipeline enter the high pressure cylinder blow-off line and couple with steam discharge therein.
It is provided with vapour pressure monitor on the waste heat boiler steam (vapor) outlet main pipeline, for detecting the waste heat boiler steam Export the pressure size of steam in main pipeline.
Filling valve is provided on the bypass duct, for controlling the steam in the bypass duct into the coal burning machine Group steam turbine high pressure cylinder.
It is provided with regulating valve on the waste heat boiler steam (vapor) outlet second branch pipeline, adjusts and enters waste heat boiler steaming The steam flow rate of vapor outlet second branch pipeline.
It is provided with temperature-decreased pressure reducer on the waste heat boiler steam (vapor) outlet second branch pipeline, for the waste heat boiler Steam in steam (vapor) outlet second branch pipeline carries out pressure and temperature reducing to enter the high pressure cylinder blow-off line and row therein Vapour coupling.Relative to the regulating valve, the temperature-decreased pressure reducer is located at the waste heat boiler steam (vapor) outlet second branch pipeline Downstream.
The present invention also provides a kind of methods that biomass incinerator is coupled with coal unit steam, this method comprises:
The steam for generating waste heat boiler is successively through waste heat boiler steam (vapor) outlet main pipeline and waste heat boiler steam (vapor) outlet the One bypass line enters the level-one extraction line after extraction check valve, is then coupled with steam extraction therein;
The steam for generating waste heat boiler successively passes through waste heat boiler steam (vapor) outlet main pipeline, waste heat boiler steam (vapor) outlet the One bypass line and bypass duct enter the level-one extraction line before extraction check valve, subsequently into coal unit steam turbine high pressure cylinder Carry out acting power generation.
This method further comprises: make waste heat boiler generate steam successively pass through waste heat boiler steam (vapor) outlet main pipeline and Waste heat boiler steam (vapor) outlet second branch pipeline enters the high pressure cylinder blow-off line being connected with coal unit steam turbine high pressure cylinder, then It is coupled with steam discharge therein.
In the method that biomass incinerator of the invention is coupled with coal unit steam, as waste heat boiler steam (vapor) outlet master When steam pressure in pipeline is less than first pressure predetermined value, the filling valve and waste heat boiler steam (vapor) outlet on bypass duct are closed Regulating valve on second branch pipeline makes steam completely into the level-one extraction line and steam extraction coupling therein after extraction check valve It closes.
In the method that biomass incinerator of the invention is coupled with coal unit steam, as waste heat boiler steam (vapor) outlet master When steam pressure in pipeline is greater than first pressure predetermined value less than second pressure predetermined value, the filling on bypass duct is opened Valve, and the regulating valve on waste heat boiler steam (vapor) outlet second branch pipeline is closed, a part for the steam for generating waste heat boiler Into the level-one extraction line after extraction check valve, another part enters the level-one extraction line before extraction check valve, then into Enter the acting power generation of coal unit steam turbine high pressure cylinder.
In the method that biomass incinerator of the invention is coupled with coal unit steam, as waste heat boiler steam (vapor) outlet master When steam pressure in pipeline is greater than second pressure predetermined value, the filling valve and waste heat boiler steam on bypass duct are opened simultaneously The regulating valve on second branch pipeline is exported, a part for the steam for generating waste heat boiler enters the level-one after extraction check valve Extraction line, the level-one extraction line that another part enters before extraction check valve eventually enter into the acting of coal unit steam turbine high pressure cylinder Power generation, some enters the high pressure cylinder blow-off line being connected with coal unit steam turbine high pressure cylinder and couples with steam discharge therein.
Biomass incinerator and coal unit steam coupled system of the invention is the steam (vapor) outlet in existing waste heat boiler Multiple bypass lines are added on pipeline, according to waste heat boiler generate quantity of steam size (in steam (vapor) outlet pipeline steam pressure and Quantity of steam is directly proportional), it adjusts steam and is respectively enterd and coal unit steam turbine high pressure cylinder by different steam (vapor) outlet bypass lines The different sections and high pressure cylinder blow-off line of connected level-one extraction line, when quantity of steam (i.e. steam pressure) is smaller, steam is complete The level-one extraction line that portion enters after extraction check valve is coupled with steam extraction therein, instead of No. 1 original high-pressure heater steam extraction; When quantity of steam increases, when No. 1 high-pressure heater steam extraction cannot dissolve the coupling steam completely, extra steam passes through steam extraction check Level-one extraction line before valve enters coal unit steam turbine high pressure cylinder and carries out acting power generation;When quantity of steam continues to increase, No. 1 is substituted High-pressure heater steam extraction and enters coal unit steam turbine high pressure cylinder mode of both doing work and combines when can not dissolve the steam completely, Extra steam enters high pressure cylinder blow-off line, couples after temperature-decreased pressure reducer with steam discharge therein, eventually enters into No. 2 high pressures Heater or cold section of coal-burning boiler reheater overcome the steam of prior art single utilization waste heat boiler generation, work as quantity of steam When larger, steam cannot dissolve the defect of coupling completely.Invention achieves following significant technologies to imitate compared with prior art Fruit:
(1) steam caused by waste heat boiler can substitute No. 1 high-pressure heater steam extraction but also return to coal unit steam turbine High pressure cylinder acting power generation has subversiveness to recognize and use traditional high-pressure heater extraction opening, substantially increases The whole coupling utilization efficiency of biomass thermal energy;
(2) novel steam coupling process is realized, due to high-pressure heater steam extraction, returns to coal unit steam turbine high pressure cylinder Acting generates electricity and carry out consumption coupling into the steam that high pressure cylinder steam discharge can generate waste heat boiler, with single coupled modes It compares, the present invention is flexible with steam consumption coupled modes, biomass processes amount and consumption coupling steam amount are big, can adapt to fire The characteristics of coal unit various loads.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is the attached drawing of technology to do simply to introduce, it is clear that drawings discussed below be only to some embodiments of the present invention, for For those of ordinary skill in the art, under the preceding topic not made the creative labor, it can also be obtained according to these attached drawings other Attached drawing.
Fig. 1 schematically shows one embodiment of the prior art.
Fig. 2 schematically shows another embodiments of the prior art.
Fig. 3 schematically shows the structure of biomass incinerator and coal unit steam coupled system of the invention.
Specific embodiment
" first pressure predetermined value " is the steam generated according to No. 1 high-pressure heater consumption coupling waste heat boiler in the present invention Amount setting, the quantity of steam that No. 1 high-pressure heater consumption coupling waste heat boiler generates reaches corresponding waste heat boiler when maximum value Vapour pressure force value in steam (vapor) outlet main pipeline 9 is first pressure predetermined value.
" second pressure predetermined value " is the steam generated according to No. 1 high-pressure heater consumption coupling waste heat boiler in the present invention It measures and coal unit steam turbine high pressure cylinder is dissolved by level-one extraction line and couples what the quantity of steam that waste heat boiler generates was set, 1 The quantity of steam and coal unit steam turbine high pressure cylinder that number high-pressure heater consumption coupling waste heat boiler generates pass through level-one extraction line The quantity of steam that consumption coupling waste heat boiler generates all reaches steaming when maximum value in corresponding waste heat boiler steam (vapor) outlet main pipeline 9 Vapour pressure force value is second pressure predetermined value.
" upstream " and " downstream " is defined according to the flow direction of fluid in pipeline in the present invention.
" the level-one extraction line before extraction check valve " and " the level-one extraction line after extraction check valve " is in the present invention It is defined according to the flow direction of steam extraction in level-one extraction line, from steam extraction from the flow direction in level-one extraction line, Level-one extraction line between extraction check valve and coal unit steam turbine high pressure cylinder is known as " the level-one extraction steam pipe before extraction check valve Road ", the level-one extraction line between extraction check valve and No. 1 high-pressure heater are known as " the level-one extraction steam pipe after extraction check valve Road ".
In order to make the technical means, the creative features, the aims and the efficiencies achieved by the present invention be readily apparent from understanding, tie below Attached drawing is closed, the present invention is further explained.
As shown in Fig. 3, in the present embodiment, biomass incinerator and coal unit steam coupled system include incinerator 1, waste heat boiler 2 and coal unit steam turbine high pressure cylinder 3.Incinerator 1 is connected with waste heat boiler 2 by flue 12.Waste heat pot Furnace 2 is connected with feedwater piping 13.Coal unit steam turbine high pressure cylinder 3 connects one end and the high pressure cylinder gland steam exhauster of level-one extraction line 10 The one end in road 11, the other end of level-one extraction line 10 connect No. 1 high-pressure heater, and the other end of high pressure cylinder blow-off line 11 connects Connect No. 2 high-pressure heaters and cold section of coal-burning boiler reheater.Extraction check valve 4 is provided on level-one extraction line 10.
Waste heat boiler 2 connects waste heat boiler steam (vapor) outlet main pipeline 9, and waste heat boiler steam (vapor) outlet main pipeline 9 is used for will be remaining The steam output that heat boiler 2 generates, waste heat boiler steam (vapor) outlet main pipeline 9 are also connected with waste heat boiler steam (vapor) outlet first branch pipe The one end in road 91, such as connected by triplet type pipeline.The other end of waste heat boiler steam (vapor) outlet first branch pipeline 91 connects Level-one extraction line 10 after extraction check valve (4), such as connected by triplet type pipeline.Waste heat boiler steam (vapor) outlet first Road pipeline 91 is also connected with one end of bypass duct 911, such as is connected by triplet type pipeline.The other end of bypass duct 911 connects Level-one extraction line 10 before connecing extraction check valve (4), such as connected by triplet type pipeline.
As shown in Fig. 3, in the present embodiment, waste heat boiler 2 is also connected with waste heat boiler steam (vapor) outlet second branch pipeline 92 one end, such as connected by triplet type pipeline.The other end of waste heat boiler steam (vapor) outlet second branch pipeline 92 connects high Cylinder pressure blow-off line 11, such as connected by triplet type pipeline.
It is provided with vapour pressure monitor 7 on waste heat boiler steam (vapor) outlet main pipeline 9, for detecting waste heat boiler steam (vapor) outlet master The pressure size of steam in pipeline 9.Filling valve 5 is provided on bypass duct 911, for adjusting the steam in bypass duct, Level-one extraction line before making it through extraction check valve enters the coal unit steam turbine high pressure cylinder and carries out acting power generation.Waste heat It is additionally provided with regulating valve 6 and temperature-decreased pressure reducer 8 on Boiler Steam outlet second branch pipeline 92, relative to regulating valve 6, desuperheat subtracts Depressor 8 is located at the downstream of waste heat boiler steam (vapor) outlet second branch pipeline 92.Regulating valve 6 enters waste heat boiler steam for adjusting Export the quantity of steam of second branch pipeline.Temperature-decreased pressure reducer 8 is used to make the steaming in waste heat boiler steam (vapor) outlet second branch pipeline Then vapour pressure and temperature reducing enters 2 grades of high-pressure heaters or cold section of coal-burning boiler reheater by high pressure cylinder blow-off line 11.
The working method of biomass incinerator of the invention and coal unit steam coupled system is as follows:
The flue gas that biomass carries out burning generation in incinerator 1 enters waste heat boiler 2 by exhaust gases passes 12, to passing through The water that feedwater piping 13 is transported in waste heat boiler 2 is heated, and is allowed to be converted into the steam of high temperature and pressure, the steam then into Enter waste heat boiler steam (vapor) outlet main pipeline 9, when vapour pressure monitor 7 detects the steam in waste heat boiler steam (vapor) outlet main pipeline 9 When pressure is less than first pressure predetermined value, filling valve 5 and regulating valve 6 are closed, in this way, the steam that waste heat boiler generates all passes through Waste heat boiler steam (vapor) outlet first branch pipeline 91 is into the level-one extraction line 10 after coal unit extraction check valve 4 and wherein Steam extraction coupling, eventually enter into No. 1 high-pressure heater.
As the quantity of steam that waste heat boiler generates increases, when vapour pressure monitor 7 detects that waste heat boiler steam (vapor) outlet is responsible for When steam pressure in road 9 is greater than first pressure predetermined value but is less than second pressure predetermined value, filling valve 5 is gradually opened, still Regulating valve 6 is still within closed state.In this way, a part of the steam in waste heat boiler steam (vapor) outlet first branch pipeline 91 is logical Cross bypass channel 911 enter extraction check valve 4 before level-one steam extraction channel 10, eventually enter into coal unit steam turbine high pressure cylinder 3 into Row acting generates electricity, and another part of the steam in waste heat boiler steam (vapor) outlet first branch pipeline 91 still enters extraction check valve Level-one extraction line 10 after 4 eventually enters into No. 1 high-pressure heater.
As the quantity of steam that waste heat boiler generates further increases, when vapour pressure monitor 7 detects that waste heat boiler steam goes out When steam pressure in mouth main pipeline 9 is greater than second pressure predetermined value, regulating valve 6 is gradually opened, filling valve 5 is also at out at this time Open state.In this way, a part of the steam in waste heat boiler steam (vapor) outlet main pipeline 9 enters waste heat boiler steam (vapor) outlet second Then road pipeline 92 enters high pressure cylinder exhaust passage 11 after temperature-decreased pressure reducer 8 carries out pressure and temperature reducing and couples with steam discharge therein, Eventually enter into No. 2 high-pressure heaters or cold section of coal-burning boiler reheater.Steam into No. 2 high-pressure heaters can substitute steamer 2 grades of steam extractions of machine enter steam turbine intermediate pressure cylinder after the heating of coal-burning boiler reheater into cold section of coal-burning boiler reheater of steam Acting.Another part of steam in waste heat boiler steam (vapor) outlet main pipeline 9 still enters waste heat boiler steam (vapor) outlet first Road pipeline 91, a part of the steam in waste heat boiler steam (vapor) outlet first branch pipeline 91 enter one after extraction check valve 4 Grade extraction line 10, eventually enter into No. 1 high-pressure heater, the steam in waste heat boiler steam (vapor) outlet first branch pipeline 91 it is another A part enters the level-one steam extraction channel 10 before extraction check valve 4 by bypass channel 911, and it is high to eventually enter into coal unit steam turbine Cylinder pressure carries out acting power generation.
Pass through above description, it can be seen that the present invention be the blade strength in former coal unit steam turbine, cylinder pressurization ratio, Under the premise of the safety of shafting vibration, thrust etc. is protected, the preferred steam coupling for generating waste heat boiler introduces energy The relatively high coal unit steam turbine high pressure cylinder level-one extraction line of utilization efficiency, instead of No. 1 original high-pressure heater steam extraction;When Quantity of steam increases, and when No. 1 high-pressure heater steam extraction cannot dissolve coupling steam completely, extra steam is introduced coal unit vapour Machine high pressure cylinder carries out acting power generation;When quantity of steam further increases, above two mode still cannot dissolve coupling steam completely When, extra steam is coupled through pressure and temperature reducing with high pressure cylinder steam discharge.The mode of this Multiple modality consumption coupling steam, greatly The whole coupling utilization efficiency of biomass thermal energy is improved greatly.Therefore, invention achieves following significant technical effects:
1. steam is coupled with the steam extraction in level-one extraction line, instead of original when the quantity of steam that waste heat boiler generates is smaller No. 1 high-pressure heater steam extraction come;
2. when the quantity of steam that waste heat boiler generates increases, No. 1 high-pressure heater steam extraction cannot dissolve the coupling steam completely When, extra steam enters coal unit steam turbine high pressure cylinder and carries out acting power generation;
3. when the quantity of steam that waste heat boiler generates continues to increase, No. 1 high-pressure heater steam extraction and entrance coal unit steam turbine When the two ways joint that high pressure cylinder does work can not dissolve the steam completely, extra steam is after temperature-decreased pressure reducer It is incorporated to high pressure cylinder steam discharge, eventually enters into No. 2 high-pressure heaters or cold section of coal-burning boiler reheater.Into No. 2 high-pressure heaters Steam can substitute 2 grades of steam extractions of steam turbine, enter vapour after the heating of coal-burning boiler reheater into cold section of reheater of steam The acting of machine intermediate pressure cylinder.
Basic principles and main features and advantages of the present invention of the invention have been shown and described above.The skill of the industry Art personnel it should be appreciated that the present invention is not limited to the above embodiments, the above embodiments and description only describe The principle of the present invention, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these Changes and improvements all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and Its equivalent thereof.

Claims (11)

1. a kind of biomass incinerator and coal unit steam coupled system, the system further include: waste heat boiler (2), coal burning machine Group steam turbine high pressure cylinder (3), the level-one extraction line (10) being connected with coal unit steam turbine high pressure cylinder (3), wherein the level-one is taken out Extraction check valve (4) are provided on steam pipe road (10),
It is characterized in that,
The waste heat boiler (2) passes through waste heat boiler steam (vapor) outlet main pipeline (9) and waste heat boiler steam (vapor) outlet first branch pipe Road (91) is connected with the level-one extraction line (10) after extraction check valve (4), wherein the waste heat boiler steam (vapor) outlet first One end of road pipeline (91) is connected with the waste heat boiler steam (vapor) outlet main pipeline (9), after the other end and extraction check valve (4) Level-one extraction line (10) is connected, in this way, the steam that waste heat boiler (2) generates passes sequentially through the waste heat boiler steam (vapor) outlet master Pipeline (9) and the waste heat boiler steam (vapor) outlet first branch pipeline (91) enter the level-one pumping after the extraction check valve (4) Steam pipe road (10) is coupled with steam extraction therein,
The waste heat boiler (2) also passes through waste heat boiler steam (vapor) outlet main pipeline (9), waste heat boiler steam (vapor) outlet first branch pipe Road (91) and bypass duct (911) are connected with the level-one extraction line (10) before extraction check valve (4), wherein the bypass duct (911) one end is connected with the waste heat boiler steam (vapor) outlet first branch pipeline (91), before the other end and extraction check valve (4) Level-one extraction line (10) be connected, in this way, waste heat boiler (2) generate steam pass sequentially through the waste heat boiler steam (vapor) outlet Main pipeline (9), the waste heat boiler steam (vapor) outlet first branch pipeline (91) and the bypass duct (911) enter the steam extraction Level-one extraction line (10) before non-return valve (4) does work subsequently into the coal unit steam turbine high pressure cylinder (3).
2. biomass incinerator according to claim 1 and coal unit steam coupled system, which is characterized in that described remaining Heat boiler (2) also by waste heat boiler steam (vapor) outlet main pipeline (9) and waste heat boiler steam (vapor) outlet second branch pipeline (92) and High pressure cylinder blow-off line (11) is connected, wherein the high pressure cylinder blow-off line (11) and the coal unit steam turbine high pressure cylinder (3) It is connected, one end of the waste heat boiler steam (vapor) outlet second branch pipeline (92) and the waste heat boiler steam (vapor) outlet main pipeline (9) it is connected, the other end is connected with the high pressure cylinder blow-off line (11), in this way, the steam that waste heat boiler (2) generates passes sequentially through The waste heat boiler steam (vapor) outlet main pipeline (9) and the waste heat boiler steam (vapor) outlet second branch pipeline (92) enter the height Cylinder pressure blow-off line (11) is coupled with steam discharge therein.
3. feature exists according to claim 1 with 2 described in any item biomass incinerators and coal unit steam coupled system In being provided with vapour pressure monitor (7) on the waste heat boiler steam (vapor) outlet main pipeline (9).
4. feature exists according to claim 1 with 2 described in any item biomass incinerators and coal unit steam coupled system In being provided with filling valve (5) on the bypass duct (911).
5. feature exists according to claim 1 with 2 described in any item biomass incinerators and coal unit steam coupled system In being provided with regulating valve (6) on the waste heat boiler steam (vapor) outlet second branch pipeline (92).
6. feature exists according to claim 1 with 2 described in any item biomass incinerators and coal unit steam coupled system In temperature-decreased pressure reducer (8) being provided on the waste heat boiler steam (vapor) outlet second branch pipeline (92), relative to the regulating valve (6), the temperature-decreased pressure reducer (8) is located at waste heat boiler steam (vapor) outlet second branch pipeline (92) downstream.
7. a kind of method that biomass incinerator is coupled with coal unit steam, which is characterized in that
The steam for generating waste heat boiler (2) is successively through waste heat boiler steam (vapor) outlet main pipeline (9) and waste heat boiler steam (vapor) outlet First branch pipeline (91) enters the level-one extraction line (10) after extraction check valve (4), then couples with steam extraction therein,
The steam for generating waste heat boiler (2) successively passes through waste heat boiler steam (vapor) outlet main pipeline (9), waste heat boiler steam (vapor) outlet First branch pipeline (91) and bypass duct (911) enter the level-one extraction line (10) before extraction check valve (4), subsequently into Coal unit steam turbine high pressure cylinder (3) carries out acting power generation.
8. the method that biomass incinerator is coupled with coal unit steam according to claim 7, which is characterized in that this method It further comprise that the steam for generating waste heat boiler (2) successively passes through waste heat boiler steam (vapor) outlet main pipeline (9) and waste heat boiler Steam (vapor) outlet second branch pipeline (92) enters the high pressure cylinder blow-off line (11) being connected with coal unit steam turbine high pressure cylinder (3), Then it is coupled with steam discharge therein.
9. according to the method that any one of claim 7 and 8 biomass incinerator is coupled with coal unit steam, feature exists In, when the steam pressure in waste heat boiler steam (vapor) outlet main pipeline (9) is less than first pressure predetermined value, closing bypass duct (911) regulating valve (6) on filling valve (5) and waste heat boiler steam (vapor) outlet second branch pipeline (92) on, keeps steam complete It is coupled into the level-one extraction line (10) after extraction check valve (4) with steam extraction therein.
10. according to the method that any one of claim 7 and 8 biomass incinerator is coupled with coal unit steam, feature It is, when the steam pressure in waste heat boiler steam (vapor) outlet main pipeline (9) is pre- less than second pressure greater than first pressure predetermined value When definite value, the filling valve (5) on bypass duct (911) is opened, and close waste heat boiler steam (vapor) outlet second branch pipeline (92) On regulating valve (6), a part of steam for generating waste heat boiler (2) enters the level-one extraction steam pipe after extraction check valve (4) Road (10), another part enters the level-one extraction line (10) before extraction check valve (4), subsequently into coal unit steam turbine high pressure Cylinder (3) acting power generation.
11. according to the method that any one of claim 7 and 8 biomass incinerator is coupled with coal unit steam, feature It is, when the steam pressure in waste heat boiler steam (vapor) outlet main pipeline (9) is greater than second pressure predetermined value, opens simultaneously bypass The regulating valve (6) on filling valve (5) and waste heat boiler steam (vapor) outlet second branch pipeline (92) on pipeline (911), makes waste heat The a part for the steam that boiler (2) generates enters the level-one extraction line (10) after extraction check valve (4), and another part enters pumping Level-one extraction line (10) before vapour non-return valve (4) eventually enters into coal unit steam turbine high pressure cylinder (3) acting power generation, and there are also one The high pressure cylinder blow-off line (11) for entering and being connected with coal unit steam turbine high pressure cylinder (3) is divided to couple with steam discharge therein.
CN201811043765.8A 2018-09-07 2018-09-07 Steam coupling system and method for biomass incinerator and coal-fired unit Active CN109372602B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811043765.8A CN109372602B (en) 2018-09-07 2018-09-07 Steam coupling system and method for biomass incinerator and coal-fired unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811043765.8A CN109372602B (en) 2018-09-07 2018-09-07 Steam coupling system and method for biomass incinerator and coal-fired unit

Publications (2)

Publication Number Publication Date
CN109372602A true CN109372602A (en) 2019-02-22
CN109372602B CN109372602B (en) 2024-01-30

Family

ID=65404856

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811043765.8A Active CN109372602B (en) 2018-09-07 2018-09-07 Steam coupling system and method for biomass incinerator and coal-fired unit

Country Status (1)

Country Link
CN (1) CN109372602B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112160807A (en) * 2020-08-25 2021-01-01 光大环境科技(中国)有限公司 Incineration power generation system

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3044991A1 (en) * 1980-11-28 1982-07-01 Steag Ag, 4300 Essen Coal plus refuse burning power station - has refuse-fired boiler steam fed into coal-fired boiler system after high-pressure turbine, before reheater
JPH0979555A (en) * 1995-09-19 1997-03-28 Kubota Corp Garbage incinerator
CN201225195Y (en) * 2008-07-30 2009-04-22 吴中华 Biological stalk gasification combined circulation power generation system
DE102008059182A1 (en) * 2008-11-27 2010-06-10 Schaad, Paul, Dipl.-Ing. Locally recycling biogenic substitute fuels such as sewage sludge, comprises generation heat energy carrier in energy generation module, and drying the substitute fuels to selected dry substance content in substitute fuel processing module
CN102080582A (en) * 2010-12-06 2011-06-01 南京凯盛开能环保能源有限公司 Coal-fired power generation and waste heat power generation coupling system for private station of cement kiln
CN103452611A (en) * 2013-09-05 2013-12-18 上海电气电站设备有限公司 Combined-cycle combined heat and power system
CN106224036A (en) * 2016-09-05 2016-12-14 重庆科技学院 The refuse gasification combustion gas of a kind of multi-stage heat exchanger and steam turbine combined generating system
CN107269335A (en) * 2017-07-28 2017-10-20 浙江大学 The rubbish and gas combustion-gas vapor combined cycle system of a kind of use combustion gas garbage drying
CN107327326A (en) * 2017-07-28 2017-11-07 浙江大学 A kind of integral combined circulating power generation system of integrated garbage gas steam
CN107327323A (en) * 2017-08-23 2017-11-07 哈尔滨锅炉厂有限责任公司 Fired power generating unit and waste incinerator working medium combined generating system
CN107559058A (en) * 2017-08-23 2018-01-09 哈尔滨锅炉厂有限责任公司 A kind of Thermal-mechanical Coupling electricity generation system of waste incinerator middle pressure steam and coal unit
CN207538880U (en) * 2017-12-06 2018-06-26 中国大唐集团科学技术研究院有限公司华东分公司 A kind of coal unit coupled biological matter gas power generation heat integration utilizes system
CN108266718A (en) * 2017-12-26 2018-07-10 哈尔滨锅炉厂有限责任公司 The high level that waste incinerator low-lying level working medium is coupled with coal-burning boiler utilizes system
CN108412562A (en) * 2018-02-05 2018-08-17 安徽国祯生态科技有限公司 A kind of fire coal coupled biological matter electrification technique and device
CN209115161U (en) * 2018-09-07 2019-07-16 上海明华电力科技有限公司 A kind of biomass incinerator and coal unit steam coupled system

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3044991A1 (en) * 1980-11-28 1982-07-01 Steag Ag, 4300 Essen Coal plus refuse burning power station - has refuse-fired boiler steam fed into coal-fired boiler system after high-pressure turbine, before reheater
JPH0979555A (en) * 1995-09-19 1997-03-28 Kubota Corp Garbage incinerator
CN201225195Y (en) * 2008-07-30 2009-04-22 吴中华 Biological stalk gasification combined circulation power generation system
DE102008059182A1 (en) * 2008-11-27 2010-06-10 Schaad, Paul, Dipl.-Ing. Locally recycling biogenic substitute fuels such as sewage sludge, comprises generation heat energy carrier in energy generation module, and drying the substitute fuels to selected dry substance content in substitute fuel processing module
CN102080582A (en) * 2010-12-06 2011-06-01 南京凯盛开能环保能源有限公司 Coal-fired power generation and waste heat power generation coupling system for private station of cement kiln
CN103452611A (en) * 2013-09-05 2013-12-18 上海电气电站设备有限公司 Combined-cycle combined heat and power system
CN106224036A (en) * 2016-09-05 2016-12-14 重庆科技学院 The refuse gasification combustion gas of a kind of multi-stage heat exchanger and steam turbine combined generating system
CN107269335A (en) * 2017-07-28 2017-10-20 浙江大学 The rubbish and gas combustion-gas vapor combined cycle system of a kind of use combustion gas garbage drying
CN107327326A (en) * 2017-07-28 2017-11-07 浙江大学 A kind of integral combined circulating power generation system of integrated garbage gas steam
CN107327323A (en) * 2017-08-23 2017-11-07 哈尔滨锅炉厂有限责任公司 Fired power generating unit and waste incinerator working medium combined generating system
CN107559058A (en) * 2017-08-23 2018-01-09 哈尔滨锅炉厂有限责任公司 A kind of Thermal-mechanical Coupling electricity generation system of waste incinerator middle pressure steam and coal unit
CN207538880U (en) * 2017-12-06 2018-06-26 中国大唐集团科学技术研究院有限公司华东分公司 A kind of coal unit coupled biological matter gas power generation heat integration utilizes system
CN108266718A (en) * 2017-12-26 2018-07-10 哈尔滨锅炉厂有限责任公司 The high level that waste incinerator low-lying level working medium is coupled with coal-burning boiler utilizes system
CN108412562A (en) * 2018-02-05 2018-08-17 安徽国祯生态科技有限公司 A kind of fire coal coupled biological matter electrification technique and device
CN209115161U (en) * 2018-09-07 2019-07-16 上海明华电力科技有限公司 A kind of biomass incinerator and coal unit steam coupled system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘永林;屈杰;周科;黄嘉驷;: "烟气余热回收利用系统节能效果试验研究", 热能动力工程, no. 04 *
王刚;曲红建;吕群;: "我国生物质气化耦合发电技术及应用探讨", 中国环保产业, no. 01 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112160807A (en) * 2020-08-25 2021-01-01 光大环境科技(中国)有限公司 Incineration power generation system

Also Published As

Publication number Publication date
CN109372602B (en) 2024-01-30

Similar Documents

Publication Publication Date Title
CN203375426U (en) Boiler tail structure capable of preventing boiler low-temperature air preheater from low-temperature corrosion
CN108266718A (en) The high level that waste incinerator low-lying level working medium is coupled with coal-burning boiler utilizes system
CN209115161U (en) A kind of biomass incinerator and coal unit steam coupled system
CN109372602A (en) A kind of biomass incinerator and coal unit steam coupled system and method
CN113803706A (en) Power generation system based on hot air recycling utilizes boiler afterbody flue gas waste heat
CN109373332B (en) Flue gas waste heat recovery system and method for coal-fired coupled garbage power generation
CN210921417U (en) Waste incineration power generation equipment with 850 ℃/2S combustion process
CN111322621A (en) Thermal power plant coupled waste incineration power generation system and method
CN102494329B (en) Device for utilizing flue gas waste heat of boiler comprehensively
CN202125937U (en) System for comprehensively recycling boiler energy in tobacco industry
CN110145754A (en) It can prevent the boiler flue gas treatment system and method for back-end surfaces low-temperature corrosion
CN210134979U (en) Garbage power generation system with external independent reheater
CN215112694U (en) Full-load denitration system of circulating fluidized bed boiler based on biomass fuel
CN207762878U (en) The high level that waste incinerator low-lying level working medium is coupled with coal-burning boiler utilizes system
CN211694839U (en) Waste incineration power generation system with biogas superheater
CN209557055U (en) High-efficiency refuse power generation by waste combustion system
CN203258668U (en) Oxygen-enriched combustion heat utilizing device
CN103234213A (en) Method and device for utilizing oxygen-enriched combustion heat
CN105782989A (en) Intake method of garbage incineration boiler hearth and garbage incineration boiler equipment thereof
CN206973523U (en) A kind of gasification of biomass coupling coal fired power generation gasification gas utilizes system
CN112797396A (en) High-moisture biomass fuel power generation system and operation method
CN211011382U (en) Waste incineration power generation bypass recovery system
CN217737175U (en) Novel superheater for improving power generation efficiency of garbage power plant
CN212108426U (en) Thermal power plant coupling waste incineration power generation system
CN202229169U (en) Self-deoxidizing waste heat power generation system capable of effectively lowering boiler discharged smoke temperature

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 200437 room 801, building 9, 171 Handan Road, Hongkou District, Shanghai

Applicant after: Shanghai Minghua Power Technology Co.,Ltd.

Applicant after: SHANGHAI ELECTRIC POWER Co.,Ltd.

Applicant after: EAST CHINA ELECTRIC POWER DESIGN INSTITUTE CO., LTD. OF CHINA POWER ENGINEERING CONSULTING Group

Address before: 200437 room 801, building 9, 171 Handan Road, Hongkou District, Shanghai

Applicant before: SHANGHAI MINGHUA ELECTRIC POWER TECHNOLOGY AND ENGINEERING Co.,Ltd.

Applicant before: SHANGHAI ELECTRIC POWER Co.,Ltd.

Applicant before: EAST CHINA ELECTRIC POWER DESIGN INSTITUTE CO., LTD. OF CHINA POWER ENGINEERING CONSULTING Group

GR01 Patent grant
GR01 Patent grant