CN109358310B - Device and method for detecting broken zero line of three-phase four-wire electric energy meter - Google Patents

Device and method for detecting broken zero line of three-phase four-wire electric energy meter Download PDF

Info

Publication number
CN109358310B
CN109358310B CN201811462638.1A CN201811462638A CN109358310B CN 109358310 B CN109358310 B CN 109358310B CN 201811462638 A CN201811462638 A CN 201811462638A CN 109358310 B CN109358310 B CN 109358310B
Authority
CN
China
Prior art keywords
phase
zero line
sampling
voltage
electric energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811462638.1A
Other languages
Chinese (zh)
Other versions
CN109358310A (en
Inventor
张奔
刘志军
刘国栋
呼进国
敖鑫
李卓伟
张加海
朱广帅
王双岭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yantai Dongfang Wisdom Electric Co Ltd
Original Assignee
Yantai Dongfang Wisdom Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yantai Dongfang Wisdom Electric Co Ltd filed Critical Yantai Dongfang Wisdom Electric Co Ltd
Priority to CN201811462638.1A priority Critical patent/CN109358310B/en
Publication of CN109358310A publication Critical patent/CN109358310A/en
Application granted granted Critical
Publication of CN109358310B publication Critical patent/CN109358310B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R35/00Testing or calibrating of apparatus covered by the other groups of this subclass
    • G01R35/04Testing or calibrating of apparatus covered by the other groups of this subclass of instruments for measuring time integral of power or current
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/50Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
  • Locating Faults (AREA)

Abstract

The invention discloses a zero line breakage detection device and a detection method for a three-phase four-wire electric energy meter. The detection device comprises three groups of voltage sampling circuits which are in one-to-one correspondence with the three-phase circuits; the voltage sampling circuit comprises a collection end, an input end, a first zero line end, a second zero line end, a first sampling resistor, a sampling capacitor and a second sampling resistor, wherein the input end is used for being connected with a sampled live wire, the first zero line end and the second zero line end are used for being connected with a zero line, the first sampling resistor is connected between the collection end and the input end, the sampling capacitor is connected between the collection end and the first zero line end, and the second sampling resistor is connected between the input end and the second zero line end; the capacitance values of the sampling capacitors of the three groups of voltage sampling circuits are equal, and the capacitance value of the other group of sampling capacitors is unequal to the capacitance value of the other two groups of sampling capacitors. The invention has simple structure, judges the zero line breaking event through the phase difference between the phase voltages, and avoids the misjudgment possibly caused by working conditions such as overvoltage, undervoltage and the like.

Description

Device and method for detecting broken zero line of three-phase four-wire electric energy meter
Technical Field
The invention relates to a low-cost broken zero line detection device suitable for a three-phase four-wire electric energy meter, and also relates to a broken zero line detection method.
Background
In a three-phase four-wire power supply system, under the working condition of unbalanced load operation, namely unbalanced load of three phases, if a zero line is disconnected, neutral points can be caused to deviate, and the danger of electric shock is easy to occur. Therefore, more and more users require the electric energy meter to have a zero line breakage detection function.
At present, the common method for detecting broken zero line is as follows: when the A, B, C phase voltage sampling loop uses sampling resistors with different resistance values and the zero line is disconnected, the sampling value of the A, B, C phase voltage sampling loop changes due to the offset of the neutral point, so that the measured A, B, C phase voltage value changes. According to the empirical value, the variation range of the voltages of each phase under the condition of zero line breakage can be obtained. And finally, the electric energy meter program judges whether the current working condition is zero line breakage or not by comparing the voltage values. However, the method is only suitable for the condition that the ammeter works at rated voltage, and the on-site working condition often generates overvoltage and undervoltage, so that misjudgment is very easy to occur under the condition.
Disclosure of Invention
The invention provides a zero line breakage detection device and a detection method for a three-phase four-wire electric energy meter, and aims at: and misjudgment of zero line breakage is avoided, and reliability of detection judgment is improved.
The technical scheme of the invention is as follows:
a broken zero line detection device of a three-phase four-wire electric energy meter comprises three groups of voltage sampling circuits which are in one-to-one correspondence with three-phase lines;
the voltage sampling circuit comprises a collection end, an input end, a first zero line end, a second zero line end, a first sampling resistor, a sampling capacitor and a second sampling resistor, wherein the input end is used for being connected with a sampled live wire, the first zero line end and the second zero line end are used for being connected with a zero line, the first sampling resistor is connected between the collection end and the input end, the sampling capacitor is connected between the collection end and the first zero line end, and the second sampling resistor is connected between the input end and the second zero line end;
the capacitance values of the sampling capacitors of the three groups of voltage sampling circuits are equal, and the capacitance value of the other group of sampling capacitors is unequal to the capacitance value of the other two groups of sampling capacitors.
As a further improvement of the invention: maximum acquisition end is setThe collectable voltage value is U', the maximum input voltage of the input end is U, and the resistance value of the first sampling resistor is R i The resistance value of the second sampling resistor is R ii The relation of the sampled resistance values is:
as a further improvement of the invention: the first sampling resistor is formed by connecting a plurality of resistors in series.
As a further improvement of the invention: in each voltage sampling circuit, the first sampling resistor is formed by connecting eight resistors with equal resistance in series.
As a further improvement of the invention: the resistance values of the second sampling resistors in the three groups of voltage sampling circuits are equal.
The broken zero line detection method based on the broken zero line detection device of the three-phase four-wire electric energy meter comprises the following steps:
step 1, setting a zero line breaking event marking bit; the method comprises the steps that (1) an electric energy meter is electrified and initialized, zero line breakage event marking positions are cleared, and the electric energy meter respectively collects voltages of A phase, B phase and C phase through each collecting end;
step 2, reading the phase difference between the voltages of the A phase, the B phase and the C phase at intervals, and setting the phase difference between the A phase and the B phase asThe phase difference between the B phase and the C phase is +.>The phase difference between A and C phases is->And (3) making:
and 3, judging according to the following criteria:
criterion a: the voltage values of the phase A, the phase B and the phase C are all larger than a preset critical voltage;
criterion b:and->At least one of which is larger than a preset phase difference threshold value;
if the two criteria are met, setting the marking position of the zero line breaking event, and executing the step 4, otherwise, resetting the marking position of the zero line breaking event, and returning to executing the step 2;
and step 4, if the zero line breaking event marking bit is kept in a set state all the time within a preset duration, judging that the zero line breaking event occurs, otherwise, returning to the step 2.
Further: the phase difference threshold is 20 degrees.
Further: the duration is 10 seconds.
Compared with the prior art, the invention has the following positive effects: (1) The structure is simple, the change to the existing design is small, and the cost is low; (2) By using the difference between capacitance values, the phase difference between three-phase voltages after the zero line is broken is changed, so that the zero line breaking event criterion can be changed from the original voltage value to the phase difference between the phase voltages, and misjudgment possibly caused by working conditions such as overvoltage and undervoltage is avoided.
Drawings
Fig. 1 is a circuit schematic diagram of a voltage sampling circuit.
Fig. 2 is a schematic circuit diagram of three voltage sampling circuits in an embodiment.
Detailed Description
The technical scheme of the invention is described in detail below with reference to the accompanying drawings:
a broken zero line detection device of a three-phase four-wire electric energy meter comprises three groups of voltage sampling circuits which are shown in figure 1 and correspond to three-phase lines one by one.
The voltage sampling circuit comprises a collection end 1, an input end 3 used for being connected with a sampled live wire, a first zero line end 6 and a second zero line end 7 used for being connected with a zero line, a first sampling resistor 2 connected between the collection end 1 and the input end 3, a sampling capacitor 4 connected between the collection end 1 and the first zero line end 6, and a second sampling resistor 5 connected between the input end 3 and the second zero line end 7;
since the resistance withstand voltage of a large resistance is insufficient, the first sampling resistor 2 is typically composed of a plurality of resistors connected in series.
Thus, as in fig. 2: the resistors R1-R9 and the capacitor C1 form an A-phase voltage sampling circuit, the resistors R10-R18 and the capacitor C2 form a B-phase voltage sampling circuit, and the resistors R19-R27 and the capacitor C3 form a C-phase voltage sampling circuit.
Further, R1-R8 are equal in resistance, R10-R17 are equal in resistance, and R19-R26 are equal in resistance. The resistance values of R9, R18 and R27 are equal.
The capacitance values of the capacitors C2 and C3 are equal, the capacitance value of the capacitor C1 is not equal to the capacitance value of the capacitor C2 and the capacitor C3, and the capacitors C2 and C3 have larger difference, so that when the working condition of zero line breakage occurs, the phase difference between A, B, C phase voltages can change due to the difference of the capacitance values of the capacitors C1, C2 and C3, and whether the zero line breakage occurs can be judged through the change of the phase difference.
In general, the capacitance ratio of C2 to C1 is greater than 5 and less than 15, and a typical value is: c1 0.01uf,C2 0.1uf,C3 0.1uf.
The resistance values of the resistors R1-R27 can be freely configured according to actual needs, and the selection of the resistance values is determined by the maximum voltage input range allowed by the sampling loop. Let the maximum collectable voltage value of the collection terminal 1 be U', the maximum input voltage of the input terminal 3 be U, and the resistance value of the first sampling resistor 2 be R i Second sampling resistor5 has a resistance value of R ii The sampling resistance should satisfy the following conditions:
the broken zero line detection method based on the broken zero line detection device of the three-phase four-wire electric energy meter comprises the following steps:
step 1, setting a zero line breaking event marking bit; the method comprises the steps that (1) an electric energy meter is electrified and initialized, zero line breakage event marking bits are cleared, and the electric energy meter respectively collects voltages of A phase, B phase and C phase through each collecting end 1;
step 2, reading the phase difference between the voltages of the A phase, the B phase and the C phase at intervals, and setting the phase difference between the A phase and the B phase asThe phase difference between the B phase and the C phase is +.>The phase difference between A and C phases is->And (3) making:
and 3, judging according to the following criteria:
criterion a: the voltage values of the phase A, the phase B and the phase C are all larger than a preset critical voltage;
criterion b:And->At least one of which is larger than a preset phase difference threshold value, wherein the phase difference threshold value is preferably 20 degrees;
if the two criteria are met, setting the marking position of the zero line breaking event, and executing the step 4, otherwise, resetting the marking position of the zero line breaking event, and returning to executing the step 2;
and 4, if the zero line breaking event mark bit is kept in a set state all the time within a preset time period (generally 10 seconds), judging that the zero line breaking event occurs, otherwise, returning to the step 2.
According to the voltage sampling circuit, when the working condition of zero line breakage occurs, the phase difference between A, B, C phase voltages can change due to different capacitance values of the capacitors C1, C2 and C3, and the 120-degree phase difference deviating from the standard is combined with the software judgment logic, so that the detection of the zero line breakage event is realized.
It is obvious that the phase difference change at the time of the zero line break is caused by the structure of the sampling circuit, particularly the relation between the capacitance values, and the method of judging the zero line break event by the phase difference is not limited to the above-mentioned one.
The scope of the present invention includes, but is not limited to, the above embodiments, and any conceivable alternatives, modifications, and improvements made to the present technology fall within the scope of the present invention.

Claims (4)

1. A broken zero line detection device of a three-phase four-wire electric energy meter is characterized in that: the voltage sampling circuit comprises three groups of voltage sampling circuits which are in one-to-one correspondence with the three-phase circuits;
the voltage sampling circuit comprises a collection end (1), an input end (3) used for being connected with a sampled live wire, a first zero line end (6) and a second zero line end (7) used for being connected with the zero line, a first sampling resistor (2) connected between the collection end (1) and the input end (3), a sampling capacitor (4) connected between the collection end (1) and the first zero line end (6) and a second sampling resistor (5) connected between the input end (3) and the second zero line end (7);
the sampling capacitors (4) of the three groups of voltage sampling circuits, wherein the capacitance values of two groups of sampling capacitors (4) are equal, and the capacitance value of the other group of sampling capacitors (4) is unequal to the capacitance value of the other two groups of sampling capacitors (4);
the maximum collectable voltage value of the collecting end (1) is set as U', the maximum input voltage of the input end (3) is set as U, and the resistance value of the first sampling resistor (2) is set as R i The resistance value of the second sampling resistor (5) is R ii The relation of the sampled resistance values is:
the detection steps are as follows:
step 1, setting a zero line breaking event marking bit; the method comprises the steps of powering on and initializing an electric energy meter, resetting a zero line breaking event marking bit, and respectively acquiring voltages of a phase A, a phase B and a phase C through each acquisition end (1) of the electric energy meter;
step 2, reading the phase difference between the voltages of the A phase, the B phase and the C phase at intervals, and setting the phase difference between the A phase and the B phase asThe phase difference between the B phase and the C phase is +.>The phase difference between A and C phases is->And (3) making:
and 3, judging according to the following criteria:
criterion a: the voltage values of the phase A, the phase B and the phase C are all larger than a preset critical voltage;
criterion b:and->At least one of which is larger than a preset phase difference threshold value; the phase difference threshold is 20 degrees;
if the two criteria are met, setting the marking position of the zero line breaking event, and executing the step 4, otherwise, resetting the marking position of the zero line breaking event, and returning to executing the step 2;
step 4, if the zero line breaking event mark position is kept in a set state all the time within a preset duration, judging that the zero line breaking event occurs, otherwise, returning to the step 2; the duration is 10 seconds.
2. The three-phase four-wire electric energy meter zero line breakage detection device according to claim 1, wherein: the first sampling resistor (2) is formed by connecting a plurality of resistors in series.
3. The three-phase four-wire electric energy meter zero line breakage detection device according to claim 2, wherein: in each voltage sampling circuit, the first sampling resistor (2) is formed by connecting eight resistors with equal resistance values in series.
4. The three-phase four-wire electric energy meter zero line breakage detection device according to claim 1, wherein: the resistance values of the second sampling resistors (5) in the three groups of voltage sampling circuits are equal.
CN201811462638.1A 2018-12-03 2018-12-03 Device and method for detecting broken zero line of three-phase four-wire electric energy meter Active CN109358310B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811462638.1A CN109358310B (en) 2018-12-03 2018-12-03 Device and method for detecting broken zero line of three-phase four-wire electric energy meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811462638.1A CN109358310B (en) 2018-12-03 2018-12-03 Device and method for detecting broken zero line of three-phase four-wire electric energy meter

Publications (2)

Publication Number Publication Date
CN109358310A CN109358310A (en) 2019-02-19
CN109358310B true CN109358310B (en) 2024-03-22

Family

ID=65330733

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811462638.1A Active CN109358310B (en) 2018-12-03 2018-12-03 Device and method for detecting broken zero line of three-phase four-wire electric energy meter

Country Status (1)

Country Link
CN (1) CN109358310B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111999554A (en) * 2020-08-25 2020-11-27 成都长城开发科技有限公司 Zero line detection circuit, ammeter and zero line detection method
CN112596019A (en) * 2020-12-22 2021-04-02 杭州海兴电力科技股份有限公司 Three-phase four-wire electric energy meter zero line lack detection method based on voltage difference
CN113009380B (en) * 2020-12-31 2022-11-04 宁波三星医疗电气股份有限公司 Neutral line disconnection fault detection method based on electric energy meter and readable storage medium
CN113777532B (en) * 2021-11-10 2022-02-18 武汉中电国为技术有限公司 System, method and device for recognizing zero-line and phase-loss of power secondary equipment side

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63265516A (en) * 1987-04-22 1988-11-02 Hitachi Ltd Ground-fault detector for three-phase ac circuit
CN1987498A (en) * 2005-12-20 2007-06-27 中兴通讯股份有限公司 Method and device for lack of zero detection for three phase circuit
CN104698291A (en) * 2015-02-03 2015-06-10 杭州海兴电力科技股份有限公司 Detection circuit and detection method for three-phase four-wire system defective zero line function
CN106405305A (en) * 2015-07-30 2017-02-15 浙江正泰电器股份有限公司 Zero line open-phase detection circuit and method for detecting open phase of zero line
CN206178037U (en) * 2016-11-23 2017-05-17 浙江恩鸿电子有限公司 Three -phase four -wire electric energy metering device with it detects function to lack zero line
WO2017197823A1 (en) * 2016-05-17 2017-11-23 深圳市思达仪表有限公司 Method and system for detecting voltage reverse phase sequence of three-phase electricity meter
CN209132417U (en) * 2018-12-03 2019-07-19 烟台东方威思顿电气有限公司 Three-phase and four-line electric energy meter line detector off zero

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63265516A (en) * 1987-04-22 1988-11-02 Hitachi Ltd Ground-fault detector for three-phase ac circuit
CN1987498A (en) * 2005-12-20 2007-06-27 中兴通讯股份有限公司 Method and device for lack of zero detection for three phase circuit
CN104698291A (en) * 2015-02-03 2015-06-10 杭州海兴电力科技股份有限公司 Detection circuit and detection method for three-phase four-wire system defective zero line function
CN106405305A (en) * 2015-07-30 2017-02-15 浙江正泰电器股份有限公司 Zero line open-phase detection circuit and method for detecting open phase of zero line
WO2017197823A1 (en) * 2016-05-17 2017-11-23 深圳市思达仪表有限公司 Method and system for detecting voltage reverse phase sequence of three-phase electricity meter
CN206178037U (en) * 2016-11-23 2017-05-17 浙江恩鸿电子有限公司 Three -phase four -wire electric energy metering device with it detects function to lack zero line
CN209132417U (en) * 2018-12-03 2019-07-19 烟台东方威思顿电气有限公司 Three-phase and four-line electric energy meter line detector off zero

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
三相四线制低压供电系统中性线断线检测方法;王鹏冲;刘伯颖;张渭澎;吕殿利;;电气应用(第16期);全文 *
三相四线制系统零线断线检测及保护研究;郑楚韬;陈永杰;;电气技术(第08期);全文 *

Also Published As

Publication number Publication date
CN109358310A (en) 2019-02-19

Similar Documents

Publication Publication Date Title
CN109358310B (en) Device and method for detecting broken zero line of three-phase four-wire electric energy meter
CN203164277U (en) Overcurrent and overvoltage protection detection circuit
CN104849542A (en) Current detection system and gear shift method therefor
CN101951010B (en) Ground protection method for small-current ground system
CN110880743B (en) Kendel rank correlation-based pilot protection method for outgoing line of wind power plant
CN202049191U (en) Overvoltage undervoltage detection circuit
CN209132417U (en) Three-phase and four-line electric energy meter line detector off zero
CN106405305B (en) Zero line phase failure detection circuit and method for detecting zero line phase failure
CN103675416A (en) Undervoltage-overvoltage protection device and method
CN103683184B (en) Undervoltage-overvolprotection protection device and method
CN109884476B (en) Method for judging fault direction of tie line suitable for double-fed power access
CN108521116A (en) A kind of method and system for transmission line of electricity longitudinal direction failure to be identified
CN112595995A (en) PT (potential Transformer) disconnection fault detection unit of automatic excitation device and working method thereof
CN207638631U (en) A kind of IGBT protection circuit
CN207677707U (en) A kind of precisely reliable UART communications level shifting circuit
CN105305796A (en) Frequency converter direct-current busbar overvoltage and under-voltage protection method and system
CN108594044B (en) Generator-side circuit breaker ground capacitor fault identification method and device
CN114002544B (en) Multi-terminal line protection fault positioning and ranging method
CN210835199U (en) PT disconnection fault detection unit of automatic excitation device
CN111948568B (en) Power grid line fault processing method based on instantaneous phase consistency
CN113607994A (en) Zero line detection circuit, zero line detection method and electric energy meter
CN204597461U (en) A kind of brshless DC motor current foldback circuit
CN111799757B (en) Longitudinal zero sequence voltage turn-to-turn protection method for generator
CN112557943A (en) Low-voltage switch system based on double current transformers
CN217443430U (en) Zero line current sampling circuit and electric energy meter

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant