CN109353942A - Spoir elevator and its working method - Google Patents
Spoir elevator and its working method Download PDFInfo
- Publication number
- CN109353942A CN109353942A CN201811335269.XA CN201811335269A CN109353942A CN 109353942 A CN109353942 A CN 109353942A CN 201811335269 A CN201811335269 A CN 201811335269A CN 109353942 A CN109353942 A CN 109353942A
- Authority
- CN
- China
- Prior art keywords
- channel steel
- welded
- spoir
- pedestal
- bracket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/02—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes with non-adjustable and non-inclinable jibs mounted solely for slewing movements
- B66C23/022—Pivot axis common with column
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/16—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes with jibs supported by columns, e.g. towers having their lower end mounted for slewing movements
- B66C23/166—Simple cranes with jibs which may be fixed or can slew or luff
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
- B66C23/72—Counterweights or supports for balancing lifting couples
- B66C23/78—Supports, e.g. outriggers, for mobile cranes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
- B66C23/84—Slewing gear
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Cage And Drive Apparatuses For Elevators (AREA)
Abstract
The present invention relates to a kind of spoir elevator and its working methods, it is characterized by comprising pedestals, the middle part connecting elements being located on pedestal and the top connecting elements being connect with intermediate attachment member, the pedestal includes two round steel pipes and four channel steels being welded between round steel pipe two-by-two in cross-shaped welding, the 5th channel steel is wherein in addition welded between first group of round steel pipe two-by-two, intermediate channel steel is connected between that first channel steel of root and the 5th channel steel in four channel steels between first group of the round steel pipe two-by-two, first channel steel, 5th channel steel connect with intermediate channel steel to be formed it is I-shaped;The present invention is convenient for disassembly and assembly, is convenient for manual handling, easy to operate, and hole side need to can be only fixed in by easy means and is used, and has the function that spoir is transferred to hole side.
Description
Technical field:
The present invention relates to one kind to mention indigenous equipment, and in particular to spoir elevator and its working method.
Background technique:
The foundation construction of remote districts, it is medium-and-large-sized, electrified, modernization due to being limited by road, construction condition
Construction equipment equipment is difficult to use or uses cost price too big, so the form of construction work of artificial digging pile is generally taken, it is this
Mode will generate a large amount of spoirs in hole.Depths spoir generally uses spoir elevator first to be promoted near coal-mine top in cheating,
Its portable is transferred to manually is cheated into the interim laydown area of side spoir again.Traditional spoir elevator is directly installed on the branch of near coal-mine top
On frame, when operating with, operator also needs to stand on the bracket that near coal-mine top is simply put up, therefore, in spoir elevator
In-site installation, promoted and spoir and manually take in the use process of hanging basket, operator, elevator, hanging basket are respectively positioned near coal-mine
Side, once equipment failure or the fault of operator's fatigue, it is possible to it causes equipment or operator to crash into hole, or injures hole by a crashing object
The safety accident of interior personnel, there are biggish security risk and risks.
Summary of the invention:
The purpose of the present invention is to provide a kind of spoir elevator and its working method, the spoir Structure of hoist is simple, designs
Rationally, be conducive to elimination operator, equipment crashes into the security risk in cheating.
To achieve the above object, the present invention adopts the following technical scheme:
Spoir elevator of the present invention, it is characterised in that: including pedestal (1), the middle part connecting elements (2) being located on pedestal (1) and
The top connecting elements (3) connecting with intermediate attachment member, the pedestal (1) include two round steel in cross-shaped welding
Pipe (1-2) and four channel steels (1-1) being welded between round steel pipe (1-2) two-by-two, wherein between first group of round steel pipe two-by-two
In addition it is welded with the 5th channel steel (1-1-1), that first slot of root in four channel steels between first group of the round steel pipe two-by-two
It is connected with intermediate channel steel (1-1-3) between steel (1-1-2) and the 5th channel steel (1-1-1), the first channel steel (1-1-2), the 5th
Channel steel (1-1-1) connect with intermediate channel steel (1-1-3) to be formed it is I-shaped;The middle part connecting elements (2) includes lower bracket (2-
1), square floor (2-2), disk (2-3) and sleeve (2-4);The square floor (2-2) is bolted to the first channel steel (1-
1-2), the 5th channel steel (1-1-1) connect the i-shaped beams upper surface formed, the lower bracket (2- with intermediate channel steel (1-1-3)
It 1) is tubular rod, lower end is welded on square floor (2-2), and the disk (2-3) is welded on the upper end of lower bracket (2-1),
The sleeve (2-4) passes through in the middle part of disk (2-3) and is welded and fixed;The top connecting elements (3) include upper bracket (3-1),
Capstan winch pedestal (3-2) and promotion boom (3-3), the upper bracket (3-1) are in pipe sleeve shape, are socketed in sleeve (2- by bearing
4) on, square tube is welded in first side of upper bracket (3-1), as the capstan winch pedestal (3-2) of hand capstan (4), second side welding
It is promoted boom (3-3), promotes boom upper end and weld two pulley baffles (5) and be mounted between two pulley baffles (5)
Pulley (6).
Further, round steel pipe (1-2) interpolation spreading steel pipe (1-3) of above-mentioned pedestal, to pass through the control long steel pipe of grafting
The length of (1-3) falls in the midpoint (A) of the overhanging farthest point line of long steel pipe (1-3) other than elevator lifting range (B).
Further, the lower part of above-mentioned sleeve (2-4) has step, to be used to support lower bearing inner ring, the upper bracket
The tubular inner wall upper and lower end of (3-1), which is respectively provided with, extends out step, to be used to support the outer ring of upper and lower bearing, the upper bracket
The clamp nut that the upper surface that the top of (3-1) is located at upper bearing (metal) is covered with gasket and connect with sleeve (2-4) threaded upper ends
(8), to prevent the play of elevator in axial direction.
Further, above-mentioned upper and lower bearing selects thrust ball bearing (7-2) and deep groove ball bearing (7-1) respectively.
Further, above-mentioned disk (2-3) has the outer rim for protruding from lower bracket (2-1), has 3 limits in the outer rim
Position notch (- 135 °, 0 °, 135 °), the periphery wall of the upper bracket (3-1) are welded with night bolt (9), the night bolt
(9) lower end can limit in spacing breach.
Further, the wirerope of above-mentioned hand capstan (4) winding output bypasses pulley (6), and is connected with hanging basket (10).
The working method of spoir elevator of the present invention, it is characterised in that: wherein spoir elevator includes pedestal (1), is located at
Middle part connecting elements (2) on pedestal (1) and the top connecting elements (3) being connect with intermediate attachment member, pedestal (1) packet
Four channel steel (the 1- for including two round steel pipes (1-2) in cross-shaped welding and being welded between round steel pipe (1-2) two-by-two
1), wherein being in addition welded with the 5th channel steel (1-1-1) between first group of round steel pipe two-by-two, first group of the round steel pipe two-by-two
Between four channel steels in that first channel steel of root (1-1-2) and the 5th channel steel (1-1-1) between be connected with intermediate channel steel (1-
1-3), the first channel steel (1-1-2), the 5th channel steel (1-1-1) connect with intermediate channel steel (1-1-3) to be formed it is I-shaped;In described
Portion's connecting elements (2) includes lower bracket (2-1), square floor (2-2), disk (2-3) and sleeve (2-4);The square floor
(2-2) is bolted to the first channel steel (1-1-2), the 5th channel steel (1-1-1) and connect the work formed with intermediate channel steel (1-1-3)
Font beam upper surface, the lower bracket (2-1) are tubular rod, and lower end is welded on square floor (2-2), the disk (2-
3) it is welded on the upper end of lower bracket (2-1), the sleeve (2-4) passes through in the middle part of disk (2-3) and is welded and fixed;The top connects
Connection member (3) includes upper bracket (3-1), capstan winch pedestal (3-2) and promotes boom (3-3), and the upper bracket (3-1) is in pipe sleeve
Shape is socketed on sleeve (2-4) by bearing, and square tube is welded in first side of upper bracket (3-1), as hand capstan (4)
Capstan winch pedestal (3-2), second side welding promoted boom (3-3), promoted boom upper end weld two pulley baffles (5) and peace
Pulley (6) between two pulley baffles (5);When work, before operation, rotation upper bracket to 0 ° of spacing breach, spring is inserted
Pin automatically falls into spacing breach under the action of the spring, after hanging basket installs the earthwork, shakes capstan winch by operator, and hanging basket is risen
When increasing above hole stake pitted surface certain distance, bolt is extracted, upper bracket is rotated, so that the earthwork is left hole stake, then counterclockwise
Capstan winch is shaken, hanging basket is down at ground, by manually removing hanging basket.
The method have the advantages that:
1, before operation, upper bracket is rotated to 0 ° of spacing breach, night bolt automatically falls into spacing breach under the action of the spring, prevents
Earthwork upper bracket in lifting process is generated relative to lower bracket circumferentially to be shaken, and the stability of whole device is improved.
2, after hanging basket installs the earthwork, capstan winch is shaken by operator, it is certain that hanging basket is increased above hole stake pitted surface
Apart from when, extract bolt, rotate upper bracket, thus by the earthwork leave hole stake, then counterclockwise shake capstan winch, hanging basket is down to ground
At face, by manually removing hanging basket.In the use process for promoting spoir and manually taking hanging basket, operator, elevator, hanging basket are equal
It is separate near coal-mine, it avoids equipment or operator crashes into hole, or injure the safety accident for cheating interior personnel by a crashing object, reduce construction risk.
3, can will promote machine base, transport or artificial short-haul operation are dismantled in middle part, top, carrying out group far near coal-mine place
Dress, assembling mode are simple and convenient.
Detailed description of the invention:
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is D structure schematic diagram of the invention;
Fig. 2 is schematic diagram of base structure of the present invention;
Fig. 3 is the cooperation profile construction schematic diagram of upper bracket and lower bracket of the present invention;
Fig. 4 is the engagement formation schematic diagram of upper bracket upper limit night bolt and disc gap of the present invention;
Fig. 5 is the structure chart of pulley and pulley baffle of the present invention;
Fig. 6 is schematic diagram of base structure.
Specific embodiment:
Spoir elevator of the present invention, it is characterised in that: including pedestal (1), the middle part connecting elements (2) being located on pedestal (1) and
The top connecting elements (3) connecting with intermediate attachment member, the pedestal (1) include two round steel in cross-shaped welding
Pipe (1-2) and four channel steels (1-1) being welded between round steel pipe (1-2) two-by-two, wherein between first group of round steel pipe two-by-two
In addition it is welded with the 5th channel steel (1-1-1), that first slot of root in four channel steels between first group of the round steel pipe two-by-two
It is connected with intermediate channel steel (1-1-3) between steel (1-1-2) and the 5th channel steel (1-1-1), the first channel steel (1-1-2), the 5th
Channel steel (1-1-1) connect with intermediate channel steel (1-1-3) to be formed it is I-shaped;The middle part connecting elements (2) includes lower bracket (2-
1), square floor (2-2), disk (2-3) and sleeve (2-4);The square floor (2-2) is bolted to the first channel steel (1-
1-2), the 5th channel steel (1-1-1) connect the i-shaped beams upper surface formed, the lower bracket (2- with intermediate channel steel (1-1-3)
It 1) is tubular rod, lower end is welded on square floor (2-2), and the disk (2-3) is welded on the upper end of lower bracket (2-1),
The sleeve (2-4) passes through in the middle part of disk (2-3) and is welded and fixed;The top connecting elements (3) include upper bracket (3-1),
Capstan winch pedestal (3-2) and promotion boom (3-3), the upper bracket (3-1) are in pipe sleeve shape, are socketed in sleeve (2- by bearing
4) on, square tube is welded in first side of upper bracket (3-1), as the capstan winch pedestal (3-2) of hand capstan (4), second side welding
It is promoted boom (3-3), promotes boom upper end and weld two pulley baffles (5) and be mounted between two pulley baffles (5)
Pulley (6).
During transportation, entire elevator can be split into pedestal (1), middle part connecting elements (2), top connecting elements
(3) three entirety reduce the solid space and single component weight of its occupancy, facilitate entrucking transport and artificial (5 kilometers of short distance
It is interior) it carries.
Elevator is matched before use, need to cover upper bracket (3-1) on lower bracket sleeve (2-4) by two bearings (7)
It closes, upper bracket (3-1) can circumferentially rotate on lower bracket (2-1), and after the completion of realizing that hanging basket (5) are promoted, the earthwork is directly shifted
To the function on hole side, to prevent operator in the personal risk of near coal-mine operation.
The present invention can be fixed on hole side by easy means, when eliminating the promotion of current artificial digging pile spoir, operator,
Equipment crashes into the security risk in hole, while novel spoir lifting machinery prevents hanging object from crashing into hole, make for autonomous brake function
Entire spoir lifting construction process more specification, safety, controllably.
During setting up elevator, round steel pipe (1-2) interpolation spreading steel pipe (1-3) of above-mentioned pedestal, to be inserted by control
The length of spreading steel pipe (1-3) makes the midpoint (A) of the overhanging farthest point line of long steel pipe (1-3) fall in elevator lifting range (B)
In addition, it can cancel in this way to the counterweight for promoting drive end unit, keep entire dress by elevator service load and self weight
The stability set avoids elevator because counterweight is unreasonable, and overthrow accident occurs.
Further, the lower part of above-mentioned sleeve (2-4) has step, to be used to support lower bearing inner ring, the upper bracket
The tubular inner wall upper and lower end of (3-1), which is respectively provided with, extends out step, to be used to support the outer ring of upper and lower bearing, the upper bracket
The clamp nut that the upper surface that the top of (3-1) is located at upper bearing (metal) is covered with gasket and connect with sleeve (2-4) threaded upper ends
(8), to prevent the play of elevator in axial direction.
Further, above-mentioned upper and lower bearing selects thrust ball bearing (7-2) and deep groove ball bearing (7-1) respectively.Two axis
It holds and selects thrust ball bearing (7-2) and deep groove ball bearing (7-1) that can both make to mention in the earthwork using this combination respectively
Upper and lower bracket mating part can bear biggish axial force when elevator is dynamic, and can be in earthwork rotational motion, circumferencial direction rotation
Compare flexibly, in addition this combination is relatively common in engineer application, can further promote the reliability of whole device.
Further, above-mentioned disk (2-3) has the outer rim for protruding from lower bracket (2-1), has 3 limits in the outer rim
11(-135 ° of notch, 0 °, 135 ° of position), the periphery wall of the upper bracket (3-1) is welded with night bolt (9), the night bolt
(9) lower end can limit in spacing breach.When elevator is when doing lifting motion, the pin shaft of night bolt falls in 0 ° of notch
In, it can prevent elevator upper and lower part from generating circumferentially opposed movement, promote the stability of whole device.Promoting fortune simultaneously
It is dynamic complete after circular motion in, the circle on top can be circumferentially rotated in the range of being limited in 0 ± 135 °, prevent top without
The rotation of limitation generates security risk.
Further, the wirerope of above-mentioned hand capstan (4) winding output bypasses pulley (6), and is connected with hanging basket (10).
Hand capstan (4) has ratchet friction plate protective device, and for wirerope one ends wound on capstan winch, the other end passes through suspension hook and hanging basket
(10) it connects, when avoiding operator's work fatigue, when operation error, capstan winch has active brake function, prevents hanging object from dropping
Injure the risk of operating personnel in cheating by a crashing object.
Humanization designing of the present invention, it is convenient for disassembly and assembly, it is convenient for manual handling, it is easy to operate, it need to only pass through easy means
It is fixed in hole side to use, and has the function that spoir is transferred to hole side, be particularly suitable for small-sized, dispersion, and be commonly located at
The form of construction work of the artificial digging pile of remote districts, in addition when operator's work fatigue, operation error, which has master
Dynamic brake function prevents hanging object tenesmus from injuring operating personnel in hole by a crashing object.
The foregoing is merely presently preferred embodiments of the present invention, all equivalent changes done according to scope of the present invention patent with
Modification, is all covered by the present invention.
Claims (7)
1. a kind of spoir elevator, it is characterised in that: including pedestal (1), the middle part connecting elements (2) being located on pedestal (1) and
The top connecting elements (3) connecting with intermediate attachment member, the pedestal (1) include two round steel in cross-shaped welding
Pipe (1-2) and four channel steels (1-1) being welded between round steel pipe (1-2) two-by-two, wherein between first group of round steel pipe two-by-two
In addition it is welded with the 5th channel steel (1-1-1), that first slot of root in four channel steels between first group of the round steel pipe two-by-two
It is connected with intermediate channel steel (1-1-3) between steel (1-1-2) and the 5th channel steel (1-1-1), the first channel steel (1-1-2), the 5th
Channel steel (1-1-1) connect with intermediate channel steel (1-1-3) to be formed it is I-shaped;The middle part connecting elements (2) includes lower bracket (2-
1), square floor (2-2), disk (2-3) and sleeve (2-4);The square floor (2-2) is bolted to the first channel steel (1-
1-2), the 5th channel steel (1-1-1) connect the i-shaped beams upper surface formed, the lower bracket (2- with intermediate channel steel (1-1-3)
It 1) is tubular rod, lower end is welded on square floor (2-2), and the disk (2-3) is welded on the upper end of lower bracket (2-1),
The sleeve (2-4) passes through in the middle part of disk (2-3) and is welded and fixed;The top connecting elements (3) include upper bracket (3-1),
Capstan winch pedestal (3-2) and promotion boom (3-3), the upper bracket (3-1) are in pipe sleeve shape, are socketed in sleeve (2- by bearing
4) on, square tube is welded in first side of upper bracket (3-1), as the capstan winch pedestal (3-2) of hand capstan (4), second side welding
It is promoted boom (3-3), promotes boom upper end and weld two pulley baffles (5) and be mounted between two pulley baffles (5)
Pulley (6).
2. spoir elevator according to claim 1, it is characterised in that: round steel pipe (1-2) interpolation spreading of the pedestal
Steel pipe (1-3), to make the midpoint of the overhanging farthest point line of long steel pipe (1-3) by the length of the control long steel pipe of grafting (1-3)
(A) it falls in other than elevator lifting range (B).
3. spoir elevator according to claim 2, it is characterised in that: the lower part of the sleeve (2-4) has step, with
It is used to support lower bearing inner ring, the tubular inner wall upper and lower end of the upper bracket (3-1), which is respectively provided with, extends out step, for branch
The outer ring of upper and lower bearing is supportted, the upper surface that the top of the upper bracket (3-1) is located at upper bearing (metal) is covered with gasket and and sleeve
The clamp nut (8) of (2-4) threaded upper ends connection, to prevent the play of elevator in axial direction.
4. spoir elevator according to claim 3, it is characterised in that: the upper and lower bearing selects thrust ball axis respectively
Hold (7-2) and deep groove ball bearing (7-1).
5. spoir elevator according to claim 4, it is characterised in that: the disk (2-3), which has, protrudes from lower bracket
The outer rim of (2-1) has 3 spacing breach (- 135 °, 0 °, 135 °), the periphery wall of the upper bracket (3-1) in the outer rim
It is welded with night bolt (9), the lower end of the night bolt (9) can limit in spacing breach.
6. spoir elevator according to claim 4, it is characterised in that: the steel wire of hand capstan (4) the winding output
Rope bypasses pulley (6), and is connected with hanging basket (10).
7. a kind of working method of spoir elevator, it is characterised in that: wherein spoir elevator includes pedestal (1), is located at pedestal
(1) middle part connecting elements (2) on and the top connecting elements (3) connecting with intermediate attachment member, the pedestal (1) include being in
Two round steel pipes (1-2) of cross-shaped welding and four channel steels (1-1) being welded between round steel pipe (1-2) two-by-two,
In be in addition welded with the 5th channel steel (1-1-1) between first group of round steel pipe two-by-two, between first group of the round steel pipe two-by-two
Four channel steels in that first channel steel of root (1-1-2) and the 5th channel steel (1-1-1) between be connected with intermediate channel steel (1-1-
3), the first channel steel (1-1-2), the 5th channel steel (1-1-1) connect with intermediate channel steel (1-1-3) to be formed it is I-shaped;The middle part
Connecting elements (2) includes lower bracket (2-1), square floor (2-2), disk (2-3) and sleeve (2-4);Square floor (the 2-
2) the first channel steel (1-1-2), the 5th channel steel (1-1-1) are bolted to and connect the I-shaped formed with intermediate channel steel (1-1-3)
Type beam upper surface, the lower bracket (2-1) are tubular rod, and lower end is welded on square floor (2-2), the disk (2-3)
It is welded on the upper end of lower bracket (2-1), the sleeve (2-4) passes through in the middle part of disk (2-3) and is welded and fixed;The top connection
Component (3) includes upper bracket (3-1), capstan winch pedestal (3-2) and promotes boom (3-3), and the upper bracket (3-1) is in pipe sleeve shape,
It is socketed on sleeve (2-4) by bearing, and square tube, the strand as hand capstan (4) are welded in first side of upper bracket (3-1)
Try to get to the heart of a matter seat (3-2), and second side welding promotes boom (3-3), promotes boom upper end and welds two pulley baffles (5) and be mounted on
Pulley (6) between two pulley baffles (5);When work, before operation, upper bracket is rotated to 0 ° of spacing breach, night bolt exists
Spacing breach is automatically fallen under spring effect, after hanging basket installs the earthwork, capstan winch is shaken by operator, hanging basket is risen and is raised to
When more than hole stake pitted surface certain distance, bolt is extracted, upper bracket is rotated, so that the earthwork is left hole stake, is then shaken counterclockwise
Hanging basket is down at ground by capstan winch, by manually removing hanging basket.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811335269.XA CN109353942A (en) | 2018-11-10 | 2018-11-10 | Spoir elevator and its working method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811335269.XA CN109353942A (en) | 2018-11-10 | 2018-11-10 | Spoir elevator and its working method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109353942A true CN109353942A (en) | 2019-02-19 |
Family
ID=65344740
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811335269.XA Pending CN109353942A (en) | 2018-11-10 | 2018-11-10 | Spoir elevator and its working method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109353942A (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030116518A1 (en) * | 2001-10-05 | 2003-06-26 | Austin Barry J. | Methods and apparatus for supporting a davit arm |
CN202346636U (en) * | 2011-10-13 | 2012-07-25 | 天元建设集团有限公司 | Crane |
CN207608239U (en) * | 2017-12-15 | 2018-07-13 | 河北天宇起重机械制造有限公司 | A kind of handling machine support of adjustable angle |
-
2018
- 2018-11-10 CN CN201811335269.XA patent/CN109353942A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030116518A1 (en) * | 2001-10-05 | 2003-06-26 | Austin Barry J. | Methods and apparatus for supporting a davit arm |
CN202346636U (en) * | 2011-10-13 | 2012-07-25 | 天元建设集团有限公司 | Crane |
CN207608239U (en) * | 2017-12-15 | 2018-07-13 | 河北天宇起重机械制造有限公司 | A kind of handling machine support of adjustable angle |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1677006A2 (en) | Wind turbine with detachable crane | |
CN102782311A (en) | A method of craneless mounting or demounting of a wind turbine blade | |
CN202358849U (en) | Small-size suspension crane | |
CN106586846B (en) | The hanging device and its construction method of a kind of wind power generating set | |
CN106276631A (en) | A kind of roofing device for hoisting and crane and the method for dismounting of crane arm | |
CN105439005B (en) | Crane | |
CN101708809A (en) | Reel frame system used for crane | |
JP2020515484A (en) | Winding system for wind turbine installation | |
CN104176648A (en) | Luffing fixed crane for wire rope of single-arm rack | |
CN109353942A (en) | Spoir elevator and its working method | |
CN104692261A (en) | Symmetrical dismounting construction method for attachment device of tower crane | |
CN103848362A (en) | Variable amplitude pulley block structure for crane and crane with same | |
CN211712453U (en) | Gantry pay-off equipment | |
CN208361715U (en) | New crane hanging mechanism | |
CN209127923U (en) | A kind of small-sized single armed of rotational automatic formula is hung | |
CN203845679U (en) | Release-preventing lifting hook | |
CN110409803A (en) | Dismantle the hanging method of hydraulic mould lifting device center drum circle | |
CN203021223U (en) | Variable-amplitude pulley block structure for crane and crane with mechanism | |
CN209721431U (en) | A kind of shaft hoisting derrick geometry | |
CN102358570A (en) | Tail row rotating device and method for equipment lifting tail-dragging | |
US20170121157A1 (en) | Security System for Operations in Wind Generators | |
CN102583163A (en) | Steel wire rope symmetrically disassembling process flow for tower crane attachment device | |
CN206188150U (en) | Car lift balancing unit | |
CN204434078U (en) | Tower machine Suspension hook structure | |
CN205472195U (en) | Mine winder |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190219 |
|
RJ01 | Rejection of invention patent application after publication |