CN109339831A - A kind of crossheading big cross section freeboard section connects top method and connects top - Google Patents
A kind of crossheading big cross section freeboard section connects top method and connects top Download PDFInfo
- Publication number
- CN109339831A CN109339831A CN201811139152.4A CN201811139152A CN109339831A CN 109339831 A CN109339831 A CN 109339831A CN 201811139152 A CN201811139152 A CN 201811139152A CN 109339831 A CN109339831 A CN 109339831A
- Authority
- CN
- China
- Prior art keywords
- crossheading
- crossbeam
- anchor cable
- section
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 15
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 30
- 239000010959 steel Substances 0.000 claims abstract description 30
- 239000003245 coal Substances 0.000 claims abstract description 15
- 239000000945 filler Substances 0.000 claims abstract description 8
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 8
- 239000000463 material Substances 0.000 claims description 8
- 241001669679 Eleotris Species 0.000 claims description 4
- 229910052742 iron Inorganic materials 0.000 claims description 4
- 238000004519 manufacturing process Methods 0.000 abstract description 4
- 238000005516 engineering process Methods 0.000 description 2
- 238000003032 molecular docking Methods 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 239000000178 monomer Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D17/00—Caps for supporting mine roofs
- E21D17/01—Caps for supporting mine roofs characterised by the shape of the cap, e.g. of specified cross-section
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D17/00—Caps for supporting mine roofs
- E21D17/10—Details of mine caps for engaging the tops of pit-props, with or without retaining-plates; Retaining-plates
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Structural Engineering (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The present invention provides a kind of crossheading big cross section freeboard section and connects top method and connect top, the following steps are included: first setting multiple rows of anchor cable along crossheading middle line and middle line two sides, two sides anchor cable is identical at a distance from middle line and portion of side, by the I-steel with eyelet along crossheading width direction across multiple rows of anchor cable, anchor cable end passes through the eyelet on I-steel, and I-steel is limited on anchor cable with fixing piece, while being hung I-steel using crossheading top wire rope;Equal one end of I-steel in two sides coal wall puts in coal wall, and one end is docked with another I-steel;Filler is inserted above I-steel to tamp.The present invention has the advantages that crossbeam is fixed by wirerope, fixing piece, it is closely knit to put filling on crossbeam, makes to connect top more more stable and stronger, improves the safety coefficient of back production to this section, provide guarantee for the normal back production of working face.
Description
Technical field
The present invention relates to advance support technologies under mine to lead, specifically a kind of crossheading big cross section freeboard section connect top method and
Connect top.
Background technique
Two lane crossheading regional area superelevation of fully-mechanized mining working is not able to satisfy the bearing height of advance timbering or monomer, need pair
The region carries out connecing top.Lack in the prior art about the effective measures for connecing top.
Summary of the invention
The technical problem to be solved by the present invention is to how improve the reliability for connecing top.
The present invention solves above-mentioned technical problem by the following technical programs:
A kind of crossheading big cross section freeboard section connects top method, the following steps are included:
Multiple rows of anchor cable first is set along crossheading middle line and middle line two sides, two sides anchor cable is identical at a distance from middle line and portion of side, will
For crossbeam with eyelet along crossheading width direction across multiple rows of anchor cable, anchor cable end passes through the eyelet on crossbeam, and uses fixing piece
By crossbeam limit on anchor cable, while crossbeam being hung using crossheading top wire rope;Coal wall is protruded at crossbeam both ends, in crossbeam
Top filling filler tamps.
Preferably, every crossbeam is at least fixed with two anchor cable ends.
Preferably, the filler of filling are as follows: move towards to strip off the skin using old anchor pole, the cooperation of basketry piece and expect place mat on crossbeam along crossheading
Portion, and be fixed on crossbeam with iron wire or wirerope;Expect that top fill tightly using coal (cash) bag cooperation sleeper stripping off the skin.
Preferably, adjacent two anchor cable spacing are 1.5m in every row, move towards adjacent two crossbeams spacing 1.5m along crossheading, strip off the skin
Expect that the spacing along crossheading width direction is 1m.
Preferably, the crossbeam protrudes into 300~500mm of coal wall.
Preferably, the crossbeam is made of more I-steel head and the tail overlap joint, lap-joint's at least anchor cable also cross.
The present invention also provides a kind of crossheading big cross section freeboard sections to connect top, including sets along crossheading middle line and middle line two sides multiple rows of
Anchor cable, two sides anchor cable is identical at a distance from middle line and portion of side, and is fixed on the crossbeam of anchor cable end, and crossbeam is along crossheading width side
To setting, one end of the beam protrudes into coal wall, and filler is inserted above crossbeam and is tamped.
Preferably, eyelet is offered on the crossbeam, anchor cable end passes through the eyelet on crossbeam, and with fixing piece by crossbeam
Limit is hung crossbeam on anchor cable, while using crossheading top wire rope.
Preferably, the fixing piece is rope card.
The present invention has the advantages that
Crossbeam is fixed by wirerope, fixing piece, makes to connect top more more stable and stronger, improves back production to this section
Safety coefficient provides guarantee for the normal back production of working face.Waste and old anchor pole and the material etc. that strips off the skin are filled on crossbeam, play waste
Required intensity can be reached while utilization.
Detailed description of the invention
Fig. 1 connects the overall structure diagram after top method connects top using crossheading big cross section freeboard section for the present embodiment.
Specific embodiment
The effect of to make to structure feature of the invention and being reached, has a better understanding and awareness, to preferable
Examples and drawings cooperation detailed description, is described as follows:
As described in Figure 1, a kind of crossheading big cross section freeboard section connects top method, comprising the following steps:
First 3 row's anchor cables 1, identical, the anchor at a distance from middle line and portion of side of two sides anchor cable 1 are set along crossheading middle line and middle line two sides
1 protruded length of rope is set according to crossheading height.By the I-steel 2 with eyelet along crossheading width direction across multiple rows of anchor cable 1, anchor
1 end of rope passes through the eyelet on I-steel 2, and is limited I-steel 2 on anchor cable 1 with rope card 3, while using steel at the top of crossheading
Cord 4 hangs I-steel 2;Every I-steel 2 is at least fixed with two 1 ends of anchor cable.I-steel 2 in two sides coal wall is equal
The depth that one end puts in coal wall 10 is 300~500mm, and one end is docked with another I-steel 2, and docking length is wide according to crossheading
Degree, the setting of 2 length of I-steel, the position of docking will guarantee have an anchor cable 1 also cross two I-steel 2.
It moves towards to strip off the skin 7 place mats of material on 2 top of I-steel using old anchor pole 5, the cooperation of basketry piece 6 along crossheading, and with iron wire or steel
Cord 4 is fixed on I-steel 2;Sleeper 9 is cooperated fill tightly using coal (cash) bag 8 stripping off the skin 7 tops of material.
1 spacing of adjacent two anchor cables is 1.5m in every row, moves towards adjacent two I-steel, 2 spacing 1.5m along crossheading, strip off the skin material 5
Spacing along crossheading width direction is 1m.
A kind of crossheading big cross section freeboard section connects top, including sets multiple rows of anchor cable, two side anchors along crossheading middle line and middle line two sides
Rope is identical at a distance from middle line and portion of side, and is fixed on the crossbeam of anchor cable end, and crossbeam is arranged along crossheading width direction, crossbeam
Coal wall is protruded into one end, and filler is inserted above crossbeam and is tamped.Crossbeam is made of more I-steel head and the tail overlap joints, is opened up on I-steel
There is eyelet, anchor cable end passes through the eyelet on I-steel, and is limited crossbeam on anchor cable with rope card, while using at the top of crossheading
Wirerope hangs crossbeam.It moves towards to strip off the skin 7 place mats of material on 2 top of I-steel using old anchor pole 5, the cooperation of basketry piece 6 along crossheading, be used in combination
Iron wire or wirerope 4 are fixed on I-steel 2;Sleeper 9 is cooperated fill tightly using coal (cash) bag 8 stripping off the skin 7 tops of material.
1 spacing of adjacent two anchor cables is 1.5m in every row, moves towards adjacent two I-steel, 2 spacing 1.5m along crossheading, strip off the skin material 5
Spacing along crossheading width direction is 1m.
The basic principles, main features and advantages of the present invention have been shown and described above.The technology of the industry
Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and what is described in the above embodiment and the description is only the present invention
Principle, various changes and improvements may be made to the invention without departing from the spirit and scope of the present invention, these variation and
Improvement is both fallen in the range of claimed invention.The present invention claims protection scope by appended claims and its
Equivalent defines.
Claims (9)
1. a kind of crossheading big cross section freeboard section connects top method, it is characterised in that: the following steps are included:
Multiple rows of anchor cable first is set along crossheading middle line and middle line two sides, two sides anchor cable is identical at a distance from middle line and portion of side, will have
For the crossbeam of eyelet along crossheading width direction across multiple rows of anchor cable, anchor cable end passes through the eyelet on crossbeam, and will be horizontal with fixing piece
Beam limits on anchor cable, while being hung crossbeam using crossheading top wire rope;Coal wall is protruded at crossbeam both ends, above crossbeam
Filling filler tamps.
2. a kind of crossheading big cross section freeboard section according to claim 1 connects top method, it is characterised in that: every crossbeam is at least
It is fixed with two anchor cable ends.
3. a kind of crossheading big cross section freeboard section according to claim 1 connects top method, it is characterised in that: the filler of filling
Are as follows: it moves towards to strip off the skin using old anchor pole, the cooperation of basketry piece and expect that place mat is fixed on cross on crossbeam top, and with iron wire or wirerope along crossheading
Liang Shang;Expect that top fill tightly using coal (cash) bag cooperation sleeper stripping off the skin.
4. a kind of crossheading big cross section freeboard section according to claim 1 connects top method, it is characterised in that: adjacent two in every row
Root anchor cable spacing is 1.5m, moves towards adjacent two crossbeams spacing 1.5m along crossheading, and the material that strips off the skin is 1m along the spacing of crossheading width direction.
5. a kind of crossheading big cross section freeboard section according to claim 1 connects top method, it is characterised in that: the crossbeam protrudes into
300~500mm of coal wall.
6. stopping a kind of 5 any crossheading big cross section freeboard sections according to claim 1 connects top method, it is characterised in that: described
Crossbeam is made of more I-steel head and the tail overlap joint, lap-joint's at least anchor cable also cross.
7. a kind of crossheading big cross section freeboard section connects top, it is characterised in that: use method according to any one of claims 1 to 6
The top obtained that connects includes that multiple rows of anchor cable is set along crossheading middle line and middle line two sides, two sides anchor cable phase at a distance from middle line and portion of side
Together, and it is fixed on the crossbeam of anchor cable end, crossbeam is arranged along crossheading width direction, and one end of the beam protrudes into coal wall, on crossbeam
Side's filling filler tamps.
8. a kind of crossheading big cross section freeboard section according to claim 1 connects top, it is characterised in that: offered on the crossbeam
Eyelet, anchor cable end passes through the eyelet on crossbeam, and is limited crossbeam on anchor cable with fixing piece, while using steel at the top of crossheading
Cord hangs crossbeam.
9. a kind of crossheading big cross section freeboard section according to claim 1 connects top, it is characterised in that: the fixing piece is rope
Card.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811139152.4A CN109339831A (en) | 2018-09-28 | 2018-09-28 | A kind of crossheading big cross section freeboard section connects top method and connects top |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811139152.4A CN109339831A (en) | 2018-09-28 | 2018-09-28 | A kind of crossheading big cross section freeboard section connects top method and connects top |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109339831A true CN109339831A (en) | 2019-02-15 |
Family
ID=65307206
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811139152.4A Pending CN109339831A (en) | 2018-09-28 | 2018-09-28 | A kind of crossheading big cross section freeboard section connects top method and connects top |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109339831A (en) |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU878953A1 (en) * | 1979-03-19 | 1981-11-07 | Всесоюзный Научно-Исследовательский И Проектно-Конструкторский Угольный Институт | Mine roof support beam |
SU1382973A1 (en) * | 1986-06-10 | 1988-03-23 | Криворожский горнорудный институт | Method of setting roof-bolt support with flexible holding member |
CN102606159A (en) * | 2012-03-26 | 2012-07-25 | 中南大学 | Medium thick heavy-pitch crushed ore body frame type artificial top downward segmenting cemented filling method |
CN102979534A (en) * | 2012-12-11 | 2013-03-20 | 安徽恒源煤电股份有限公司 | TU shed support process |
CN103939107A (en) * | 2014-04-28 | 2014-07-23 | 山东黄金矿业(玲珑)有限公司 | Method for forming roadway in inbreak loose rock |
CN204386632U (en) * | 2014-12-26 | 2015-06-10 | 四川广旺能源发展(集团)有限责任公司 | The artificial base plate of large-inclination-angle coal bed roof cracking band and false top facility |
CN104948213A (en) * | 2015-05-11 | 2015-09-30 | 杭州金培科技有限公司 | Gob-side entry retaining method used for remote-control coal mining |
CN105863692A (en) * | 2016-04-27 | 2016-08-17 | 太原理工大学 | Device and method for controlling sinking of top plate of worked-out section by adopting beam-column combined structure |
CN106481346A (en) * | 2016-12-16 | 2017-03-08 | 中国神华能源股份有限公司 | A kind of fully-mechanized mining working back production is by the method in empty lane |
CN206220977U (en) * | 2016-12-06 | 2017-06-06 | 晋城煤炭规划设计院 | Second mining area supporting roadway surrounding rock device |
CN108005654A (en) * | 2017-11-27 | 2018-05-08 | 淮南矿业(集团)有限责任公司 | Face upward and adopt large-mining-height working surface and cross old working construction technology |
CN108150206A (en) * | 2017-11-16 | 2018-06-12 | 大同煤矿集团有限责任公司 | A kind of method by fully-mechanized mining working crossheading caving place |
CN207598274U (en) * | 2017-10-23 | 2018-07-10 | 四川达竹煤电(集团)有限责任公司斌郎煤矿 | Large-inclination-angle coal bed Man-made False facility |
-
2018
- 2018-09-28 CN CN201811139152.4A patent/CN109339831A/en active Pending
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU878953A1 (en) * | 1979-03-19 | 1981-11-07 | Всесоюзный Научно-Исследовательский И Проектно-Конструкторский Угольный Институт | Mine roof support beam |
SU1382973A1 (en) * | 1986-06-10 | 1988-03-23 | Криворожский горнорудный институт | Method of setting roof-bolt support with flexible holding member |
CN102606159A (en) * | 2012-03-26 | 2012-07-25 | 中南大学 | Medium thick heavy-pitch crushed ore body frame type artificial top downward segmenting cemented filling method |
CN102979534A (en) * | 2012-12-11 | 2013-03-20 | 安徽恒源煤电股份有限公司 | TU shed support process |
CN103939107A (en) * | 2014-04-28 | 2014-07-23 | 山东黄金矿业(玲珑)有限公司 | Method for forming roadway in inbreak loose rock |
CN204386632U (en) * | 2014-12-26 | 2015-06-10 | 四川广旺能源发展(集团)有限责任公司 | The artificial base plate of large-inclination-angle coal bed roof cracking band and false top facility |
CN104948213A (en) * | 2015-05-11 | 2015-09-30 | 杭州金培科技有限公司 | Gob-side entry retaining method used for remote-control coal mining |
CN105863692A (en) * | 2016-04-27 | 2016-08-17 | 太原理工大学 | Device and method for controlling sinking of top plate of worked-out section by adopting beam-column combined structure |
CN206220977U (en) * | 2016-12-06 | 2017-06-06 | 晋城煤炭规划设计院 | Second mining area supporting roadway surrounding rock device |
CN106481346A (en) * | 2016-12-16 | 2017-03-08 | 中国神华能源股份有限公司 | A kind of fully-mechanized mining working back production is by the method in empty lane |
CN207598274U (en) * | 2017-10-23 | 2018-07-10 | 四川达竹煤电(集团)有限责任公司斌郎煤矿 | Large-inclination-angle coal bed Man-made False facility |
CN108150206A (en) * | 2017-11-16 | 2018-06-12 | 大同煤矿集团有限责任公司 | A kind of method by fully-mechanized mining working crossheading caving place |
CN108005654A (en) * | 2017-11-27 | 2018-05-08 | 淮南矿业(集团)有限责任公司 | Face upward and adopt large-mining-height working surface and cross old working construction technology |
Non-Patent Citations (1)
Title |
---|
赵进锋: "白庄煤矿薄煤层大断面沿空留巷支护探讨", 《白庄煤矿薄煤层大断面沿空留巷支护探讨》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105201535B (en) | A kind of control bottom distension allows anti-device and its construction method | |
EP2843189A1 (en) | Self-moving tunnel support canopy | |
CN203487475U (en) | Line suspending and reinforcing structure for existing line jacking bridge and culvert construction | |
CN110529144B (en) | Mixed type advanced support method for small-section mining roadway | |
CN101761338A (en) | Gob-side entry retaining method of a solid filling coal mining half-section one-leg shed | |
CN212153123U (en) | Sideslip device is used in construction of T roof beam | |
CN108005654B (en) | Construction process for overhead mining large-mining-height working face old roadway passing | |
CN103696788A (en) | Abandoned roadway timbering device and construction method of fully mechanized coal mining face passed through abandoned roadway | |
CN103758529A (en) | Coal mine gob-side entry retaining side supporting method | |
CN103397597B (en) | A kind of large-tonnage combination anchor system and method being applicable to steep rock side slope | |
CN205172609U (en) | Asymmetric supporting device in tunnel | |
CN107268352A (en) | Refoot the fixed track usage plan device of operation for tunnel | |
CN103470289A (en) | Contiguous coal seam mining support method | |
CN109339831A (en) | A kind of crossheading big cross section freeboard section connects top method and connects top | |
CN108166395B (en) | A kind of construction method for building beam bridge across Business Line | |
CN104389605B (en) | A kind of coal-face intensive steel cord shielding withdraws method | |
CN102633086B (en) | Clamping device for rubber belt | |
CN105370307B (en) | Coal working face crosses freeboard section support process | |
CN103527226A (en) | Steeply inclined seam working face shielding and retracing method | |
CN207484509U (en) | Anchor anti-sliding piled barricade is put in hole | |
CN203022777U (en) | Shed erection support at underground fork or tunnel opening | |
CN205741926U (en) | Stretch-draw prepressing device in Cast-in-situ Beam steel pipe beret truss platform | |
CN207079430U (en) | Refoot the fixed track usage plan device of operation for tunnel | |
CN203958146U (en) | Be applicable to the radial type track linkage section of hydraulic walking Self-moving equipment train | |
CN203878450U (en) | Novel ropeway bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190215 |