CN109372240A - All steel attachment type raise scaffold - Google Patents

All steel attachment type raise scaffold Download PDF

Info

Publication number
CN109372240A
CN109372240A CN201811487598.6A CN201811487598A CN109372240A CN 109372240 A CN109372240 A CN 109372240A CN 201811487598 A CN201811487598 A CN 201811487598A CN 109372240 A CN109372240 A CN 109372240A
Authority
CN
China
Prior art keywords
plate
main body
wall
steel
balcony
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811487598.6A
Other languages
Chinese (zh)
Inventor
郭娇龙
李冬冬
蒋昊辰
孟双
张松
瞿绪浩
杨喜锋
瞿宁
瞿涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Feng Li Security Technology Co Ltd
Original Assignee
Guangzhou Feng Li Security Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Feng Li Security Technology Co Ltd filed Critical Guangzhou Feng Li Security Technology Co Ltd
Priority to CN201811487598.6A priority Critical patent/CN109372240A/en
Publication of CN109372240A publication Critical patent/CN109372240A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • E04G3/325Safety devices for stabilising the mobile platform, e.g. to avoid it swinging in the wind
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Movable Scaffolding (AREA)

Abstract

The present invention relates to scaffold fields, more particularly to a kind of all steel attachment type raise scaffold, including main body, the main body upper end is provided with outside lateral suspension scaffold, the suspension scaffold free end is provided with upward outlet upright bar, it is provided with pedal on the suspension scaffold, is provided with hound between the outlet upright bar and main body;It is evenly arranged with multiple rows of catching device for connecting with wall or balcony from top to bottom on the inside of the main body, wherein the catching device with wall connecting is the first catching device, is provided with connecting beam apparatus between first catching device and wall;The main body includes the multilayer Z-shaped support frame being sequentially arranged from top to bottom, Z-shaped support frame upper end is provided with pedal, it is provided with sealing panel turnover device between pedal corresponding with the Z-shaped support frame of balcony face and balcony, it is easy for installation, structural strength is high, adaptable.

Description

All steel attachment type raise scaffold
Technical field
The present invention relates to scaffold field more particularly to a kind of all steel attachment type raise scaffolds.
Background technique
Attached lifting scaffold, which refers to, to be set up certain altitude and is attached in engineering structure, by itself lifting device and Device successively can climb or decline with engineering structure, the external scaffolding with overturn-preventing, falling proof device;Adhering lifting foot hand Frame is mainly filled by attached lifting scaffold frame structure, attachment support, anti-tilt device, falling proof device, elevating mechanism and control It sets etc. and to constitute.
Due to building structure multiplicity at this stage, and single layer floor chooses high reduction, reasonable by the way of staggered floor balcony Creation balcony space, and mostly use and float eaves to increase the main body aesthetic measure of room body and waterproof performance, existing adhesion type liter Scaffold is dropped when being directed to staggered floor balcony, is installed often through the mode of emptying, stress is caused to concentrate, safety coefficient drop It is low, for float eaves when, lateral outer builder's jack is built by steel pipe in existing main body upper end, for operator stand, it has not been convenient to It installs and safety coefficient is low.
Summary of the invention
It is an object of the invention to overcome deficiency in the prior art, provide it is a kind of it is easy for installation, structural strength is high, adapts to The strong all steel attachment type raise scaffold of property.
The present invention is achieved by the following technical solutions: a kind of all steel attachment type raise scaffold, including main body, described Main body upper end is provided with outside lateral suspension scaffold, and the suspension scaffold free end is provided with upward outlet upright bar, the overhanging It is provided with pedal on frame, is provided with hound between the outlet upright bar and main body;
It is evenly arranged with multiple rows of catching device for connecting with wall or balcony from top to bottom on the inside of the main body, wherein with wall The catching device of body connection is the first catching device, is provided with connecting beam apparatus between first catching device and wall;
The main body includes the multilayer Z-shaped support frame being sequentially arranged from top to bottom, and Z-shaped support frame upper end, which is provided with, to be stepped on Plate is provided with sealing panel turnover device between pedal corresponding with the Z-shaped support frame of balcony face and balcony.
Further, the hound has two rows, and two rows of hounds are parallel to each other, and the suspension scaffold is arranged in two rows Between hound, the hound both ends are provided with hound connecting plate, the hound by hound connecting plate and main body, Outlet upright bar connection, the outlet upright bar are provided with protective net outside.
Further, the connecting beam apparatus includes attachment beam, and the installation end of the attachment beam is provided with attachment beam and fixes Plate, the attachment beam are fixed by attachment beam fixed plate with wall, and the free end of the attachment beam is provided with for preventing with first The seat board of device connection is fallen, seat board upper end middle position is provided with seat board connecting hole, is arranged between the seat board and attachment beam There is gusset, the free end upper surface of the attachment beam is provided with upper connecting base, sets between the upper connecting base and corresponding balcony Be equipped with upper connecting rod, the free end lower end surface of the attachment beam is provided with lower connecting base, the lower connecting base and corresponding balcony it Between be provided with lower supporting rod.
Further, the attachment beam includes the channel steel that Open Side Down, and uniform intervals are provided with multiple in the channel steel Fagging, it is described support board ends and channel steel both wings connect, the gusset include be arranged in channel steel upper surface vertical gusset and The lateral gusset of channel steel side is set, and the vertical gusset and lateral gusset are triangular support plate, the vertical gusset Upper and seat board junction middle position is provided with semicircular opening, and the seat board connecting hole is lateral strip hole.
Further, the upper connecting rod and lower supporting rod include two connecting rods being coaxially set, corresponding two companies Screw thread is provided on the opposite one end outer wall of extension bar, and the hand of spiral in corresponding two connecting rods is on the contrary, corresponding two Connecting rod mutually from one end be provided with lateral connecting hole, the connecting rod is connected by connecting hole with corresponding attachment base, institute It is vertical with corresponding connecting rod to state connector sleeve, adjusting sleeve is provided between corresponding two connecting rods, the adjusting sleeve includes set Pipe, described sleeve pipe both ends, which are provided with, is provided with adjustment with the matched internal screw thread of corresponding connecting rod, described sleeve pipe outer wall middle position Handle.
Further, the sealing panel turnover device includes connecting with the multiple turnover panels of corresponding pedal connection being uniformly arranged Frame, the turnover panel connection frame include I-shaped connection frame, the I-shaped connection frame both ends respectively with pedal and turnover panel hinged seat It is fixed.
Further, the I-shaped connection frame includes the lateral connection column made of square steel tube, the connecting column both ends It is provided with vertical connection frame connecting plate, is provided with bolt hole on the connection frame connecting plate, it is corresponding with turnover panel hinged seat Connection frame connecting plate lower end be provided with outside supporting plate, the turnover panel hinged seat is arranged on supporting plate.
Further, turnover panel includes plate body, and the plate body lower end surface is provided with turnover panel support plate, the turnover panel hinged seat with Sealing plate is provided in gap between corresponding pedal, the sealing plate is located above I-shaped connection frame.
Further, crown wall adjustment wheel apparatus, the crown wall adjustment wheel dress are provided between the main body and balcony exterior wall The turning rolls including being connected in main body is set, the idler wheel for compressing with balcony exterior wall, the rolling are provided on the turning rolls It takes turns vertically arranged.
Further, protective net is provided on the outside of the main body.
The beneficial effects of the present invention are: setting suspension scaffold, pedal can facilitate operator to construct the eaves that floats, if Setting outlet upright bar can be to protecting, while facilitating installation hound, improves structural strength, and connecting beam apparatus is arranged, can Increase the supporting point of main body, improves stability.
Detailed description of the invention
Fig. 1 is 1 front view schematic diagram of embodiment;
Fig. 2 is suspension scaffold front view schematic diagram;
Fig. 3 is that hound and lower beam structural diagrams are intended to;
Fig. 4 is attachment beam front view schematic diagram;
Fig. 5 is attachment beam top view illustration;
Fig. 6 is lash adjusting device right view schematic diagram;
Fig. 7 is upper connecting rod sectional view schematic diagram;
Fig. 8 is reverse turning bed structure top view illustration;
Fig. 9 is reverse turning bed structure front view schematic diagram;
Figure 10 is turnover panel connection frame front view schematic diagram;
Figure 11 is turnover panel connection frame top view illustration;
Figure 12 is turnover panel connection frame right view schematic diagram;
Figure 13 is jackscrew sectional view schematic diagram;
Figure 14 is crown wall wheel front view schematic diagram;
Figure 15 is crown wall wheel top view illustration;
Wherein: 1- wall, 2- balcony, 3- float eaves, 4- main body, 401- pedal, 5- connecting beam apparatus, 501- attachment beam, and 502- connects Meet beam fixed plate, 503- seat board, the vertical gusset of 504-, 505- transverse direction gusset, 506- upper connecting base, 507- lower connecting base, 508- Support plate, 509- adjustment bottom plate, 510- guide post, 511- hold-down bolt, 512- puller bolt, 513- fixation hole, 514- casing, 515- nut, 516- cylindrical seat, 517- adjust handle, 518- positioning pin, 519- guide cylinder, 520- guide sleeve, 521- connection Bar, 522- steel plate, 523- connecting hole, 524- short tube, 525- strip hole, 6- suspension scaffold, 601- hound, 602- upper boom, 603- Protective net, 605- hound connecting plate, 606- flange, 607- lower beam connecting rod, 608- pedal drag beam, 609- lower beam, 7- turnover panel Device, 701- turnover panel, 702- turnover panel connection frame, 703- sealing plate, 704- opening, 705- pull ring, 706- connecting column, 707- connection Frame connecting plate, 708- supporting plate, 709- turnover panel hinged seat, 710- turnover panel support plate, 711- mounting plate, 712- fabrication hole, 713- connect Connecting bolt hole, 714- jackscrew, 715- spring, 8- crown wall wheel apparatus, 801- mounting plate, 802- pedestal axle sleeve, 803- axis, 804- add Power bar jack, 805- turning rolls axle sleeve, 806- turning rolls, 807- compressed spring, 808- roller shaft, 809- idler wheel, 810- reinforce Gusset, 9- catching device.
Specific embodiment
In the description of the present invention, it is also necessary to which explanation is unless specifically defined or limited otherwise, term " setting ", " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be fixedly connected, may be a detachable connection or one Connect to body;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, it can also be indirect by intermediary It is connected, can be the connection inside two elements.For the ordinary skill in the art, on being understood with concrete condition State the concrete meaning of term in the present invention.
Below in conjunction with the attached drawing in inventive embodiments, technical solution in the embodiment of the present invention carries out clear, complete Ground description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based on this Embodiment in invention, every other reality obtained by those of ordinary skill in the art without making creative efforts Example is applied, shall fall within the protection scope of the present invention.
Embodiment 1
As shown in figures 1-15, a kind of all steel attachment type raise scaffold, including main body 4, main body upper end are equipped with outside transverse direction Suspension scaffold 6, suspension scaffold free end are equipped with upward outlet upright bar, and outlet upright bar includes the lower beam connecting with hound 601 609, lower beam upper end coaxial line is equipped with upper boom 602, and upper boom and lower beam are made of square tube, passes through flange between upper boom and lower beam 606 connections, hound have two rows, and two rows of hounds are parallel to each other, and suspension scaffold is mounted between two rows of hounds, hound It is the body of rod of T-type including section, to mitigate weight, the body of rod is hollow stem, and body of rod both ends are welded with hound connecting plate 605, hound mounting hole is machined on hound connecting plate, can guarantee structural strength, while facilitating installation, adjacent two It is mounted on lower beam connecting rod 607 between lower beam both ends, is equipped with and steps between the adjacent corresponding lower beam connecting rod of two lower beams The outer end of plate support beam 608, pedal 401 is connect with pedal joist, and in the present embodiment, pedal is suspension scaffold, and pedal outer end is set up On pedal bracket.
Protective net 603 is installed outside outlet upright bar.
In the present embodiment, when for the skyscraper with eaves structure of floaing, then first mounting body pre-installs suspension scaffold list Body, suspension scaffold monomer include two lower beams, are welded with lower beam connecting rod between two lower beams and pedal drags beam, any suspension scaffold list Body has been bolted four hounds, and the suspension scaffold monomer that prepackage is completed is mounted in main body by bolt, two neighboring outstanding Lower beam connecting rod between builder's jack monomer, pedal drag beam to be bolted, then install pedal, and pedal outer end passes through bolt and phase The pedal bracket connection answered, easy for installation, after pedal is installed, operator, which may stand on pedal, to install upper boom and prevents Protective net facilitates operation.
It is evenly arranged with multiple rows of catching device 9 for connecting with wall or balcony from top to bottom on the inside of main body, wherein with The catching device of wall connecting is the first catching device, is provided with connecting beam apparatus 5, attachment beam between first catching device and wall Device includes attachment beam 501, and attachment beam includes the channel steel that Open Side Down, and uniform intervals are equipped with multiple support plates 508 in channel steel, Spacing between two neighboring support plate is 500mm, supports the both wings of board ends and channel steel to be welded to connect, the installation end of attachment beam It is welded with attachment beam fixed plate 502, attachment beam is fixed by attachment beam fixed plate with wall, attachment beam fixed plate and wall Between lash adjusting device is installed, lash adjusting device includes the adjustment bottom plate 509 for being fixed on the wall, adjust bottom plate It is fixed by fixation hole 513 and bolt with wall, adjusts the guide post 510 for being welded on bottom plate and being directed toward attachment beam, connection In beam fixed plate be machined with pilot hole at guide post opposite position, tune is installed between attachment beam fixed plate and adjustment bottom plate Whole bolt, in the present embodiment, guide post 510 is made of square tube, and guide post and adjustment bolt have two groups, is symmetricly set on attachment beam Upper and lower two sides, adjustment bolt include the hold-down bolt 511 being fixed on adjustment bottom plate, and hold-down bolt passes through the fixed sleeve-board of attachment beam Equipped with clamp nut, adjustment bolt further includes that screw thread is installed on the Top fastening screw 512 that adjustment bottom plate is directed toward in attachment beam fixed plate, Gap adjustment can be carried out according to the construction difference of building by lash adjusting device, improve adaptability, while can be installation Space is provided.
The free end of attachment beam is equipped with the seat board 503 for connecting with catching device, and seat board upper end middle position is machined with Seat board connecting hole, is equipped with gusset between seat board and attachment beam, the free end upper surface of attachment beam is welded with for installing pull-up The upper connecting base 506 of bar, the free end lower end surface of attachment beam are welded with the lower connecting base 507 for installing lower supporting rod, this implementation In example, gusset includes the vertical gusset 504 for being welded on channel steel upper surface and the lateral gusset 505 for being welded on channel steel side, vertically Gusset and lateral gusset are triangular support plate, are machined with semicircle with the middle position of seat board junction on vertical gusset and open Mouthful, seat board connecting hole is lateral strip hole.
Upper connecting rod is installed between upper connecting base and corresponding balcony, is equipped with down between lower connecting base and corresponding balcony Strut, upper connecting rod and lower supporting rod include the connecting rod 521 of two coaxial lines installation, the opposite one end of corresponding two connecting rods Be threaded on outer wall, and the hand of spiral in corresponding two connecting rods on the contrary, corresponding two connecting rods mutually from one End is machined with lateral connecting hole 523, and in the present embodiment, upper connecting rod and lower supporting rod include the connecting rod of two coaxial lines installation 8, connecting rod is made of round tube, is threaded on the opposite one end outer wall of two connecting rods, the thread rotary orientation phase in two connecting rods Instead, two connecting rods mutually from one end have a connecting hole 523, corresponding two connecting rods mutually from one end outer end face be machined with slot, It is installed by welding with steel plate 522 at slot, connects hole machined on the steel plate, specifically, steel plate inner face is welded with short tube 524, it is short Pipe is inserted into connecting rod, and short tube and connecting rod are interference fitted, and short tube is inserted into connecting rod outer end, steel plate and slot by external force Edge welding, bonding strength is high, while can be avoided stress and concentrating on slot edge.
Adjusting sleeve is installed, adjusting sleeve includes casing 514, and casing is made of round tube, and casing both ends are same between two connecting rods Axis is fixed with nut 515, and casing is threadedly coupled with connecting rod by nut, is equipped in adjusting sleeve for carrying out to connecting rod The guiding device of guiding, guiding device include the cylindrical seat 3 that clearance fit is installed in adjusting sleeve, and the installation of cylindrical seat both ends is oriented Outer guide cylinder 519, connecting rod is made of round tube, and guide cylinder outer end is inserted into corresponding connecting rod, and cylindrical seat is by justifying Pipe is made, guide cylinder gap of inner end cooperation is inserted into cylindrical seat, guide cylinder is welded and fixed with cylindrical seat, guide cylinder and Connecting rod clearance fit is equipped with the positioning pin 518 for preventing cylindrical seat from rotating, casing interposition between cylindrical seat and casing It sets and is machined with bolt hole, cylindrical seat middle position is machined with strip hole 525 corresponding with bolt hole, and positioning pin selects bolt, Positioning pin passes through bolt hole and strip hole, and connecting rod inner end is located at thread bush on the outer wall in casing and guide sleeve 520, guiding are housed Clearance fit between set and casing.
On sleeve outer wall close to middle position be symmetrically installed there are two adjust handle 517.
During installation, casing, connecting rod, cylindrical seat are first processed, the cylindrical seat that prepackage is completed is installed in casing, then Connecting rod and casing tube wearing, welded nut that prepackage is completed are installed, when in use, pass through connecting hole and main body and wall Body connection, rotational handle compress support rod with corresponding main body and wall.
When in use, connecting rod is limited by guide cylinder, guide sleeve, nut, can guarantees connecting rod and set Concentricity between pipe, avoids stress from concentrating, and improves service life and stability.
Main body includes the multilayer Z-shaped support frame being sequentially arranged from top to bottom, and Z-shaped support frame upper end, which is provided with, to be stepped on Plate is provided with sealing panel turnover device 7, sealing turnover panel dress between pedal corresponding with the Z-shaped support frame of balcony face and balcony The multiple turnover panel connection frames 702 being uniformly arranged including connecting with corresponding pedal 401 are set, between two neighboring turnover panel connection frame Spacing be 400mm, turnover panel connection frame includes I-shaped connection frame, and I-shaped connection frame includes laterally connecting made of square steel tube Column 706 is connect, connecting column is made of square tube, and connecting column both ends are welded with vertical connection frame connecting plate 8, on connection frame connecting plate It is machined with bolt hole, there are two the bolts hole on any connection frame connecting plate, two bolts hole on any connection frame connecting plate It is highly identical and be lateral strip hole, facilitate installation.
Connection frame connecting plate lower end corresponding with turnover panel hinged seat is equipped with outside supporting plate 708, in the present embodiment, support Plate is integrally formed with corresponding connection frame connecting plate, and turnover panel hinged seat is mounted on supporting plate, can be improved bonding strength, turnover panel 701 include plate body, and plate body lower end surface is equipped with turnover panel support plate 710, specifically, plate body is by curved with a thickness of the steel plate of 1.5-2mm It rolls over, plate body is wherein corresponding with turnover panel hinged seat under a flapwise, and turnover panel support plate is welded between the both wings of plate body, for convenience It individually opens sealing plate and constructs, plate body includes multiple plate body monomers arranged side by side, between two neighboring plate body monomer Gap is 1-2mm, and the pull ring 705 for lifting plate body monomer is equipped with above the free end of plate body monomer.
I-shaped connection frame both ends are fixed with pedal and 709 bolt of turnover panel hinged seat respectively, turnover panel hinged seat with it is corresponding Gap location between pedal is equipped with sealing plate 703, and sealing plate is located above I-shaped connection frame, in the present embodiment, sealing plate Along multiple veneers of straight line installation, any veneer is made of the iron plate of two pieces of lay out in parallel, and the thickness value of iron plate is 1.5-2mm, It is machined with the opening 704 for passing through attached wall elevating scaffold column between corresponding two pieces of iron plates, facilitates processing, and can have Effect avoids column, and sealing performance is high, easy for installation.
In the present embodiment, turnover panel connection frame includes the mounting plate 711 for connecting with pedal, is machined with installation on mounting plate Bolt hole, mounting plate middle position are welded with outside connecting column 706, and connecting column is made of square tube, on connecting column side wall It is machined with fabrication hole 712, can reduce connecting column weight, while guaranteeing connecting column structural strength, connecting column outer end is welded and fixed There is the connecting base plate 707 for connecting with turnover panel hinged seat, is machined with link bolt hole 713, link bolt hole on connecting base plate There are two, two link bolt hole arrangement height are identical, and two link bolt hole are lateral slotted eye.
Connecting base plate lower end is integrally formed with outside supporting plate 708, and screw thread is coated with for pushing up sealing plate upwards on supporting plate The jackscrew 714 of hinged seat, there are two jackscrews, and two jackscrews are distributed in two ends of bearing plate position, and jackscrew upper surface is machined with upward Spring mounting hole, spring 715 is equipped in spring mounting hole, and spring upper end exceeds spring mounting hole.
Scaffold provided in this embodiment first passes through installation bolt hole during installation with sealing turnover panel connection frame It is mounted on pedal, then multiple same straight line installations of connection frame install sealing plate hinged seat, pass through link bolt hole and bolt Then connection adjusts sealing plate hinged seat by jackscrew, causes sealing plate hinged seat lower end uniform force, can be made by spring It is compressed between jackscrew and supporting plate, prevents jackscrew from loosening.
Crown wall wheel 8 is also equipped between main body and balcony, crown wall wheel includes pedestal, apical axis is connected on pedestal, apical axis is Telescopic shaft, apical axis end are connected with turning rolls 806, specifically, pedestal includes mounting plate 801, are equipped with datum axle on mounting plate 802 are covered, turning rolls axle sleeve 805 corresponding with pedestal axle sleeve is welded on turning rolls, between pedestal axle sleeve and turning rolls axle sleeve It is coated with axis 803, axis is made of round tube, and oppositely oriented screw thread, pedestal axle sleeve and turning rolls axis are machined on the outer wall of axis both ends It puts on and is also accordingly threaded, axis middle position is machined with the reinforcing bar jack 804 for rotation axis.
Idler wheel 809 is installed on turning rolls, roller shaft 808 is coated on turning rolls, idler wheel is ball bearing, and roller housing is mounted in On roller shaft, roller surface is set with hard set, and hard set is quenching steel bushing, can be improved the wear-resisting property of idler wheel, turning rolls On integrally formed with the stiffener plate 810 for Auxiliary support roller shaft, improve axial arrangement intensity.
The compressed spring 807 for pushing out moving axis is coated in pedestal axle sleeve and turning rolls axle sleeve, it can be effective Prevent axis from loosening.
Raise scaffold provided in this embodiment crown wall wheel when installation, is pre-installed raise scaffold crown wall wheel, is led to It crosses mounting plate to be mounted on frame body, by reinforcing bar jack rotation axis, apical axis elongation is compressed idler wheel and metope, what is used In the process, compressed spring can play anti-loose effect, and when frame body deforms, prepackage raise scaffold crown wall wheel can It is moved on wall, and then changes supporting point position, guarantee job stability.
Finally, it should be noted that the foregoing is only a preferred embodiment of the present invention, it is not intended to restrict the invention, Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features, All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in of the invention Within protection scope.

Claims (10)

1. a kind of all steel attachment type raise scaffold, including main body, it is characterised in that: the main body upper end is provided with outside cross To suspension scaffold, the suspension scaffold free end is provided with upward outlet upright bar, and pedal, the outlet are provided on the suspension scaffold Hound is provided between upright bar and main body;
It is evenly arranged with multiple rows of catching device for connecting with wall or balcony from top to bottom on the inside of the main body, wherein with wall The catching device of body connection is the first catching device, is provided with connecting beam apparatus between first catching device and wall;
The main body includes the multilayer Z-shaped support frame being sequentially arranged from top to bottom, and Z-shaped support frame upper end, which is provided with, to be stepped on Plate is provided with sealing panel turnover device between pedal corresponding with the Z-shaped support frame of balcony face and balcony.
2. all steel attachment type raise scaffold according to claim 1, it is characterised in that: the hound has upper and lower two Row, two rows of hounds are parallel to each other, and the suspension scaffold is arranged between two rows of hounds, and the hound both ends are provided with diagonal brace Bar connecting plate, the hound are connect by hound connecting plate with main body, outlet upright bar, are provided with outside the outlet upright bar anti- Protective net.
3. all steel attachment type raise scaffold according to claim 1, it is characterised in that: the connecting beam apparatus includes connecting Beam is connect, the installation end of the attachment beam is provided with attachment beam fixed plate, and the attachment beam is solid by attachment beam fixed plate and wall Fixed, the free end of the attachment beam is provided with the seat board for connecting with the first catching device, and seat board upper end interposition installs It is equipped with seat board connecting hole, gusset is provided between the seat board and attachment beam, the free end upper surface of the attachment beam is provided with Upper connecting base, is provided with upper connecting rod between the upper connecting base and corresponding balcony, the free end lower end surface of the attachment beam is set It is equipped with lower connecting base, is provided with lower supporting rod between the lower connecting base and corresponding balcony.
4. all steel attachment type raise scaffold according to claim 3, it is characterised in that: the attachment beam include opening to Under channel steel, uniform intervals are provided with multiple support plates in the channel steel, and the both wings of the support board ends and channel steel connect, institute Stating gusset includes the vertical gusset that channel steel upper surface is arranged in and the lateral gusset that channel steel side is arranged in, the vertical gusset and Lateral gusset is triangular support plate, and the middle position of seat board junction is provided with semicircle on the vertical gusset and opens Mouthful, the seat board connecting hole is lateral strip hole.
5. all steel attachment type raise scaffold according to claim 3, it is characterised in that: the upper connecting rod and lower supporting rod are equal The connecting rod being coaxially set including two is provided with screw thread on the opposite one end outer wall of corresponding two connecting rods, and corresponding Two connecting rods on hand of spiral on the contrary, corresponding two connecting rods mutually from one end be provided with lateral connecting hole, institute Connecting rod to be stated to connect by connecting hole with corresponding attachment base, the connector sleeve is vertical with corresponding connecting rod, and corresponding two Adjusting sleeve is provided between connecting rod, the adjusting sleeve includes casing, and described sleeve pipe both ends are provided with to be matched with corresponding connecting rod Internal screw thread, described sleeve pipe outer wall middle position is provided with adjustment handle.
6. all steel attachment type raise scaffold according to claim 1, it is characterised in that: the sealing panel turnover device includes With the multiple turnover panel connection frames of corresponding pedal connection being uniformly arranged, the turnover panel connection frame includes I-shaped connection frame, institute I-shaped connection frame both ends are stated to fix with pedal and turnover panel hinged seat respectively.
7. all steel attachment type raise scaffold according to claim 6, it is characterised in that: the I-shaped connection frame includes The lateral connection column made of square steel tube, the connecting column both ends are provided with vertical connection frame connecting plate, the connection frame Bolt hole is provided on connecting plate, connection frame connecting plate lower end corresponding with turnover panel hinged seat is provided with outside supporting plate, institute Turnover panel hinged seat is stated to be arranged on supporting plate.
8. all steel attachment type raise scaffold according to claim 6, it is characterised in that: turnover panel includes plate body, the plate Body lower end surface is provided with turnover panel support plate, is provided with sealing plate in the gap between the turnover panel hinged seat and corresponding pedal, The sealing plate is located above I-shaped connection frame.
9. all steel attachment type raise scaffold according to claim 1, it is characterised in that: the main body and balcony exterior wall it Between be provided with crown wall adjustment wheel apparatus, crown wall adjustment wheel apparatus includes the turning rolls being connected in main body, the turning rolls On be provided with idler wheel for compressing with balcony exterior wall, the idler wheel is vertically arranged.
10. all steel attachment type raise scaffold according to claim 1, it is characterised in that: be provided on the outside of the main body Protective net.
CN201811487598.6A 2018-12-06 2018-12-06 All steel attachment type raise scaffold Pending CN109372240A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811487598.6A CN109372240A (en) 2018-12-06 2018-12-06 All steel attachment type raise scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811487598.6A CN109372240A (en) 2018-12-06 2018-12-06 All steel attachment type raise scaffold

Publications (1)

Publication Number Publication Date
CN109372240A true CN109372240A (en) 2019-02-22

Family

ID=65375932

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811487598.6A Pending CN109372240A (en) 2018-12-06 2018-12-06 All steel attachment type raise scaffold

Country Status (1)

Country Link
CN (1) CN109372240A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110219450A (en) * 2019-05-30 2019-09-10 深圳市特辰科技股份有限公司 The full-automatic climbing frame supporting device of upper and lower guide bracket cooperative bearing
CN112096044A (en) * 2020-11-09 2020-12-18 山东新活新材料科技有限公司 Bottom pedal of climbing frame
CN114809565A (en) * 2022-04-18 2022-07-29 中建八局第一建设有限公司 Ultrahigh-rise core tube variable-section inclined wall hanging frame and construction method
CN115450417A (en) * 2022-10-13 2022-12-09 中天建设集团有限公司 Combined type climbing frame supporting structure of high-rise large-spacing staggered balcony building and climbing frame construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201962932U (en) * 2010-12-20 2011-09-07 江苏南通三建集团第十六建设发展有限公司 Building construction segmented overhung outer scaffold
KR20120008002U (en) * 2011-05-16 2012-11-26 (주)신일산업 Scaffold that safety door estabilshed in outer wall railing of construction is equiped
CN107268987A (en) * 2017-06-30 2017-10-20 上海建工集团股份有限公司 Across formula adjustable climb seat in the plane reaction frame and its construction method
CN206942109U (en) * 2017-05-23 2018-01-30 北京六建集团有限责任公司 One kind is without special bracket and the protection support body of encorbelmenting of off-load industrialization security protection
CN108487624A (en) * 2018-05-25 2018-09-04 广州丰利达安防科技有限公司 Attachment type raise scaffold
CN207847057U (en) * 2018-01-24 2018-09-11 中建一局集团第一建筑有限公司 A kind of asymmetric buildings integrated form elevating scaffold attachment system
CN208122258U (en) * 2018-03-27 2018-11-20 北京博大新元房地产开发有限公司 Suspension scaffold
CN209293393U (en) * 2018-12-06 2019-08-23 广州丰利达安防科技有限公司 All steel attachment type raise scaffold

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201962932U (en) * 2010-12-20 2011-09-07 江苏南通三建集团第十六建设发展有限公司 Building construction segmented overhung outer scaffold
KR20120008002U (en) * 2011-05-16 2012-11-26 (주)신일산업 Scaffold that safety door estabilshed in outer wall railing of construction is equiped
CN206942109U (en) * 2017-05-23 2018-01-30 北京六建集团有限责任公司 One kind is without special bracket and the protection support body of encorbelmenting of off-load industrialization security protection
CN107268987A (en) * 2017-06-30 2017-10-20 上海建工集团股份有限公司 Across formula adjustable climb seat in the plane reaction frame and its construction method
CN207847057U (en) * 2018-01-24 2018-09-11 中建一局集团第一建筑有限公司 A kind of asymmetric buildings integrated form elevating scaffold attachment system
CN208122258U (en) * 2018-03-27 2018-11-20 北京博大新元房地产开发有限公司 Suspension scaffold
CN108487624A (en) * 2018-05-25 2018-09-04 广州丰利达安防科技有限公司 Attachment type raise scaffold
CN209293393U (en) * 2018-12-06 2019-08-23 广州丰利达安防科技有限公司 All steel attachment type raise scaffold

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110219450A (en) * 2019-05-30 2019-09-10 深圳市特辰科技股份有限公司 The full-automatic climbing frame supporting device of upper and lower guide bracket cooperative bearing
CN110219450B (en) * 2019-05-30 2021-08-17 深圳市特辰科技股份有限公司 Top supporting device of full-automatic climbing frame with upper and lower guide seats under cooperative stress
CN112096044A (en) * 2020-11-09 2020-12-18 山东新活新材料科技有限公司 Bottom pedal of climbing frame
CN112096044B (en) * 2020-11-09 2021-01-29 山东新活新材料科技有限公司 Bottom pedal of climbing frame
CN114809565A (en) * 2022-04-18 2022-07-29 中建八局第一建设有限公司 Ultrahigh-rise core tube variable-section inclined wall hanging frame and construction method
CN114809565B (en) * 2022-04-18 2023-07-07 中建八局第一建设有限公司 Super high-rise core tube variable-section inclined wall hanger and construction method
CN115450417A (en) * 2022-10-13 2022-12-09 中天建设集团有限公司 Combined type climbing frame supporting structure of high-rise large-spacing staggered balcony building and climbing frame construction method
CN115450417B (en) * 2022-10-13 2024-03-08 中天建设集团有限公司 Combined climbing frame supporting structure of high-rise large-spacing staggered balcony building and construction method thereof

Similar Documents

Publication Publication Date Title
CN109372240A (en) All steel attachment type raise scaffold
DE10339438C5 (en) Tower for a wind turbine
CN106801510A (en) Plastic formwork early removing system
CN209293393U (en) All steel attachment type raise scaffold
CN212743427U (en) Climbing type discharging platform
CN106592760B (en) Bolt-ball net frame high-altitude, which dissipates, spells construction method
CN205100531U (en) Lift scaffold support body assembly
CN218779929U (en) Telescopic wall-attached device at bay window
CN108590151A (en) A kind of scalable elevator hanging basket in four sides
CN111206783A (en) Shaped steel beam mounting structure and construction method
CN115520255A (en) Multifunctional multipurpose rotation transportation hoisting device and using method thereof
CN207228750U (en) Become length section triple strain combination emergent repairing tower
CN214801306U (en) Fixing device is used in transportation of view tree
CN106698242B (en) Support frame for pipeline installation
CN209670056U (en) A kind of adjustable bracket
CN209163419U (en) Connecting beam apparatus for raise scaffold
CN209082344U (en) A kind of cable-stayed type large-span steel roof beam structure
CN201730306U (en) Light-weight scaffold
CN220056059U (en) Nonstandard construction hoisting machinery
CN206903246U (en) A kind of structure with oblique member for building
CN209163452U (en) Lift all steel scaffold suitable for the eaves structural construction that floats
CN221321697U (en) Climbing device for climbing frame during high-rise structure
CN220791263U (en) Auxiliary installation device for tunnel primary support arch frame
CN220056282U (en) Follow-on hanging flower basket limit protector
CN219952623U (en) Prefabricated stair operation platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination