CN109322703A - 顶板淋水收集器 - Google Patents

顶板淋水收集器 Download PDF

Info

Publication number
CN109322703A
CN109322703A CN201811439513.7A CN201811439513A CN109322703A CN 109322703 A CN109322703 A CN 109322703A CN 201811439513 A CN201811439513 A CN 201811439513A CN 109322703 A CN109322703 A CN 109322703A
Authority
CN
China
Prior art keywords
disk
upper disk
tapping pipe
top plate
connecting tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811439513.7A
Other languages
English (en)
Inventor
亢建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811439513.7A priority Critical patent/CN109322703A/zh
Publication of CN109322703A publication Critical patent/CN109322703A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Filtration Of Liquid (AREA)

Abstract

本发明属于煤矿临时搭建的大棚装置领域,具体是一种顶板淋水收集器。解决煤矿临时搭建的大棚顶板淋水大影响正常掘进的问题,包括下部圆盘、上部圆盘、泄水管以及连接管,下部圆盘和上部圆盘结构相同,下部圆盘和上部圆盘外环上设有一圈若干个螺栓孔,下部圆盘和上部圆盘对应的螺栓孔之间由螺栓紧固,下部圆盘和上部圆盘的中部设置有圆孔,泄水管穿过下部圆盘的圆孔与上部圆盘的圆孔连接,上部圆盘的圆孔处设置有过滤网,泄水管下部设有螺纹,泄水管通过螺纹与连接管连通,泄水管和连接管之间设置有紧固圈,紧固圈内侧与泄水管螺纹连接,下部圆盘和上部圆盘之间夹紧固定有防水布,防水布的周侧与顶板固定。连接管另一端与地下排水结构连接。

Description

顶板淋水收集器
技术领域
本发明属于煤矿临时搭建的大棚装置领域,具体是一种顶板淋水收集器。
背景技术
在煤矿掘进过程中和各种大型的临时搭建大棚都会存在淋水和积水问题,一直困扰这人们。
在煤矿掘进下山或者掘进过后巷道顶板淋水无法收集,使煤矿入井工人饱受淋水之苦,生产条件苦不堪言。在多年管理生产过程中,掘进淋水一直困扰着人们。再一次掘进下山过程中,顶板淋水大,全部流入工作面迎头,在掘进机截割头割煤时,割下来的煤和水混在一起无法出煤和排水,影响正常掘进,工人每班都穿雨衣,但是长时间的淋浴,雨衣根本无法保证衣服不湿。而且穿了雨衣行动笨重,无法正常掘进,一个月掘进不到二十米,生产任务无法完成。
发明内容
本发明为了解决煤矿临时搭建的大棚顶板淋水大,全部流入工作面迎头,在掘进机截割头割煤时,割下来的煤和水混在一起无法出煤和排水,影响正常掘进,提供一种顶板淋水收集器。
本发明采取以下技术方案:一种顶板淋水收集器,包括下部圆盘、上部圆盘、泄水管以及连接管,下部圆盘和上部圆盘结构相同,下部圆盘和上部圆盘外环上设有一圈若干个螺栓孔,下部圆盘和上部圆盘对应的螺栓孔之间由螺栓紧固,下部圆盘和上部圆盘的中部设置有圆孔,泄水管穿过下部圆盘的圆孔与上部圆盘的圆孔连接,上部圆盘的圆孔处设置有过滤网,泄水管下部设有螺纹,泄水管通过螺纹与连接管连通,泄水管和连接管之间设置有紧固圈,紧固圈内侧与泄水管螺纹连接,下部圆盘和上部圆盘之间夹紧固定有防水布,防水布的周侧与顶板固定。连接管另一端与地下排水结构连接。
与现有技术相比,本发明顶板渗漏下来的水顺着防水布流进上部圆盘内,水通过过滤网由泄水管和连接管排出,煤渣则被收集在上部圆盘内,解决了掘进过程中顶板淋水问题,可以运用于大型的软体棚式防水,可以防止垮棚危险。
附图说明
图1为本发明结构图;
图2为本发明使用示意图;
图3为上部圆盘俯视图;
图中1-下部圆盘,2-上部圆盘,3-过滤网,4-泄水管,5-紧固圈,6-连接管,7-防水布,8-螺钉,9-螺栓,10-螺栓孔。
具体实施方式
为使本发明实施例的目的、技术方案和优点更加清楚,下面将对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本发明的一部分实施例,而不是全部的实施例;基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
如图所示,一种顶板淋水收集器,包括下部圆盘1、上部圆盘2、泄水管4以及连接管6,下部圆盘1和上部圆盘2结构相同,下部圆盘1和上部圆盘2外环上设有一圈若干个螺栓孔10,下部圆盘1和上部圆盘2对应的螺栓孔10之间由螺栓9紧固,下部圆盘1和上部圆盘2的中部设置有圆孔,泄水管4穿过下部圆盘1的圆孔与上部圆盘2的圆孔连接,上部圆盘2的圆孔处设置有过滤网3,泄水管4下部设有螺纹,泄水管4通过螺纹与连接管6连通,泄水管4和连接管6之间设置有紧固圈5,紧固圈5内侧与泄水管4螺纹连接,下部圆盘1和上部圆盘2之间夹紧固定有防水布7,防水布7的周侧与顶板固定。连接管6另一端与地下排水结构连接。
使用时,防水布7周侧通过螺钉固定在顶板上,紧固圈5拧紧后,下部圆盘1和上部圆盘2紧紧地把防水布7夹紧。顶板渗漏下来的水顺着防水布7流进上部圆盘2内,水通过过滤网3由泄水管4和连接管5排出,煤渣则被收集在上部圆盘2内,从而解决顶板漏水以及水煤不分的问题。
最后应说明的是:以上各实施例仅用以说明本发明的技术方案,而非对其限制;尽管参照前述各实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分或者全部技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例技术方案的范围。

Claims (2)

1.一种顶板淋水收集器,其特征在于:包括下部圆盘(1)、上部圆盘(2)、泄水管(4)以及连接管(6),下部圆盘(1)和上部圆盘(2)结构相同,下部圆盘(1)和上部圆盘(2)外环上设有一圈若干个螺栓孔(10),下部圆盘(1)和上部圆盘(2)对应的螺栓孔(10)之间由螺栓紧固,下部圆盘(1)和上部圆盘(2)的中部设置有圆孔,泄水管(4)穿过下部圆盘(1)的圆孔与上部圆盘(2)的圆孔连接,上部圆盘(2)的圆孔处设置有过滤网(3),泄水管(4)下部设有螺纹,泄水管(4)通过螺纹与连接管(6)连通,泄水管(4)和连接管(6)之间设置有紧固圈(5),紧固圈(5)内侧与泄水管(4)螺纹连接,下部圆盘(1)和上部圆盘(2)之间夹紧固定有防水布(7),防水布(7)的周侧与顶板固定。
2.根据权利要求1所述的顶板淋水收集器,其特征在于:所述的连接管(6)另一端与地下排水结构连接。
CN201811439513.7A 2018-11-29 2018-11-29 顶板淋水收集器 Pending CN109322703A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811439513.7A CN109322703A (zh) 2018-11-29 2018-11-29 顶板淋水收集器

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811439513.7A CN109322703A (zh) 2018-11-29 2018-11-29 顶板淋水收集器

Publications (1)

Publication Number Publication Date
CN109322703A true CN109322703A (zh) 2019-02-12

Family

ID=65259420

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811439513.7A Pending CN109322703A (zh) 2018-11-29 2018-11-29 顶板淋水收集器

Country Status (1)

Country Link
CN (1) CN109322703A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109882218A (zh) * 2019-03-25 2019-06-14 东北大学 一种深部特厚煤层冲击地压防治设备
CN110486085A (zh) * 2019-03-12 2019-11-22 浙江交工宏途交通建设有限公司 一种岩溶地质隧道施工排水装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120100455A (ko) * 2011-03-04 2012-09-12 이덕래 도로의 우수받이
CN203296816U (zh) * 2013-05-24 2013-11-20 煤炭工业济南设计研究院有限公司 一种煤矿井下收集水装置
CN104847407A (zh) * 2015-05-19 2015-08-19 山东大学 一种顶板淋涌水收集组合装置及其装配方法
CN204748482U (zh) * 2015-07-01 2015-11-11 西山煤电(集团)有限责任公司 输送带皮带剥离装置
CN209557035U (zh) * 2018-11-29 2019-10-29 亢建华 顶板淋水收集器

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120100455A (ko) * 2011-03-04 2012-09-12 이덕래 도로의 우수받이
CN203296816U (zh) * 2013-05-24 2013-11-20 煤炭工业济南设计研究院有限公司 一种煤矿井下收集水装置
CN104847407A (zh) * 2015-05-19 2015-08-19 山东大学 一种顶板淋涌水收集组合装置及其装配方法
CN204748482U (zh) * 2015-07-01 2015-11-11 西山煤电(集团)有限责任公司 输送带皮带剥离装置
CN209557035U (zh) * 2018-11-29 2019-10-29 亢建华 顶板淋水收集器

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110486085A (zh) * 2019-03-12 2019-11-22 浙江交工宏途交通建设有限公司 一种岩溶地质隧道施工排水装置
CN110486085B (zh) * 2019-03-12 2020-12-11 浙江交工宏途交通建设有限公司 一种岩溶地质隧道施工排水装置
CN109882218A (zh) * 2019-03-25 2019-06-14 东北大学 一种深部特厚煤层冲击地压防治设备
CN109882218B (zh) * 2019-03-25 2020-09-18 东北大学 一种深部特厚煤层冲击地压防治设备

Similar Documents

Publication Publication Date Title
CN109322703A (zh) 顶板淋水收集器
CN209557035U (zh) 顶板淋水收集器
CN205036383U (zh) 盾构始发井洞门延长保护装置
CN206132576U (zh) 一种布料渗浆测试装置
CN208073542U (zh) 用于有害气体隧道的一体式水气分离四通盒
CN213175659U (zh) 预防衬砌混凝土外观灌浆污染装置
CN209494587U (zh) 一种下向孔孔底积水排放装置
CN209539921U (zh) 一种安全绳连接预警装置
CN208486912U (zh) 一种用于岩性地层隧道涌水的临时集中引排装置
CN212363704U (zh) 一种煤矿使用便携式预测钻屑量收集装置
CN207974811U (zh) 无线随钻测斜仪专用定向接头
CN208396681U (zh) 一种拦截袋式堵漏工具
CN206917605U (zh) 一种管棚钻进施工的伸缩式纠偏钻头
CN209945605U (zh) 一种水利水电工程水坝测压管保护装置
CN217950461U (zh) 一种顶板淋水的收集疏散装置
CN216006845U (zh) 一种农田水利用引水渠的钢筋结构
CN221442534U (zh) 锚杆钻机防尘罩
CN203054246U (zh) 一种用于覆岩导水裂隙带监测系统的快速注水装置
CN211038548U (zh) 一种钻孔冲洗液孔口导流结构
CN221207450U (zh) 一种便携式湿式除尘器
CN207905770U (zh) 一种孔内循环注浆孔口封闭装置
CN218581646U (zh) 瓦斯抽采钻孔施工孔口防瓦斯防粉尘装置
CN216151179U (zh) 一种管道带压钻孔装置
CN213574134U (zh) 一种盾构隧道出洞临时防水装置
CN214757778U (zh) 一种坡面挖窝植草装置

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination