CN109356285A - A kind of prefabricated column component, assembled combination prefabricated post and its assembly method - Google Patents

A kind of prefabricated column component, assembled combination prefabricated post and its assembly method Download PDF

Info

Publication number
CN109356285A
CN109356285A CN201811360965.6A CN201811360965A CN109356285A CN 109356285 A CN109356285 A CN 109356285A CN 201811360965 A CN201811360965 A CN 201811360965A CN 109356285 A CN109356285 A CN 109356285A
Authority
CN
China
Prior art keywords
prefabricated
outsourcing
core column
post
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811360965.6A
Other languages
Chinese (zh)
Other versions
CN109356285B (en
Inventor
王志龙
罗文升
周俊
范海飞
龚神甫
李龙明
唐凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGXI SECOND CONSTRUCTION Co Ltd
Original Assignee
JIANGXI SECOND CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGXI SECOND CONSTRUCTION Co Ltd filed Critical JIANGXI SECOND CONSTRUCTION Co Ltd
Priority to CN201811360965.6A priority Critical patent/CN109356285B/en
Publication of CN109356285A publication Critical patent/CN109356285A/en
Application granted granted Critical
Publication of CN109356285B publication Critical patent/CN109356285B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/21Connections specially adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

The invention discloses a kind of prefabricated column components, including prefabricated core column, grout blanket and outsourcing prefabricated post;Prefabricated core column is solid cylindrical structure;Outsourcing prefabricated post is open column shape structure;Prefabricated core column is placed in inside outsourcing prefabricated post;It is grout blanket between prefabricated core column and outsourcing prefabricated post;Prefabricated core column, outsourcing prefabricated post both ends are provided with pre-embedded steel slab;The top of prefabricated core column is higher than the top of outsourcing prefabricated post.The present invention provides a kind of prefabricated column component, assembled combination prefabricated post and its assembly method, the outsourcing prefabricated post loading characteristic and full prefabricated post loading characteristic in assembled combination prefabricated post are essentially identical.Prefabricated core column joint location is located at moment of flexure smaller part, avoids node, and stress is more reasonable;Because building structure bottom pillar is larger by shearing, when prefabrication, can properly increase the prefabricated core column stirrup ratio of reinforcement in a certain range of bottom, resist horizontal shear jointly by prefabricated core column, grouting material, outsourcing prefabricated post.

Description

A kind of prefabricated column component, assembled combination prefabricated post and its assembly method
Technical field
The present invention relates to technical field of buildings, more particularly to a kind of prefabricated column component, assembled group Close prefabricated post and its assembly method.
Background technique
In recent years, China tries to explore to develop assembled architecture, mainly there is prefabricated integral frame structure, assembled integral Shear wall structure, prefabricated integral frame-shear wall structure;Prefabricated post generally uses full prefabricated post at present, and full prefabricated post is erected Generally connected to connection using grout sleeve by root, because joint reinforcing bar density is big, it is desirable that machining accuracy is high, operation difficulty it is larger and Full prefabricated post weight is larger.
Therefore, how a kind of assembled that difficulty of construction is low combination prefabricated post is provided and its assembly method is art technology The problem of personnel's urgent need to resolve.
Summary of the invention
In view of this, the present invention provides a kind of prefabricated column component, assembled combination prefabricated post and its assembly sides Method, assembled combine prefabricated post in outsourcing prefabricated post loading characteristic and full prefabricated post loading characteristic it is essentially identical.Prefabricated core column Joint location is located at moment of flexure smaller part, avoids node, and stress is more reasonable;Because building structure bottom pillar is by larger, the work of shearing Factory can properly increase the prefabricated core column stirrup ratio of reinforcement when prefabricated in a certain range of bottom, pass through prefabricated core column, grouting material, outsourcing Prefabricated post resists horizontal shear jointly.
To achieve the goals above, the invention provides the following technical scheme:
A kind of prefabricated column component, comprising: prefabricated core column, grout blanket and outsourcing prefabricated post;The prefabricated core column is Solid cylindrical structure;The outsourcing prefabricated post is open column shape structure;The prefabricated core column is placed in inside the outsourcing prefabricated post; It is grout blanket between the prefabricated core column and the outsourcing prefabricated post;The prefabricated core column, outsourcing prefabricated post both ends are pre- Bury steel plate;The prefabricated core column and the outsourcing prefabricated post are contour, and the top of the prefabricated core column is prefabricated higher than the outsourcing The top of column.
Through the above technical solution, technical effect of the invention: the top of prefabricated core column is higher than the top of outsourcing prefabricated post End, when connection, prefabricated core column joint location is located at moment of flexure smaller part, with the connector of outsourcing prefabricated post not in the same horizontal position, Stress is more reasonable.
Preferably, prefabricated post, including bottom, middle layer and top layer are combined in a kind of above-mentioned assembled;The wherein dress It is connected with formula precast column unit head and the tail, the pre-embedded steel slab of the prefabricated column component bottom end of bottom is welded on foundation floor On;Middle layer is welded by the pre-embedded steel slab of described prefabricated core column one end and the pre-embedded steel slab of another prefabricated core column It connects, while the pre-embedded steel slab of outsourcing prefabricated post one end and the pre-embedded steel slab of another outsourcing prefabricated post weld It connects;The pre-embedded steel slab on the top of the middle layer and the top layer pre-embedded steel slab are contour.
Through the above technical solution, it technical effect of the invention: is attached by welding, construction Difficulties is transferred to Precast plant, convenient for control, site operation difficulty is substantially reduced, and construction quality can be guaranteed well.
Preferably, prefabricated post is combined in a kind of above-mentioned assembled, further includes precast beam reserved opening, the precast beam is reserved One end of the outsourcing prefabricated post, and the precast beam reserved opening pre-embedded steel slab is arranged in mouth.
Through the above technical solution, technical effect of the invention: precast beam reserved opening pre-embedded steel slab, convenient for prefabricated post with The connection of precast beam is directly welded with pre-embedded steel slab on precast beam by pre-embedded steel slab at precast beam reserved opening, is simplified The connection procedure of column beam, site operation difficulty substantially reduce, and construction quality can be guaranteed well.
Preferably, prefabricated post is combined in a kind of above-mentioned assembled, the precast beam reserved opening is at least arranged one.
Through the above technical solution, technical effect of the invention: according to actual needs to the quantity of precast beam reserved opening It is selected.
Preferably, prefabricated post is combined in a kind of above-mentioned assembled, the section of the prefabricated core column includes but is not limited to: circle Shape, square, diamond shape.
Preferably, prefabricated post is combined in a kind of above-mentioned assembled, the section of the outsourcing prefabricated post includes but is not limited to: Round, square, diamond shape.
Through the above technical solution, outsourcing prefabricated post internal mode when technical effect of the invention: being square or diamond shape Plate is made into chamfering in four right angles, is convenient for demoulding.
A kind of assembly method of assembled combination prefabricated post, which is characterized in that comprise the following specific steps that:
S1 completes prefabricated core column, outsourcing precast production in precast plant according to the requirement of design drawing;
For S2 after the concrete strength of prefabricated core column, outsourcing prefabricated post reaches the intensity of lifting requirements, transport is existing to constructing ?;
After the lifting positioning of S3 prefabricated core column, interim diagonal brace is taken to fix, by prefabricated core column end pre-embedded steel slab and basic building Layer pre-embedded steel slab firm welding, then removes interim diagonal brace;
S4 lifts outsourcing prefabricated post, and interim diagonal brace is taken to fix, by the prefabricated column end pre-embedded steel slab of outsourcing and basis, floor Pre-embedded steel slab firm welding;
Grouting material is perfused in S5 between prefabricated core column and outsourcing prefabricated post, and grouting material is filled to the 5cm of bottom elevation lower part;
S6 removes the interim diagonal brace of fixed outsourcing prefabricated post after back-grouting material reaches some strength;
S7 assembles middle layer, according to practice of construction it needs to be determined that the quantity of the prefabricated column component of middle layer, intermediate The pre-embedded steel slab of the prefabricated core column of the pre-embedded steel slab and bottom of the prefabricated core column of layer welds;The outsourcing prefabricated post of middle layer it is pre-buried The pre-embedded steel slab of the outsourcing prefabricated post of steel plate and bottom welds;
S8 assembles top layer, and for the prefabricated column sleeve of the outsourcing of top layer on the prefabricated core column of middle layer, the outsourcing for welding top layer is prefabricated The pre-embedded steel slab of the outsourcing prefabricated post of the pre-embedded steel slab and middle layer of column.
It can be seen via above technical scheme that compared with prior art, the present disclosure provides a kind of prefabricated Column component, assembled combination prefabricated post and its assembly method, assembled combine outsourcing prefabricated post loading characteristic in prefabricated post with Full prefabricated post loading characteristic is essentially identical.Prefabricated core column joint location is located at moment of flexure smaller part, avoids node, and stress is more closed Reason;Because building structure bottom pillar is larger by shearing, when prefabrication, can properly increase prefabricated core column in a certain range of bottom The stirrup ratio of reinforcement resists horizontal shear jointly by prefabricated core column, grouting material, outsourcing prefabricated post.
Compared with prior art, the present invention beneficial effect is: assembled combination prefabricated post stress is more reasonable, and construction is difficult Point is transferred to precast plant, and convenient for control, site operation difficulty is substantially reduced, and construction quality can be guaranteed well.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this The embodiment of invention for those of ordinary skill in the art without creative efforts, can also basis The attached drawing of offer obtains other attached drawings.
Fig. 1 attached drawing is assembling schematic diagram of the invention;
Fig. 2 attached drawing is top view of the invention;
Fig. 3 attached drawing is bottom assembling schematic diagram of the invention;
Fig. 4 attached drawing is top layer assembling schematic diagram of the invention.
In figure: 1 prefabricated core column, 2 grout blankets, 3 outsourcing prefabricated posts, 4 pre-embedded steel slabs, 5 precast beam reserved openings.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
The embodiment of the invention discloses a kind of prefabricated column component, assembleds to combine prefabricated post and its assembly method, Outsourcing prefabricated post loading characteristic and full prefabricated post loading characteristic in assembled combination prefabricated post is essentially identical.Prefabricated core column connector Position is located at moment of flexure smaller part, avoids node, and stress is more reasonable;Because building structure bottom pillar is larger by shearing, factory is pre- The prefabricated core column stirrup ratio of reinforcement can be properly increased when processed in a certain range of bottom, it is prefabricated by prefabricated core column, grouting material, outsourcing Column resists horizontal shear jointly.
As shown in Figs. 1-2, a kind of prefabricated column component, including prefabricated core column 1, grout blanket 2 and outsourcing prefabricated post 3; Prefabricated core column 1 is solid cylindrical structure;Outsourcing prefabricated post 3 is open column shape structure;Prefabricated core column 1 is placed in outsourcing prefabricated post 3 Portion;It is grout blanket 2 between prefabricated core column 1 and outsourcing prefabricated post 3;Prefabricated core column 1, the equal pre-embedded steel slab 4 in 3 both ends of outsourcing prefabricated post; The top of prefabricated core column 1 is higher than the top of outsourcing prefabricated post 3.
A kind of assembled combination prefabricated post, including bottom, middle layer and top layer;Wherein prefabricated column component head and the tail connect It connects, the pre-embedded steel slab 4 of the prefabricated column component bottom end of bottom is welded on foundation floor;Middle layer passes through prefabricated core column 1 The pre-embedded steel slab 4 of the pre-embedded steel slab 4 of one end and another prefabricated core column 1 welds, while the pre-embedded steel slab 4 of 3 one end of outsourcing prefabricated post It is welded with the pre-embedded steel slab 4 of another outsourcing prefabricated post 3;The pre-embedded steel slab 4 on the top of middle layer and the pre-embedded steel slab 4 etc. of top layer It is high.
It in order to further optimize the above technical scheme, further include precast beam reserved opening 5, precast beam reserved opening 5 is arranged outside One end of packet prefabricated post 3, and 5 pre-embedded steel slab 4 of precast beam reserved opening.
In order to further optimize the above technical scheme, precast beam reserved opening 5 is at least arranged one.
In order to further optimize the above technical scheme, the section of prefabricated core column 1 includes but is not limited to: round, square, water chestnut Shape.
In order to further optimize the above technical scheme, the section of outsourcing prefabricated post 3 includes but is not limited to: round, square, Diamond shape.
A kind of assembly method of assembled combination prefabricated post, comprises the following specific steps that:
S1 completes prefabricated core column 1, outsourcing prefabricated post 3 in precast plant according to the requirement of design drawing;
S2 is after the concrete strength of prefabricated core column 1, outsourcing prefabricated post 3 reaches the intensity of lifting requirements, transport to construction Scene;
After the lifting positioning of S3 prefabricated core column 1, interim diagonal brace is taken to fix, by 1 end pre-embedded steel slab 4 of prefabricated core column and base Plinth, 4 firm welding of floor pre-embedded steel slab, then remove interim diagonal brace;
S4 lifts outsourcing prefabricated post 3, and interim diagonal brace is taken to fix, by 3 end pre-embedded steel slab 4 of outsourcing prefabricated post and basic building Layer 4 firm welding of pre-embedded steel slab;
Grouting material is perfused in S5 between prefabricated core column 1 and outsourcing prefabricated post 3, and grouting material is filled to the 5cm of bottom elevation lower part;
S6 removes the interim diagonal brace of fixed outsourcing prefabricated post 3 after grouting material reaches some strength;
S7 assembles middle layer, according to practice of construction it needs to be determined that the quantity of the prefabricated column component of middle layer, intermediate The pre-embedded steel slab of the prefabricated core column of the pre-embedded steel slab and bottom of the prefabricated core column of layer welds;The outsourcing prefabricated post of middle layer it is pre-buried The pre-embedded steel slab of the outsourcing prefabricated post of steel plate and bottom welds;
S8 assembles top layer, and for the prefabricated column sleeve of the outsourcing of top layer on the prefabricated core column of middle layer, the outsourcing for welding top layer is prefabricated The pre-embedded steel slab of the outsourcing prefabricated post of the pre-embedded steel slab and middle layer of column.
In actual assembling process, prefabricated core column connector is in moment of flexure smaller part, and the prefabricated column joint of outsourcing is in beam bottom, and every layer Prefabricated core column connector column joint more prefabricated than outsourcing is about high half layer high, and prefabricated core column length=first floor prefabricated components are high layer by layer for the first time + second layer prefabricated components are high layer by layer/and 2.
As shown in figure 3, the prefabricated core column of bottom is welded on foundation floor, by the prefabricated column sleeve of outsourcing on prefabricated core column, And the pre-embedded steel slab of the bottom end of outsourcing prefabricated post is welded on foundation floor, it is filled between outsourcing prefabricated post and prefabricated core column The bottom of slurry, assembled combination prefabricated post is installed;
As described in Figure 4, the top of the prefabricated core column of middle layer upper end is higher than the top of the outsourcing prefabricated post of same layer, top layer dress Timing puts on outsourcing prefabricated post for outside the prefabricated core column for leaking out outsourcing prefabricated post, welds the pre-embedded steel slab of outsourcing prefabricated post, and Grouting, assembled combine prefabricated post assembly and complete.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other The difference of embodiment, the same or similar parts in each embodiment may refer to each other.For device disclosed in embodiment For, since it is corresponded to the methods disclosed in the examples, so being described relatively simple, related place is said referring to method part It is bright.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.

Claims (7)

1. a kind of prefabricated column component, which is characterized in that prefabricated core column, grout blanket and outsourcing prefabricated post;The pre- coremaking Column is solid cylindrical structure;The outsourcing prefabricated post is open column shape structure;The prefabricated core column is placed in the outsourcing prefabricated post It is internal;It is grout blanket between the prefabricated core column and the outsourcing prefabricated post;The prefabricated core column, outsourcing prefabricated post both ends It is provided with pre-embedded steel slab;The top of the prefabricated core column is higher than the top of the outsourcing prefabricated post.
2. a kind of assembled of prefabricated column component according to claim 1 combines prefabricated post, which is characterized in that packet Include bottom, middle layer and top layer;The prefabricated column component head and the tail connect, the prefabricated column component bottom of bottom The pre-embedded steel slab at end is welded on foundation floor;The pre-embedded steel slab and another institute of the middle layer by described prefabricated core column one end State the pre-embedded steel slab welding of prefabricated core column, while the pre-embedded steel slab of outsourcing prefabricated post one end and another described outer The pre-embedded steel slab of packet prefabricated post welds;The pre-embedded steel slab on the top of the middle layer and the top layer pre-embedded steel slab are contour.
3. a kind of assembled according to claim 2 combines prefabricated post, which is characterized in that it further include precast beam reserved opening, One end of the outsourcing prefabricated post, and the precast beam reserved opening pre-embedded steel slab is arranged in the precast beam reserved opening.
4. a kind of assembled according to claim 3 combines prefabricated post, which is characterized in that the precast beam reserved opening is at least Setting one.
5. according to a kind of described in any item assembled combination prefabricated posts of claim 2-4, which is characterized in that the prefabricated core column Section include but is not limited to: round, square, diamond shape.
6. according to a kind of described in any item assembled combination prefabricated posts of claim 2-4, which is characterized in that the outsourcing is prefabricated The section of column includes but is not limited to: round, square, diamond shape.
7. a kind of assembly method of assembled combination prefabricated post, which is characterized in that comprise the following specific steps that:
S1 completes prefabricated core column, outsourcing precast production in precast plant according to the requirement of design drawing;
S2 is after the concrete strength of prefabricated core column, outsourcing prefabricated post reaches the intensity of lifting requirements, transport to construction site;
After the lifting positioning of S3 prefabricated core column, interim diagonal brace is taken to fix, prefabricated core column end pre-embedded steel slab and foundation floor is pre- Steel plate firm welding is buried, interim diagonal brace is then removed;
S4 lifts outsourcing prefabricated post, and interim diagonal brace is taken to fix, and the prefabricated column end pre-embedded steel slab of outsourcing and foundation floor is pre-buried Steel plate firm welding;
Grouting material is perfused in S5 between prefabricated core column and outsourcing prefabricated post, and grouting material is filled to the 5cm of bottom elevation lower part;
S6 removes the interim diagonal brace of fixed outsourcing prefabricated post after grouting material reaches some strength;
S7 assembles middle layer, according to practice of construction it needs to be determined that the quantity of the prefabricated column component of middle layer, middle layer The pre-embedded steel slab of the prefabricated core column of the pre-embedded steel slab and bottom of prefabricated core column welds;The pre-embedded steel slab of the outsourcing prefabricated post of middle layer It is welded with the pre-embedded steel slab of the outsourcing prefabricated post of bottom;
S8 assembles top layer, and the prefabricated column sleeve of the outsourcing of top layer welds the outsourcing prefabricated post of top layer on the prefabricated core column of middle layer The pre-embedded steel slab of the outsourcing prefabricated post of pre-embedded steel slab and middle layer.
CN201811360965.6A 2018-11-15 2018-11-15 Assembled prefabricated column component, assembled combined prefabricated column and assembling method thereof Active CN109356285B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811360965.6A CN109356285B (en) 2018-11-15 2018-11-15 Assembled prefabricated column component, assembled combined prefabricated column and assembling method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811360965.6A CN109356285B (en) 2018-11-15 2018-11-15 Assembled prefabricated column component, assembled combined prefabricated column and assembling method thereof

Publications (2)

Publication Number Publication Date
CN109356285A true CN109356285A (en) 2019-02-19
CN109356285B CN109356285B (en) 2023-10-27

Family

ID=65345250

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811360965.6A Active CN109356285B (en) 2018-11-15 2018-11-15 Assembled prefabricated column component, assembled combined prefabricated column and assembling method thereof

Country Status (1)

Country Link
CN (1) CN109356285B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110145070A (en) * 2019-05-13 2019-08-20 悉地国际设计顾问(深圳)有限公司 A kind of prefabricated column assembly and its construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07207759A (en) * 1994-01-24 1995-08-08 Tokyu Koken Kk Precast steel reinforced concrete made member and construction method of structure using the member
CN105297895A (en) * 2015-11-30 2016-02-03 北方工业大学 Compound steel pipe concrete column-steel beam semi-through haunch type node
CN106437034A (en) * 2016-11-29 2017-02-22 南昌大学 Steel tube and semi-prefabricated semi-cast-in-place construction waste recycled concrete combined column and preparation method thereof
CN209179177U (en) * 2018-11-15 2019-07-30 江西建工第二建筑有限责任公司 A kind of prefabricated column component, assembled combine prefabricated post

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07207759A (en) * 1994-01-24 1995-08-08 Tokyu Koken Kk Precast steel reinforced concrete made member and construction method of structure using the member
CN105297895A (en) * 2015-11-30 2016-02-03 北方工业大学 Compound steel pipe concrete column-steel beam semi-through haunch type node
CN106437034A (en) * 2016-11-29 2017-02-22 南昌大学 Steel tube and semi-prefabricated semi-cast-in-place construction waste recycled concrete combined column and preparation method thereof
CN209179177U (en) * 2018-11-15 2019-07-30 江西建工第二建筑有限责任公司 A kind of prefabricated column component, assembled combine prefabricated post

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110145070A (en) * 2019-05-13 2019-08-20 悉地国际设计顾问(深圳)有限公司 A kind of prefabricated column assembly and its construction method

Also Published As

Publication number Publication date
CN109356285B (en) 2023-10-27

Similar Documents

Publication Publication Date Title
CN107060140B (en) Prefabricated double-steel-tube concrete shear wall and assembling method thereof
CN105781125B (en) A kind of installation method of assembled architecture
CN206308796U (en) A kind of post insertion prefabricated PC concrete frame frame system
CN108193782A (en) Prefabricated modular frame node and assembling method thereof
CN207003652U (en) A kind of compound concrete-filled tubular column and steel tube concrete beam composite frame structure
CN205954921U (en) Novel big board shear wall structure is secretly supported in bolted connection's prefabricated assembled area
CN108678218B (en) Assembly type concrete shear wall based on multipurpose thin-wall steel pipe and construction method thereof
CN108797791B (en) A kind of assembly method of upper and lower self-heat conserving external wall and floor
CN108661221A (en) A kind of precast floor slab and its connection structure and its construction method
CN208668765U (en) Precast prestressed beam and assembled composite frame structure
CN109057004A (en) A kind of assembled steel-Combined concrete frame and its connection installation method
CN108457422A (en) Precast prestressed beam, assembled composite frame structure and its installation method
CN103628571B (en) Beam-column joint for reverse construction method and construction method
JP3160748B2 (en) Precast structural member composed of reinforced concrete columns and steel beams, and method of constructing structure using the same
CN208105477U (en) Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam L shape connecting node
CN109183983A (en) A kind of assembly method of upper and lower interior wall and floor
CN209179177U (en) A kind of prefabricated column component, assembled combine prefabricated post
CN208105473U (en) A kind of assembly node of upper and lower self-heat conserving external wall and floor
CN109356285A (en) A kind of prefabricated column component, assembled combination prefabricated post and its assembly method
CN208105474U (en) A kind of assembly node of upper and lower interior wall and floor
CN108265823A (en) Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam L-shaped connecting node
CN105951987B (en) Node and construction method are poured after the secondary external permanent aluminium sheet external mold of frame
CN208363421U (en) Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam cross connecting node
CN209163035U (en) A kind of assembled group frame beam column construction
CN208023735U (en) Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam T shape connecting nodes

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant