CN109358353B - 一种集电线路基础快速分坑放样方法 - Google Patents
一种集电线路基础快速分坑放样方法 Download PDFInfo
- Publication number
- CN109358353B CN109358353B CN201811285818.7A CN201811285818A CN109358353B CN 109358353 B CN109358353 B CN 109358353B CN 201811285818 A CN201811285818 A CN 201811285818A CN 109358353 B CN109358353 B CN 109358353B
- Authority
- CN
- China
- Prior art keywords
- foundation
- coordinates
- axis
- making
- basic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01S—RADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
- G01S19/00—Satellite radio beacon positioning systems; Determining position, velocity or attitude using signals transmitted by such systems
- G01S19/38—Determining a navigation solution using signals transmitted by a satellite radio beacon positioning system
- G01S19/39—Determining a navigation solution using signals transmitted by a satellite radio beacon positioning system the satellite radio beacon positioning system transmitting time-stamped messages, e.g. GPS [Global Positioning System], GLONASS [Global Orbiting Navigation Satellite System] or GALILEO
- G01S19/42—Determining position
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01S—RADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
- G01S19/00—Satellite radio beacon positioning systems; Determining position, velocity or attitude using signals transmitted by such systems
- G01S19/01—Satellite radio beacon positioning systems transmitting time-stamped messages, e.g. GPS [Global Positioning System], GLONASS [Global Orbiting Navigation Satellite System] or GALILEO
- G01S19/13—Receivers
Abstract
本发明公开了一种集电线路基础快速分坑放样方法,包括以下步骤:A、将集电线路基础中心桩的坐标输入CAD软件,基础中心点O;B、标注出基础的转角度数θ;C、做出转角θ的角平分线,此角平分线即为基础的一根轴线,然后通过该基础中心点O做该轴线的垂线,此垂线为基础的另一条轴线,至此基础轴线确定完成;D、根据图纸给定的基础尺寸及侧根开值A,做两条基础轴线的平行线,平行线与轴线之间距离为A/2,然后根据基础尺寸作基础4个腿承台边线;E、利用CAD软件标注出轴线与开挖底口边线交点坐标,并输入GPS测量仪器,现场根据坐标进行放线即可。采用该方法进行分坑放样,无需多次测量及计算,降低了出错率和工作强度,减少了对操作人员的要求。
Description
技术领域
本发明涉及集电线路施工技术领域,尤其涉及一种集电线路基础快速分坑放样方法。
背景技术
集电线路基础分坑放样是根据中心桩及基础,依照设计图纸规定的尺寸进行放样的工作。集电线路是电力输送的关键,在近年施工中,多次出现线路基础分坑错误或分坑误差太大,导致返工或影响线路安全运行。
目前常用的集电线路分坑放线方法,多采用角度分坑法:
1)全站仪仪器架于塔位中心桩O,对中整平后,水平度盘调零,前后视相邻两塔中心线,如转角塔复核线路转角度数θ。
2)以1/2*(180°-θ)定出转角塔内角平分线K。
3)以横线路方向(转角塔为角平分线)K为基准,左、右分别转45°,正倒镜定出四个辅桩C1、C2、C3、C4。
4)以O点为基准,在OC3线段上分别量取L0=*A,L1=*(A-a),L2=*(A+a),定出坑口中心及坑角控制桩,量取2*a(a为坑口尺寸)长度的量尺,使其两端分别固定在1、3桩上,以量尺的中点为基点定出2桩,同样方法定出另一侧4桩,这样坑口放样完成。
5)同上方法定出另外三个坑口位置。
现有技术的客观缺点:上述方法需要全站仪或经纬仪测量角度,要求能通视无遮挡物,而集电线路多在山区及陡坡上,需清理树木达到通视,陡坡架设全站仪又极为困难,耗时耗力;基坑开挖前还需将中心点及控制桩引测至开挖范围之外,开挖完成后再将中心点及控制点引测至基坑内,需多次引点与转点,程序多累计误差较大;测量距离现场条件在初次分坑时难以满足,需多人配合测量,环节多、出错可能性大,对工作人员的要求高。
发明内容
本发明针对现有技术的不足,研制一种集电线路基础快速分坑放样方法,采用该方法进行分坑放样,无需多次测量及计算,降低了出错率和工作强度,减少了对操作人员的要求。
本发明解决技术问题的技术方案为:一方面,本发明的实施例提供了一种集电线路基础快速分坑放样方法,包括以下步骤:
A、将集电线路基础中心桩的坐标输入CAD软件,将各中心桩之间用直线连接,画出集电线路路径图,基础中心点O;
B、用CAD软件中的标注工具,标注出基础的转角度数θ,并与设计图纸进行校核,核对基础转角度数与设计是否相符,发现问题及时纠正;
C、做出转角θ的角平分线,此角平分线即为基础的一根轴线,然后通过该基础中心点O做该轴线的垂线,此垂线为基础的另一条轴线,至此基础轴线确定完成;
D、根据图纸给定的基础尺寸及侧根开值A,做两条基础轴线的平行线,平行线与轴线之间距离为A/2,然后根据基础尺寸作基础4个腿承台边线,然后根据基础工作面尺寸a做基础边线的平行线,画出基础四条开挖底口边线;
E、利用CAD软件标注出轴线与开挖底口边线交点坐标,并输入GPS测量仪器,现场根据坐标进行放线即可。
作为优化,步骤E中进行放线时,可直接确定桩轴线,也可提取基础任意位置坐标。
作为优化,所述CAD软件中的坐标和GPS测量仪器中的坐标都为X、Y平面直角位置坐标。
发明内容中提供的效果仅仅是实施例的效果,而不是发明所有的全部效果,上述技术方案具有如下优点或有益效果:采用该方法进行分坑放样,无需多次测量及计算,降低了出错率和工作强度,减少了对操作人员的要求。本专利采用CAD与GPS软件可现场直接GPS放线,在室内就可以将基础各个部位进行坐标精确提取,通过CAD软件标注尺寸工具可对各尺寸进行检查,省时省力。加快了施工进度,缩短了工期,一个人一台仪器就可以完成所有分坑及定位放线工作,免去了多人配合测量,有利于节约施工成本。仪器设备使用简单,野外作业仅用一台轻便GPS测量仪就实现基础分坑放线所有工作,既免去了常规放线全站仪多次引点及设置辅助桩的复杂程序,也可避免多次引测带来的误差。可以对基础任意部位提取坐标并现场放样,实现了对尺寸及位置精准控制。不需要占用较多的测量技术人员,即使普通施工人员无需知道分坑复杂过程,也无需学习全站仪复杂操作,仅学会用GPS放点这一简单操作即可完成集电线路分坑及基础放线所有工作。可以不受场地限制,GPS完全不受地形影响,无需通视即可快速放线分坑。
附图说明
图1为现有分坑放线法的原理图。
图2为本发明的工作原理图。
具体实施方式
为了能清楚说明本方案的技术特点,下面通过具体实施方式,并结合其附图,对本发明进行详细阐述。下文的公开提供了许多不同的实施例或例子用来实现本发明的不同结构。为了简化本发明的公开,下文中对特定例子的部件和设置进行描述。此外,本发明可以在不同例子中重复参考数字和/或字母。这种重复是为了简化和清楚的目的,其本身不指示所讨论各种实施例和/或设置之间的关系。应当注意,在附图中所图示的部件不一定按比例绘制。本发明省略了对公知组件和处理技术及工艺的描述以避免不必要地限制本发明。
图2为本发明的一种实施例,如图所示,一种集电线路基础快速分坑放样方法,包括以下步骤:
A、将集电线路基础中心桩的坐标输入CAD软件,将各中心桩之间用直线连接,画出集电线路路径图,基础中心点O;
B、用CAD软件中的标注工具,标注出基础的转角度数θ,并与设计图纸进行校核,核对基础转角度数与设计是否相符,发现问题及时纠正;
C、做出转角θ的角平分线,此角平分线即为基础的一根轴线,然后通过该基础中心点O做该轴线的垂线,此垂线为基础的另一条轴线,至此基础轴线确定完成;
D、根据图纸给定的基础尺寸及侧根开值A,做两条基础轴线的平行线,平行线与轴线之间距离为A/2,然后根据基础尺寸作基础4个腿承台边线,然后根据基础工作面尺寸a做基础边线的平行线,画出基础四条开挖底口边线;
E、利用CAD软件标注出轴线与开挖底口边线交点坐标,并输入GPS测量仪器,现场根据坐标进行放线即可。
步骤E中进行放线时,可直接确定桩轴线,也可提取基础任意位置坐标。
所述CAD软件中的坐标和GPS测量仪器中的坐标都为X、Y平面直角位置坐标。采用该方法进行分坑放样,无需多次测量及计算,降低了出错率和工作强度,减少了对操作人员的要求。本专利采用CAD与GPS软件可现场直接GPS放线,在室内就可以将基础各个部位进行坐标精确提取,通过CAD软件标注尺寸工具可对各尺寸进行检查,省时省力。加快了施工进度,缩短了工期,一个人一台仪器就可以完成所有分坑及定位放线工作,免去了多人配合测量,有利于节约施工成本。仪器设备使用简单,野外作业仅用一台轻便GPS测量仪就实现基础分坑放线所有工作,既免去了常规放线全站仪多次引点及设置辅助桩的复杂程序,也可避免多次引测带来的误差。可以对基础任意部位提取坐标并现场放样,实现了对尺寸及位置精准控制。不需要占用较多的测量技术人员,即使普通施工人员无需知道分坑复杂过程,也无需学习全站仪复杂操作,仅学会用GPS放点这一简单操作即可完成集电线路分坑及基础放线所有工作。可以不受场地限制,GPS完全不受地形影响,无需通视即可快速放线分坑。
上述虽然结合附图对发明的具体实施方式进行了描述,但并非对本发明保护范围的限制,在本发明的技术方案的基础上,本领域技术人员不需要付出创造性劳动即可做出的各种修改或变形仍在本发明的保护范围以内。
Claims (3)
1.一种集电线路基础快速分坑放样方法,其特征是,包括以下步骤:
A、将集电线路基础中心桩的坐标输入CAD软件,将各中心桩之间用直线连接,画出集电线路路径图,基础中心点O;
B、用CAD软件中的标注工具,标注出基础的转角度数θ,并与设计图纸进行校核,核对基础转角度数与设计是否相符,发现问题及时纠正;
C、做出转角θ的角平分线,此角平分线即为基础的一根轴线,然后通过该基础中心点O做该轴线的垂线,此垂线为基础的另一条轴线,至此基础轴线确定完成;
D、根据图纸给定的基础尺寸及侧根开值A,做两条基础轴线的平行线,平行线与轴线之间距离为A/2,然后根据基础尺寸作基础4个腿承台边线,然后根据基础工作面尺寸a做基础边线的平行线,画出基础四条开挖底口边线;
E、利用CAD软件标注出轴线与开挖底口边线交点坐标,并输入GPS测量仪器,现场根据坐标进行放线即可。
2.根据权利要求1所述的一种集电线路基础快速分坑放样方法,其特征是,步骤E中进行放线时,可直接确定桩轴线,也可提取基础任意位置坐标。
3.根据权利要求1或2所述的一种集电线路基础快速分坑放样方法,其特征是,所述CAD软件中的坐标和GPS测量仪器中的坐标都为X、Y平面直角位置坐标。
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811285818.7A CN109358353B (zh) | 2018-10-31 | 2018-10-31 | 一种集电线路基础快速分坑放样方法 |
PCT/CN2019/113274 WO2020088363A1 (zh) | 2018-10-31 | 2019-10-25 | 一种集电线路基础快速分坑放样方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811285818.7A CN109358353B (zh) | 2018-10-31 | 2018-10-31 | 一种集电线路基础快速分坑放样方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109358353A CN109358353A (zh) | 2019-02-19 |
CN109358353B true CN109358353B (zh) | 2022-12-09 |
Family
ID=65347443
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811285818.7A Active CN109358353B (zh) | 2018-10-31 | 2018-10-31 | 一种集电线路基础快速分坑放样方法 |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN109358353B (zh) |
WO (1) | WO2020088363A1 (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109358353B (zh) * | 2018-10-31 | 2022-12-09 | 中国电建集团山东电力建设第一工程有限公司 | 一种集电线路基础快速分坑放样方法 |
CN111121731B (zh) * | 2019-12-11 | 2022-09-09 | 国网湖北省电力有限公司荆州供电公司 | 一种基础分坑仪 |
CN112052498B (zh) * | 2020-09-02 | 2024-02-02 | 国家电网有限公司 | 一种斜井开挖放样检测方法及装置 |
CN112906089A (zh) * | 2021-02-07 | 2021-06-04 | 中国建筑第八工程局有限公司 | Cad任意封闭曲线的数量快速统计方法及统计系统 |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1820004A (en) * | 1928-06-12 | 1931-08-18 | Fed Telegraph Co | Aerial navigation system and method |
JP2004239805A (ja) * | 2003-02-07 | 2004-08-26 | Ryozo Kimura | 3次元測量支援方法及びその装置 |
CN102022993A (zh) * | 2010-11-02 | 2011-04-20 | 河南省电力公司洛阳供电公司 | 一种线路单杆塔基础分坑的方法 |
CN102021916A (zh) * | 2010-11-02 | 2011-04-20 | 河南省电力公司洛阳供电公司 | 一种铁塔基础施工的方法 |
CN201812040U (zh) * | 2010-09-25 | 2011-04-27 | 国家电网公司交流建设分公司 | 一种送电线路施工测量仪 |
CN105369838A (zh) * | 2015-12-02 | 2016-03-02 | 国家电网公司 | 杆塔基础分坑绳具及其应用和一种杆塔基础分坑方法 |
CN205353360U (zh) * | 2016-01-19 | 2016-06-29 | 国网河南省电力公司漯河供电公司 | 一种塔杆基础分坑测距定位仪 |
CN107268662A (zh) * | 2017-06-05 | 2017-10-20 | 三峡大学 | 一种输电线路铁塔基础分坑方法 |
CN108149703A (zh) * | 2017-08-31 | 2018-06-12 | 中国电建集团河南工程有限公司 | 输电线路工程基础预制施工方法 |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6882314B2 (en) * | 2000-01-24 | 2005-04-19 | Novariant, Inc. | Carrier-based differential-position determination using multi-frequency pseudolites |
JP4473400B2 (ja) * | 2000-03-17 | 2010-06-02 | 株式会社フジタ | 構築物の基礎及びその施工方法 |
US20120053805A1 (en) * | 2010-08-30 | 2012-03-01 | The University Of North Texas | Methods for detection of driving conditions and habits |
CN102022996A (zh) * | 2010-11-03 | 2011-04-20 | 河南省电力公司洛阳供电公司 | 山区送电线路复测分坑的方法 |
KR102103608B1 (ko) * | 2014-07-16 | 2020-04-23 | 매그나칩 반도체 유한회사 | 수직형 홀 센서, 홀 센서 모듈 및 그 제조 방법 |
CN104775447B (zh) * | 2015-04-13 | 2017-02-01 | 中国电力工程顾问集团中南电力设计院有限公司 | 用于陡峭山区输电塔的子母基础框架及其施工工艺 |
CN105421480A (zh) * | 2015-11-25 | 2016-03-23 | 国家电网公司 | 输电塔的正方形基础分坑方法 |
CN109358353B (zh) * | 2018-10-31 | 2022-12-09 | 中国电建集团山东电力建设第一工程有限公司 | 一种集电线路基础快速分坑放样方法 |
-
2018
- 2018-10-31 CN CN201811285818.7A patent/CN109358353B/zh active Active
-
2019
- 2019-10-25 WO PCT/CN2019/113274 patent/WO2020088363A1/zh active Application Filing
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1820004A (en) * | 1928-06-12 | 1931-08-18 | Fed Telegraph Co | Aerial navigation system and method |
JP2004239805A (ja) * | 2003-02-07 | 2004-08-26 | Ryozo Kimura | 3次元測量支援方法及びその装置 |
CN201812040U (zh) * | 2010-09-25 | 2011-04-27 | 国家电网公司交流建设分公司 | 一种送电线路施工测量仪 |
CN102022993A (zh) * | 2010-11-02 | 2011-04-20 | 河南省电力公司洛阳供电公司 | 一种线路单杆塔基础分坑的方法 |
CN102021916A (zh) * | 2010-11-02 | 2011-04-20 | 河南省电力公司洛阳供电公司 | 一种铁塔基础施工的方法 |
CN105369838A (zh) * | 2015-12-02 | 2016-03-02 | 国家电网公司 | 杆塔基础分坑绳具及其应用和一种杆塔基础分坑方法 |
CN205353360U (zh) * | 2016-01-19 | 2016-06-29 | 国网河南省电力公司漯河供电公司 | 一种塔杆基础分坑测距定位仪 |
CN107268662A (zh) * | 2017-06-05 | 2017-10-20 | 三峡大学 | 一种输电线路铁塔基础分坑方法 |
CN108149703A (zh) * | 2017-08-31 | 2018-06-12 | 中国电建集团河南工程有限公司 | 输电线路工程基础预制施工方法 |
Non-Patent Citations (3)
Title |
---|
基于GPS的山区输电线路复测分坑方法;李岩;《电力建设》;20110701;117-119 * |
斜置式插入钢管基础施工的定位测量与控制;叶建云等;《电力建设》;20120901(第09期);全文 * |
架空送电线路铁塔基础扭转偏差的探讨;吕桂强;《电力建设》;20060928(第09期);全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN109358353A (zh) | 2019-02-19 |
WO2020088363A1 (zh) | 2020-05-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109358353B (zh) | 一种集电线路基础快速分坑放样方法 | |
CN107402001B (zh) | 基于3d扫描的超高层建筑施工偏差数字化检验系统及方法 | |
CN110411364B (zh) | 施工外脚手架变形的监测方法 | |
CN109405817B (zh) | 一种圆形立柱垂直度检测方法 | |
CN105423993A (zh) | 基于三维激光扫描的变形监测坐标基准建立方法及装置 | |
EP3620746B1 (en) | Traverse-type measurement method for dual-system bilateral-survey composite level | |
CN104101326A (zh) | 一种基于空间几何分析的盾构姿态自动测量方法及装置 | |
CN110542388A (zh) | 基于移动三维激光扫描的隧道掌子面变形报警方法 | |
CN112197741B (zh) | 基于扩展卡尔曼滤波的无人机slam技术测量倾斜角系统 | |
CN106638318A (zh) | 斜拉桥梁端锚固点的定位方法及索导管安装方法 | |
CN107421519B (zh) | 一种涵洞顶进纠偏的监控测量方法 | |
CN111256730A (zh) | 一种用于低空倾斜摄影测量技术的土方平衡修正计算方法 | |
CN111337944B (zh) | 基于地基激光雷达的塔基验收方法及装置 | |
CN108318011B (zh) | 一种通过无人机搭载全站仪监测施工场地周边位移的方法 | |
CN113808093A (zh) | 基于3d激光扫描仪的隧道初支喷射混凝土厚度检测方法 | |
CN110672622A (zh) | 一种基于点云数据和全站仪的隧道缺陷快速定位方法 | |
CN110940271A (zh) | 基于空间三维测控网的船舶等大型工业制造检测、监测和智能搭载安装方法 | |
CN113865570A (zh) | 一种钢结构圆形立柱垂直度测量方法 | |
CN107644119B (zh) | 一种基于三维扫描点云的半孔率自动计算方法 | |
CN106289125B (zh) | 一种船舶大合拢阶段模拟搭载的测量方法 | |
CN112857315B (zh) | 基于三维激光扫描的钢管柱垂直度测量方法 | |
CN112884823A (zh) | 面向实测实量应用的靠尺模拟点云选取与计算方法 | |
CN103759705A (zh) | 用于复合水准仪的三点闭合布设测量法 | |
CN108120430B (zh) | 一种核岛安全壳上闸门安装孔的放线方法 | |
CN110231055B (zh) | 一种垂准仪和天顶仪的检校方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |