CN109339816A - The slag gathering hopper of double mode TBM - Google Patents
The slag gathering hopper of double mode TBM Download PDFInfo
- Publication number
- CN109339816A CN109339816A CN201811474142.6A CN201811474142A CN109339816A CN 109339816 A CN109339816 A CN 109339816A CN 201811474142 A CN201811474142 A CN 201811474142A CN 109339816 A CN109339816 A CN 109339816A
- Authority
- CN
- China
- Prior art keywords
- inner cylinder
- outer cylinder
- plate
- sealing
- hopper
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000002893 slag Substances 0.000 title claims abstract description 28
- 238000007789 sealing Methods 0.000 claims abstract description 21
- 238000009434 installation Methods 0.000 abstract description 7
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 3
- 239000011435 rock Substances 0.000 description 11
- 239000002689 soil Substances 0.000 description 10
- 230000005641 tunneling Effects 0.000 description 7
- 238000010276 construction Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 5
- 238000009412 basement excavation Methods 0.000 description 4
- 239000004576 sand Substances 0.000 description 3
- 238000006243 chemical reaction Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000004927 clay Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/12—Devices for removing or hauling away excavated material or spoil; Working or loading platforms
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
A kind of slag gathering hopper of double mode TBM, it is characterized in that, including inner cylinder, interior tube end-plate, inner cylinder sealing, outer cylinder sealing, outer cylinder, sliding block, hopper and limit plate, inner cylinder is mounted on the inside of outer cylinder with being slidably matched, it is equipped with interior tube end-plate in the front end of the inner cylinder, limit plate is equipped with before the interior tube end-plate;It is equipped with feed inlet in the upper front end of the inner cylinder, is provided with hopper in the feed inlet;Behind interior tube end-plate and outer cylinder front end is respectively provided with mutual corresponding inner cylinder sealing and outer cylinder sealing;The outer cylinder can be moved forward and backward by main driving driving.It is isolated the invention has the advantages that room can will be excavated with conveyer installing port, in order to the installation of screw conveyor, and continues to tunnel under EPB mode;The edge of sealing is equipped with the sealing that can bear 5bar pressure, and muddy water is avoided to enter.Compact-sized, installation space is small, and switching is quick, easy to operate, laborsaving, safe.
Description
Technical field
The present invention relates to the slag gathering hoppers of double mode TBM a kind of, are mainly used for double mode TBM and switch belt in tunneling process
Isolation when conveyer and screw conveyor.
Background technique
Currently, development machine is widely used in the excavation site of the tunnel structures such as subway tunnel and mountain tunnel, development machine
It is divided into according to the difference of the geology of excavation: earth pressure balance development machine (referred to as: EPB) and tunneling boring hard rock mole (abbreviation:
TBM), earth pressure balance development machine is for tunneling weak soil or sand geology, and tunneling boring hard rock mole is for tunneling hard rock geology.
But current development machine only can be suitably used for that ambient enviroment is of less demanding and the single area of geological conditions, however in driving same
During tunnel, it is easy the different stratum of driving, and development machine is not able to satisfy the construction requirement of different geological conditions at present, leads
Cause separate unit development machine use scope relatively narrow.
The design of bimodulus TBM is not single excavation project especially suitable for geology, which can face firmly along tunnel
Rock stratum and weak soil or sandy soils, because bimodulus TBM can be carried out in die sinking (belt conveyor) and die closing (screw conveyor)
Switching, meets being required for hard rock TBM and EPB type.
Bimodulus TBM is a kind of extremely complex TBM, and in all engineering projects, the alternating of rock and clay is many institute's weeks
Know with it is predetermined, allow constructing tunnel personnel to shift to an earlier date and the timely all conversion operations arranged between hard rock TBM and EPB.
There are two types of conventional conversion modes, the first is reserved hard rock center slag gathering hopper and the bottom EPB slag notch simultaneously, in driving hard rock
When matter, belt conveyor is installed, cooperation center slag gathering hopper is slagged tap;When tunneling weak soil or sand geology, belt conveyor is dismantled,
In bottom, slag notch inserts screw conveyor.The translative mode is inconvenient, time-consuming and laborious.Second is the reserved hard rock that misplaces simultaneously
Center slag gathering hopper and the bottom EPB slag notch install belt conveyor and screw conveyor simultaneously in shield body, in driving hard rock
When matter, opens belt conveyor and slag tap;When tunneling weak soil or sand geology, belt conveyor is closed, opens spiral transferring
Machine is sent to slag tap, which leads to insufficient space in shield body, and it is inconvenient for operation, it is unable to satisfy the construction of minor diameter TBM
It is required that.
Summary of the invention
It is an object of the invention to provide the slag gathering hopper of double mode TBM a kind of, to solve of the existing technology to lead to shield
Internal insufficient space, inconvenient for operation, the problem of being unable to satisfy the construction requirement of minor diameter TBM.
The technical scheme is that a kind of slag gathering hopper of double mode TBM, which is characterized in that including inner cylinder, inner cylinder end
Plate, inner cylinder sealing, outer cylinder sealing, outer cylinder, sliding block, hopper and limit plate, inner cylinder are mounted in outer cylinder with being slidably matched, the outer cylinder
It is mounted in main driving;The front end of the inner cylinder be equipped with interior tube end-plate, the rear end of the inner cylinder be mounted on it is hydraulic in the outer cylinder
The piston rod of cylinder connects;It is equipped with feed inlet in the upper front end of the inner cylinder, hopper is housed on the inner cylinder in the feed inlet;Inside
Behind tube end-plate and outer cylinder front end is respectively provided with mutual corresponding inner cylinder sealing and outer cylinder sealing.
The lower part of the inner cylinder is slidably connected on the sliding rail of outer cylinder inside bottom by sliding block.
The flange flange connecting for the entrance with conveyer is equipped in the rear end of the inner cylinder.
Limit plate is equipped with before the interior tube end-plate.
The invention has the advantages that can will excavate room (the subsequent entire chamber of cutterhead) and conveyer installing port (flange) every
From in order to the installation of screw conveyor, and continuing to tunnel under EPB mode;Being equipped between interior tube end-plate and outer cylinder can hold
By the sealing of 5bar pressure, muddy water is avoided to enter.Conveyer installing port is connected by the entrance of flange and conveyer, is simplified more
Change operation;The inner cylinder of slag gathering hopper can be sealed by the slide construction of Driven by Hydraulic Cylinder and be excavated room, be switched efficient and convenient.It can basis
Cutterhead needs to adjust the stroke size of inner cylinder back-and-forth motion, to ensure that feed inlet is met the requirements.Compact-sized, installation space is small,
Switching is quick, easy to operate, laborsaving, safe.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the embodiment of the present invention;
Fig. 2 is the structural schematic diagram that the present invention applies on bimodulus TBM and (uses belt conveyor);
Schematic diagram when Fig. 3 is present invention switching boring mode (will be switched to screw conveyor);
Fig. 4 is that the present invention is switched to screw conveyor status diagram.
Description of symbols: A, slag gathering hopper, 1, cutterhead, 2, interior tube end-plate, 3, main driving, 4, belt conveyor, 5, belt
Conveyer connecting plate, 6, screw conveyor connecting plate, 7, screw conveyor, 8, inner cylinder, 9, inner cylinder sealing, 10, outer cylinder sealing,
11, outer cylinder, 12, sliding block, 13, flange, 14, hopper, 15, limit plate, 16, feed inlet, 17, hydraulic cylinder.
Specific embodiment
As shown in Figure 1, a kind of slag gathering hopper of double mode TBM of the present invention, which is characterized in that including inner cylinder, interior tube end-plate 2,
Inner cylinder sealing 9, outer cylinder sealing 10, outer cylinder 11, sliding block 12, hopper 14 and limit plate 15, inner cylinder 8 are mounted on outer cylinder with being slidably matched
In 11, which is mounted in main driving 3;Interior tube end-plate 2, the rear end of the inner cylinder 8 and installation are equipped in the front end of the inner cylinder 8
The piston rod of hydraulic cylinder 17 in the outer cylinder 11 connects;It is equipped with feed inlet 16 in the upper front end of the inner cylinder 8, in the feed inlet
Hopper 14 is housed on interior inner cylinder 8;Behind interior tube end-plate 2 and to be respectively provided with mutual corresponding inner cylinder close 11 front end of outer cylinder
Envelope 9 and outer cylinder sealing 10.Limit plate 15 is equipped with before the interior tube end-plate 2.
The lower part of the inner cylinder 8 is slidably connected on the sliding rail of 11 inside bottom of outer cylinder by sliding block 12, and inner cylinder 8 is by liquid
The driving of cylinder pressure 17 is moved forward and backward along sliding rail (relative to outer cylinder 11).
The flange flange 13 connecting for the entrance with conveyer is equipped in the rear end of the inner cylinder 8.
Referring to fig. 2, it is defeated with belt to be mounted on middle part behind cutterhead 1 (in driving hard rock state) in application by A of the present invention
Send between the feed inlet (front end) of machine 4, the inner cylinder 8 of A of the present invention move forward (outer cylinder 11 is fixed in the main driving 3 of TBM) into
Material mouth 16 is opened, and dregs passes through cutterhead 1 and cuts, and is fallen in inner cylinder 8, and be collected into belt conveyor 4 by hopper 14 to feed
Mouthful, it is transported on the slag-soil truck at rear, is transported to outside hole by belt conveyor 4.
As shown in figure 3, needing belt conveyor 4 being switched to screw conveyor shown in Fig. 4 when encountering sandy soil geology
7, the inner cylinder 8 of slag gathering hopper 2 is retracted to be closed with the front end of outer cylinder 11, seals 10 for inner cylinder 8 and outer cylinder by inner cylinder sealing 9 and outer cylinder
Closed state is formed between 11, can dismantle belt conveyor 4 at this time, replaces screw conveyor 7, carries out Soft Soil Layer driving.
Fig. 4 show driving weak soil state diagram, and inner cylinder 8 skids off outer cylinder 11, and dregs falls on slag gathering hopper A by the cutting of cutterhead 1
Interior, screw conveyor 7 is connect by screw conveyor connecting plate 6 with the flange 13 of slag gathering hopper A, and dregs passes through screw conveyor 7
It is transported in the slag-soil truck of rear, is transported to outside hole.
The invention has the characteristics that:
1, the invention patent devises the slag gathering hopper of new structure bimodulus TBM a kind of.
2, slag gathering hopper is slide construction by Driven by Hydraulic Cylinder in the invention patent, can seal and excavate room, allows spiral
Conveyer installation, and continue to tunnel under EPB mode.
3, slag gathering hopper is mounted with special sealing in the invention patent, can bear the pressure of 5bar, avoid enter into muddy water.
4, slag gathering hopper has feed hopper function under two kinds of excavation modes in the invention patent.
5, the invention patent is mounted with flange on belt conveyor and screw conveyor to simplify replacement operation.
6, the stroke needed for the invention patent can be adjusted according to cutterhead is open.
7, the invention patent is compact-sized, and installation space is small, safe and efficient, improves construction efficiency.
Claims (4)
1. a kind of slag gathering hopper of double mode TBM, which is characterized in that sealed including inner cylinder, interior tube end-plate, inner cylinder sealing, outer cylinder, is outer
Cylinder, sliding block, hopper and limit plate, inner cylinder are mounted in outer cylinder with being slidably matched, which is mounted in main driving;In the inner cylinder
Front end be equipped with interior tube end-plate, the rear end of the inner cylinder is connect with the piston rod for the hydraulic cylinder being mounted in the outer cylinder;In the inner cylinder
Upper front end be equipped with feed inlet, on the inner cylinder in the feed inlet be equipped with hopper;Behind interior tube end-plate and before outer cylinder
End is respectively provided with mutual corresponding inner cylinder sealing and outer cylinder sealing.
2. the slag gathering hopper of double mode TBM according to claim 1, which is characterized in that the lower part of the inner cylinder passes through cunning
Block is slidably connected on the sliding rail of outer cylinder inside bottom.
3. the slag gathering hopper of double mode TBM according to claim 1, which is characterized in that be equipped with and use in the rear end of the inner cylinder
In the flange flange that the entrance with conveyer is connect.
4. the slag gathering hopper of double mode TBM according to claim 1, which is characterized in that be equipped with before the interior tube end-plate
Limit plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811474142.6A CN109339816A (en) | 2018-12-04 | 2018-12-04 | The slag gathering hopper of double mode TBM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811474142.6A CN109339816A (en) | 2018-12-04 | 2018-12-04 | The slag gathering hopper of double mode TBM |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109339816A true CN109339816A (en) | 2019-02-15 |
Family
ID=65320166
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811474142.6A Pending CN109339816A (en) | 2018-12-04 | 2018-12-04 | The slag gathering hopper of double mode TBM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109339816A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113107519A (en) * | 2021-03-17 | 2021-07-13 | 中铁工程装备集团有限公司 | TBM host and TBM |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4116011A (en) * | 1976-06-04 | 1978-09-26 | Pablo Girault | Method of excavating tunnels |
FR2795129A1 (en) * | 1999-06-15 | 2000-12-22 | Nfm Tech | Tunnel boring machine has conveyor which can pass through wall's opening and move between position with head inside blasting chamber and position where its end section closes the opening |
CN202483580U (en) * | 2012-02-01 | 2012-10-10 | 上海力行工程技术发展有限公司 | Device capable of changing between earth pressure balance shield and tunnel boring machine (TBM) hard rock tunneling |
CN202645582U (en) * | 2012-06-29 | 2013-01-02 | 中国铁建重工集团有限公司 | Sealable fragment receiving hopper used for dual-mode full-section rock tunneling machine |
CN103104263A (en) * | 2013-02-05 | 2013-05-15 | 中船重工(青岛)轨道交通装备有限公司 | Heading machine suitable for complex stratum |
CN104196538A (en) * | 2014-09-05 | 2014-12-10 | 中船重工(青岛)轨道交通装备有限公司 | Combined type double-shield tunneling machine |
CN104929651A (en) * | 2015-05-15 | 2015-09-23 | 中铁二局股份有限公司 | TBM-EPB (tunnel boring machine and earth pressure balance) dual-mode shield tunneling machine |
CN108374668A (en) * | 2018-02-14 | 2018-08-07 | 上海隧道工程有限公司 | Telescopic locking device for shield excavation machine Tu Cang and shell |
CN108386204A (en) * | 2018-05-04 | 2018-08-10 | 中铁工程装备集团有限公司 | Apparatus for fast switching applied to unlimited-earth pressure balance double mode shield machine |
CN209308690U (en) * | 2018-12-04 | 2019-08-27 | 中船重工(青岛)轨道交通装备有限公司 | The slag gathering hopper of double mode TBM |
-
2018
- 2018-12-04 CN CN201811474142.6A patent/CN109339816A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4116011A (en) * | 1976-06-04 | 1978-09-26 | Pablo Girault | Method of excavating tunnels |
FR2795129A1 (en) * | 1999-06-15 | 2000-12-22 | Nfm Tech | Tunnel boring machine has conveyor which can pass through wall's opening and move between position with head inside blasting chamber and position where its end section closes the opening |
CN202483580U (en) * | 2012-02-01 | 2012-10-10 | 上海力行工程技术发展有限公司 | Device capable of changing between earth pressure balance shield and tunnel boring machine (TBM) hard rock tunneling |
CN202645582U (en) * | 2012-06-29 | 2013-01-02 | 中国铁建重工集团有限公司 | Sealable fragment receiving hopper used for dual-mode full-section rock tunneling machine |
CN103104263A (en) * | 2013-02-05 | 2013-05-15 | 中船重工(青岛)轨道交通装备有限公司 | Heading machine suitable for complex stratum |
CN104196538A (en) * | 2014-09-05 | 2014-12-10 | 中船重工(青岛)轨道交通装备有限公司 | Combined type double-shield tunneling machine |
CN104929651A (en) * | 2015-05-15 | 2015-09-23 | 中铁二局股份有限公司 | TBM-EPB (tunnel boring machine and earth pressure balance) dual-mode shield tunneling machine |
CN108374668A (en) * | 2018-02-14 | 2018-08-07 | 上海隧道工程有限公司 | Telescopic locking device for shield excavation machine Tu Cang and shell |
CN108386204A (en) * | 2018-05-04 | 2018-08-10 | 中铁工程装备集团有限公司 | Apparatus for fast switching applied to unlimited-earth pressure balance double mode shield machine |
CN209308690U (en) * | 2018-12-04 | 2019-08-27 | 中船重工(青岛)轨道交通装备有限公司 | The slag gathering hopper of double mode TBM |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113107519A (en) * | 2021-03-17 | 2021-07-13 | 中铁工程装备集团有限公司 | TBM host and TBM |
CN113107519B (en) * | 2021-03-17 | 2022-03-22 | 中铁工程装备集团有限公司 | TBM host and TBM |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202707070U (en) | Composite shield machine with earth pressure balance and slurry balance double modes | |
CN105443138A (en) | Small-diameter hard rock pipe-jacking machine suitable for complex strata | |
CN202560238U (en) | Soft and hard rock mode conversion heading machine | |
CN210217732U (en) | Slurry-soil pressure double-mode shield machine | |
CN113464136B (en) | Fluidized coal mining system and method combining ground directional drilling and underground roadway | |
CN203905953U (en) | Hard rock fast tunneling machine | |
CN103104263A (en) | Heading machine suitable for complex stratum | |
CN108035730B (en) | Long-distance coal mine roadway pipe jacking tunneling method | |
CN205297589U (en) | Minor diameter hard rock pipe pushing jack suitable for compound stratum | |
CN208845181U (en) | Muddy water opens wide double mode rock tunnel(ling) machine | |
CN209308690U (en) | The slag gathering hopper of double mode TBM | |
CN109882190B (en) | Multi-mode closed TBM suitable for long and large mountain tunnel and construction method thereof | |
CN109882173A (en) | Big thick ore body vertically Two step mining stope filling system and placement method | |
CN109339816A (en) | The slag gathering hopper of double mode TBM | |
CN110985024B (en) | Double-mode front shield structure for soil-pressing muddy water | |
CN113338988B (en) | Bimodulus entry driving machine of slagging tap and compound slag tapping system thereof | |
CN113309531B (en) | Muddy water open type double-mold shield machine with normal-pressure cutter head | |
CN109736821B (en) | Small-diameter normal-pressure tool changing cutter disc | |
CN111894615A (en) | Air pressure balance shield machine and construction method | |
CN105840829B (en) | One kind impact rotary high pressure sealing device | |
CN209761442U (en) | Muddy water balance and soil pressure balance dual-mode intelligent pipe-jacking tunneling machine | |
CN212177137U (en) | Rectangular heading machine | |
CN109184719B (en) | Open and close chest earth pressure balance double mode single shield TBM entry driving machine | |
CN108517910B (en) | Dregs transfer device and method in pipe after the municipal and environment-friendly construction artificial push pipe in underground | |
CN214273650U (en) | Shield machine capable of detecting and treating cavity |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |