CN207079430U - Refoot the fixed track usage plan device of operation for tunnel - Google Patents
Refoot the fixed track usage plan device of operation for tunnel Download PDFInfo
- Publication number
- CN207079430U CN207079430U CN201720961719.0U CN201720961719U CN207079430U CN 207079430 U CN207079430 U CN 207079430U CN 201720961719 U CN201720961719 U CN 201720961719U CN 207079430 U CN207079430 U CN 207079430U
- Authority
- CN
- China
- Prior art keywords
- longeron
- crossbeam
- usage plan
- track usage
- fixed track
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 28
- 239000010959 steel Substances 0.000 claims description 28
- 238000003825 pressing Methods 0.000 claims description 9
- 238000003466 welding Methods 0.000 claims description 8
- 230000014759 maintenance of location Effects 0.000 claims description 7
- 239000000758 substrate Substances 0.000 claims description 6
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 238000000034 method Methods 0.000 description 7
- 241001669679 Eleotris Species 0.000 description 3
- 238000010276 construction Methods 0.000 description 3
- 230000007547 defect Effects 0.000 description 2
- 201000010099 disease Diseases 0.000 description 2
- 208000037265 diseases, disorders, signs and symptoms Diseases 0.000 description 2
- 230000007774 longterm Effects 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000003032 molecular docking Methods 0.000 description 1
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 230000011218 segmentation Effects 0.000 description 1
- 238000007569 slipcasting Methods 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- Railway Tracks (AREA)
Abstract
The utility model provides a kind of fixed track usage plan device for the operation that refooted for tunnel, including:Some crossbeams, the crossbeam is parallel to each other and is arranged in the lower section of rail at interval, and two ends of each crossbeam are located on the drainage channel of rail on both sides;The longeron of rail on both sides is arranged in, the longeron is directly set up on the crossbeam in the end regions of the crossbeam.
Description
Technical field
It the utility model is related to a kind of fixed track usage plan device for the operation that refooted for tunnel.
Background technology
Rail track, especially Heavy-haul Freight circuit subject sizable load.Tunnel Base is in the long-term of dynamic load
Crack can be produced under effect, in addition it is broken.In addition, some drainage systems can be ineffective after long-term alluvial, ponding is through ditch
Gap invades railway roadbed so that the diseases such as sinking, upper drum occur for tunnel shop fixtures, inverted arch and solid concrete roabed.Thus circuit gauge is caused
Change, very big potential safety hazard is caused to hauling operation.
As a rule, the Defect of Foundation Bed of Express in tunnel can be prevented by the method for substrate slip casting.But for having sent out
For the location for having given birth to serious depression disease, the operation that refoots can only be carried out to tunnel, so as to be turned over to damaged portion comprehensively
Repair, dredge pumping equipment, or even reform foundation bed structure.Because circuit operation can not be interrupted, therefore frame is needed in the operation that refoots
Ceases to be busy road, ensure the physical dimension and frame stiffness of track, it is ensured that train by when be perfectly safe.
For at present, typically have to the overhead method of rail track:(1) maked somebody a mere figurehead using T24 girder steels;(2) simple shield is used
Structure method is maked somebody a mere figurehead;(3) maked somebody a mere figurehead using horizontal lift beam method;(4) maked somebody a mere figurehead using longitudinal and transverse lift beam method.However, these above-mentioned methods are present not
The defects of with degree, ensure unsatisfactoryly train by when security, while working procedure is more complicated, cost
It is high.
Utility model content
For at least some technical problems as described above, the utility model aims to provide a kind of to refoot operation for tunnel
Fixed track usage plan device, it can provide very high frame stiffness, it is ensured that train can be while simple in construction with safety, applies
Work is convenient.
According to the utility model, there is provided a kind of fixed track usage plan device for the operation that refooted for tunnel, including:Some horizontal strokes
Beam, the crossbeam is parallel to each other and is arranged in the lower section of rail at interval, and two ends of each crossbeam are located at rail on both sides
On drainage channel;The longeron of rail on both sides is arranged in, the longeron is directly set up in the end regions of the crossbeam
On the crossbeam.
In one embodiment, the crossbeam is H profile steel, I-steel or welding shaped steel, and the longeron includes two side by side
H profile steel, I-steel or the welding shaped steel of arrangement.
In one embodiment, each longeron includes several along the longeron unit being longitudinally connected to each other, two neighboring
Longeron unit is connected by being arranged in the connecting plate of the intermediate rib both sides of each H profile steel, I-steel or welding shaped steel.
In one embodiment, the join domain of the two neighboring longeron unit in two longerons of rail on both sides that
This staggers.
In one embodiment, the crossbeam and longeron are connected to each other by fixing device, the fixing device include from
Top encases the shape of a saddle buckle of the longeron, and encases the U bolt of the crossbeam from below.
In one embodiment, the shape of a saddle buckle includes horizontal bottom, and vertical from the both ends of the bottom
Two vertical portions that ground extends out, the free end of described two vertical portions is protruding along opposite horizontal direction respectively and shape
The fixed part horizontal into two, each fixed part include fixing hole.
In one embodiment, be each formed with ribs in two sides of the fixed part, its by each fixed part with
Corresponding vertical portion connects.
In one embodiment, the lumen width of the U bolt is equal to the width of the crossbeam, the shape of a saddle buckle
Lumen width be equal to the longeron width, and the U bolt pass through the shape of a saddle buckle in corresponding fixed part
On fixing hole.
In one embodiment, the join domain of two neighboring longeron unit is within the U bolt.
In one embodiment, the longeron by the concrete for including reinforcing bar that is filled in the drainage channel or
The buttress spaced apart in the drainage channel is arranged in support.
In one embodiment, the fixed track usage plan device includes being used for the retention mechanism being fixed on rail on crossbeam,
The retention mechanism includes the substrate being fixed on crossbeam, the bearing being integrally formed on the top surface of the substrate, Yi Jian
The pedestal mounted pressing plate for unclipped railway lines.
Brief description of the drawings
The utility model is illustrated below with reference to accompanying drawings.
Fig. 1 shows the top view for the operation that refooted according to fixed track usage plan device of the present utility model applied to tunnel;
Fig. 2 shows the front view for the operation that refooted according to fixed track usage plan device of the present utility model applied to tunnel;
Fig. 3 shows the cross-sectional view of the crossbeam according to fixed track usage plan device of the present utility model;
Fig. 4 shows the cross-sectional view of the longeron according to fixed track usage plan device of the present utility model;
Fig. 5 shows the connecting plate for connecting longeron shown in two Fig. 4;
Fig. 6 shows the front view of the fixing device for crossbeam and longeron to be fixed together;
Fig. 7 shows the side view of the fixing device for crossbeam and longeron to be fixed together;
Fig. 8 shows the front view of the buckle in the fixing device shown in Fig. 6 and 7;
Fig. 9 shows the top view of the buckle shown in Fig. 8;
Figure 10 shows the front view of the retention mechanism for being fastened on rail on crossbeam;
Figure 11 shows the top view of retention mechanism shown in Figure 10.
In this application, all accompanying drawings are schematical accompanying drawing, are merely to illustrate principle of the present utility model, and not
It is drawn to scale.
Embodiment
The utility model is introduced below by way of accompanying drawing.It should be noted that it is only for explanation that these, which are introduced,
Principle of the present utility model and provide, be not so limited the scope of the utility model.
Fig. 1 and 2, which respectively illustrates, to be applied to tunnel according to fixed track usage plan device 100 of the present utility model and refoots the bowing of operation
View and front view.As illustrated in fig. 1 and 2, crossbeam 110 is mainly included according to fixed track usage plan device 100 of the present utility model and is indulged
Beam 120.Wherein, some crossbeams 110 are set up in the lower section of rail 20 in a manner of parallel to each other and be spaced apart, for by rail
20 support.So, sleeper (not shown) can be extracted out from the lower section of rail 20.Spacing between adjacent two crossbeams 110 can
Selected according to actual conditions and experience, the total quantity of crossbeam 110 can select according to the length of operation interval.
Fixed track usage plan device 100 also includes two longerons 120, and they are in a manner of parallel to each other and be spaced apart in each horizontal stroke
The end of beam 110 is set up on crossbeam 110.That is, the base 121 (see Fig. 4) of longeron 120 and the top of crossbeam 110
Side 111 fits (see Fig. 3).As shown in Fig. 2 the both ends of crossbeam 110 usually extend to the drainage channel 50 of the both sides of rail 20
Opening position, drainage channel 50 is interior to be filled and led up (shown in the black bars in Fig. 2) by irrigating slurry.Therefore, two longerons 120 are distinguished
It is roughly parallel to the drainage channel 50 of the both sides of rail 20 and extends.
So, intersecting the fixed track usage plan device 100 formed by two longerons 120 and some crossbeams 110 can be effectively
Aerial rail 20, total have very high rigidity so that train 10 (schematically showing in fig. 2) can safely pass through
Rail 20.At the same time, region 30 can be removed to the inverted arch filling below rail 20 and inverted arch is removed region 31 and operated.
Fig. 3 shows the cross-sectional view of the crossbeam 110 according to fixed track usage plan device 100 of the present utility model.Such as Fig. 3 institutes
Show, crossbeam 110 is H profile steel, I-steel or welding shaped steel.In a specific embodiment, crossbeam 110 employ HN300 ×
200 type H profile steels, length are 4.4 meters.
Fig. 4 shows the cross-sectional view of the longeron 120 according to fixed track usage plan device of the present utility model.As shown in figure 4,
Longeron 120 includes two I-steel being arranged in juxtaposition, I-steel or welding shaped steel.In a specific embodiment, longeron 120
Employ two 45b being arranged in juxtaposition type I-steel.Longeron 120 is erected at the end region of crossbeam 110, parallel to track 20
And extend.Because longeron 120 is directly erected at the top of crossbeam 110, therefore after the laying of crossbeam 110 is completed, can facilitate
Longeron 120 is installed on ground, is avoided caused because of installing space when longeron is installed on below the crossbeam (such as in drainage channel)
It is narrow and cause the problem of inconvenient for operation.
As a rule, railway track is very long, and the limited length of longeron 120 (I-steel of trussed stringer 120 in other words).
Therefore, usually require that some longerons 120 link together in a longitudinal direction in a practical situation, to reach satisfactory
Construction length.Fig. 5 shows the connecting plate 115 for connecting two neighboring longeron 120, which is provided with some connecting holes 116.
Connecting plate 115 be arranged at the docking region of two longerons 120 intermediate rib 122 of each longeron 120 two sides 123,
On 124.Preferably the fixture (not shown) of bolt-nut passes through connecting hole 116, will be arranged on the centre of each longeron 120
Two pieces of connecting plates 115 at two sides 123,124 of rib 122 connect.Thus, it is possible to provide the group of any required length
Box-like longeron 120.
Preferably, connecting plate 115 is arranged so that in the wiring of two neighboring longeron 120 and the longitudinal direction of connecting plate 115
Heart line overlaps.Relative to the longitudinal centre line of connecting plate 115, both sides have been arranged symmetrically 5 connecting holes 116.This 5 connecting holes
116 are preferably arranged for quincunx, i.e., 4 corners for being arranged in an imagination square, it is remaining that to be arranged in the imagination square
The geometric center of shape.By this set, very high bonding strength can be reached, ensure firmly connecting for two neighboring longeron 120
Connect.
In a preferred embodiment, the join domain of the longeron 120 of circuit arranged on left and right sides is arranged to offset one from another.
In this way, the weak spot that can be effectively reduced on longeron 120, integral rigidity is improved.
In order to which longeron 120 is erected on crossbeam 110 securely, according to fixed track usage plan device 100 of the present utility model also
Including fixing device 130.As shown in Figures 6 and 7, fixing device 130 includes buckle 131 and U bolt 132.
Show the front view and top view of the buckle 131 of fixing device 130 respectively in figs. 8 and 9.As illustrated, button
Plate 131 is formed approximately in the part of a shape of a saddle, including horizontal bottom 135, and substantially perpendicular from the both ends of bottom 135
Two vertical portions 136 directly to extend out.The free end of two vertical portions 136 is respectively along opposite horizontal direction to overhanging
Go out, form two horizontal fixed parts 137.Fixing hole 138 is provided with each fixed part 137.In addition, the two of fixed part 137
Individual side is each formed with ribs 139, and it connects each fixed part 137 and corresponding vertical portion 136, there is provided increases
Strong rigidity.
Referring again to Fig. 6 and 7, according to the utility model, two U bolts 132 are arranged in the both sides of longeron 120,
And crossbeam 110 is contained in its inner chamber.This is especially clearly shown in Fig. 7 section below.Preferably, crossbeam 110
Base 112 (see Fig. 3) and the base of U bolt 132 fit, and the width of the inner chamber of U bolt 132 is substantially equal to crossbeam
110 width.Thereby it is ensured that crossbeam 110 can be connected by form fit to be securely arranged in U bolt 132.
Two buckles 131, which are spaced, turns up the soil by its inner chamber to be fastened on longeron 120, and its spacing is substantially equal to U-shaped
The spacing at the both ends of bolt 132.The both ends of U bolt 132 are each passed through the fixing hole 138 on two buckles 131, and utilize nut
Fastening.
Pass through fixing device 130, it is possible to longeron 120 is securely fixed on crossbeam 110, is effectively improved whole
The rigidity of fixed track usage plan device 100, ensure that train by when security.
In a preferred embodiment, fixing device 130 is arranged so that the connection of two longitudinally adjacent longerons 120
Portion is in the inner chamber of U bolt 132.So, the firm of the connecting portion of two longitudinally adjacent longerons 120 is further ensured
Property.
In order to strengthen the stability of circuit overhead device 100, its longitudinally spaced can also be turned up the soil in the interior edge of drainage channel 50
Some buttress (not shown) are set, so as to support stringer 120.Buttress for example can be sleeper pier.The spacing of sleeper pier can be according to tool
Body construction situation and experience select.This situation for arranging that the concrete for being preferably applied to the lower section of drainage channel 50 is thicker.It is standby
Selection of land, the concrete for completely including reinforcing bar can also be filled in drainage channel 50, so as to support stringer 120.
In a preferred embodiment, also included being arranged on each according to fixed track usage plan device 100 of the present utility model
Rail distance rod (not shown) between longeron 120 and that adjacent root rail 20.Rail distance rod is that those skilled in the art institute is ripe
Know, its specific descriptions is omitted here.Thus, it is possible to ensure the distance between each longeron 120 and that adjacent root rail 20 perseverance
It is fixed, further ensure train by when security.
In order to which rail 20 is fastened on crossbeam 110, fastening is also included according to fixed track usage plan device 100 of the present utility model
Mechanism 140.Figure 10 and Figure 11 respectively illustrates the front view and top view of the retention mechanism 140.As shown in FIG. 10 and 11, this is tight
Gu mechanism 140 includes U-shaped substrate 141, its two U-shaped sides are fastened by bolts part 142 fixed on crossbeam 110.In U-shaped base
Integrally-formed bearing 143, one end of pressing plate 144 are supported on bearing 143 on bottom 141, and the other end is pressed on rail 20.Tightly
Fixing bolt 145 passes through pressing plate 144, for applying fastening force to pressing plate, so as to which pressing plate 144 is pressed on rail 20.Pressing plate 144
Being provided with can extend there through relative to the inclined oblique groove 146 of crossbeam 110, fastening bolt 145.So, pressing plate 144 can be along oblique
Moved to groove 146, so as to be conveniently adjusted position of the pressing plate 144 relative to crossbeam 110.
Rail can be maked somebody a mere figurehead securely according to fixed track usage plan device of the present utility model, it is ensured that train is logical safely
Cross, while can easily carry out the operation that refoots.Furthermore it is possible to realize the purpose of segmentation while operation.That is, in a certain section of circuit
It is upper with one according to fixed track usage plan device of the present utility model by this section of fixed track usage plan, after being then spaced a distance, with another
One according to fixed track usage plan device of the present utility model by another section of fixed track usage plan.This twolink can carry out the behaviour that refoots simultaneously
Make.Thus, greatly save the engineering time, while being capable of proof strength, it is ensured that train by when be perfectly safe.
Finally it should be noted that the foregoing is only preferred embodiment of the present utility model, do not form to this
Any restrictions of utility model.Although the utility model is described in detail with reference to foregoing embodiments, for
For those skilled in the art, the technical scheme described in previous embodiment can still be modified, or to wherein
Some technical characteristics carry out equivalent substitution.All any modifications within the spirit and principles of the utility model, made, equally replace
Change, improve, should be included within the scope of protection of the utility model.
Claims (11)
1. a kind of fixed track usage plan device for the operation that refooted for tunnel, including:
Some crossbeams, the crossbeam is parallel to each other and is arranged in the lower section of rail at interval, and two ends of each crossbeam are located at
On the drainage channel of rail on both sides;
The longeron of rail on both sides is arranged in, the longeron is directly set up in the crossbeam in the end regions of the crossbeam
On.
2. fixed track usage plan device according to claim 1, it is characterised in that the crossbeam is H profile steel, I-steel or welding
Shaped steel, the longeron include two H profile steels being arranged side by side, I-steel or welding shaped steel.
3. fixed track usage plan device according to claim 2, it is characterised in that each longeron include several along longitudinal direction that
The longeron unit of this connection, two neighboring longeron unit is by being arranged in each H profile steel, I-steel or the intermediate rib for welding shaped steel
The connecting plate of both sides is connected.
4. fixed track usage plan device according to claim 3, it is characterised in that the phase in two longerons of rail on both sides
The join domain of adjacent two longeron units offsets one from another.
5. the fixed track usage plan device according to any one of claim 1 to 4, it is characterised in that the crossbeam and longeron lead to
Fixing device to be crossed to be connected to each other, the fixing device includes encasing the shape of a saddle buckle of the longeron from top, and from below
Encase the U bolt of the crossbeam.
6. fixed track usage plan device according to claim 5, it is characterised in that the shape of a saddle buckle includes horizontal bottom
Portion, and two vertical portions vertically to be extended out from the both ends of the bottom,
The free end of described two vertical portions is protruding along opposite horizontal direction respectively and forms two horizontal fixed parts,
Each fixed part includes fixing hole.
7. fixed track usage plan device according to claim 6, it is characterised in that be respectively formed in two sides of the fixed part
There is ribs, it connects each fixed part and corresponding vertical portion.
8. fixed track usage plan device according to claim 7, it is characterised in that the lumen width of the U bolt is equal to institute
The width of crossbeam is stated, the lumen width of the shape of a saddle buckle is equal to the width of the longeron, and the U bolt passes through institute
State the fixing hole on the corresponding fixed part in shape of a saddle buckle.
9. fixed track usage plan device according to claim 5, it is characterised in that at the join domain of two neighboring longeron unit
Within the U bolt.
10. the fixed track usage plan device according to any one of claim 1 to 4, it is characterised in that the longeron passes through filling
The concrete for including reinforcing bar in the drainage channel is arranged in the buttress spaced apart in the drainage channel to prop up
Support.
11. the fixed track usage plan device according to any one of claim 1 to 4, it is characterised in that the fixed track usage plan device
Including the retention mechanism for being fixed on rail on crossbeam, the retention mechanism includes substrate, the one being fixed on crossbeam
Formula forms the bearing on the top surface of the substrate, and the pressing plate for unclipped railway lines on bearing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720961719.0U CN207079430U (en) | 2017-08-03 | 2017-08-03 | Refoot the fixed track usage plan device of operation for tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720961719.0U CN207079430U (en) | 2017-08-03 | 2017-08-03 | Refoot the fixed track usage plan device of operation for tunnel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207079430U true CN207079430U (en) | 2018-03-09 |
Family
ID=61423941
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720961719.0U Active CN207079430U (en) | 2017-08-03 | 2017-08-03 | Refoot the fixed track usage plan device of operation for tunnel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207079430U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107268352A (en) * | 2017-08-03 | 2017-10-20 | 中国铁道科学研究院铁道建筑研究所 | Refoot the fixed track usage plan device of operation for tunnel |
-
2017
- 2017-08-03 CN CN201720961719.0U patent/CN207079430U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107268352A (en) * | 2017-08-03 | 2017-10-20 | 中国铁道科学研究院铁道建筑研究所 | Refoot the fixed track usage plan device of operation for tunnel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102979041B (en) | Soft overhead reinforcing jacking method for construction of span box bridge of jacking block of underpass turnout group of railway | |
CN107268352A (en) | Refoot the fixed track usage plan device of operation for tunnel | |
CN203487475U (en) | Line suspending and reinforcing structure for existing line jacking bridge and culvert construction | |
CN208472733U (en) | A kind of foundation pit supporting beam trestle | |
CN106192620B (en) | A kind of railway ballastless track supporting layer and substructure change method | |
CN104612712A (en) | Tunnel secondary lining construction formwork trolley based on rectangular supports | |
KR102105230B1 (en) | Railroad bridge construction method for keeping preexistence railroad track and rail service | |
CN105178968A (en) | Pushing and supporting device of tunneling machine and construction method | |
KR20120137749A (en) | Lifting device for girder | |
CN207079430U (en) | Refoot the fixed track usage plan device of operation for tunnel | |
KR20150062284A (en) | Rail Track Structure Using Beam having Embedded Rail and Supporting Pile, and Constructing Method of Rail Track Structure | |
CN202220400U (en) | Lap-joint type formwork support beam | |
JP4136959B2 (en) | "How to build underground structures and installation girder" | |
CN207159722U (en) | Fixation kit for fixed track usage plan device | |
CN102589913A (en) | Horizontal tunnel lining model test platform modularization loading machine frame | |
CN201330365Y (en) | Bench formwork trolley for construction of two-course pavement structure in tunnel | |
CN105236265B (en) | Reinforcing method and reinforcing structure for rail of portal crane | |
CN211081900U (en) | Tunnel reinforcing structure | |
KR102105229B1 (en) | Temporary facility construction method for underground construction fo railroad track lower pass | |
CN207451442U (en) | Subway station bellend gantry crane rail beam | |
JP7129168B2 (en) | Bridge reinforcement structure and method | |
CN105178190B (en) | A kind of construction method of the crossbeam overlay pipe nipple I-steel levelling circuit discrepancy in elevation | |
CN202522428U (en) | Horizontal tunnel lining model test platform modularization loading machine frame | |
DE102011107918B4 (en) | Superstructure cover, arrangement of the superstructure cover, bored pile and plug-in girder, as well as a temporary bridge-free method for the rapid connection of traffic routes and routes of a bridge or underpass structure using a cover construction | |
CN206070342U (en) | A kind of large span construction beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |