CN109371809A - A kind of bridge construction temporarily builds portable folding footbridge structure - Google Patents

A kind of bridge construction temporarily builds portable folding footbridge structure Download PDF

Info

Publication number
CN109371809A
CN109371809A CN201811273640.4A CN201811273640A CN109371809A CN 109371809 A CN109371809 A CN 109371809A CN 201811273640 A CN201811273640 A CN 201811273640A CN 109371809 A CN109371809 A CN 109371809A
Authority
CN
China
Prior art keywords
bridge
support frame
folding
connecting rod
floorings
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811273640.4A
Other languages
Chinese (zh)
Other versions
CN109371809B (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinxing Transportation Construction Co., Ltd
Original Assignee
于振海
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 于振海 filed Critical 于振海
Priority to CN201811273640.4A priority Critical patent/CN109371809B/en
Publication of CN109371809A publication Critical patent/CN109371809A/en
Application granted granted Critical
Publication of CN109371809B publication Critical patent/CN109371809B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/12Portable or sectional bridges
    • E01D15/124Folding or telescopic bridges; Bridges built up from folding or telescopic sections
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges

Abstract

What the present invention provided a kind of bridge construction temporarily builds portable folding footbridge structure, including main support column and load-bearing bolt;The folding support top of the trellis is equipped with connecting rod at ten, and position is equipped with connecting rod at nine among folding support frame, and folding support frame bottom is equipped with connecting rod at eight;The bridge plate supporting block shares at 20, and bridge plate supporting block is rotationally connected at folding support top of the trellis is installed ten on connecting rod outer end at 20;The floorings share at nine, and floorings bottom is equipped with inserted block at 12, and floorings bottom is mounted in bridge plate supporting block top end surface everywhere;Personnel are facilitated to be laid with bridge main body position, build bridge main body simple and efficient, it saves bridge and builds the time, it can also be in bridge transportation, pass through folding support frame self-characteristic, folding support frame itself is folded, bridge main body area occupancy can be greatly reduced, facilitates personnel's transport and handling work.

Description

A kind of bridge construction temporarily builds portable folding footbridge structure
Technical field
The invention belongs to bridge construction technical fields, and more specifically, in particular to a kind of bridge construction is temporarily taken Build portable folding footbridge structure.
Background technique
With the aging of bridge, the bridge quality that early stage is built is further unstable, needs to be removed row again in time and builds, Support personnel walks safe;But bridge is complex, can not build in the short time, in the period of building, is easy to week The trip of the family Bian Ju causes obstacle, needs to build the bridge for personnel's walking in bridging toughening period, ensures that periphery occupies family and goes out Row.
Based on above-mentioned, the inventors discovered that, existing footbridge structure, such as number of patent application CN205591098U are mentioned The detachable bridge on foot of a kind of portable Fast Installation arrived, including two be embedded in vertically on the ground of river two sides respectively Pylon, two pairs of combination anchorage stakes and folding bridge floor, two pylons are set side by side and are parallel to each other, and each pylon deviates from the one of river A pair of corresponding combination anchorage stake is buried on the ground of side, is equipped with two main push-towing ropes being parallel to each other between two pylons, often The both ends of main push-towing rope are separately connected the top of corresponding two pylons, fold bridge floor and are horizontally set between two pylons, and position In the lower section of two main push-towing ropes, and its both ends passes through anchoring pile and is fixed on the ground of river two sides, folds bridge floor relative to its length The two sides in direction pass through a corresponding main push-towing rope of several hoist cable connections top respectively, and each pair of combination anchorage stake passes through pair respectively Cable connects corresponding tower top.Advantage: it is simple in construction, easy to disassemble and assemble, more quick, light weight is set up, it is easy to carry, Practicability is stronger.
A kind of vertical collapsible pontoon bridge of spanning that also such as number of patent application CN106284051B is previously mentioned, belongs to pontoon bridge skill Art field, the pontoon bridge include more than two modularization pontoon bridge units, even bank springboard, anchoring system and electric control system;Mould Block pontoon bridge sequence of unit is fixedly connected, and passes through locking device between the modularization pontoon bridge unit in flow width middle position It is fixed;Fixed module pontoon bridge unit forms pontoon bridge main body across river, the modularization pontoon bridge list on bank after being fully deployed Member overlap joint even forms complete pontoon bridge after bank springboard, pontoon bridge main body since the modularization pontoon bridge unit of installation locking device successively Close up, it is current for ship that navigation channel can be opened after the completion of closing up;Each modularization pontoon bridge unit is correspondingly connected with a set of anchoring system; Electric control system control module pontoon bridge unit close up and expansion movement and action sequence.The present invention can be rapidly by floating Bridge center is collapsed to the folding of two sides direction, open navigation channel, and pontoon bridge can rapid deployment recovery original sample after ship is current.
Based on the retrieval of patent at above-mentioned two, and device in the prior art is combined to find, although above-mentioned apparatus can Meet personnel go on a journey needs, but its during actual use there are some problems, include: installing and dismounting is more numerous It is trivial, it is easy the consumption plenty of time, bridge could be built and be finished, in the build process of long period, is easy to periphery user Trip impact;And device specification is larger, can not fold up well in disassembly, is easy to occupy more storage Difficulty is caused to the transport and storage in later period in space.
Then, in view of this, being studied improvement for existing structure and missing, a kind of facing for bridge construction is provided When build portable folding footbridge structure, to achieve the purpose that with more more practical value.
Summary of the invention
Portable folding walking is temporarily built in order to solve the above technical problem, the present invention provides a kind of bridge construction Bridge structure, to solve existing footbridge structure, installing and dismounting is relatively complicated, is easy the consumption plenty of time, could take bridge It builds and finishes, in the build process of long period, be easy to impact the trip of periphery user;And device specification is larger, It can not be folded up well in disassembly, be easy to occupy more parking space, difficulty is caused to the transport and storage in later period The problem of.
The purpose and effect for temporarily building portable folding footbridge structure of bridge construction of the present invention, by detail below Technological means is reached:
A kind of bridge construction temporarily builds portable folding footbridge structure, including folding support frame, connecting rod, bridge plate Supporting block assigns hole, floorings, inserted block, isolating frame, chain, LED light strip, bottom support frame, fixing groove, topmast dagger, fixation Bar, main support column and load-bearing bolt;The folding support top of the trellis is equipped with connecting rod at ten, and position peace among folding support frame Equipped with connecting rod at nine, and folding support frame bottom is equipped with connecting rod at eight;The bridge plate supporting block shares at 20, and 20 Place's bridge plate supporting block is rotationally connected at folding support top of the trellis is installed ten on connecting rod outer end;The floorings share nine Place, and floorings bottom is equipped with inserted block at 12, and floorings bottom is mounted in bridge plate supporting block top end surface everywhere; The isolating frame is divided into two groups, shares at 18, and isolating frame passes through that bolt is vertical to be mounted at nine on floorings;It is described LED light strip is at two, and LED light strip is located on two groups of chains at two;The bottom support frame be everywhere, and everywhere bottom support Frame is separately mounted on top support column top end everywhere, and topmast dagger is connected two-by-two by fixed link at two everywhere;It is described It is hollow structure inside main support column, and load-bearing bolt at five is installed on main support column.
Further, the folding support frame shares at three, and folding support frame is mutual by connecting rod at 28 at three It links together, and folding support frame is more diamond shape foldable structures.
Further, the bridge plate supporting block top end surface, which offers, assigns hole at six, and bridge plate supporting block is sleeved on folding On the connecting rod outer end installed at the top of folded support frame, and the inserted block that floorings bottom end face is installed assigns into bridge plate supporting block Top end surface opens up to assign in hole.
Further, described to be mounted on floorings front/rear end from frame bottom by bolt, and isolating frame passes through chain It is connected with adjacent isolating frame.
Further, the LED light strip is wrapped on chain, and LED light strip passes through power supply line and external control circuit phase Even.
Further, the bottom support frame is shared everywhere, and is forked structure at the top of the support frame of bottom, and bottom support frame Top respectively with installed inside bridge plate supporting block five at connecting rod be connected.
Further, fixing groove at five is offered at the top of the bottom support frame, and rod slide is connected to bottom support frame top In the fixing groove that portion is opened up.
Further, in the top support column bottom is slidably connected at the top of main support column, and load-bearing bolt-through is in top Inside support column and main support column, and main support column bottom is cone structure.
Compared with prior art, the invention has the following beneficial effects:
The setting of folding support frame facilitates personnel to be laid with bridge main body position, builds bridge main body easy to be fast Victory is saved bridge and is built the time, can also be in bridge transportation, by folding support frame self-characteristic, to folding support frame itself It is folded, bridge main body area occupancy can be greatly reduced, facilitate personnel's transport and handling work, and bridge plate is cooperated to support Block, assigns hole, the use of floorings and inserted block, facilitate personnel to be laid at the top of bridge main body for pedestrian's walking horizontal bridge Face is laid with bridge floor more simple and efficient, shortens construction-time.
The setting of isolating frame and chain is conducive to protect pedestrian of the walking on bridge, avoid personnel pedestrian from It is fallen on bridge, pedestrian is damaged;And the use of cooperated with LED light bar can illuminate bridge floor at night, facilitate people Member sees bridge floor clearly, makes pedestrian's more safety convenient in night walking.
The setting of bottom support frame and fixing groove is conducive to promote bridge self load bearing to multi-point support is carried out at the top of bridge Effect meets personnel's walking needs, avoids bridge force-bearing bending deformation, influence bridge self stability;And cooperate top support The setting of column and main support column facilitates personnel to install locating landform according to bridge, to bridge bottom everywhere bottom support frame height into Row is adjusted, make at the top of bottom support frame it is more enough it is even closer link together with bridge main body, ensure bridge bearing effect, avoid Bridge bottom attached portion position is hanging, influences bridge self load bearing effect.
Detailed description of the invention
Fig. 1 is schematic view of the front view of the invention.
Fig. 2 is floorings top structure schematic diagram of the invention.
Fig. 3 is folding support frame schematic view of the front view of the invention.
Fig. 4 is folding support frame overlooking structure diagram of the invention.
Fig. 5 is floorings schematic view of the front view of the invention.
Fig. 6 is floorings bottom substance schematic diagram of the invention.
Fig. 7 is the partial structure diagram of chain and LED light band connection of the invention.
Fig. 8 is bottom support frame overlooking structure diagram of the invention.
Fig. 9 is bottom support frame schematic view of the front view of the invention.
Figure 10 is main support column partial cross-sectional structural diagram of the invention.
In figure, the corresponding relationship of component names and accompanying drawing number are as follows:
Hole -301 is assigned in folding support frame -1, connecting rod -2, bridge plate supporting block -3, floorings -4, inserted block -5, isolating frame -6, Chain -7, LED light strip -8, bottom support frame -9, fixing groove -901, topmast dagger -10, fixed link -11 and are held main support column -12 Weight bolt -13.
Specific embodiment
Embodiments of the present invention are described in further detail with reference to the accompanying drawings and examples.Following embodiment is used for Illustrate the present invention, but cannot be used to limit the scope of the invention.
In the description of the present invention, unless otherwise indicated, the meaning of " plurality " is two or more;Term " on ", The orientation or positional relationship of the instructions such as "lower", "left", "right", "inner", "outside", " front end ", " rear end ", " head ", " tail portion " is It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of description of the present invention and simplification of the description, rather than instruction or dark Show that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as pair Limitation of the invention.In addition, term " first ", " second ", " third " etc. are used for description purposes only, and should not be understood as instruction or Imply relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " connected " " connects Connect " it shall be understood in a broad sense, for example, it may be being fixedly connected, it may be a detachable connection, or be integrally connected;It can be machine Tool connection, is also possible to be electrically connected;It can be directly connected, it can also be indirectly connected through an intermediary.For this field For those of ordinary skill, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
Embodiment:
As shown in attached drawing 1 to attached drawing 10:
What the present invention provided a kind of bridge construction temporarily builds portable folding footbridge structure, including folding support frame 1, connecting rod 2, bridge plate supporting block 3 assigns hole 301, floorings 4, inserted block 5, isolating frame 6, chain 7, LED light strip 8, bottom support frame 9, Fixing groove 901, topmast dagger 10, fixed link 11, main support column 12 and load-bearing bolt 13;It is installed at the top of the folding support frame 1 There are connecting rod 2 at ten, and the intermediate position of folding support frame 1 is equipped with connecting rod 2 at nine, and 1 bottom of folding support frame is equipped with eight Locate connecting rod 2;The bridge plate supporting block 3 shares at 20, and bridge plate supporting block 3 is rotationally connected with the top of folding support frame 1 at 20 Portion installed ten on 2 outer end of connecting rod;The floorings 4 share at nine, and 4 bottom of floorings is equipped with inserted block 5 at 12, And 4 bottom of floorings is mounted in 3 top end surface of bridge plate supporting block everywhere;It is two groups that the isolating frame 6, which is divided to, shares 18 Place, and isolating frame 6 is mounted at nine on floorings 4 by the way that bolt is vertical;The LED light strip 8 is and LED at two at two Light bar 8 is located on two groups of chains 7;The bottom support frame 9 is everywhere that and bottom support frame 9 is separately mounted to push up everywhere everywhere In 10 top end of support column, and topmast dagger 10 is connected two-by-two by fixed link 11 at two everywhere;In the main support column 12 Portion is hollow structure, and load-bearing bolt 13 at five is equipped on main support column 12.
Wherein, the folding support frame 1 shares at three, and folding support frame 1 passes through 2 phase of connecting rod interconnection at 28 at three It is connected together, and folding support frame 1 is more diamond shape foldable structures;Specific effect, facilitates personnel to carry out bridge main body position Installation is laid with, and keeps bridge main body installation more simple and efficient, and when dismantling to bridge main body, can pass through folding support frame 1 Bridge main body is carried out folding shrinking, reduces the space occupancy rate of bridge main body by itself folding characteristic, and personnel is facilitated to transport and deposit Store up work.
Wherein, 3 top end surface of bridge plate supporting block, which offers, assigns hole 301 at six, and bridge plate supporting block 3 is sleeved on folding On 2 outer end of connecting rod that folded 1 top of support frame is installed, and the inserted block 5 that 4 bottom end face of floorings is installed assigns into bridge plate branch 3 top end surface of bracer opens up to assign in hole 301;Specific effect, facilitates personnel to be laid with floorings at the top of folding support frame 1 4, keep the installation fixation of floorings 4 easier, saves the pontic set-up time, and to being fixed at the top of folding support frame 1, avoid Folding support frame 1 is influenced to extend to both ends by gravity, influences the fastness of pontic.
Wherein, 6 bottom of isolating frame is mounted on 4 front/rear end of floorings by bolt, and isolating frame 6 passes through chain 7 are connected with adjacent isolating frame 6;Specific effect, can protect the passerby to walk at the top of floorings 4, avoid personnel from bridge Back portion is fallen, and is damaged to personnel.
Wherein, the LED light strip 8 is wrapped on chain 7, and LED light strip 8 passes through power supply line and external control circuit phase Even;Specific effect, can illuminate bridge by LED light strip 8, and pedestrian's more safety convenient in night walking is made.
Wherein, the bottom support frame 9 is shared everywhere, and is forked structure at the top of bottom support frame 9, and bottom support frame 9 Top installed respectively with the inside of bridge plate supporting block 3 five at connecting rod 2 be connected;Specific effect, can be to 1 bottom of folding support frame Multi-point support is carried out, bridge self load bearing effect is promoted, meets crowd's walking needs, avoids bridge force-bearing bending deformation, influence Bridge self stability.
Wherein, fixing groove 901 at five are offered at the top of the bottom support frame 9, and connecting rod 2 is slidably connected to bottom support frame 9 In the fixing groove 901 that top is opened up;Specific effect, can not only be fixed connecting rod 2, ensure bridge stability, also save The bridge set-up time keeps bridge assembling more simple and efficient, improves bridge packaging efficiency.
Wherein, 10 basal sliding of topmast dagger is connected in 12 top of main support column, and load-bearing bolt 13 through Inside topmast dagger 10 and main support column 12, and 12 bottom of main support column is cone structure;Specific effect, can be to topmast dagger 10 overhead heights are adjusted, and the bottom support frame 9 for installing 10 top of topmast dagger is more enough to be connected with connecting rod 2, ensure bridge Beam bottom portion stressed effect avoids at the top of bridge vacantly, influencing bridge self load bearing effect.
The specifically used mode and effect of the present embodiment:
In the use of the present invention, staff will assign into the sandstone of water flow bottom main 12 bottom of support column everywhere, pass through 9 height of bottom support frame everywhere is adjusted in load-bearing bolt 13, makes support frame 9 height in bottom is more enough to be everywhere consistent;Then work Make personnel folding support frame 1 is unfolded, and the folding support frame of unfolded state 1 and connecting rod 2 are taken and are placed on bottom support frame 9 everywhere On, so that the fixing groove opened up at the top of bottom support frame 9 901 is connected with connecting rod 2, plays the effect fixed to folding support frame 1;It connects Floorings 4 are passed through inserted block 5 and are mounted on 3 top end of bridge plate supporting block that 1 top of folding support frame is installed by the staff that gets off On face;After 1 top floorings 4 of support frame to be folded are laid with, two groups of isolating frames 6 are mounted on bridge by screw by staff On panel 4;The LED light strip 8 being wrapped on chain 7 is connected external control power supply by last staff, is completed bridge at once and is taken Build work.
The embodiment of the present invention is given for the purpose of illustration and description, and is not exhaustively or by this to send out It is bright to be limited to disclosed form.Many modifications and variations are obvious for the ordinary skill in the art.Choosing Selecting and describe embodiment is and to make those skilled in the art to more preferably illustrate the principle of the present invention and practical application It will be appreciated that the present invention is to design various embodiments suitable for specific applications with various modifications.

Claims (8)

1. a kind of bridge construction temporarily builds portable folding footbridge structure, it is characterised in that: the bridge construction Temporarily building portable folding footbridge structure includes folding support frame, connecting rod, bridge plate supporting block, assigns hole, and floorings are inserted Block, isolating frame, chain, LED light strip, bottom support frame, fixing groove, topmast dagger, fixed link, main support column and load-bearing bolt;Institute It states folding support top of the trellis and connecting rod at ten is installed, and position is equipped with connecting rod at nine among folding support frame, and folds branch Support bottom is equipped with connecting rod at eight;The bridge plate supporting block shares at 20, and bridge plate supporting block is rotationally connected at 20 Folding support top of the trellis installed ten on connecting rod outer end;The floorings share at nine, and floorings bottom is equipped with ten Inserted block at two, and floorings bottom is mounted in bridge plate supporting block top end surface everywhere;The isolating frame is divided into two groups, shares At 18, and isolating frame passes through that bolt is vertical to be mounted at nine on floorings;The LED light strip is and LED at two at two Light bar is located on two groups of chains;The bottom support frame is everywhere that and bottom support frame is separately mounted to top support everywhere everywhere On the end of column top, and topmast dagger is connected two-by-two by fixed link at two everywhere;It is hollow structure inside the main support column, And load-bearing bolt at five is installed on main support column.
2. bridge construction as described in claim 1 temporarily builds portable folding footbridge structure, it is characterised in that: described Folding support frame shares at three, and folding support frame is interconnected by connecting rod at 28 at three, and folds branch Support is more diamond shape foldable structures.
3. bridge construction as described in claim 1 temporarily builds portable folding footbridge structure, it is characterised in that: described Bridge plate supporting block top end surface, which offers, assigns hole at six, and bridge plate supporting block is sleeved on the company that folding support top of the trellis is installed On bar outer end, and the inserted block installed of floorings bottom end face assigns into bridge plate supporting block top end surface and opens up to assign hole It is interior.
4. bridge construction as described in claim 1 temporarily builds portable folding footbridge structure, it is characterised in that: described It is mounted on floorings front/rear end from frame bottom by bolt, and isolating frame is connected by chain with adjacent isolating frame.
5. bridge construction as described in claim 1 temporarily builds portable folding footbridge structure, it is characterised in that: described LED light strip is wrapped on chain, and LED light strip is connected by power supply line with external control circuit.
6. bridge construction as described in claim 1 temporarily builds portable folding footbridge structure, it is characterised in that: described Bottom support frame is shared everywhere, and is forked structure at the top of the support frame of bottom, and at the top of the support frame of bottom respectively with bridge plate supporting block Connecting rod is connected at internal five installed.
7. bridge construction as described in claim 1 temporarily builds portable folding footbridge structure, it is characterised in that: described Fixing groove at five is offered at the top of the support frame of bottom, and rod slide is connected in the fixing groove opened up at the top of the support frame of bottom.
8. bridge construction as described in claim 1 temporarily builds portable folding footbridge structure, it is characterised in that: described In top support column bottom is slidably connected at the top of main support column, and load-bearing bolt-through is inside topmast dagger and main support column, And main support column bottom is cone structure.
CN201811273640.4A 2018-10-30 2018-10-30 Temporary building portable folding walking bridge structure for bridge construction Active CN109371809B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811273640.4A CN109371809B (en) 2018-10-30 2018-10-30 Temporary building portable folding walking bridge structure for bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811273640.4A CN109371809B (en) 2018-10-30 2018-10-30 Temporary building portable folding walking bridge structure for bridge construction

Publications (2)

Publication Number Publication Date
CN109371809A true CN109371809A (en) 2019-02-22
CN109371809B CN109371809B (en) 2020-08-04

Family

ID=65390305

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811273640.4A Active CN109371809B (en) 2018-10-30 2018-10-30 Temporary building portable folding walking bridge structure for bridge construction

Country Status (1)

Country Link
CN (1) CN109371809B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565502A (en) * 2019-09-16 2019-12-13 长安大学 Folding bridge and use method thereof
CN113969540A (en) * 2020-07-24 2022-01-25 天津电力工程监理有限公司 Construction temporary trestle and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29901528U1 (en) * 1999-01-29 1999-07-01 Maier Gmbh Peter bridge
KR20120059838A (en) * 2010-12-01 2012-06-11 사단법인 미래융합건설연구원 Temporary bridge for middle and small size river
CN104452571A (en) * 2014-12-26 2015-03-25 重庆交通大学 Modern bamboo sidewalk truss bridge
CN205035902U (en) * 2015-07-14 2016-02-17 中铁十八局集团建筑安装工程有限公司 Crutch supported complicated curved surface rack axle construction in large -scale minute
CN107815956A (en) * 2016-05-30 2018-03-20 丽水市正明机械科技有限公司 A kind of simple plastic cement rescue pontoon bridge
CN107841936A (en) * 2017-11-10 2018-03-27 中国人民解放军国防科技大学 Expandable bridge

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29901528U1 (en) * 1999-01-29 1999-07-01 Maier Gmbh Peter bridge
EP1163394A1 (en) * 1999-01-29 2001-12-19 Peter Maier Leichtbau GmbH Bridge
KR20120059838A (en) * 2010-12-01 2012-06-11 사단법인 미래융합건설연구원 Temporary bridge for middle and small size river
CN104452571A (en) * 2014-12-26 2015-03-25 重庆交通大学 Modern bamboo sidewalk truss bridge
CN205035902U (en) * 2015-07-14 2016-02-17 中铁十八局集团建筑安装工程有限公司 Crutch supported complicated curved surface rack axle construction in large -scale minute
CN107815956A (en) * 2016-05-30 2018-03-20 丽水市正明机械科技有限公司 A kind of simple plastic cement rescue pontoon bridge
CN107841936A (en) * 2017-11-10 2018-03-27 中国人民解放军国防科技大学 Expandable bridge

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565502A (en) * 2019-09-16 2019-12-13 长安大学 Folding bridge and use method thereof
CN110565502B (en) * 2019-09-16 2024-04-12 长安大学 Folding bridge and application method thereof
CN113969540A (en) * 2020-07-24 2022-01-25 天津电力工程监理有限公司 Construction temporary trestle and construction method thereof
CN113969540B (en) * 2020-07-24 2024-02-20 天津电力工程监理有限公司 Construction temporary trestle and construction method thereof

Also Published As

Publication number Publication date
CN109371809B (en) 2020-08-04

Similar Documents

Publication Publication Date Title
US9093583B2 (en) Folding solar canopy assembly
US20130055512A1 (en) Transportation and erection integrated machine with displacement platforms and methods for erecting bridge using the same
US4352220A (en) Method for the construction of a cable-stayed or rein-girth bridge
CN102797222A (en) Hanging bracket hinge joint type bridge maintenance vehicle capable of avoiding bridge-side obstacles
US10378201B2 (en) Collapsible modular building
CN103495265B (en) High-rise Super High climb type fire-fighting and rescue system
CN109371809A (en) A kind of bridge construction temporarily builds portable folding footbridge structure
CN105735103B (en) A kind of detachable bridge on foot of portable Fast Installation
CN110485255A (en) A kind of collapsible emergency bridge and application method
US2878498A (en) Bridge construction
WO2014035288A1 (en) Mobile multi-tier automatic car park
CN103835220B (en) A kind of quickly expandable prestressing force steel bridge
NO337317B1 (en) Foldable, elongated support structure module and a foldable, elongated modular beam structure.
CN108316124B (en) Camouflage type large-span automatic rapid-stretching emergency bridge
CN217480936U (en) Movable folding hangar
CN215925692U (en) Overlength multispan assembly type integrated multifunctional bridge girder erection machine
CN202730646U (en) Bridge maintenance car with articulated type hanging bracket and capable of avoiding bridge-side barriers
RU122108U1 (en) MOBILE CAR MAP PARKING
CN201953000U (en) Adjustable-height intelligent rain shed
CN217480937U (en) Movable folding hangar capable of being transversely unfolded and folded
RU2581909C1 (en) Prefabricated frame structure and method for installation thereof
CN111646101B (en) Folding type bridge device for circular tube conveyor and installation method of folding type bridge device
ES2624211B1 (en) System to expand a cable-stayed bridge structure, extended cable-stayed bridge structure and its construction process
CN217480935U (en) Movable folding hangar capable of being transversely unfolded or folded
CN110359697A (en) The modular aerial sliding concatenation platform in high-altitude

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Sun Yunming

Inventor after: Yue Yinglong

Inventor after: Other inventor requests not to publish the name

Inventor before: Request for anonymity

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20200713

Address after: No.52 Zhujiang Road, Yantai Development Zone, Yantai City, Shandong Province

Applicant after: Xinxing Transportation Construction Co., Ltd

Address before: 136300 Dongfeng Town, Dongfeng County, Dongfeng County, Liaoyuan, Jilin

Applicant before: Yu Zhenhai

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant