CN109356162A - A kind of OPT interlocking pile slip casting around pile water-stopping method and slip casting pipe device - Google Patents

A kind of OPT interlocking pile slip casting around pile water-stopping method and slip casting pipe device Download PDF

Info

Publication number
CN109356162A
CN109356162A CN201811446476.2A CN201811446476A CN109356162A CN 109356162 A CN109356162 A CN 109356162A CN 201811446476 A CN201811446476 A CN 201811446476A CN 109356162 A CN109356162 A CN 109356162A
Authority
CN
China
Prior art keywords
slip casting
water
pile
pipe
skirt piles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811446476.2A
Other languages
Chinese (zh)
Other versions
CN109356162B (en
Inventor
李蕊
蒋瑞泳
甄德鹏
高攀
李玲利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Di Kuang Engineering Construction Co Ltd
Original Assignee
Beijing Di Kuang Engineering Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Di Kuang Engineering Construction Co Ltd filed Critical Beijing Di Kuang Engineering Construction Co Ltd
Priority to CN201811446476.2A priority Critical patent/CN109356162B/en
Publication of CN109356162A publication Critical patent/CN109356162A/en
Application granted granted Critical
Publication of CN109356162B publication Critical patent/CN109356162B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/18Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material

Abstract

The present invention relates to a kind of OPT interlocking pile slip casting around pile water-stopping method and slip casting pipe device, the step of water-stopping method includes: shaft excavation construction;PBA transverse passage-way and pilot drive;The construction plastic concrete stake in pilot tunnel and transverse passage-way;It drills between adjacent two plastic concrete stakes to skirt piles.By vertical slip casting penstock installation on the steel reinforcement cage of skirt piles, place is engaged positioned at skirt piles and the separate station of plastic concrete stake;Slip casting steel pipe part corresponding with water-bearing layer absolute altitude offers injected hole, and locking device is by injected hole temporary sealing.Steel reinforcement cage is transferred, casting concrete is mutually twisted skirt piles with plastic concrete stake, forms hole internal gearing pile water stopping curtain.High-pressure slip-casting is carried out to slip casting steel pipe, high pressure slurries spray into surrounding aqueous layer, and sealing effect is played in solidification at water-bearing layer.The present invention carries out slip casting by installing slip casting pipe device on steel reinforcement cage at water-bearing layer, so that the sealing leakproof of OPT interlocking pile is realized, it is easy for construction, economical.

Description

A kind of OPT interlocking pile slip casting around pile water-stopping method and slip casting pipe device
Technical field
The present invention relates to the technical fields of bridge construction, more particularly, to a kind of OPT interlocking pile slip casting around pile water-stopping method And slip casting pipe device.
Background technique
In the prior art, interlocking pile is that part circumference is mutually embedding between adjacent concrete campshed, and in the alternate construction of rear order It affixes one's name in stake into steel reinforcement cage, is allowed to be formed whole continuous waterproof, earth-retaining building enclosure with good barrier effect.
With reference to Fig. 3 and Figure 10, interlocking pile is that a kind of foundation pit 24 that formation is mutually twisted arrangement between stake and stake goes along with sb. to guard him knot Structure.The arrangement mode of stake is not arrangement of reinforcement and use extra retarded set plain concrete pile (A) and a reinforced concrete pile (B Stake) arranged for interval.It when construction, first constructs A, B constructions are completed in rear construction B before A pile concrete initial set.B brills Hole cuts away the concrete of adjacent A intersection when constructing, to realize occlusion.
It is engaged after the completion of pile driving construction, because construction quality problem will appear local drainage.As shown in Figure 10, existing skill In art, the blocking method of interlocking pile is generally first dredged to be blocked up afterwards, i.e., in the pre-buried water conservancy diversion water pipe 71 of leakage, forms a reserved infiltration Aquaporin quickly blocks gap with cement after water is discharged, in envelope water conservancy diversion water pipe 71 after cement reaches some strength. If water leakage is larger, success cannot be once blocked, it is also necessary to repeatedly block.Excavation section by section is taken in 24 work progress of foundation pit, It is segmented leak stopping, facilitates blocking construction, avoids large area excavation that leak section is caused excessively to cause danger.
When water is larger, it is also necessary to which auxiliary method, such as the outer precipitation in hole, interlocking pile back-grouting, steel plate block.
The applicant had submitted the patent of entitled " a kind of OPT construction method of interlocking pile " on May 26th, 2018 Application, application No. is 201810517421.X.The OPT construction method of interlocking pile recorded in application documents refers to based on PBA engineering method Hole internal gearing pile water stopping curtain construction method." OP " refers to writing a Chinese character in simplified form for Occlusion Pile, represents interlocking pile;" T " is Tunnel's writes a Chinese character in simplified form, and represents tunnel.With reference to Fig. 1 and Fig. 2, cardinal principle is interlocking pile of constructing in pilot tunnel 23 and transverse passage-way 22, The skirt piles 11 in former PBA engineering method are utilized as reinforced concrete pile, after plain concrete pile is arranged among skirt piles 11 in interlocking pile Form water-stop curtain.
The blocking method of above-mentioned interlocking pile have the following deficiencies: first is that aqueduct water guide carry out blocking again need it is artificial, and And water plugging effect is affected by leak size, manual work environment is poor, has a certain impact to foundation trench operating environment.Second is that Ancillary measure needs behind interlocking pile there are certain space place, so that corresponding machinery is to dewatering well, injected hole 41 or steel The construction of plate.And hole internal gearing stake is due to being constructed in pilot tunnel 23 and transverse passage-way 22, in pilot tunnel 23 that space is limited, so right It is unfavorable for implementing in ancillary measure.Therefore, it is necessary to research and develop a kind of leak stopping sealing scheme that can be applied to hole internal gearing stake.
Summary of the invention
The object of the present invention is to provide one kind can be suitable for OPT interlocking pile slip casting around pile pipe device.
Foregoing invention purpose of the invention has the technical scheme that
A kind of OPT interlocking pile slip casting around pile pipe device, it is described including the Grouting Pipe being fixed on pile body steel reinforcement cage and locking device Grouting Pipe part corresponding with water-bearing layer absolute altitude offers injected hole, and locking device is by injected hole temporary sealing;The interlocking pile Plastic concrete stake including the rigid skirt piles that are set in pilot tunnel and transverse passage-way and between two rigid skirt piles, skirt piles with Plastic concrete stake is mutually twisted, and one circle closing structure of all skirt piles and plastic concrete stake composition, forms the stake of hole internal gearing Water-stop curtain.
It is realized by installing slip casting pipe device on steel reinforcement cage by positioning slip casting by using above-mentioned technical proposal Local strengthening sealing is carried out, carries out the anti-system of leak stopping in advance;All operations can be completed in the small space of pilot tunnel, and be not required to cheat The ancillary measures such as outer precipitation.
The present invention is further arranged to: the Grouting Pipe is vertically arranged, positioned at the separate vehicle of skirt piles and plastic concrete stake At the occlusion stood.
By using above-mentioned technical proposal, slip casting is accurately located at water-bearing layer and occlusion, saves material, it is economical high Effect.
The present invention is further arranged to: further including the arc Grouting Pipe for being set to water-bearing layer corresponding position, arc Grouting Pipe It is fixed on the outer peripheral surface of steel reinforcement cage, the side positioned at steel reinforcement cage far from station offers injected hole, arc note in arc Grouting Pipe Slurry pipe is connected to slip casting steel pipe;Locking device is by injected hole temporary sealing.
By using above-mentioned technical proposal, arc Grouting Pipe will not only carry out slip casting at occlusion, but water-bearing layer is whole Slip casting forms integral waterproofing structure, thoroughly blocks water flow, water-stagnating effect is more guaranteed.
The present invention is further arranged to: arc Grouting Pipe is located at the close basal surface position in water-bearing layer.
By using above-mentioned technical proposal, economical and efficient, speed of application is fast, and water-stagnating effect is more preferably.
The present invention is further arranged to: two Grouting Pipes and two arc slip castings are equipped on the steel reinforcement cage of every skirt piles Pipe, two arc Grouting Pipes are connected to two Grouting Pipes respectively;The other end closing of two arc Grouting Pipes;A piece arc slip casting Pipe is located at the close basal surface position in water-bearing layer, and another arc Grouting Pipe is located at the close medium position in water-bearing layer.
By using above-mentioned technical proposal, the situation thicker suitable for water-bearing layer.
The present invention is further arranged to: locking device includes the rubber layer for being wrapped in slip casting tube outer surface outside.
By using above-mentioned technical proposal, rubber layer can prevent the cement grout of concrete from entering in Grouting Pipe, also can It is enough to be broken through by high-pressure slip-casting liquid, realize slip casting effect.
The present invention is further arranged to: locking device further includes the plastic foil for being wrapped in slip casting tube outer surface outside, plastic foil position On the inside of rubber layer.
By using above-mentioned technical proposal, better seal protection is carried out to injected hole.
The present invention is further arranged to: rubber layer uses iron wire or adhesive tape binding and fixing.
By using above-mentioned technical proposal, prevent rubber layer from falling off.
It is a further object to provide a kind of methods suitable for OPT interlocking pile sealing.The purpose be by with What lower technical solution was realized:
A kind of OPT interlocking pile slip casting around pile water-stopping method, including following construction procedure:
S1, shaft excavation construction;
S2, PBA transverse passage-way and pilot drive;
S3, in pilot tunnel and transverse passage-way skirt piles design position, plastic concrete stake of constructing between two skirt piles;Plastic concrete The diameter of stake is greater than the clear spacing of two skirt piles;The stake end stretch of plastic concrete stake enters silo bottom or less stratum;
S4, it drills between adjacent two plastic concrete stakes to skirt piles;Grouting Pipe is mounted on the steel reinforcement cage of skirt piles, Place is engaged positioned at skirt piles and the separate station of plastic concrete stake;Grouting Pipe part corresponding with water-bearing layer absolute altitude opens up There is an injected hole, locking device is by injected hole temporary sealing;Steel reinforcement cage is transferred, casting concrete makes skirt piles and plastic concrete stake phase Mutually occlusion, and one circle closing structure of all skirt piles and plastic concrete stake composition, form hole internal gearing pile water stopping curtain;
S5, high-pressure slip-casting, locking device and the cover to reinforcement concrete quilt at injected hole aperture are carried out to slip casting steel pipe After breaking through, high pressure slurries are sprayed into surrounding aqueous layer, and sealing effect is played in solidification at water-bearing layer.
The present invention is further arranged to: in water-bearing layer, corresponding position installs arc Grouting Pipe, and arc Grouting Pipe is fixed on steel The outer peripheral surface of muscle cage, the side positioned at steel reinforcement cage far from station offer injected hole, arc Grouting Pipe and note in arc Grouting Pipe Starch steel pipe connection;Locking device is by injected hole temporary sealing.
By using above-mentioned technical proposal, realize the ejection for water plugging of OPT interlocking pile, in advance at water-bearing layer and occlusion into Row leak stopping is reinforced, it is therefore prevented that water penetrates into foundation pit, facilitates the excavation construction of foundation pit.
In conclusion advantageous effects of the invention are as follows:
1. by steel reinforcement cage install slip casting pipe device, realize by positioning slip casting carry out local strengthening sealing, in advance into The anti-system of row leak stopping;It is accurately located at water-bearing layer and occlusion, saves material, economical and efficient;All operations can be in the narrow of pilot tunnel It is completed in small space, and is not required to cheat the ancillary measures such as outer precipitation;
2. the setting of arc Grouting Pipe reaches better water-stagnating effect so that form whole anti-water sealing structure in water-bearing layer;
3. the setting of the double-deck arc Grouting Pipe makes the program be suitable for the thicker water-bearing layer of thickness.
Detailed description of the invention
Fig. 1 is the schematic view of facade structure for leading the internal gearing stake of in-cavity construction hole;
Fig. 2 is the plan view of pilot tunnel and transverse passage-way internal gearing stake (skirt piles are not drawn into);
Fig. 3 is the plan view for being provided with slip casting steel pipe interlocking pile;
Fig. 4 is the structural schematic diagram for being provided with the steel reinforcement cage of slip casting steel pipe;
Fig. 5 is the slip casting steel-tube construction schematic diagram for being enclosed with plastic foil and rubber layer;
Fig. 6 is the structural schematic diagram for being provided with the steel reinforcement cage of arc Grouting Pipe;
Fig. 7 is the Grouting Pipe apparatus structure schematic diagram that locking device is closing cock;
Fig. 8 is the enlarged drawing of part A in Fig. 7;
Fig. 9 is the structural schematic diagram for the arc Grouting Pipe that locking device is closing cock;
Figure 10 is the schematic diagram of existing interlocking pile blocking method in background technique.
In figure, 11, skirt piles;21, vertical shaft;22, transverse passage-way;23, pilot tunnel;24, foundation pit;31, plastic concrete stake;32, it infuses Starch steel pipe;33, arc Grouting Pipe;34, steel reinforcement cage;41, injected hole;42, rubber layer;43, plastic foil;44, iron wire;51, aqueous Layer;61, closing cock;62, protection board;63, protective partition;71, water conservancy diversion water pipe.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Embodiment one:
A kind of OPT interlocking pile slip casting around pile water-stopping method, including following construction procedure:
S1, in conjunction with Fig. 1 and Fig. 2,21 excavation construction of vertical shaft;
S2, PBA transverse passage-way 22 and pilot tunnel 23 excavate;
S3, as shown in figure 3, going out 11 position of skirt piles according to design setting-out, two skirt piles 11 design in pilot tunnel 23 and transverse passage-way 22 Construction plastic concrete stake 31 between position;The diameter of plastic concrete stake 31 is greater than the clear spacing of two skirt piles 11;Plasticity is mixed The stake end stretch of solidifying soil stake 31 enters 21 bottom of vertical shaft or less stratum;
S4, it drills between adjacent two plastic concrete stakes 31 to skirt piles 11;Grouting Pipe is mounted on to the steel of skirt piles 11 On muscle cage 34, Grouting Pipe as shown in the figure can be vertically arranged slip casting steel pipe 32, be also possible to set around the winding of steel reinforcement cage 34 Plastic tube or PE pipe for setting etc., the present embodiment are described by taking vertical slip casting steel pipe 32 as an example.Preferably, vertical slip casting steel pipe 32 is set Be placed in skirt piles 11 and the separate station of plastic concrete stake 31 is engaged place.In conjunction with Fig. 4, slip casting steel pipe 32 and water-bearing layer 51 are marked High corresponding part offers injected hole 41, and locking device is by 41 temporary sealing of injected hole, wherein 51 absolute altitude base area of water-bearing layer Matter drilling data determines.As shown in figure 5, locking device includes plastic foil 43 and the rubber for being successively wrapped in 32 outer surface of slip casting steel pipe outside Glue-line 42, the preferably waste and old bicycle tube of rubber layer 42, to realize recycling.44 binding and fixing of iron wire of rubber layer 42, Or it is sticked on slip casting steel pipe 32 with adhesive tape.
Slip casting steel pipe 32 can use the steel pipe that outer diameter is 3mm for 32mm wall thickness.The diameter of injected hole 41 is 2 ~ 5mm, excellent Select 3mm;Spacing between two neighboring injected hole 41 can be 30 ~ 60mm, preferably 50mm.Injected hole 41 is provided only on slip casting steel Pipe 32 is far from station side.
S5, decentralization steel reinforcement cage 34, casting concrete is mutually twisted skirt piles 11 with plastic concrete stake 31, and all skirt piles 11 and plastic concrete stake 31 composition one circle closing structure, formed hole internal gearing pile water stopping curtain.In 34 decentralization process of steel reinforcement cage, Must not hit cage, pier cage, turn round cage, guarantee injected hole 41 towards and position it is accurate.
S6, high-pressure slip-casting, locking device and the cover to reinforcement at 41 aperture of injected hole are carried out to slip casting steel pipe 32 After concrete is broken through, high pressure slurries are sprayed into surrounding aqueous layer 51, and sealing effect is played in solidification at water-bearing layer 51.Note Pressure about 3 ~ 10MPa is starched, flow rate of grouting is no more than 75L/min.Slip casting operation starts after being suitable for pile 2 days, should not be later than into After stake 30 days, so that high pressure slurries can easily break through the cover concrete of pile body.
Embodiment two:
With embodiment one the difference is that: as shown in fig. 6,51 corresponding position of water-bearing layer be arranged arc Grouting Pipe 33, arc Grouting Pipe 33 is fixed on the outer peripheral surface of steel reinforcement cage 34, the side positioned at steel reinforcement cage 34 far from station, opens up in arc Grouting Pipe 33 There is injected hole 41, arc Grouting Pipe 33 is connected to slip casting steel pipe 32;Locking device can be using identical material in embodiment one, will 41 temporary sealing of injected hole.Bicycle tube can be wrapped in the appearance of arc Grouting Pipe 33 by the way of winding or socket Face.Arc Grouting Pipe 33 is preferably plastic tube, can be connect with elbow bend with slip casting steel pipe 32.
When water-bearing layer, 51 thickness is not too thick, e.g. < 0.5m when, arc Grouting Pipe 33 be preferably provided to together, one end It is connected to a slip casting steel pipe 32, other end closing.Preferably, the close bottom surface in water-bearing layer 51 is arranged in arc Grouting Pipe 33 Position can first block 51 water of water-bearing layer compared with the bottom position of concentration, not with slurries when so as to slurries ejection Disconnected to spray, also constantly accumulation is upward for solidifying body, until water-bearing layer 51 is all blocked.Pass through multiple simulation test, arc slip casting For the setting of pipe 33 at 51 middle part of water-bearing layer or top, slurries become downward seepage flow, and water-stagnating effect is bad.
When 51 thickness of water-bearing layer is thicker, upper layer and lower layer, the reinforcing bar of every skirt piles 11 is can be set into arc Grouting Pipe 33 Two slip casting steel pipes 32 and upper and lower two arc Grouting Pipes 33, every arc Grouting Pipe 33 and a slip casting steel are installed on cage 34 Pipe 32 is connected to, other end closing;A piece arc Grouting Pipe 33 is located at the close basal surface position in water-bearing layer 51, another arc note Slurry pipe 33 is located at the close medium position in water-bearing layer 51.The program equally makes arc Grouting Pipe 33 be integrally located at water-bearing layer 51 Middle and lower part when slip casting, preferably first carries out the slip casting of bottom arc Grouting Pipe 33, restarts upper layer arc Grouting Pipe after a certain period of time 33 slip casting.Such setting main distinction in two or more arc Grouting Pipes 33 are connected to same root slip casting steel pipe 32, because During slip casting, as long as after slurries break through cover concrete in an arc Grouting Pipe 33, another arc Grouting Pipe 33 Middle slurry pressure can immediately reduce, and be difficult to break through protective layer again.Based on the principle, when 51 thickness of water-bearing layer is thicker or stratum in When water is bigger, the road number of arc Grouting Pipe 33 in the vertical direction can be increased, while increasing by 32 quantity of slip casting steel pipe, guaranteed Every arc Grouting Pipe 33 is only connected to a slip casting steel pipe 32.
Embodiment three:
With embodiment one the difference is that: as illustrated in figs. 7 and 8, locking device be inserted into injected hole 41 in closing cock 61, one end that closing cock 61 is inserted into injected hole 41 is cone cell.When casting concrete, closing cock 61 prevents cement grout from slip casting Hole 41 flows into slip casting steel pipe 32, and when slip casting, high pressure slurries eject closing cock 61, after breaking through cover concrete, injects aqueous In layer 51.
Closing cock 61 can be steel needle, it is preferable that and in insertion, fabric or plastics elastomeric material are wrapped up in end, so as to It is preferably ejected when high-pressure slip-casting.
Further, closing cock 61 is set as shuttle shape, and two tip settings, one end is inserted into injected hole 41, the other end Cover concrete can preferably be worn out.
In addition, closing cock 61 is not destroyed in order to during protection down steel reinforcement cage 34 and when casting concrete, so In the circumferential welding protection board 62 of slip casting steel pipe 32, the length of protection board 62 is greater than the length of the prominent slip casting steel pipe 32 of closing cock 61. The upper and lower ends in 41 region of injected hole are arranged in protection board 62, also can according to need and are set as multiple tracks in vertical direction.
Example IV:
With embodiment two the difference is that: locking device is used such as the closing cock in the insertion injected hole 41 in embodiment three 61。
As shown in figure 9, two pieces of ring protections are arranged in order to protect the closing cock 61 in arc Grouting Pipe 33 not to be destroyed Partition 63 is located at the two sides up and down of arc Grouting Pipe 33, and intrados and steel reinforcement cage 34 weld, and extrados extension elongation is big The length of arc Grouting Pipe 33 is stretched out in closing cock 61.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it It is interior.

Claims (10)

1. a kind of OPT interlocking pile slip casting around pile pipe device, it is characterised in that: including the slip casting being fixed on pile body steel reinforcement cage (34) Pipe and locking device, Grouting Pipe part corresponding with water-bearing layer (51) absolute altitude offer injected hole (41), and locking device will Injected hole (41) temporary sealing;The interlocking pile include the rigid skirt piles (11) that are set in pilot tunnel (23) and transverse passage-way (22) and Plastic concrete stake (31) between two rigid skirt piles (11), skirt piles (11) are mutually stung with plastic concrete stake (31) It closes, and one circle closing structure of all skirt piles (11) and plastic concrete stake (31) composition, forms hole internal gearing pile water stopping curtain.
2. OPT interlocking pile slip casting around pile pipe device according to claim 1, it is characterised in that: the Grouting Pipe is vertically set It sets, be located at skirt piles (11) and the separate station of plastic concrete stake (31) is engaged place.
3. OPT interlocking pile slip casting around pile pipe device according to claim 1, it is characterised in that: further include be set to it is aqueous The arc Grouting Pipe (33) of layer (51) corresponding position, arc Grouting Pipe (33) are fixed on the outer peripheral surface of steel reinforcement cage (34), are located at steel Side of the muscle cage (34) far from station, offers injected hole (41) in arc Grouting Pipe (33), arc Grouting Pipe (33) and slip casting Pipe connection;Locking device is by injected hole (41) temporary sealing.
4. OPT interlocking pile slip casting around pile pipe device according to claim 3, it is characterised in that: arc Grouting Pipe (33) position Close basal surface position in water-bearing layer (51).
5. OPT interlocking pile slip casting around pile pipe device according to claim 3, it is characterised in that: the steel of every skirt piles (11) Two Grouting Pipes and two arc Grouting Pipes (33) are installed, two arc Grouting Pipes (33) are infused with two respectively on muscle cage (34) Starch pipe connection;The other end closing of two arc Grouting Pipes (33);A piece arc Grouting Pipe (33) is located at leaning on for water-bearing layer (51) Nearly basal surface position, another arc Grouting Pipe (33) are located at the close medium position in water-bearing layer (51).
6. OPT interlocking pile slip casting around pile pipe device according to claim 1, it is characterised in that: locking device includes wrapping up in outside In the rubber layer (42) of slip casting tube outer surface.
7. OPT interlocking pile slip casting around pile pipe device according to claim 6, it is characterised in that: locking device further includes outer It is wrapped in the plastic foil (43) of slip casting tube outer surface, plastic foil (43) is located on the inside of rubber layer (42).
8. OPT interlocking pile slip casting around pile pipe device according to claim 6, it is characterised in that: rubber layer (42) uses iron Silk (44) or adhesive tape binding and fixing.
9. a kind of OPT interlocking pile slip casting around pile water-stopping method, it is characterised in that including following construction procedure:
S1, vertical shaft (21) excavation construction;
S2, PBA transverse passage-way (22) and pilot tunnel (23) excavate;
S3, plasticity of constructing between the design position of pilot tunnel (23) and transverse passage-way (22) interior skirt piles (11), two skirt piles (11) are mixed Solidifying soil stake (31);The diameter of plastic concrete stake (31) is greater than the clear spacing of two skirt piles (11);Plastic concrete stake (31) Stake end stretch enters vertical shaft (21) bottom or less stratum;
S4, it drills between adjacent two plastic concrete stakes (31) to skirt piles (11);Grouting Pipe is mounted on skirt piles (11) on steel reinforcement cage (34), be located at skirt piles (11) and the separate station of plastic concrete stake (31) is engaged place;The slip casting It manages corresponding with water-bearing layer (51) absolute altitude part to offer injected hole (41), locking device is by injected hole (41) temporary sealing;Under Put steel reinforcement cage (34), casting concrete is mutually twisted skirt piles (11) with plastic concrete stake (31), and all skirt piles (11) and One circle closing structure of plastic concrete stake (31) composition, forms hole internal gearing pile water stopping curtain;
S5, high-pressure slip-casting, locking device and the cover to reinforcement concrete being located at injected hole (41) aperture are carried out to Grouting Pipe After breaking through, high pressure slurries are sprayed into surrounding aqueous layer (51), and sealing effect is played in solidification at water-bearing layer (51).
10. OPT interlocking pile slip casting around pile water-stopping method according to claim 8, it is characterised in that: right in water-bearing layer (51) Answer position that arc Grouting Pipe (33) are installed, arc Grouting Pipe (33) is fixed on the outer peripheral surface of steel reinforcement cage (34), is located at steel reinforcement cage (34) it is offered injected hole (41) far from the side at station, in arc Grouting Pipe (33), arc Grouting Pipe (33) and Grouting Pipe connect It is logical;Locking device is by injected hole (41) temporary sealing.
CN201811446476.2A 2018-11-29 2018-11-29 OPT occlusion pile side grouting water stopping method and grouting pipe device Active CN109356162B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811446476.2A CN109356162B (en) 2018-11-29 2018-11-29 OPT occlusion pile side grouting water stopping method and grouting pipe device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811446476.2A CN109356162B (en) 2018-11-29 2018-11-29 OPT occlusion pile side grouting water stopping method and grouting pipe device

Publications (2)

Publication Number Publication Date
CN109356162A true CN109356162A (en) 2019-02-19
CN109356162B CN109356162B (en) 2023-12-29

Family

ID=65343474

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811446476.2A Active CN109356162B (en) 2018-11-29 2018-11-29 OPT occlusion pile side grouting water stopping method and grouting pipe device

Country Status (1)

Country Link
CN (1) CN109356162B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914390A (en) * 2019-04-20 2019-06-21 北京中岩大地科技股份有限公司 It is a kind of to construct the slip casting structure and construction method of cold seam for biting connecions campshed
CN110158598A (en) * 2019-05-31 2019-08-23 浙江同济科技职业学院 A kind of large diameter pile foundation wash preventing method and device that main passive protection combines
CN111155542A (en) * 2020-01-14 2020-05-15 中铁隧道集团二处有限公司 PBA construction method tunnel waterproof curtain construction method based on hole guiding technology
CN111197310A (en) * 2020-01-07 2020-05-26 中冶交通建设集团有限公司 Grouting device, equipment and grouting method for sounding pipe of water-rich stratum of cast-in-place pile
CN112177023A (en) * 2020-10-12 2021-01-05 北京建工土木工程有限公司 Pile type water stop structure engagement degree repairing device and precise slurry supplementing method thereof
CN114351741A (en) * 2021-11-30 2022-04-15 中交路桥华南工程有限公司 Construction method of anchorage supporting and water sealing structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB191109240A (en) * 1911-04-13 1912-04-11 Maxwell Mayhew Upson Improvements in and relating to Concrete Piles.
CN105937221A (en) * 2016-05-31 2016-09-14 深圳市宏业基基础工程有限公司 Manufacturing method for drilled grouting piles
CN108797620A (en) * 2018-05-25 2018-11-13 北京地矿工程建设有限责任公司 A kind of OPT construction method of interlocking pile
CN108797641A (en) * 2018-07-20 2018-11-13 中铁十八局集团有限公司 A kind of structure and its construction method of Underground Subway Station construction period full station sealing
CN209243728U (en) * 2018-11-29 2019-08-13 北京地矿工程建设有限责任公司 A kind of OPT interlocking pile slip casting around pile pipe device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB191109240A (en) * 1911-04-13 1912-04-11 Maxwell Mayhew Upson Improvements in and relating to Concrete Piles.
CN105937221A (en) * 2016-05-31 2016-09-14 深圳市宏业基基础工程有限公司 Manufacturing method for drilled grouting piles
CN108797620A (en) * 2018-05-25 2018-11-13 北京地矿工程建设有限责任公司 A kind of OPT construction method of interlocking pile
CN108797641A (en) * 2018-07-20 2018-11-13 中铁十八局集团有限公司 A kind of structure and its construction method of Underground Subway Station construction period full station sealing
CN209243728U (en) * 2018-11-29 2019-08-13 北京地矿工程建设有限责任公司 A kind of OPT interlocking pile slip casting around pile pipe device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914390A (en) * 2019-04-20 2019-06-21 北京中岩大地科技股份有限公司 It is a kind of to construct the slip casting structure and construction method of cold seam for biting connecions campshed
CN110158598A (en) * 2019-05-31 2019-08-23 浙江同济科技职业学院 A kind of large diameter pile foundation wash preventing method and device that main passive protection combines
CN111197310A (en) * 2020-01-07 2020-05-26 中冶交通建设集团有限公司 Grouting device, equipment and grouting method for sounding pipe of water-rich stratum of cast-in-place pile
CN111155542A (en) * 2020-01-14 2020-05-15 中铁隧道集团二处有限公司 PBA construction method tunnel waterproof curtain construction method based on hole guiding technology
CN112177023A (en) * 2020-10-12 2021-01-05 北京建工土木工程有限公司 Pile type water stop structure engagement degree repairing device and precise slurry supplementing method thereof
CN114351741A (en) * 2021-11-30 2022-04-15 中交路桥华南工程有限公司 Construction method of anchorage supporting and water sealing structure

Also Published As

Publication number Publication date
CN109356162B (en) 2023-12-29

Similar Documents

Publication Publication Date Title
CN109356162A (en) A kind of OPT interlocking pile slip casting around pile water-stopping method and slip casting pipe device
CN104806272B (en) Tunnel shunting combined type guarded drainage integrated system and construction method and using method
CN206308690U (en) Grout pile bottom stake side one grouting behind shaft or drift lining construction tool
CN105927231B (en) Inclined shaft passes through rich water densification drifting sand layer circulation-induced curtain-grouting method
CN204572015U (en) A kind of tunnel shunting combined type waterproof and water drainage system
CN212003197U (en) Subway station tunnel door ring beam seepage-proofing drainage construction structure
CN108797641A (en) A kind of structure and its construction method of Underground Subway Station construction period full station sealing
CN107327308A (en) A kind of Railway Tunnel waterproof method
CN209339169U (en) A kind of precipitation well in foundation pit plugging device
CN107513995A (en) A kind of bridge struction pile post grouting construction method
CN209385153U (en) Plugging structure at tunnel duct piece leak
CN201883435U (en) Preburied pipe pile grouting device
CN107217676A (en) A kind of steel cylinder with seal groove and occlusion structure or steel sheet pile and steel construction diaphragm wall
CN108517898B (en) The construction method of uplift pile and bottom plate seam crossing waterproof construction
CN111810176A (en) Subway station end reinforcement construction method for water-rich sand layer shield construction
CN107882040A (en) A kind of construction method of foundation ditch prestress anchorage cable
CN109339079A (en) A kind of foundation pit water-stopping system and its construction technology close to river permeable stratum
CN106013078A (en) Construction method for strong permeable ground layer strengthened curtain structure
CN108166532A (en) A kind of groutable underground continuous wall connector and its construction method
CN209243728U (en) A kind of OPT interlocking pile slip casting around pile pipe device
CN212250042U (en) Subway station end reinforcing structure for water-rich sand layer shield construction
CN111424695B (en) Seepage-proofing and leakage-stopping method for deep-buried karst pipeline
CN105220700A (en) Foundation pit waterproof curtain reinforcement
CN204982923U (en) Foundation ditch stagnant water curtain reinforcement structure
CN111733894A (en) Anti-floating system of deep foundation pit underground structure and construction process

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant